Andro Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 50136-50137 [2023-16238]
Download as PDF
50136
Federal Register / Vol. 88, No. 146 / Tuesday, August 1, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.6 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.7 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, The Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
4 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
5 Id. at P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
18:34 Jul 31, 2023
Jkt 259001
electronically should submit an original
and three copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on, August 9, 2023.
Dated: July 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–16237 Filed 7–31–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2375–123 & 8277–072]
Andro Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-capacity
Amendment of License.
b. Project Nos: 2375–123 & 8277–072.
c. Date Filed: June 15, 2023.
d. Applicant: Andro Hydro, LLC
(licensee).
e. Name of Projects: Riley-JayLivermore Hydroelectric Project and
Otis Hydroelectric Project.
f. Location: The projects are located
on the Androscoggin River in Oxford,
Franklin, and Androscoggin counties in
Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: David Fox,
Senior Director, Regulatory Affairs;
Andro Hydro, LLC; c/o Eagle Creek
Renewable Energy, LLC; 7315
Wisconsin Avenue, Suite 1100W;
Bethesda, MD 20814; (240) 482–2700;
david.fox@eaglecreekre.com.
i. FERC Contact: Chris Chaney, (202)
502–6778, christopher.chaney@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include the docket
numbers P–2375–123 & P–8277–072.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to change both points
of interconnection for the projects’
transmission lines from the
Androscoggin Mill (Mill) to an existing
switchyard adjacent to the Mill. The
licensee states the change is necessary
due to the Mill ceasing operations as of
April 2023, which caused the projects to
lose their interconnection with the
utility grid. For the Riley-Jay-Livermore
Project: the Riley Development’s
transmission line would shorten from
one mile to approximately 2,200 feet
long, the Jay Development’s
transmission line would lengthen from
6,000 feet long to 1.7 miles long, and the
Livermore Development’s transmission
line would connect at the Jay
Development’s switchyard. For the Otis
Project, the transmission line would
lengthen from 3 miles long to 3.8 miles
long. To interconnect at the new point,
the licensee would also make changes to
appurtenant transmission equipment.
The licensee states all work would be
along existing disturbed areas, including
dirt roads, driveways, and paved areas
in rights of way, which are regularly
disturbed due to maintenance of
existing poles and lines, parking areas,
and driveways. The application
includes revised Exhibit G drawings to
reflect the addition of approximately 3.9
E:\FR\FM\01AUN1.SGM
01AUN1
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 146 / Tuesday, August 1, 2023 / Notices
acres of land to the Riley-Jay-Livermore
Project boundary, and approximately
5.3 acres of land to the Otis Project
boundary due the change in
interconnection point. The licensee is
not proposing any changes to project
operations, recreation facilities, or
public access.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
VerDate Sep<11>2014
18:34 Jul 31, 2023
Jkt 259001
p. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: July 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–16238 Filed 7–31–23; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–515–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on July 17, 2023
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Route 56,
Owensboro, Kentucky 42301., filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.216(b)of the
Commission’s regulations under the
Natural Gas Act (NGA), and Southern
Star’s blanket certificate issued in
Docket No. CP82–479–000, for
authorization to abandon two wells in
Southern Star’s South Welda Storage
Field in Anderson County, Kansas and
one well in Southern Star’s Piqua
Storage Field in Woodson County,
Kansas. (South Welda and Piqua Well
Abandonment Project). The Project will
allow Southern Star to comply with its
Storage Integrity Management Plan
implementing the storage integrity
regulations of the Pipeline and
Hazardous Materials Administration.
The estimated cost for the project is
$153,902, all as more fully set forth in
the request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
Frm 00039
Fmt 4703
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to Cindy Thompson,
Director, Regulatory, Compliance, and
Information Governance, Southern Star
Central Gas Pipeline, Inc., 4700 State
Route 56, Owensboro, Kentucky 42301,
by phone at 270–852–4655, or by email
to cindy.thompson@southernstar.com.
Public Participation
BILLING CODE 6717–01–P
PO 00000
50137
Sfmt 4703
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 25, 2023.
How to file protests, motions to
intervene, and comments is explained
below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\01AUN1.SGM
01AUN1
Agencies
[Federal Register Volume 88, Number 146 (Tuesday, August 1, 2023)]
[Notices]
[Pages 50136-50137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-16238]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2375-123 & 8277-072]
Andro Hydro, LLC; Notice of Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project Nos: 2375-123 & 8277-072.
c. Date Filed: June 15, 2023.
d. Applicant: Andro Hydro, LLC (licensee).
e. Name of Projects: Riley-Jay-Livermore Hydroelectric Project and
Otis Hydroelectric Project.
f. Location: The projects are located on the Androscoggin River in
Oxford, Franklin, and Androscoggin counties in Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: David Fox, Senior Director, Regulatory
Affairs; Andro Hydro, LLC; c/o Eagle Creek Renewable Energy, LLC; 7315
Wisconsin Avenue, Suite 1100W; Bethesda, MD 20814; (240) 482-2700;
[email protected].
i. FERC Contact: Chris Chaney, (202) 502-6778,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include the docket numbers P-2375-123 & P-8277-072. Comments emailed to
Commission staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee proposes to change both
points of interconnection for the projects' transmission lines from the
Androscoggin Mill (Mill) to an existing switchyard adjacent to the
Mill. The licensee states the change is necessary due to the Mill
ceasing operations as of April 2023, which caused the projects to lose
their interconnection with the utility grid. For the Riley-Jay-
Livermore Project: the Riley Development's transmission line would
shorten from one mile to approximately 2,200 feet long, the Jay
Development's transmission line would lengthen from 6,000 feet long to
1.7 miles long, and the Livermore Development's transmission line would
connect at the Jay Development's switchyard. For the Otis Project, the
transmission line would lengthen from 3 miles long to 3.8 miles long.
To interconnect at the new point, the licensee would also make changes
to appurtenant transmission equipment.
The licensee states all work would be along existing disturbed
areas, including dirt roads, driveways, and paved areas in rights of
way, which are regularly disturbed due to maintenance of existing poles
and lines, parking areas, and driveways. The application includes
revised Exhibit G drawings to reflect the addition of approximately 3.9
[[Page 50137]]
acres of land to the Riley-Jay-Livermore Project boundary, and
approximately 5.3 acres of land to the Otis Project boundary due the
change in interconnection point. The licensee is not proposing any
changes to project operations, recreation facilities, or public access.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
p. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or [email protected].
Dated: July 25, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-16238 Filed 7-31-23; 8:45 am]
BILLING CODE 6717-01-P