Download as PDF lotter on DSK11XQN23PROD with NOTICES1 47488 Federal Register / Vol. 88, No. 140 / Monday, July 24, 2023 / Notices FERC Contact: Prabharanjani Madduri; phone: (202) 502–8017, or by email at prabharanjani.madduri@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502 6595 or OPP@ ferc.gov. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P– 15313–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P–15313) in the docket number field to access the document. For assistance, contact FERC Online Support. VerDate Sep<11>2014 16:56 Jul 21, 2023 Jkt 259001 Dated: July 18, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–15603 Filed 7–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–108–000 Applicants: Enfinity Global, Inc., American Falls Solar, LLC, American Falls Solar II, LLC, CSOLAR IV South, LLC, CSOLAR IV West, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Enfinity Global, Inc., et al. Filed Date: 7/14/23. Accession Number: 20230714–5232. Comment Date: 5 p.m. ET 8/4/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–59–001. Applicants: Blue Cloud Wind Energy, LLC Description: Notice of Non-Material Change in Status of Blue Cloud Wind Energy, LLC. Filed Date: 7/14/23. Accession Number: 20230714–5230 Comment Date: 5 p.m. ET 8/4/23. Docket Numbers: ER22–2359–001. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Order 881 & 881–A Compliance Filing to be effective 12/31/9998. Filed Date: 7/18/23. Accession Number: 20230718–5066. Comment Date: 5 p.m. ET 8/8/23. Docket Numbers: ER23–425–003. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment of Amended WMPA, SA No. 6062; Queue No. AG1–253; Docket No. ER23–425 to be effective 1/16/2023. Filed Date: 6/2/23. Accession Number: 20230602–5219. Comment Date: 5 p.m. ET 7/24/23. Docket Numbers: ER23–1718–000. Applicants: Pacific Gas and Electric Company. Description: Refund Report: CCSF Refund Report for missed unmetered Points (WDT SA 275) ER23–1718 to be effective N/A. Filed Date: 7/18/23. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Accession Number: 20230718–5117. Comment Date: 5 p.m. ET 8/8/23. Docket Numbers: ER23–1734–000; ER23–1733–000. Applicants: SFE Energy Massachusetts, Inc., SFE Energy, Inc. Description: Refund Report of SFE Energy, Inc., et al. Filed Date: 7/17/23. Accession Number: 20230717–5222. Comment Date: 5 p.m. ET 8/7/23. Docket Numbers: ER23–2419–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6992; Queue No. AF2–361 to be effective 6/15/2023. Filed Date: 7/17/23. Accession Number: 20230717–5136. Comment Date: 5 p.m. ET 8/7/23. Docket Numbers: ER23–2420–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original IISA, SA No. 6979 and ICSA, SA No. 6986; Queue No. AG1–153 to be effective 6/16/2023. Filed Date: 7/17/23. Accession Number: 20230717–5161. Comment Date: 5 p.m. ET 8/7/23. Docket Numbers: ER23–2421–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement Number 6983; Queue No. AF1–153 to be effective 9/18/2023. Filed Date: 7/17/23. Accession Number: 20230717–5172 Comment Date: 5 p.m. ET 8/7/23. Docket Numbers: ER23–2422–000. Applicants: Arizona Public Service Company. Description: Petition for Waiver of Arizona Public Service Company. Filed Date: 7/14/23. Accession Number: 20230714–5236. Comment Date: 5 p.m. ET 8/4/23. Docket Numbers: ER23–2423–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–07–18_SA 4124 NIPSCO-Malden Solar GIA (J1447) to be effective 9/17/ 2023. Filed Date: 7/18/23. Accession Number: 20230718–5047. Comment Date: 5 p.m. ET 8/8/23. Docket Numbers: ER23–2424–000. Applicants: Duke Energy Progress, LLC. Description: Tariff Amendment: DEP– DEP—Notice of Termination SA–419 to be effective 9/16/2023. Filed Date: 7/18/23. Accession Number: 20230718–5091. E:\FR\FM\24JYN1.SGM 24JYN1 lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 140 / Monday, July 24, 2023 / Notices Comment Date: 5 p.m. ET 8/8/23. Docket Numbers: ER23–2425–000. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Virginia Electric and Power Company submits tariff filing per 35.13(a)(2)(iii: VEPCO submits one WDSA, SA No. 6997 to be effective 6/26/2023. Filed Date: 7/18/23. Accession Number: 20230718–5092. Comment Date: 5 p.m. ET 8/8/23. Docket Numbers: ER23–2426–000. Applicants: Pattern Energy Management Services LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff with Waiver Requests to be effective 7/19/ 2023. Filed Date: 7/18/23. Accession Number: 20230718–5095. Comment Date: 5 p.m. ET 8/8/23. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA04–2–002. Applicants: MORENCI WATER AND ELECTRIC CO. Description: Amendment to Application for Disclaimer of Jurisdiction and Waiver of the Reciprocity Requirement under Order Nos. 888 and 889 for The Morenci Water Electric Company. Filed Date: 7/14/23. Accession Number: 20230714–5227. Comment Date: 5 p.m. ET 8/4/23. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR22–4–003. Applicants: North American Electric Reliability Corporation. Description: Request of the North American Electric Reliability Corporation to expend funds from the Assessment Stabilization Reserve to fund the Inter-Regional Transfer Capability Study. Filed Date: 7/14/23. Accession Number: 20230714–5231. Comment Date: 5 p.m. ET 7/24/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is VerDate Sep<11>2014 16:56 Jul 21, 2023 Jkt 259001 necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: July 18, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–15601 Filed 7–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–507–000] Equitrans, L.P.; Notice of Application and Establishing Intervention Deadline Take notice that on June 30, 2023, Equitrans, L.P. (Equitrans), 2200 Energy Drive, Canonsburg, Pennsylvania 15317, filed an application under sections 7(b) and 7(c), of the Natural Gas Act (NGA), and part 157 of the Commission’s regulations requesting authorization for its Swarts and Hunters Cave Well Replacement Project (Project). The Project consists of: (i) abandonment by sale of injection/withdrawal wells in the existing Hunters Cave Storage Field; (ii) construction of two horizontal wells: one in the Hunters Cave Field and one in the Swarts Complex to replace the capacity and capabilities of the storage fields; (iii) acquiring pipelines to serve as well lines; and (iv) selling base gas. The Hunter’s Cave Field and Swarts Complex are located in Greene County, Pennsylvania. The Project will allow CONSOL Pennsylvania Coal Company LLC to proceed with planned mining activities while preserving Equitrans’ ability to satisfy its contractual obligations to its Mainline storage customers. Equitrans estimates the total PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 47489 cost of the Project to be $7,295,312 and proposes to use the applicable Mainline Storage System rates as the maximum recourse rates for service on the Project and to roll-in the costs of the Project into its general system rates, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions regarding the proposed project should be directed to Matthew Eggerding, Deputy General Counsel, at Equitrans, L.P., 2200 Energy Drive, Canonsburg, PA 15317 by phone at (412) 553–5786, or by email at Meggerding@equitransmidstream.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Water Quality Certification Equitrans’ application states that a water quality certificate under section 401 of the Clean Water Act is required for the project from PADEP—Southwest Regional Office, Oil & Gas. The request 1 18 E:\FR\FM\24JYN1.SGM CFR (Code of Federal Regulations) 157.9. 24JYN1

Agencies

[Federal Register Volume 88, Number 140 (Monday, July 24, 2023)]
[Notices]
[Pages 47488-47489]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-15601]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-108-000
    Applicants: Enfinity Global, Inc., American Falls Solar, LLC, 
American Falls Solar II, LLC, CSOLAR IV South, LLC, CSOLAR IV West, 
LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Enfinity Global, Inc., et al.
    Filed Date: 7/14/23.
    Accession Number: 20230714-5232.
    Comment Date: 5 p.m. ET 8/4/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-59-001.
    Applicants: Blue Cloud Wind Energy, LLC
    Description: Notice of Non-Material Change in Status of Blue Cloud 
Wind Energy, LLC.
    Filed Date: 7/14/23.
    Accession Number: 20230714-5230
    Comment Date: 5 p.m. ET 8/4/23.

    Docket Numbers: ER22-2359-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Order 881 & 881-A Compliance Filing 
to be effective 12/31/9998.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5066.
    Comment Date: 5 p.m. ET 8/8/23.

    Docket Numbers: ER23-425-003.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Amendment of Amended WMPA, SA No. 
6062; Queue No. AG1-253; Docket No. ER23-425 to be effective 1/16/2023.
    Filed Date: 6/2/23.
    Accession Number: 20230602-5219.
    Comment Date: 5 p.m. ET 7/24/23.

    Docket Numbers: ER23-1718-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Refund Report: CCSF Refund Report for missed unmetered 
Points (WDT SA 275) ER23-1718 to be effective N/A.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5117.
    Comment Date: 5 p.m. ET 8/8/23.

    Docket Numbers: ER23-1734-000; ER23-1733-000.
    Applicants: SFE Energy Massachusetts, Inc., SFE Energy, Inc.
    Description: Refund Report of SFE Energy, Inc., et al.
    Filed Date: 7/17/23.
    Accession Number: 20230717-5222.
    Comment Date: 5 p.m. ET 8/7/23.

    Docket Numbers: ER23-2419-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6992; Queue No. AF2-361 to be effective 6/15/2023.
    Filed Date: 7/17/23.
    Accession Number: 20230717-5136.
    Comment Date: 5 p.m. ET 8/7/23.

    Docket Numbers: ER23-2420-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original IISA, SA No. 6979 
and ICSA, SA No. 6986; Queue No. AG1-153 to be effective 6/16/2023.
    Filed Date: 7/17/23.
    Accession Number: 20230717-5161.
    Comment Date: 5 p.m. ET 8/7/23.

    Docket Numbers: ER23-2421-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA, Service 
Agreement Number 6983; Queue No. AF1-153 to be effective 9/18/2023.
    Filed Date: 7/17/23.
    Accession Number: 20230717-5172
    Comment Date: 5 p.m. ET 8/7/23.

    Docket Numbers: ER23-2422-000.
    Applicants: Arizona Public Service Company.
    Description: Petition for Waiver of Arizona Public Service Company.
    Filed Date: 7/14/23.
    Accession Number: 20230714-5236.
    Comment Date: 5 p.m. ET 8/4/23.

    Docket Numbers: ER23-2423-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2023-07-18_SA 4124 NIPSCO-
Malden Solar GIA (J1447) to be effective 9/17/2023.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5047.
    Comment Date: 5 p.m. ET 8/8/23.

    Docket Numbers: ER23-2424-000.
    Applicants: Duke Energy Progress, LLC.
    Description: Tariff Amendment: DEP-DEP--Notice of Termination SA-
419 to be effective 9/16/2023.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5091.

[[Page 47489]]

    Comment Date: 5 p.m. ET 8/8/23.

    Docket Numbers: ER23-2425-000.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Virginia Electric and Power 
Company submits tariff filing per 35.13(a)(2)(iii: VEPCO submits one 
WDSA, SA No. 6997 to be effective 6/26/2023.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5092.
    Comment Date: 5 p.m. ET 8/8/23.

    Docket Numbers: ER23-2426-000.
    Applicants: Pattern Energy Management Services LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff with Waiver Requests to be effective 7/19/2023.
    Filed Date: 7/18/23.
    Accession Number: 20230718-5095.
    Comment Date: 5 p.m. ET 8/8/23.

    Take notice that the Commission received the following open access 
transmission tariff filings:

    Docket Numbers: OA04-2-002.
    Applicants: MORENCI WATER AND ELECTRIC CO.
    Description: Amendment to Application for Disclaimer of 
Jurisdiction and Waiver of the Reciprocity Requirement under Order Nos. 
888 and 889 for The Morenci Water Electric Company.
    Filed Date: 7/14/23.
    Accession Number: 20230714-5227.
    Comment Date: 5 p.m. ET 8/4/23.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR22-4-003.
    Applicants: North American Electric Reliability Corporation.
    Description: Request of the North American Electric Reliability 
Corporation to expend funds from the Assessment Stabilization Reserve 
to fund the Inter-Regional Transfer Capability Study.
    Filed Date: 7/14/23.
    Accession Number: 20230714-5231.
    Comment Date: 5 p.m. ET 7/24/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene, to protest, or to answer a 
complaint in any of the above proceedings must file in accordance with 
Rules 211, 214, or 206 of the Commission's Regulations (18 CFR 385.211, 
385.214, or 385.206) on or before 5:00 p.m. Eastern time on the 
specified comment date. Protests may be considered, but intervention is 
necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: July 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-15601 Filed 7-21-23; 8:45 am]