Environmental Assessment and Finding of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans, 48268-48271 [2023-15777]

Download as PDF 48268 Federal Register / Vol. 88, No. 142 / Wednesday, July 26, 2023 / Notices Agenda: To carry out administrative functions and to consider preliminary recommendations for agency action. As identified above, the meeting of the President’s Committee on the Arts and the Humanities will be closed to the public and personnel pursuant to subsections (c)(6) and (c)(9)(B) of section 552b of Title 5, United States Code, as amended. The closed session will consider information of a personal nature where disclosure would constitute a clearly unwarranted invasion of privacy and will consider information which if prematurely disclosed would be likely to significantly frustrate implementation of proposed agency action. Dated: July 21, 2023. Suzanne Mbollo, Grants Management Specialist, Institute of Museum and Library Services. [FR Doc. 2023–15858 Filed 7–24–23; 8:45 am] BILLING CODE 7036–01–P from NSF, NASA, DOE and other agencies relevant to astronomy and astrophysics; to discuss current and potential areas of cooperation between the agencies; to formulate recommendations for continued and new areas of cooperation and mechanisms for achieving them. Dated: July 20, 2023. Crystal Robinson, Committee Management Officer. [FR Doc. 2023–15741 Filed 7–25–23; 8:45 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [NRC–2023–0123] Environmental Assessment and Finding of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Nuclear Regulatory Commission. ACTION: Environmental assessment and finding of no significant impact; issuance. AGENCY: NATIONAL SCIENCE FOUNDATION lotter on DSK11XQN23PROD with NOTICES1 Astronomy and Astrophysics Advisory Committee; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92– 463, as amended), the National Science Foundation (NSF) announces the following meeting: Name and Committee Code: Astronomy and Astrophysics Advisory Committee (#13883) (Hybrid). Date and Time: September 18, 2023; 9:00 a.m.–4:00 p.m.; September 19, 2023, 9:00 a.m.–4:00 p.m. Place: National Science Foundation, 2415 Eisenhower Avenue, Alexandria, VA 22314, Room E 3410. Type of Meeting: Open. Attendance information for the meeting will be forthcoming on the AAAC website at: https://www.nsf.gov/ mps/ast/aaac.jsp. Contact Person: Dr. Carrie Black, Program Director, Division of Astronomical Sciences, Suite W 9188, National Science Foundation, 2415 Eisenhower Avenue, Alexandria, VA 22314; Telephone: 703–292–2426. Purpose of Meeting: To provide advice and recommendations to the National Science Foundation (NSF), the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy (DOE) on issues within the field of astronomy and astrophysics that are of mutual interest and concern to the agencies. To prepare the annual report. Agenda: To hear presentations of current programming by representatives VerDate Sep<11>2014 19:56 Jul 25, 2023 Jkt 259001 The U.S. Nuclear Regulatory Commission (NRC) is publishing this notice regarding the issuance of a final environmental assessment (EA) and a finding of no significant impact (FONSI) for its review and approval of the updated decommissioning funding plans (DFPs) submitted by independent spent fuel storage installation (ISFSI) licensees for the ISFSIs listed in the ‘‘Discussion’’ section of this document. DATES: The EA and FONSI referenced in this document are available on July 26, 2023. ADDRESSES: Please refer to Docket ID NRC–2023–0123 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2023–0123. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at SUMMARY: PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, at 301–415–4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Tilda Liu, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 404–997– 4730; email: Tilda.Liu@nrc.gov. SUPPLEMENTARY INFORMATION: I. Introduction The NRC is considering the approval of the updated DFPs submitted by ISFSI licensees. The NRC staff has prepared a final EA and FONSI determination for each of the updated ISFSI DFPs in accordance with the NRC regulations in part 51 of title 10 of the Code of Federal Regulations (10 CFR), ‘‘Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,’’ which implement the National Environmental Policy Act of 1969, as amended (42 U.S.C. 4321 et seq.). The NRC requires its licensees to plan for the eventual decommissioning of their licensed facilities prior to license termination. On June 17, 2011, the NRC published a final rule in the Federal Register amending its decommissioning planning regulations (76 FR 35511). The final rule amended the NRC regulation, 10 CFR 72.30, which concerns financial assurance and decommissioning for ISFSIs. This regulation requires each holder of, or applicant for, a license under 10 CFR part 72 to submit a DFP for the NRC’s review and approval. The DFP is to demonstrate the licensee’s financial assurance, i.e., that funds will be available to decommission the ISFSI. The NRC staff will later publish its financial analyses of the DFP submittals which will be available for public inspection in ADAMS. E:\FR\FM\26JYN1.SGM 26JYN1 Federal Register / Vol. 88, No. 142 / Wednesday, July 26, 2023 / Notices II. Discussion The table in this notice includes the plant name, docket number, licensee, and ADAMS accession number for the final EA and FONSI determination for each of the individual ISFSIs. The table also includes the ADAMS accession numbers for other relevant documents, including the updated DFP submittals. For further details with respect to these actions, see the NRC staff’s final EA and FONSI determinations which are available for public inspection in 48269 ADAMS and at https:// www.regulations.gov under Docket ID NRC–2023–0123. For additional direction on accessing information related to this document, see the ADDRESSES section of this document. FINDING OF NO SIGNIFICANT IMPACT Facility Joseph M. Farley Nuclear Plant Docket No ............................ Licensee ............................... Proposed Action ................... Environmental Impact of Proposed Action. 72–42. Southern Nuclear Operating Company (SNC). The NRC’s review and approval of SNC’s updated DFPs submitted in accordance with 10 CFR 72.30(c). The NRC staff has determined that the proposed action, the review and approval of SNC’s updated DFPs, submitted in accordance with 10 CFR 72.30(c), will not authorize changes to licensed operations or maintenance activities, or result in changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of solid waste. Moreover, the approval of the updated DFPs will not authorize any construction activity, facility modification, or other land-disturbing activity. The NRC staff has concluded that the proposed action is a procedural and administrative action that will not have a significant impact on the environment. The proposed action does not require changes to the ISFSI’s licensed routine operations, maintenance activities, or monitoring programs, nor does it require new construction or land-disturbing activities. The scope of the proposed action concerns only the NRC’s review and approval of SNC’s updated DFPs. The scope of the proposed action does not include, and will not result in, the review and approval of decontamination or decommissioning activities or license termination for the ISFSI or for other parts of the Joseph M. Farley Nuclear Plant. Therefore, the NRC staff determined that approval of the updated DFPs for the Joseph M. Farley Nuclear Plant ISFSI will not significantly affect the quality of the human environment, and accordingly, the staff has concluded that a FONSI is appropriate. The NRC staff further finds that preparation of an environmental impact statement is not required. Federal Register notice. Final Rule ‘‘Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions and Related Conforming Amendments,’’ dated March 12, 1984 (49 FR 9381). Federal Register notice. Final Rule ‘‘Decommissioning Planning,’’ dated June 17, 2011 (76 FR 35512). Federal Register notice. Environmental Assessments and Findings of no Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans, dated May 20, 2021 (86 FR 27485). Alabama Emergency Management Agency. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Farley Nuclear Plant Units 1 and 2 Independent Spent Fuel Storage Installation Decommissioning Funding Plan,’’ dated March 18, 2021 (ADAMS Accession No. ML21081A039). U.S. Nuclear Regulatory Commission. 2003/08/31–NUREG–1748, ‘‘Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, Final Report.’’ August 2003 (ADAMS Accession No. ML032540811). U.S. Nuclear Regulatory Commission. ‘‘Environmental Assessment re: Final Rule: Decommissioning Planning’’ (10 CFR parts 20, 30, 40, 50, 70, and 72; RIN 3150–AI55). February 2009 (ADAMS Accession No. ML090500648). U.S. Nuclear Regulatory Commission. ESA Section 7 No Effect Determination for ISFSI DFP Reviews (Note to File), dated May 15, 2017 (ADAMS Accession No. ML17135A062). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Farley Nuclear Plant Units 1 and 2 Independent Spent Fuel Storage Installation Decommissioning Funding Plan,’’ dated March 9, 2021 (ADAMS Accession No. ML21057A252). U.S. Nuclear Regulatory Commission. ‘‘Final Environmental Assessment and Finding of No Significant Impact for the Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30 for Farley Independent Spent Fuel Storage Installation,’’ dated May 10, 2021 (ADAMS Package Accession No. ML21085A675). U.S. Nuclear Regulatory Commission. ‘‘Analysis of Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plans for the Farley, Hatch, and Vogtle Independent Spent Fuel Storage Installations,’’ dated May 20, 2021 (ADAMS Accession No. ML21089A241). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact Related to Farley Independent Spent Fuel Storage Installation Updated Decommissioning Funding Plans.’’ dated May 18, 2023 (ADAMS Accession No. ML23116A133, non-public, withheld pursuant to 10 CFR 2.390). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan, dated March 31, 2014 (ADAMS Accession No. ML14091A008). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 30, 2017 (ADAMS Accession No. ML17089A520). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 31, 2020 (ADAMS Accession No. ML20091K821). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 29, 2023 (ADAMS Accession No. ML23088A173). Finding of No Significant Impact. lotter on DSK11XQN23PROD with NOTICES1 Available Documents ........... Facility Docket No ............................ Licensee ............................... Proposed Action ................... VerDate Sep<11>2014 19:56 Jul 25, 2023 Edward I. Hatch Nuclear Plant 72–36. Southern Nuclear Operating Company (SNC). The NRC’s review and approval of SNC’s updated DFPs submitted in accordance with 10 CFR 72.30(c). Jkt 259001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\26JYN1.SGM 26JYN1 48270 Federal Register / Vol. 88, No. 142 / Wednesday, July 26, 2023 / Notices Facility Edward I. Hatch Nuclear Plant Environmental Impact of Proposed Action. The NRC staff has determined that the proposed action, the review and approval of SNC’s updated DFPs, submitted in accordance with 10 CFR 72.30(c), will not authorize changes to licensed operations or maintenance activities, or result in changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of solid waste. Moreover, the approval of the updated DFPs will not authorize any construction activity, facility modification, or other land-disturbing activity. The NRC staff has concluded that the proposed action is a procedural and administrative action that will not have a significant impact on the environment. The proposed action does not require changes to the ISFSI’s licensed routine operations, maintenance activities, or monitoring programs, nor does it require new construction or land-disturbing activities. The scope of the proposed action concerns only the NRC’s review and approval of SNC’s updated DFPs. The scope of the proposed action does not include, and will not result in, the review and approval of decontamination or decommissioning activities or license termination for the ISFSI or for other parts of the Edward I. Hatch Nuclear Plant. Therefore, the NRC staff determined that approval of the updated DFPs for the Edward I. Hatch Nuclear Plant ISFSI will not significantly affect the quality of the human environment, and accordingly, the staff has concluded that a FONSI is appropriate. The NRC staff further finds that preparation of an environmental impact statement is not required. Federal Register notice. Final Rule ‘‘Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions and Related Conforming Amendments,’’ dated March 12, 1984 (49 FR 9381). Federal Register notice. Final Rule ‘‘Decommissioning Planning,’’ dated June 17, 2011 (76 FR 35512). Federal Register notice. Environmental Assessments and Findings of no Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans, dated May 20, 2021 (86 FR 27485). U.S. Nuclear Regulatory Commission. 2003/08/31–NUREG–1748, ‘‘Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, Final Report.’’ August 2003 (ADAMS Accession No. ML032540811). U.S. Nuclear Regulatory Commission. ‘‘Environmental Assessment re: Final Rule: Decommissioning Planning’’ (10 CFR parts 20, 30, 40, 50, 70, and 72; RIN 3150–AI55). February 2009 (ADAMS Accession No. ML090500648). U.S. Nuclear Regulatory Commission. ESA Section 7 No Effect Determination for ISFSI DFP Reviews (Note to File), dated May 15, 2017 (ADAMS Accession No. ML17135A062). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Hatch and Vogtle Independent Spent Fuel Storage Installation Decommissioning Funding Plans,’’ dated March 9, 2021 (ADAMS Accession No. ML21057A315). U.S. Nuclear Regulatory Commission. ‘‘Final Environmental Assessment and Finding of No Significant Impact for the Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30 for Hatch Independent Spent Fuel Storage Installation,’’ dated May 10, 2021 (ADAMS Package Accession No. ML21085A829). U.S. Nuclear Regulatory Commission. ‘‘Analysis of Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plans for the Farley, Hatch, and Vogtle Independent Spent Fuel Storage Installations,’’ dated May 20, 2021 (ADAMS Accession No. ML21089A241). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact Related to Hatch and Vogtle Independent Spent Fuel Storage Installation Updated Decommissioning Funding Plans,’’ dated May 14, 2023 (ADAMS Accession No. ML23114A236). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan, dated March 31, 2014 (ADAMS Accession No. ML14091A008). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 30, 2017 (ADAMS Accession No. ML17089A520). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 31, 2020 (ADAMS Accession No. ML20091K821). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 29, 2023 (ADAMS Accession No. ML23088A173). Finding of No Significant Impact. Available Documents ........... Facility Vogtle Electric Generating Plant Docket No ............................ Licensee ............................... Proposed Action ................... Environmental Impact of Proposed Action. 72–1039. Southern Nuclear Operating Company (SNC). The NRC’s review and approval of SNC’s updated DFPs submitted in accordance with 10 CFR 72.30(c). The NRC staff has determined that the proposed action, the review and approval of SNC’s updated DFPs, submitted in accordance with 10 CFR 72.30(c), will not authorize changes to licensed operations or maintenance activities, or result in changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of solid waste. Moreover, the approval of the updated DFPs will not authorize any construction activity, facility modification, or other land-disturbing activity. The NRC staff has concluded that the proposed action is a procedural and administrative action that will not have a significant impact on the environment. The proposed action does not require changes to the ISFSI’s licensed routine operations, maintenance activities, or monitoring programs, nor does it require new construction or land-disturbing activities. The scope of the proposed action concerns only the NRC’s review and approval of SNC’s updated DFPs. The scope of the proposed action does not include, and will not result in, the review and approval of decontamination or decommissioning activities or license termination for the ISFSI or for other parts of the Vogtle Electric Generating Plant. Therefore, the NRC staff determined that approval of the updated DFPs for the Vogtle Electric Generating Plant ISFSI will not significantly affect the quality of the human environment, and accordingly, the staff has concluded that a FONSI is appropriate. The NRC staff further finds that preparation of an environmental impact statement is not required. lotter on DSK11XQN23PROD with NOTICES1 Finding of No Significant Impact. VerDate Sep<11>2014 19:56 Jul 25, 2023 Jkt 259001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\26JYN1.SGM 26JYN1 Federal Register / Vol. 88, No. 142 / Wednesday, July 26, 2023 / Notices Facility Vogtle Electric Generating Plant Available Documents ........... Federal Register notice. Final Rule ‘‘Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions and Related Conforming Amendments,’’ dated March 12, 1984 (49 FR 9381). Federal Register notice. Final Rule ‘‘Decommissioning Planning,’’ dated June 17, 2011 (76 FR 35512). Federal Register notice. Environmental Assessments and Findings of no Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans, dated May 20, 2021 (86 FR 27485). U.S. Nuclear Regulatory Commission. 2003/08/31–NUREG–1748, ‘‘Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, Final Report.’’ August 2003 (ADAMS Accession No. ML032540811). U.S. Nuclear Regulatory Commission. ‘‘Environmental Assessment re: Final Rule: Decommissioning Planning’’ (10 CFR parts 20, 30, 40, 50, 70, and 72; RIN 3150–AI55). February 2009 (ADAMS Accession No. ML090500648). U.S. Nuclear Regulatory Commission. ESA Section 7 No Effect Determination for ISFSI DFP Reviews (Note to File), dated May 15, 2017 (ADAMS Accession No. ML17135A062). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Hatch and Vogtle Independent Spent Fuel Storage Installation Decommissioning Funding Plans,’’ dated March 9, 2021 (ADAMS Accession No. ML21057A315). U.S. Nuclear Regulatory Commission. ‘‘Final Environmental Assessment and Finding of No Significant Impact for the Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30 for Vogtle Independent Spent Fuel Storage Installation,’’ dated May 10, 2021 (ADAMS Package Accession No. ML21089A221). U.S. Nuclear Regulatory Commission. ‘‘Analysis of Southern Nuclear Operating Company, Inc’s Initial Decommissioning Funding Plans for the Farley, Hatch, and Vogtle Independent Spent Fuel Storage Installations,’’ dated May 20, 2021 (ADAMS Accession No. ML21089A241). U.S. Nuclear Regulatory Commission. ‘‘Review of the Draft Environmental Assessment and Finding of No Significant Impact Related to Hatch and Vogtle Independent Spent Fuel Storage Installation Updated Decommissioning Funding Plans,’’ dated May 14, 2023 (ADAMS Accession No. ML23114A236). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan, dated March 31, 2014 (ADAMS Accession No. ML14091A008). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 30, 2017 (ADAMS Accession No. ML17089A520). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 31, 2020 (ADAMS Accession No. ML20091K821). Southern Nuclear Operating Company. ISFSI Decommissioning Funding Plan Triennial Update, dated March 29, 2023 (ADAMS Accession No. ML23088A173). Dated: July 20, 2023. For the Nuclear Regulatory Commission. Yoira K. Diaz-Sanabria, Chief, Storage and Transportation Licensing Branch, Division of Fuel Management, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2023–15777 Filed 7–25–23; 8:45 am] BILLING CODE 7590–01–P OFFICE OF PERSONNEL MANAGEMENT [Docket ID: OPM–2023–0016] Submission for Review: 3206–0215, Verification of Full-Time School Attendance, RI 25–49 Office of Personnel Management. AGENCY: The Office of Personnel Management (OPM), Retirement Services, offers the general public and other Federal agencies the opportunity to comment on the review of an expiring information collection request (ICR) without change, titled ‘‘Verification of Full-Time School Attendance,’’ RI 25– 49. SUMMARY: VerDate Sep<11>2014 19:56 Jul 25, 2023 Comments are encouraged and will be accepted until September 25, 2023. DATES: You may submit comments, identified by docket number and title, by the following method: • Federal Rulemaking Portal: https:// www.regulations.gov. Follow the instructions for submitting comments. All submissions received must include the agency name and docket number for this document. The general policy for comments and other submissions from members of the public is to make these submissions available for public viewing at https:// www.regulations.gov as they are received without change, including any personal identifiers or contact information. ADDRESSES: A copy of this ICR with applicable supporting documentation, may be obtained by contacting the Retirement Services Publications Team, Office of Personnel Management, 1900 E Street, NW, Room 3316–L, Washington, DC 20415, Attention: Cyrus S. Benson, or sent by email to Cyrus.Benson@opm.gov or faxed to (202) 606–0910 or reached via telephone at (202) 936–0401. SUPPLEMENTARY INFORMATION: As required by the Paperwork Reduction FOR FURTHER INFORMATION CONTACT: 60-Day notice and request for comments. ACTION: lotter on DSK11XQN23PROD with NOTICES1 48271 Jkt 259001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 Act of 1995 (Pub. L. 104–13, 44 U.S.C. chapter 35), as amended by the ClingerCohen Act (Pub. L. 104–106), OPM is soliciting comments for this collection (OMB No. 3206–0215). RI 25–49 is used to verify that adult student annuitants are entitled to payment. The Office of Personnel Management must confirm that a full-time enrollment has been maintained. The Office of Management and Budget is particularly interested in comments that: 1. Evaluate whether the proposed collection of information is necessary for the proper performance of functions of the agency, including whether the information will have practical utility; 2. Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; 3. Enhance the quality, utility, and clarity of the information to be collected; and 4. Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, E:\FR\FM\26JYN1.SGM 26JYN1

Agencies

[Federal Register Volume 88, Number 142 (Wednesday, July 26, 2023)]
[Notices]
[Pages 48268-48271]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-15777]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2023-0123]


Environmental Assessment and Finding of No Significant Impact of 
Independent Spent Fuel Storage Facilities Decommissioning Funding Plans

AGENCY: Nuclear Regulatory Commission.

ACTION: Environmental assessment and finding of no significant impact; 
issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is publishing 
this notice regarding the issuance of a final environmental assessment 
(EA) and a finding of no significant impact (FONSI) for its review and 
approval of the updated decommissioning funding plans (DFPs) submitted 
by independent spent fuel storage installation (ISFSI) licensees for 
the ISFSIs listed in the ``Discussion'' section of this document.

DATES: The EA and FONSI referenced in this document are available on 
July 26, 2023.

ADDRESSES: Please refer to Docket ID NRC-2023-0123 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0123. Address 
questions about Docket IDs in Regulations.gov to Stacy Schumann; 
telephone: 301-415-0624; email: [email protected]. For technical 
questions, contact the individual listed in the For Further Information 
Contact section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, 
or by email to [email protected]. The ADAMS accession number for 
each document referenced (if it is available in ADAMS) is provided the 
first time that it is mentioned in this document.
     NRC's PDR: The PDR, where you may examine and order copies 
of publicly available documents, is open by appointment. To make an 
appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.

FOR FURTHER INFORMATION CONTACT: Tilda Liu, Office of Nuclear Material 
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001; telephone: 404-997-4730; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is considering the approval of the updated DFPs submitted 
by ISFSI licensees. The NRC staff has prepared a final EA and FONSI 
determination for each of the updated ISFSI DFPs in accordance with the 
NRC regulations in part 51 of title 10 of the Code of Federal 
Regulations (10 CFR), ``Environmental Protection Regulations for 
Domestic Licensing and Related Regulatory Functions,'' which implement 
the National Environmental Policy Act of 1969, as amended (42 U.S.C. 
4321 et seq.).
    The NRC requires its licensees to plan for the eventual 
decommissioning of their licensed facilities prior to license 
termination. On June 17, 2011, the NRC published a final rule in the 
Federal Register amending its decommissioning planning regulations (76 
FR 35511). The final rule amended the NRC regulation, 10 CFR 72.30, 
which concerns financial assurance and decommissioning for ISFSIs. This 
regulation requires each holder of, or applicant for, a license under 
10 CFR part 72 to submit a DFP for the NRC's review and approval. The 
DFP is to demonstrate the licensee's financial assurance, i.e., that 
funds will be available to decommission the ISFSI. The NRC staff will 
later publish its financial analyses of the DFP submittals which will 
be available for public inspection in ADAMS.

[[Page 48269]]

II. Discussion

    The table in this notice includes the plant name, docket number, 
licensee, and ADAMS accession number for the final EA and FONSI 
determination for each of the individual ISFSIs. The table also 
includes the ADAMS accession numbers for other relevant documents, 
including the updated DFP submittals. For further details with respect 
to these actions, see the NRC staff's final EA and FONSI determinations 
which are available for public inspection in ADAMS and at https://www.regulations.gov under Docket ID NRC-2023-0123. For additional 
direction on accessing information related to this document, see the 
ADDRESSES section of this document.

                    Finding of No Significant Impact
------------------------------------------------------------------------
           Facility                  Joseph M. Farley Nuclear Plant
------------------------------------------------------------------------
Docket No....................  72-42.
Licensee.....................  Southern Nuclear Operating Company (SNC).
Proposed Action..............  The NRC's review and approval of SNC's
                                updated DFPs submitted in accordance
                                with 10 CFR 72.30(c).
Environmental Impact of        The NRC staff has determined that the
 Proposed Action.               proposed action, the review and approval
                                of SNC's updated DFPs, submitted in
                                accordance with 10 CFR 72.30(c), will
                                not authorize changes to licensed
                                operations or maintenance activities, or
                                result in changes in the types,
                                characteristics, or quantities of
                                radiological or non-radiological
                                effluents released into the environment
                                from the ISFSI, or result in the
                                creation of solid waste. Moreover, the
                                approval of the updated DFPs will not
                                authorize any construction activity,
                                facility modification, or other land-
                                disturbing activity. The NRC staff has
                                concluded that the proposed action is a
                                procedural and administrative action
                                that will not have a significant impact
                                on the environment.
Finding of No Significant      The proposed action does not require
 Impact.                        changes to the ISFSI's licensed routine
                                operations, maintenance activities, or
                                monitoring programs, nor does it require
                                new construction or land-disturbing
                                activities. The scope of the proposed
                                action concerns only the NRC's review
                                and approval of SNC's updated DFPs. The
                                scope of the proposed action does not
                                include, and will not result in, the
                                review and approval of decontamination
                                or decommissioning activities or license
                                termination for the ISFSI or for other
                                parts of the Joseph M. Farley Nuclear
                                Plant. Therefore, the NRC staff
                                determined that approval of the updated
                                DFPs for the Joseph M. Farley Nuclear
                                Plant ISFSI will not significantly
                                affect the quality of the human
                                environment, and accordingly, the staff
                                has concluded that a FONSI is
                                appropriate. The NRC staff further finds
                                that preparation of an environmental
                                impact statement is not required.
Available Documents..........  Federal Register notice. Final Rule
                                ``Environmental Protection Regulations
                                for Domestic Licensing and Related
                                Regulatory Functions and Related
                                Conforming Amendments,'' dated March 12,
                                1984 (49 FR 9381).
                               Federal Register notice. Final Rule
                                ``Decommissioning Planning,'' dated June
                                17, 2011 (76 FR 35512).
                               Federal Register notice. Environmental
                                Assessments and Findings of no
                                Significant Impact of Independent Spent
                                Fuel Storage Facilities Decommissioning
                                Funding Plans, dated May 20, 2021 (86 FR
                                27485).
                               Alabama Emergency Management Agency.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact for the Farley Nuclear Plant
                                Units 1 and 2 Independent Spent Fuel
                                Storage Installation Decommissioning
                                Funding Plan,'' dated March 18, 2021
                                (ADAMS Accession No. ML21081A039).
                               U.S. Nuclear Regulatory Commission. 2003/
                                08/31-NUREG-1748, ``Environmental Review
                                Guidance for Licensing Actions
                                Associated with NMSS Programs, Final
                                Report.'' August 2003 (ADAMS Accession
                                No. ML032540811).
                               U.S. Nuclear Regulatory Commission.
                                ``Environmental Assessment re: Final
                                Rule: Decommissioning Planning'' (10 CFR
                                parts 20, 30, 40, 50, 70, and 72; RIN
                                3150-AI55). February 2009 (ADAMS
                                Accession No. ML090500648).
                               U.S. Nuclear Regulatory Commission. ESA
                                Section 7 No Effect Determination for
                                ISFSI DFP Reviews (Note to File), dated
                                May 15, 2017 (ADAMS Accession No.
                                ML17135A062).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact for the Farley Nuclear Plant
                                Units 1 and 2 Independent Spent Fuel
                                Storage Installation Decommissioning
                                Funding Plan,'' dated March 9, 2021
                                (ADAMS Accession No. ML21057A252).
                               U.S. Nuclear Regulatory Commission.
                                ``Final Environmental Assessment and
                                Finding of No Significant Impact for the
                                Southern Nuclear Operating Company,
                                Inc's Initial Decommissioning Funding
                                Plan Submitted in Accordance with 10 CFR
                                72.30 for Farley Independent Spent Fuel
                                Storage Installation,'' dated May 10,
                                2021 (ADAMS Package Accession No.
                                ML21085A675).
                               U.S. Nuclear Regulatory Commission.
                                ``Analysis of Southern Nuclear Operating
                                Company, Inc's Initial Decommissioning
                                Funding Plans for the Farley, Hatch, and
                                Vogtle Independent Spent Fuel Storage
                                Installations,'' dated May 20, 2021
                                (ADAMS Accession No. ML21089A241).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact Related to Farley Independent
                                Spent Fuel Storage Installation Updated
                                Decommissioning Funding Plans.'' dated
                                May 18, 2023 (ADAMS Accession No.
                                ML23116A133, non-public, withheld
                                pursuant to 10 CFR 2.390).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan, dated
                                March 31, 2014 (ADAMS Accession No.
                                ML14091A008).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 30, 2017 (ADAMS
                                Accession No. ML17089A520).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 31, 2020 (ADAMS
                                Accession No. ML20091K821).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 29, 2023 (ADAMS
                                Accession No. ML23088A173).
------------------------------------------------------------------------


 
           Facility                  Edward I. Hatch Nuclear Plant
------------------------------------------------------------------------
Docket No....................  72-36.
Licensee.....................  Southern Nuclear Operating Company (SNC).
Proposed Action..............  The NRC's review and approval of SNC's
                                updated DFPs submitted in accordance
                                with 10 CFR 72.30(c).
------------------------------------------------------------------------


[[Page 48270]]


------------------------------------------------------------------------
           Facility                  Edward I. Hatch Nuclear Plant
------------------------------------------------------------------------
Environmental Impact of        The NRC staff has determined that the
 Proposed Action.               proposed action, the review and approval
                                of SNC's updated DFPs, submitted in
                                accordance with 10 CFR 72.30(c), will
                                not authorize changes to licensed
                                operations or maintenance activities, or
                                result in changes in the types,
                                characteristics, or quantities of
                                radiological or non-radiological
                                effluents released into the environment
                                from the ISFSI, or result in the
                                creation of solid waste. Moreover, the
                                approval of the updated DFPs will not
                                authorize any construction activity,
                                facility modification, or other land-
                                disturbing activity. The NRC staff has
                                concluded that the proposed action is a
                                procedural and administrative action
                                that will not have a significant impact
                                on the environment.
Finding of No Significant      The proposed action does not require
 Impact.                        changes to the ISFSI's licensed routine
                                operations, maintenance activities, or
                                monitoring programs, nor does it require
                                new construction or land-disturbing
                                activities. The scope of the proposed
                                action concerns only the NRC's review
                                and approval of SNC's updated DFPs. The
                                scope of the proposed action does not
                                include, and will not result in, the
                                review and approval of decontamination
                                or decommissioning activities or license
                                termination for the ISFSI or for other
                                parts of the Edward I. Hatch Nuclear
                                Plant. Therefore, the NRC staff
                                determined that approval of the updated
                                DFPs for the Edward I. Hatch Nuclear
                                Plant ISFSI will not significantly
                                affect the quality of the human
                                environment, and accordingly, the staff
                                has concluded that a FONSI is
                                appropriate. The NRC staff further finds
                                that preparation of an environmental
                                impact statement is not required.
Available Documents..........  Federal Register notice. Final Rule
                                ``Environmental Protection Regulations
                                for Domestic Licensing and Related
                                Regulatory Functions and Related
                                Conforming Amendments,'' dated March 12,
                                1984 (49 FR 9381).
                               Federal Register notice. Final Rule
                                ``Decommissioning Planning,'' dated June
                                17, 2011 (76 FR 35512).
                               Federal Register notice. Environmental
                                Assessments and Findings of no
                                Significant Impact of Independent Spent
                                Fuel Storage Facilities Decommissioning
                                Funding Plans, dated May 20, 2021 (86 FR
                                27485).
                               U.S. Nuclear Regulatory Commission. 2003/
                                08/31-NUREG-1748, ``Environmental Review
                                Guidance for Licensing Actions
                                Associated with NMSS Programs, Final
                                Report.'' August 2003 (ADAMS Accession
                                No. ML032540811).
                               U.S. Nuclear Regulatory Commission.
                                ``Environmental Assessment re: Final
                                Rule: Decommissioning Planning'' (10 CFR
                                parts 20, 30, 40, 50, 70, and 72; RIN
                                3150-AI55). February 2009 (ADAMS
                                Accession No. ML090500648).
                               U.S. Nuclear Regulatory Commission. ESA
                                Section 7 No Effect Determination for
                                ISFSI DFP Reviews (Note to File), dated
                                May 15, 2017 (ADAMS Accession No.
                                ML17135A062).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact for the Hatch and Vogtle
                                Independent Spent Fuel Storage
                                Installation Decommissioning Funding
                                Plans,'' dated March 9, 2021 (ADAMS
                                Accession No. ML21057A315).
                               U.S. Nuclear Regulatory Commission.
                                ``Final Environmental Assessment and
                                Finding of No Significant Impact for the
                                Southern Nuclear Operating Company,
                                Inc's Initial Decommissioning Funding
                                Plan Submitted in Accordance with 10 CFR
                                72.30 for Hatch Independent Spent Fuel
                                Storage Installation,'' dated May 10,
                                2021 (ADAMS Package Accession No.
                                ML21085A829).
                               U.S. Nuclear Regulatory Commission.
                                ``Analysis of Southern Nuclear Operating
                                Company, Inc's Initial Decommissioning
                                Funding Plans for the Farley, Hatch, and
                                Vogtle Independent Spent Fuel Storage
                                Installations,'' dated May 20, 2021
                                (ADAMS Accession No. ML21089A241).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact Related to Hatch and Vogtle
                                Independent Spent Fuel Storage
                                Installation Updated Decommissioning
                                Funding Plans,'' dated May 14, 2023
                                (ADAMS Accession No. ML23114A236).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan, dated
                                March 31, 2014 (ADAMS Accession No.
                                ML14091A008).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 30, 2017 (ADAMS
                                Accession No. ML17089A520).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 31, 2020 (ADAMS
                                Accession No. ML20091K821).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 29, 2023 (ADAMS
                                Accession No. ML23088A173).
------------------------------------------------------------------------


 
           Facility                 Vogtle Electric Generating Plant
------------------------------------------------------------------------
Docket No....................  72-1039.
Licensee.....................  Southern Nuclear Operating Company (SNC).
Proposed Action..............  The NRC's review and approval of SNC's
                                updated DFPs submitted in accordance
                                with 10 CFR 72.30(c).
Environmental Impact of        The NRC staff has determined that the
 Proposed Action.               proposed action, the review and approval
                                of SNC's updated DFPs, submitted in
                                accordance with 10 CFR 72.30(c), will
                                not authorize changes to licensed
                                operations or maintenance activities, or
                                result in changes in the types,
                                characteristics, or quantities of
                                radiological or non-radiological
                                effluents released into the environment
                                from the ISFSI, or result in the
                                creation of solid waste. Moreover, the
                                approval of the updated DFPs will not
                                authorize any construction activity,
                                facility modification, or other land-
                                disturbing activity. The NRC staff has
                                concluded that the proposed action is a
                                procedural and administrative action
                                that will not have a significant impact
                                on the environment.
Finding of No Significant      The proposed action does not require
 Impact.                        changes to the ISFSI's licensed routine
                                operations, maintenance activities, or
                                monitoring programs, nor does it require
                                new construction or land-disturbing
                                activities. The scope of the proposed
                                action concerns only the NRC's review
                                and approval of SNC's updated DFPs. The
                                scope of the proposed action does not
                                include, and will not result in, the
                                review and approval of decontamination
                                or decommissioning activities or license
                                termination for the ISFSI or for other
                                parts of the Vogtle Electric Generating
                                Plant. Therefore, the NRC staff
                                determined that approval of the updated
                                DFPs for the Vogtle Electric Generating
                                Plant ISFSI will not significantly
                                affect the quality of the human
                                environment, and accordingly, the staff
                                has concluded that a FONSI is
                                appropriate. The NRC staff further finds
                                that preparation of an environmental
                                impact statement is not required.
------------------------------------------------------------------------


[[Page 48271]]


------------------------------------------------------------------------
           Facility                 Vogtle Electric Generating Plant
------------------------------------------------------------------------
Available Documents..........  Federal Register notice. Final Rule
                                ``Environmental Protection Regulations
                                for Domestic Licensing and Related
                                Regulatory Functions and Related
                                Conforming Amendments,'' dated March 12,
                                1984 (49 FR 9381).
                               Federal Register notice. Final Rule
                                ``Decommissioning Planning,'' dated June
                                17, 2011 (76 FR 35512).
                               Federal Register notice. Environmental
                                Assessments and Findings of no
                                Significant Impact of Independent Spent
                                Fuel Storage Facilities Decommissioning
                                Funding Plans, dated May 20, 2021 (86 FR
                                27485).
                               U.S. Nuclear Regulatory Commission. 2003/
                                08/31-NUREG-1748, ``Environmental Review
                                Guidance for Licensing Actions
                                Associated with NMSS Programs, Final
                                Report.'' August 2003 (ADAMS Accession
                                No. ML032540811).
                               U.S. Nuclear Regulatory Commission.
                                ``Environmental Assessment re: Final
                                Rule: Decommissioning Planning'' (10 CFR
                                parts 20, 30, 40, 50, 70, and 72; RIN
                                3150-AI55). February 2009 (ADAMS
                                Accession No. ML090500648).
                               U.S. Nuclear Regulatory Commission. ESA
                                Section 7 No Effect Determination for
                                ISFSI DFP Reviews (Note to File), dated
                                May 15, 2017 (ADAMS Accession No.
                                ML17135A062).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact for the Hatch and Vogtle
                                Independent Spent Fuel Storage
                                Installation Decommissioning Funding
                                Plans,'' dated March 9, 2021 (ADAMS
                                Accession No. ML21057A315).
                               U.S. Nuclear Regulatory Commission.
                                ``Final Environmental Assessment and
                                Finding of No Significant Impact for the
                                Southern Nuclear Operating Company,
                                Inc's Initial Decommissioning Funding
                                Plan Submitted in Accordance with 10 CFR
                                72.30 for Vogtle Independent Spent Fuel
                                Storage Installation,'' dated May 10,
                                2021 (ADAMS Package Accession No.
                                ML21089A221).
                               U.S. Nuclear Regulatory Commission.
                                ``Analysis of Southern Nuclear Operating
                                Company, Inc's Initial Decommissioning
                                Funding Plans for the Farley, Hatch, and
                                Vogtle Independent Spent Fuel Storage
                                Installations,'' dated May 20, 2021
                                (ADAMS Accession No. ML21089A241).
                               U.S. Nuclear Regulatory Commission.
                                ``Review of the Draft Environmental
                                Assessment and Finding of No Significant
                                Impact Related to Hatch and Vogtle
                                Independent Spent Fuel Storage
                                Installation Updated Decommissioning
                                Funding Plans,'' dated May 14, 2023
                                (ADAMS Accession No. ML23114A236).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan, dated
                                March 31, 2014 (ADAMS Accession No.
                                ML14091A008).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 30, 2017 (ADAMS
                                Accession No. ML17089A520).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 31, 2020 (ADAMS
                                Accession No. ML20091K821).
                               Southern Nuclear Operating Company. ISFSI
                                Decommissioning Funding Plan Triennial
                                Update, dated March 29, 2023 (ADAMS
                                Accession No. ML23088A173).
------------------------------------------------------------------------


    Dated: July 20, 2023.

    For the Nuclear Regulatory Commission.
Yoira K. Diaz-Sanabria,
Chief, Storage and Transportation Licensing Branch, Division of Fuel 
Management, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2023-15777 Filed 7-25-23; 8:45 am]
BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.