Port Arthur LNG, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Port Arthur Liquified Natural Gas Amendment, 47492-47494 [2023-15604]
Download as PDF
47492
Federal Register / Vol. 88, No. 140 / Monday, July 24, 2023 / Notices
on the Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Docket Nos.
File date
Prohibited:
1. CP21–57–000, CP16–10–000, CP19–477–000 ............................
2. CP21–57–000, CP16–10–000, CP19–477–000 ............................
Exempt:
1. P–2100–000 ...................................................................................
2. ER21–2818–000 ............................................................................
3. P–2100–000 ...................................................................................
1 Emailed
2 Emailed
Presenter or requester
7–18–2023
7–18–2023
FERC Staff.1
FERC Staff.2
7–12–2023
7–13–2023
7–14–2023
City Council of the City of Oroville, CA.
U.S. Congressman Ken Buck.
The State Water Contractors.
comments dated 7/17/23 from Darcy Gentner.
comments dated 7/17/23 from William Limpert.
Dated: July 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–15600 Filed 7–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–501–000]
Port Arthur LNG, LLC; Notice of
Scoping Period Requesting Comments
on Environmental Issues for the
Proposed Port Arthur Liquified Natural
Gas Amendment
lotter on DSK11XQN23PROD with NOTICES1
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Port Arthur LNG, LLC’s (PALNG)
Amendment (Amendment). If
authorized, the Amendment would
allow 24-hour-per day construction
activities, increase in the total workforce
to construct the project, and increase the
parking available at the approved
liquified natural gas (LNG) terminal
from what was previously authorized in
the final Environmental Impact
Statement for the Port Arthur
Liquefaction Project in Jefferson County,
Texas (Docket No. CP17–20–000), which
the Commission authorized on April 18,
2019. This request is only regarding the
facilities described in CP17–20–000.
The Commission will use this
environmental document in its
decision-making process to determine
whether the project is in the public
interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
VerDate Sep<11>2014
16:56 Jul 21, 2023
Jkt 259001
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of an authorization. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on 8/17/
2023. Comments may be submitted in
writing. Further details on how to
submit comments are provided in the
Public Participation section of this
notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on June 21, 2023,
you will need to file those comments in
Docket No. CP23–501–000 to ensure
they are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
proposed project and encourage them to
comment on their areas of concern.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP23–501- 000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
E:\FR\FM\24JYN1.SGM
24JYN1
Federal Register / Vol. 88, No. 140 / Monday, July 24, 2023 / Notices
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Summary of the Proposed Amendment
As part of the Amendment, PALNG
proposes to: (1) extend the work hours
from 7 a.m. to 10 p.m. to 24-hours-perday until completion of the facilities
described in CP17–20–000; (2) increase
the workforce from 3,000 to 6,000
workers during peak construction; and
(3) increase the onsite terminal parking
from 500 to 1,000 parking spaces.
PALNG indicates that this
Amendment would maintain a
development schedule that maximizes
construction efficiency while
minimizing the duration of
environmental and community
disturbance in the vicinity of the
approved terminal and meet the
approved terminal construction
schedule.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
lotter on DSK11XQN23PROD with NOTICES1
The Amendment request does not
involve the construction of any new
facilities nor any additional land
disturbance at the Port Arthur LNG
Terminal site. The additional 500
parking spaces would be within the
previously authorized terminal site.
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
VerDate Sep<11>2014
16:56 Jul 21, 2023
Jkt 259001
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
proposed Amendment under the
relevant general resource areas:
• geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• socioeconomics;
• environmental justice;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
Amendment or portions of the project
and make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed
Amendment. If Commission staff
prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will
be issued, which will open an
additional comment period. Staff will
then prepare a draft EIS which will be
issued for public comment. Commission
staff will consider all timely comments
received during the comment period on
the draft EIS and revise the document,
as necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
47493
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes state, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
other interested parties; and local
libraries and newspapers. This list also
includes all affected landowners (as
defined in the Commission’s
regulations) who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within certain
distances of aboveground facilities, and
anyone who submits comments on the
project and includes a mailing address
with their comments. Commission staff
will update the environmental mailing
list as the analysis proceeds to ensure
that Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at title 40, Code of Federal
Regulations, section 1501.8.
4 The Advisory Council on Historic Preservation’s
regulations are at title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\24JYN1.SGM
24JYN1
47494
Federal Register / Vol. 88, No. 140 / Monday, July 24, 2023 / Notices
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP23–501–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: July 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–15604 Filed 7–21–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
lotter on DSK11XQN23PROD with NOTICES1
[FRL–11169–01–OA]
Public Meeting of the Science Advisory
Board Environmental Justice Screen
(EJScreen) Review Panel
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) Science Advisory Board
SUMMARY:
VerDate Sep<11>2014
16:56 Jul 21, 2023
Jkt 259001
(SAB) Staff Office is announcing a
public meeting of the Science Advisory
Board Environmental Justice Screen
(EJScreen) Review Panel. The purpose
of the meeting is to review and discuss
the Panel’s draft report on the EPA’s
EJScreen mapping and screening tool.
DATES:
Public meeting: The Science Advisory
Board EJScreen Review Panel will meet
on August 14, 2023, from 12 p.m. to 4
p.m. Eastern Time.
Comments: See the section titled
‘‘Procedures for providing public input’’
under SUPPLEMENTARY INFORMATION for
instructions and deadlines.
ADDRESSES: The August 14, 2023,
meeting will be conducted virtually.
Please refer to the SAB website at
https://sab.epa.gov for information on
how to attend the meeting.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wants further
information concerning this document
may contact Dr. Zaida Figueroa,
Designated Federal Officer (DFO), by
telephone at (202) 566–2643 or via
email at figueroa.zaida@epa.gov.
General information about the SAB, as
well as any updates concerning the
meeting announced in this document,
can be found on the SAB website at
https://sab.epa.gov.
SUPPLEMENTARY INFORMATION:
Background: The SAB was
established pursuant to the
Environmental Research, Development,
and Demonstration Authorization Act
(ERDDAA), codified at 42 U.S.C. 4365,
to provide independent scientific and
technical advice to the EPA
Administrator on the scientific and
technical basis for agency positions and
regulations. The SAB is a Federal
Advisory Committee chartered under
the Federal Advisory Committee Act
(FACA), 5 U.S. Code 10. The SAB will
comply with the provisions of FACA
and all appropriate SAB Staff Office
procedural policies. Pursuant to FACA
and EPA policy, notice is hereby given
that the Science Advisory Board
EJScreen Review Panel will hold a
public meeting to review and discuss
the Panel’s draft report on the EPA’s
EJScreen mapping and screening tool.
Availability of meeting materials: All
meeting materials, including the agenda,
will be available on the SAB web page
at https://sab.epa.gov.
Procedures for providing public input:
Public comment for consideration by
EPA’s federal advisory committees and
panels has a different purpose from
public comment provided to EPA
program offices. Therefore, the process
for submitting comments to a federal
advisory committee is different from the
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
process used to submit comments to an
EPA program office. Federal advisory
committees and panels, including
scientific advisory committees, provide
independent advice to the EPA.
Members of the public can submit
relevant comments pertaining to the
committee’s charge or meeting
materials. Input from the public to the
SAB will have the most impact if it
provides specific scientific or technical
information or analysis for the SAB to
consider or if it relates to the clarity or
accuracy of the technical information.
Members of the public wishing to
provide comment should follow the
instructions below to submit comments.
Oral statements: In general,
individuals or groups requesting an oral
presentation at a meeting conducted
virtually will be limited to three
minutes. Each person making an oral
statement should consider providing
written comments as well as their oral
statement so that the points presented
orally can be expanded upon in writing.
Persons interested in providing oral
statements should contact the DFO, in
writing (preferably via email) at the
contact information noted above in FOR
FURTHER INFORMATION CONTACT, by
August 10, 2023, to be placed on the list
of registered speakers.
Written statements: Written
statements will be accepted throughout
the advisory process; however, for
timely consideration by SAB members,
statements should be submitted to the
DFO by August 10, 2023, for
consideration at the August 14, 2023,
meeting. Written statements should be
supplied to the DFO at the contact
information above via email. Submitters
are requested to provide an unsigned
version of each document because the
SAB Staff Office does not publish
documents with signatures on its
website. Members of the public should
be aware that their personal contact
information if included in any written
comments, may be posted to the SAB
website. Copyrighted material will not
be posted without the explicit
permission of the copyright holder.
Accessibility: For information on
access or services for individuals with
disabilities, please contact the DFO, at
the contact information noted above,
preferably at least ten days prior to the
meeting, to give the EPA as much time
as possible to process your request.
V. Khanna Johnston,
Deputy Director, Science Advisory Board Staff
Office.
[FR Doc. 2023–15623 Filed 7–21–23; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 88, Number 140 (Monday, July 24, 2023)]
[Notices]
[Pages 47492-47494]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-15604]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-501-000]
Port Arthur LNG, LLC; Notice of Scoping Period Requesting
Comments on Environmental Issues for the Proposed Port Arthur Liquified
Natural Gas Amendment
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the Port Arthur LNG, LLC's (PALNG)
Amendment (Amendment). If authorized, the Amendment would allow 24-
hour-per day construction activities, increase in the total workforce
to construct the project, and increase the parking available at the
approved liquified natural gas (LNG) terminal from what was previously
authorized in the final Environmental Impact Statement for the Port
Arthur Liquefaction Project in Jefferson County, Texas (Docket No.
CP17-20-000), which the Commission authorized on April 18, 2019. This
request is only regarding the facilities described in CP17-20-000. The
Commission will use this environmental document in its decision-making
process to determine whether the project is in the public interest.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of an authorization. This gathering of public input is
referred to as ``scoping.'' The main goal of the scoping process is to
focus the analysis in the environmental document on the important
environmental issues. Additional information about the Commission's
NEPA process is described below in the NEPA Process and Environmental
Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on 8/17/2023. Comments may be submitted
in writing. Further details on how to submit comments are provided in
the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on June 21, 2023, you will need to file
those comments in Docket No. CP23-501-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is also located on the Commission's website
(www.ferc.gov) under the link to FERC Online. With eFiling, you can
provide comments in a variety of formats by attaching them as a file
with your submission. New eFiling users must first create an account by
clicking on ``eRegister.'' You will be asked to select the type of
filing you are making; a comment on a particular project is considered
a ``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP23-
501- 000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all
[[Page 47493]]
issuances and submittals regarding the dockets/projects to which you
subscribe. These instant email notifications are the fastest way to
receive notification and provide a link to the document files which can
reduce the amount of time you spend researching proceedings. Go to
https://www.ferc.gov/ferc-online/overview to register for
eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Summary of the Proposed Amendment
As part of the Amendment, PALNG proposes to: (1) extend the work
hours from 7 a.m. to 10 p.m. to 24-hours-per-day until completion of
the facilities described in CP17-20-000; (2) increase the workforce
from 3,000 to 6,000 workers during peak construction; and (3) increase
the onsite terminal parking from 500 to 1,000 parking spaces.
PALNG indicates that this Amendment would maintain a development
schedule that maximizes construction efficiency while minimizing the
duration of environmental and community disturbance in the vicinity of
the approved terminal and meet the approved terminal construction
schedule.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room. For assistance, contact FERC at
[email protected] or call toll free, (886) 208-3676 or TTY
(202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
The Amendment request does not involve the construction of any new
facilities nor any additional land disturbance at the Port Arthur LNG
Terminal site. The additional 500 parking spaces would be within the
previously authorized terminal site.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the proposed Amendment under
the relevant general resource areas:
geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
socioeconomics;
environmental justice;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed Amendment or portions of the project and make recommendations
on how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
Amendment. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open an
additional comment period. Staff will then prepare a draft EIS which
will be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft EIS and
revise the document, as necessary, before issuing a final EIS. Any EA
or draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\3\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at title 40, Code of Federal
Regulations, section 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes state, and local government
representatives and agencies; elected officials; environmental and
public interest groups; Native American Tribes; other interested
parties; and local libraries and newspapers. This list also includes
all affected landowners (as defined in the Commission's regulations)
who are potential right-of-way grantors, whose property may be used
temporarily for project purposes, or who own homes within certain
distances of aboveground facilities, and anyone who submits comments on
the project and includes a mailing address with their comments.
Commission staff will update the environmental mailing list as the
analysis proceeds to ensure that Commission notices related to this
environmental review are sent to all individuals, organizations, and
government entities interested in and/or
[[Page 47494]]
potentially affected by the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP23-501-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: July 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-15604 Filed 7-21-23; 8:45 am]