Denali Commission Fiscal Year 2024 Draft Work Plan, 51787-51789 [2023-16638]
Download as PDF
Federal Register / Vol. 88, No. 149 / Friday, August 4, 2023 / Notices
The EIS will consider potential
adverse impacts associated with the
proposed action. The EIS will also
contemplate measures that would avoid,
minimize, or mitigate identified adverse
impacts. The proposed action is
expected to require review and approval
by the Commission of Fine Arts and
coordination with the National Capital
Planning Commission. The decisionmaking process will include publication
of a Draft EIS, a Final EIS, and a Record
of Decision.
Federal, Tribal, state, and local
agencies, along with members of the
public, are invited to participate in the
NEPA and NHPA processes. The NEPA
scoping process will identify factors that
will influence the NEPA analysis,
including alternatives and mitigation.
The EIS will address input provided
during the August 23, 2023, meeting
and the 30-day public scoping period,
along with other information and
analyses relevant to the proposed
action.
The August 23, 2023 meeting will
initiate the public consultation process
required by the NHPA. The Army will
seek input regarding alternatives that
will avoid, minimize, or mitigate
adverse effects of the monument’s
removal. In terms of the NHPA, the
scoping process will provide the public
with information about the undertaking
and its effects on historic properties and
will seek public comment and input in
accordance with 36 CFR 800.2(d).
Interested persons may submit written
comments. Written comments must be
sent within 30 days of publication of
this NOI in the Federal Register.
A virtual public meeting will be held
August 23, 2023. The meeting time and
instructions on how to access the
meeting will be publicly announced,
including on the ANC web page.
Pertinent materials, including all
posters, fact sheets, and comment forms,
will be made available online at: https://
www.arlingtoncemetery.mil/About/
Confederate-Memorial-Removal.
James W. Satterwhite Jr.,
U.S. Army Federal Register Liaison Officer.
ddrumheller on DSK120RN23PROD with NOTICES1
[FR Doc. 2023–16639 Filed 8–3–23; 8:45 am]
BILLING CODE 3711–02–P
VerDate Sep<11>2014
18:51 Aug 03, 2023
Jkt 259001
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Extension of Comment Period for
Notice of Intent To Prepare a
Supplemental Environmental Impact
Statement for the Matagorda Ship
Channel Improvement Project,
Calhoun and Matagorda Counties, TX
Corps of Engineers, Department
of the Army, DoD.
ACTION: Extension of comment period
for notice of intent to prepare a draft
supplemental environmental impact
statement for the Matagorda Ship
Channel Improvement Project, Calhoun
and Matagorda Counties, TX.
AGENCY:
The Galveston District, U.S.
Army Corps of Engineers (USACE)
intends to prepare a Draft Supplemental
Environmental Impact Statement (SEIS)
for the Matagorda Ship Channel
Improvement Project consistent with the
National Environmental Policy Act of
1969 (NEPA). While a Record of
Decision (ROD) for this project was
signed on April 22, 2020, during the
pre-construction engineering and design
(PED) phase, USACE identified a
discrepancy between its current
calculations on the quantity of material
to be dredged from the Matagorda Ship
Channel and the quantity reflected in
the ROD. Due to the discrepancy,
USACE will prepare a SEIS to document
and disclose the impacts of substantial
changes to the proposed action and new
information that are relevant to
environmental concerns. By publication
of this NOI, USACE is extending the
scoping period and accepting comments
due to a previously published incorrect
email address.
DATES: Public scoping comments should
be submitted on or before September 5,
2023, electronically or mailed as written
letters.
ADDRESSES: Submit all electronic public
comments via email to MSC_SEIS@
usace.army.mil. Written comments may
be mailed to U.S. Army Corps of
Engineers, Galveston District, ATTN:
Matagorda Ship Channel Improvement
Project, P.O. Box 1229, Galveston, TX
77553–1229.
Pertinent information about the study
can be found at: https://
www.swg.usace.army.mil/Projects/
Matagorda-Ship-Channel/.
FOR FURTHER INFORMATION CONTACT:
Questions or comments regarding the
proposed Draft SEIS can be addressed
by contacting Franchelle Nealy by
phone at (409) 766–3187, emailing at
MSC_SEIS@usace.army.mil, or mailed
SUMMARY:
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
51787
to U.S. Army Corps of Engineers,
Galveston District, ATTN: Matagorda
Ship Channel Improvement Project, P.O.
Box 1229, Galveston, TX 77553–1229.
SUPPLEMENTARY INFORMATION:
Extension of Comment Period. On
June 2, 2023, a Notice of Intent (NOI)
was published in the Federal Register
for a 30-day scoping period for the
MSCIP SEIS (88 FR 36285). However, it
was brought to USACE’s attention that
one of the email addresses provided in
the June 2, 2023 NOI and the June 7,
2023 scoping meeting invitation and
meeting materials was incorrect. Emails
sent to the incorrect address may not
have been received; those who
submitted comments are welcome to
resubmit them. This notice also
announces USACE intent to seek public
input on the scope of the SEIS,
information, or topics to be addressed,
and public concerns surrounding the
proposed action. A public meeting was
held on June 7, 2023 in Port Lavaca, TX.
Comments received during the June
scoping period in addition to this
additional scoping period, will be
considered during development of the
SEIS. The extension of the comment
period ends on September 5, 2023.
Public Disclosure Statement. If you
wish to comment, you may use the mail
or email your comments as indicated
under the ADDRESSES section of this
notice. Before including your address,
phone number, email address, or any
other personal identifying information
in your comment, you should be aware
that your entire comment—including
your personal identifying information—
may be made available to the public at
any time. While you can request in your
comment for us to withhold your
personal identifying information from
public review, we cannot guarantee that
we will be able to do so.
Wesley E. Coleman, Jr.,
Programs Director, Southwestern Division.
[FR Doc. 2023–16677 Filed 8–3–23; 8:45 am]
BILLING CODE 3720–58–P
DENALI COMMISSION
Denali Commission Fiscal Year 2024
Draft Work Plan
Denali Commission.
Notice.
AGENCY:
ACTION:
The Denali Commission
(Commission) is an independent Federal
agency based on an innovative federalstate partnership designed to provide
critical utilities, infrastructure, and
support for economic development and
training in Alaska by delivering federal
SUMMARY:
E:\FR\FM\04AUN1.SGM
04AUN1
51788
Federal Register / Vol. 88, No. 149 / Friday, August 4, 2023 / Notices
services in the most cost-effective
manner possible. The Commission is
required to develop an annual work
plan for future spending which will be
published in the Federal Register,
providing an opportunity for a 30-day
period of public review and written
comment. This Federal Register notice
serves to announce the 30-day
opportunity for public comment on the
Denali Commission Draft Work Plan for
Federal Fiscal Year 2024 (FY 2024).
DATES: Comments and related material
are to be received by, September 8,
2023.
Submit comments to the
Denali Commission, Attention: Elinda
Hetemi, 550 W 7th Avenue, Suite 1230,
Anchorage, AK 99501.
FOR FURTHER INFORMATION CONTACT:
Elinda Hetemi, Denali Commission, 550
W 7th Avenue, Suite 1230, Anchorage,
AK 99501. Telephone:907–271–3415.
Email: ehetemi@denali.gov.
SUPPLEMENTARY INFORMATION:
Background: The Denali
Commission’s mission is to partner with
tribal, federal, state, and local
governments and collaborate with all
Alaskans to improve the effectiveness
and efficiency of government services,
to build and ensure the operation and
maintenance of Alaska’s basic
infrastructure, and to develop a welltrained labor force employed in a
diversified and sustainable economy.
By creating the Commission, Congress
mandated that all parties involved
partner together to find new and
innovative solutions to the unique
infrastructure and economic
development challenges in America’s
most remote communities. Pursuant to
the Denali Commission Act, the
Commission determines its own basic
operating principles and funding
criteria on an annual federal fiscal year
(October 1 to September 30) basis. The
Commission outlines these priorities
and funding recommendations in an
annual work plan. The FY 2024 Work
Plan was developed in the following
manner.
• At a meeting of the Denali
Commissioners the Commissioners
voted to adopt the FY 2024 Workplan.
• The work plan was published on
Denali.gov for review by the public in
advance of public testimony.
ddrumheller on DSK120RN23PROD with NOTICES1
ADDRESSES:
• A public hearing was held to record
public comments and recommendations
on the preliminary draft work plan.
• No public comments were received.
• The Federal Co-Chair prepared the
draft work plan for publication in the
Federal Register providing a 30-day
period for public review and written
comment. During this time, the draft
work plan will also be disseminated to
Commission program partners
including, but not limited to, the Bureau
of Indian Affairs (BIA), the Economic
Development Administration (EDA),
Department of Agriculture—Rural
Utilities Service (USDA/RUS), and the
State of Alaska.
• At the conclusion of the Federal
Register Public comment period
Commission staff will provide the
Federal Co-Chair with a summary of
public comments and
recommendations, if any, on the draft
work plan.
• If no revisions are made to the draft,
the Federal Co-Chair will provide notice
of approval of the work plan to the
Commissioners, and forwards the work
plan to the Secretary of Commerce for
approval; or, if there are revisions the
Federal Co-Chair provides notice of
modifications to the Commissioners for
their consideration and approval, and
upon receipt of approval from
Commissioners, forwards the work plan
to the Secretary of Commerce for
approval.
• The Secretary of Commerce
approves the work plan.
• The Federal Co-Chair then approves
grants and contracts based upon the
approved work plan.
FY 2023 Appropriations Summary
The Commission has historically
received federal funding from several
sources. The two primary sources at this
time include the Energy & Water
Appropriation Bill (‘‘base’’ or
‘‘discretionary’’ funds), Transportation
Housing and Urban Development
(THUD) and an annual allocation from
the Trans-Alaska Pipeline Liability
(TAPL) fund. The proposed FY 2024
Work Plan assumes the Commission
will receive $15,000,000 of base funds,
which is the amount referenced in the
reauthorization of the Commission
passed by Congress in 2016 (ref: Public
Law 114–322), $20,000,000 from THUD,
less administrative expenses, and a
Base
Energy Reliability and Security:
Diesel Power Plants and Interties ............................................................
Wind, Hydro, Biomass, Other Proven Renewables and Emerging Technologies .................................................................................................
Audits, TA, & Community Energy Efficiency Improvements ....................
VerDate Sep<11>2014
18:51 Aug 03, 2023
Jkt 259001
PO 00000
Frm 00022
Fmt 4703
$2,917,000 TAPL allocation based on
discussions with the Office of
Management and Budget (OMB).
Approximately $4,000,000 of the base
funds will be used for administrative
expenses and non-project program
support. The total base funding shown
in the Work Plan also includes an
amount typically available from project
closeouts and other de-obligations that
occur in any given year. Approximately
$117,000 of the TAPL funds will be
utilized for administrative expenses and
non-project program support, leaving
$2,800,000 available for program
activities. Absent any new specific
direction or limitations provided by
Congress these funding sources are
governed by the following general
principles, either by statute or by
language in the Work Plan itself:
• Funds from the Energy & Water
Appropriation are eligible for use in all
programs.
• TAPL funds can only be used for
bulk fuel related projects and activities
while THUD funds can only be used for
Transportation.
• Appropriated funds may be reduced
due to Congressional action, rescissions
by OMB, and other federal agency
actions.
• All investment amounts identified
in the work plan, are ‘‘up to’’ amounts,
and may be reassigned to other
programs included in the current year
work plan, if they are not fully
expended in a program component area
or a specific project.
• Funds set aside for administrative
expenses that subsequently become
available, may be used for program
activities included in the current year
work plan.
DENALI COMMISSION FY 2024
FUNDING SUMMARY
Available for
program
activities
Source
Energy and Water Funds .....
TAPL Funds ..........................
THUD Funds .........................
$13,000,000
2,800,000
19,800,000
Grand Total .......................
35,600,000
Notes:
1 If the final appropriation is less than indicated the Federal Co-Chair shall reduce investments to balance the FY 2024 Work Plan.
TAPL
THUD
$3,700,000
........................
........................
$3,700,000
800,000
400,000
........................
........................
........................
........................
$800,000
400,000
Sfmt 4703
E:\FR\FM\04AUN1.SGM
04AUN1
Total
51789
Federal Register / Vol. 88, No. 149 / Friday, August 4, 2023 / Notices
Base
THUD
Total
RPSU Maintenance and Improvement Projects .......................................
1,000,000
........................
........................
1,000,000
Subtotal .............................................................................................
5,900,000
........................
........................
5,900,000
Bulk Fuel Safety and Security:
New/Refurbished Facilities .......................................................................
Maintenance and Improvement Projects ..................................................
........................
........................
$1,500,000
700,000
........................
........................
1,500,000
700,000
Subtotal .............................................................................................
........................
2,200,000
........................
2,200,000
Village Infrastructure Protection ......................................................................
Transportation:
Surface Transportation .............................................................................
Waterfront Improvements .........................................................................
500,000
........................
........................
500,000
........................
........................
........................
........................
$14,800,000
5,000,000
14,800,000
5,000,000
Subtotal .............................................................................................
........................
........................
19,800,000
19,800,000
Sanitation:
Village Water, Wastewater and Solid Waste ...........................................
1,500,000
........................
........................
1,500,000
Subtotal .............................................................................................
1,500,000
........................
........................
1,500,000
Community Facilities:
Housing .....................................................................................................
Health and Wellness ................................................................................
1,000,000
500,000
........................
........................
........................
........................
1,000,000
500,000
Subtotal .............................................................................................
1,500,000
........................
........................
1,500,000
Broadband .......................................................................................................
Workforce Development:
Energy and Bulk Fuel ...............................................................................
Other .........................................................................................................
250,000
........................
........................
250,000
300,000
1,000,000
600,000
........................
........................
........................
900,000
1,000,000
Subtotal .............................................................................................
1,300,000
600,000
........................
1,900,000
Flexible Funding ..............................................................................................
2,050,000
........................
........................
2,050,000
Subtotal .....................................................................................................
2,050,000
........................
........................
2,050,000
TOTALS .............................................................................................
13,000,000
2,800,000
19,800,000
35,600,000
Authority: Pub. L. 105–277 section
304(b)(1).
Anne Stanislowski,
Administrative Officer.
[FR Doc. 2023–16638 Filed 8–3–23; 8:45 am]
BILLING CODE 3300–01–P
DEPARTMENT OF EDUCATION
Reopening; Applications for New
Awards; Education Innovation and
Research (EIR) Program—Early-Phase
Grants
Office of Elementary and
Secondary Education, Department of
Education.
ACTION: Notice.
AGENCY:
ddrumheller on DSK120RN23PROD with NOTICES1
TAPL
On May 23, 2023, we
published in the Federal Register a
notice inviting applications (NIA) for
fiscal year (FY) 2023 for the EIR
program—Early-phase Grants
competition, Assistance Listing Number
84.411C (Early-phase Grants). The NIA
established a deadline date of August 1,
2023, for the transmittal of applications.
SUMMARY:
VerDate Sep<11>2014
18:51 Aug 03, 2023
Jkt 259001
For eligible applicants located in the
New York counties of Clinton, Dutchess,
Essex, Hamilton, Ontario, Orange,
Putnam, and Rockland; the Oklahoma
counties of Beaver, Cimarron,
Comanche, Cotton, Craig, Creek,
Delaware, Harper, Jefferson, Love,
Major, Mayes, McCurtain, Payne,
Pushmataha, Rogers, Stephens, Tulsa,
and Woodward; and the State of
Vermont, which are covered by major
disaster declarations issued by the
President, this notice reopens the
competition until August 16, 2023 and
extends the date of intergovernmental
review until October 16, 2023.
DATES:
Deadline for Transmittal of
Applications for Affected Applicants:
August 16, 2023.
Deadline for Intergovernmental
Review: October 16, 2023.
FOR FURTHER INFORMATION CONTACT:
Yvonne Crockett, U.S. Department of
Education, 400 Maryland Avenue SW,
Room 3E344, Washington, DC 20202–
5900. Telephone: (202) 453–7122.
Email: eir@ed.gov.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
If you are deaf, hard of hearing, or
have a speech disability and wish to
access telecommunications relay
services, please dial 7–1–1.
SUPPLEMENTARY INFORMATION: On May
23, 2023, we published the NIA in the
Federal Register (88 FR 33126) for
Early-phase Grants. Under the NIA,
applications were due on August 1,
2023. We are reopening this competition
to allow affected applicants (as defined
under Eligibility) more time—until
August 16, 2023—to prepare and submit
their applications.
Eligibility: The extended application
deadline only applies to eligible
applicants under the Early-phase Grants
competition that are affected applicants.
An eligible applicant for this
competition is defined in the NIA. To
qualify as an affected applicant, the
applicant must have a mailing address
that is located in the federally declared
disaster areas and must provide
appropriate supporting documentation,
if requested.
The applicable federally declared
disaster area under this declaration is
the area in which assistance to
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 88, Number 149 (Friday, August 4, 2023)]
[Notices]
[Pages 51787-51789]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-16638]
=======================================================================
-----------------------------------------------------------------------
DENALI COMMISSION
Denali Commission Fiscal Year 2024 Draft Work Plan
AGENCY: Denali Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Denali Commission (Commission) is an independent Federal
agency based on an innovative federal-state partnership designed to
provide critical utilities, infrastructure, and support for economic
development and training in Alaska by delivering federal
[[Page 51788]]
services in the most cost-effective manner possible. The Commission is
required to develop an annual work plan for future spending which will
be published in the Federal Register, providing an opportunity for a
30-day period of public review and written comment. This Federal
Register notice serves to announce the 30-day opportunity for public
comment on the Denali Commission Draft Work Plan for Federal Fiscal
Year 2024 (FY 2024).
DATES: Comments and related material are to be received by, September
8, 2023.
ADDRESSES: Submit comments to the Denali Commission, Attention: Elinda
Hetemi, 550 W 7th Avenue, Suite 1230, Anchorage, AK 99501.
FOR FURTHER INFORMATION CONTACT: Elinda Hetemi, Denali Commission, 550
W 7th Avenue, Suite 1230, Anchorage, AK 99501. Telephone:907-271-3415.
Email: [email protected].
SUPPLEMENTARY INFORMATION:
Background: The Denali Commission's mission is to partner with
tribal, federal, state, and local governments and collaborate with all
Alaskans to improve the effectiveness and efficiency of government
services, to build and ensure the operation and maintenance of Alaska's
basic infrastructure, and to develop a well-trained labor force
employed in a diversified and sustainable economy.
By creating the Commission, Congress mandated that all parties
involved partner together to find new and innovative solutions to the
unique infrastructure and economic development challenges in America's
most remote communities. Pursuant to the Denali Commission Act, the
Commission determines its own basic operating principles and funding
criteria on an annual federal fiscal year (October 1 to September 30)
basis. The Commission outlines these priorities and funding
recommendations in an annual work plan. The FY 2024 Work Plan was
developed in the following manner.
At a meeting of the Denali Commissioners the Commissioners
voted to adopt the FY 2024 Workplan.
The work plan was published on Denali.gov for review by
the public in advance of public testimony.
A public hearing was held to record public comments and
recommendations on the preliminary draft work plan.
No public comments were received.
The Federal Co-Chair prepared the draft work plan for
publication in the Federal Register providing a 30-day period for
public review and written comment. During this time, the draft work
plan will also be disseminated to Commission program partners
including, but not limited to, the Bureau of Indian Affairs (BIA), the
Economic Development Administration (EDA), Department of Agriculture--
Rural Utilities Service (USDA/RUS), and the State of Alaska.
At the conclusion of the Federal Register Public comment
period Commission staff will provide the Federal Co-Chair with a
summary of public comments and recommendations, if any, on the draft
work plan.
If no revisions are made to the draft, the Federal Co-
Chair will provide notice of approval of the work plan to the
Commissioners, and forwards the work plan to the Secretary of Commerce
for approval; or, if there are revisions the Federal Co-Chair provides
notice of modifications to the Commissioners for their consideration
and approval, and upon receipt of approval from Commissioners, forwards
the work plan to the Secretary of Commerce for approval.
The Secretary of Commerce approves the work plan.
The Federal Co-Chair then approves grants and contracts
based upon the approved work plan.
FY 2023 Appropriations Summary
The Commission has historically received federal funding from
several sources. The two primary sources at this time include the
Energy & Water Appropriation Bill (``base'' or ``discretionary''
funds), Transportation Housing and Urban Development (THUD) and an
annual allocation from the Trans-Alaska Pipeline Liability (TAPL) fund.
The proposed FY 2024 Work Plan assumes the Commission will receive
$15,000,000 of base funds, which is the amount referenced in the
reauthorization of the Commission passed by Congress in 2016 (ref:
Public Law 114-322), $20,000,000 from THUD, less administrative
expenses, and a $2,917,000 TAPL allocation based on discussions with
the Office of Management and Budget (OMB). Approximately $4,000,000 of
the base funds will be used for administrative expenses and non-project
program support. The total base funding shown in the Work Plan also
includes an amount typically available from project closeouts and other
de-obligations that occur in any given year. Approximately $117,000 of
the TAPL funds will be utilized for administrative expenses and non-
project program support, leaving $2,800,000 available for program
activities. Absent any new specific direction or limitations provided
by Congress these funding sources are governed by the following general
principles, either by statute or by language in the Work Plan itself:
Funds from the Energy & Water Appropriation are eligible
for use in all programs.
TAPL funds can only be used for bulk fuel related projects
and activities while THUD funds can only be used for Transportation.
Appropriated funds may be reduced due to Congressional
action, rescissions by OMB, and other federal agency actions.
All investment amounts identified in the work plan, are
``up to'' amounts, and may be reassigned to other programs included in
the current year work plan, if they are not fully expended in a program
component area or a specific project.
Funds set aside for administrative expenses that
subsequently become available, may be used for program activities
included in the current year work plan.
Denali Commission FY 2024 Funding Summary
------------------------------------------------------------------------
Available for
Source program
activities
------------------------------------------------------------------------
Energy and Water Funds.................................. $13,000,000
TAPL Funds.............................................. 2,800,000
THUD Funds.............................................. 19,800,000
---------------
Grand Total........................................... 35,600,000
------------------------------------------------------------------------
Notes:
\1\ If the final appropriation is less than indicated the Federal Co-
Chair shall reduce investments to balance the FY 2024 Work Plan.
----------------------------------------------------------------------------------------------------------------
Base TAPL THUD Total
----------------------------------------------------------------------------------------------------------------
Energy Reliability and Security:
Diesel Power Plants and Interties........... $3,700,000 .............. .............. $3,700,000
Wind, Hydro, Biomass, Other Proven 800,000 .............. .............. $800,000
Renewables and Emerging Technologies.......
Audits, TA, & Community Energy Efficiency 400,000 .............. .............. 400,000
Improvements...............................
[[Page 51789]]
RPSU Maintenance and Improvement Projects... 1,000,000 .............. .............. 1,000,000
---------------------------------------------------------------
Subtotal................................ 5,900,000 .............. .............. 5,900,000
----------------------------------------------------------------------------------------------------------------
Bulk Fuel Safety and Security:
New/Refurbished Facilities.................. .............. $1,500,000 .............. 1,500,000
Maintenance and Improvement Projects........ .............. 700,000 .............. 700,000
---------------------------------------------------------------
Subtotal................................ .............. 2,200,000 .............. 2,200,000
----------------------------------------------------------------------------------------------------------------
Village Infrastructure Protection............... 500,000 .............. .............. 500,000
Transportation:
Surface Transportation...................... .............. .............. $14,800,000 14,800,000
Waterfront Improvements..................... .............. .............. 5,000,000 5,000,000
---------------------------------------------------------------
Subtotal................................ .............. .............. 19,800,000 19,800,000
----------------------------------------------------------------------------------------------------------------
Sanitation:
Village Water, Wastewater and Solid Waste... 1,500,000 .............. .............. 1,500,000
---------------------------------------------------------------
Subtotal................................ 1,500,000 .............. .............. 1,500,000
----------------------------------------------------------------------------------------------------------------
Community Facilities:
Housing..................................... 1,000,000 .............. .............. 1,000,000
Health and Wellness......................... 500,000 .............. .............. 500,000
---------------------------------------------------------------
Subtotal................................ 1,500,000 .............. .............. 1,500,000
----------------------------------------------------------------------------------------------------------------
Broadband....................................... 250,000 .............. .............. 250,000
Workforce Development:
Energy and Bulk Fuel........................ 300,000 600,000 .............. 900,000
Other....................................... 1,000,000 .............. .............. 1,000,000
---------------------------------------------------------------
Subtotal................................ 1,300,000 600,000 .............. 1,900,000
----------------------------------------------------------------------------------------------------------------
Flexible Funding................................ 2,050,000 .............. .............. 2,050,000
---------------------------------------------------------------
Subtotal.................................... 2,050,000 .............. .............. 2,050,000
---------------------------------------------------------------
TOTALS.................................. 13,000,000 2,800,000 19,800,000 35,600,000
----------------------------------------------------------------------------------------------------------------
Authority: Pub. L. 105-277 section 304(b)(1).
Anne Stanislowski,
Administrative Officer.
[FR Doc. 2023-16638 Filed 8-3-23; 8:45 am]
BILLING CODE 3300-01-P