Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 46792-46793 [2023-15428]
Download as PDF
46792
Federal Register / Vol. 88, No. 138 / Thursday, July 20, 2023 / Notices
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
For further information, contact
Rebecca Martin at 202–502–6012 or
Rebecca.Martin@ferc.gov.
Dated: July 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
Public Participation
[FR Doc. 2023–15426 Filed 7–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–504–000]
lotter on DSK11XQN23PROD with NOTICES1
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on June 27, 2023,
Columbia Gas Transmission (Columbia),
700 Louisiana Street, Suite 1300,
Houston, Texas 77002–2700, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.216(b) of the Commission’s
regulations under the Natural Gas Act
(NGA), and Columbia’s blanket
certificate issued in Docket No. CP83–
76–000, for authorization to abandon
one injection/withdrawal well,
connecting pipe, and appurtenant
facilities. All of the above facilities are
located in the Wellington Storage Field
in Lorain County, Ohio. The project will
allow Columbia to protect the integrity
of the Wellington Storage Field as well
as Columbia’s certificated facilities and
services and thereby safeguard the
interests of Columbia’s customers,
affected landowners, and the
environment. The estimated cost for the
project is $550,000, all as more fully set
forth in the request which is on file with
the Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
VerDate Sep<11>2014
17:19 Jul 19, 2023
Any questions concerning this request
should be directed to David A. Alonzo,
Manager, Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, at (832) 320–5477 or
david_alonzo@tcenergy.com.
Jkt 259001
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 12, 2023.
How to file protests, motions to
intervene, and comments is explained
below.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is
September 12, 2023. A protest may also
serve as a motion to intervene so long
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
PO 00000
1 18
2 Persons
Frm 00062
Fmt 4703
Sfmt 4703
as the protestor states it also seeks to be
an intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 12,
2023. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
12, 2023. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
4 18
5 18
E:\FR\FM\20JYN1.SGM
CFR 385.214.
CFR 157.10.
20JYN1
Federal Register / Vol. 88, No. 138 / Thursday, July 20, 2023 / Notices
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–504–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–504–
000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To file via any other method: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
TX 77002–2700, or by david_alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
lotter on DSK11XQN23PROD with NOTICES1
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
17:19 Jul 19, 2023
Jkt 259001
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: July 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–15428 Filed 7–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–106–000.
Applicants: GenOn Bowline, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of GenOn Bowline,
LLC.
Filed Date: 7/13/23.
Accession Number: 20230713–5178.
Comment Date: 5 p.m. ET 8/3/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–226–000.
Applicants: Strauss Wind, LLC.
Description: Strauss Wind, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 7/14/23.
Accession Number: 20230714–5000.
Comment Date: 5 p.m. ET 8/4/23.
Docket Numbers: EG23–227–000.
Applicants: Arica Solar, LLC.
Description: Arica Solar, LLC submits
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 7/14/23.
Accession Number: 20230714–5121.
Comment Date: 5 p.m. ET 8/4/23.
Docket Numbers: EG23–228–000.
Applicants: Redonda PV LLC.
Description: Redonda PV LLC submits
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 7/14/23.
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
46793
Accession Number: 20230714–5122.
Comment Date: 5 p.m. ET 8/4/23.
Docket Numbers: EG23–229–000.
Applicants: Victory Pass I, LLC.
Description: Victory Pass I, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 7/14/23.
Accession Number: 20230714–5124.
Comment Date: 5 p.m. ET 8/4/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–467–009.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO Amendment to October 20, 2022
Cmplnc re: Technical Corrections to
eTariff to be effective 9/8/2020.
Filed Date: 7/14/23.
Accession Number: 20230714–5109.
Comment Date: 5 p.m. ET 8/4/23.
Docket Numbers: ER21–9–004; ER21–
86–004; ER21–88–004.
Applicants: Orange County Energy
Storage 3 LLC, Orange County Energy
Storage 2 LLC, Henrietta D Energy
Storage LLC.
Description: Notice of Non-Material
Change in Status of Henrietta D Energy
Storage LLC, et al.
Filed Date: 7/13/23.
Accession Number: 20230713–5166.
Comment Date: 5 p.m. ET 8/3/23.
Docket Numbers: ER22–1748–002;
ER22–1744–002; ER22–1751–002;
ER15–1972–001; ER22–69–003; ER22–
1745–002.
Applicants: Indeck-Olean Limited
Partnership, Indeck Niles, LLC, Indeck
Corinth Limited Partnership, IndeckYerkes Limited Partnership, Indeck
Energy Services of Silver Springs, Inc.,
Indeck-Oswego Limited Partnership.
Description: Triennial Market Power
Analysis for Northeast Region of Indeck
Corinth Limited Partnership, et al.
Filed Date: 7/13/23.
Accession Number: 20230713–5174.
Comment Date: 5 p.m. ET 9/11/23.
Docket Numbers: ER22–2356–001.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: 2023–
07–14—Att S—Order 881 Compliance
Filing to be effective 7/12/2025.
Filed Date: 7/14/23.
Accession Number: 20230714–5148.
Comment Date: 5 p.m. ET 8/4/23.
Docket Numbers: ER23–2391–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: PNM
CAISO Phase 2 Enhancements to be
effective 7/1/2023.
Filed Date: 7/14/23.
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 88, Number 138 (Thursday, July 20, 2023)]
[Notices]
[Pages 46792-46793]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-15428]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-504-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on June 27, 2023, Columbia Gas Transmission
(Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, filed in the above referenced docket, a prior notice request
pursuant to sections 157.205 and 157.216(b) of the Commission's
regulations under the Natural Gas Act (NGA), and Columbia's blanket
certificate issued in Docket No. CP83-76-000, for authorization to
abandon one injection/withdrawal well, connecting pipe, and appurtenant
facilities. All of the above facilities are located in the Wellington
Storage Field in Lorain County, Ohio. The project will allow Columbia
to protect the integrity of the Wellington Storage Field as well as
Columbia's certificated facilities and services and thereby safeguard
the interests of Columbia's customers, affected landowners, and the
environment. The estimated cost for the project is $550,000, all as
more fully set forth in the request which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions concerning this request should be directed to David
A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission,
LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at
(832) 320-5477 or [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on September 12,
2023. How to file protests, motions to intervene, and comments is
explained below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is September 12, 2023. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is September 12, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before September 12, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
[[Page 46793]]
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-504-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-504-000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other method: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, Columbia Gas Transmission,
LLC, 700 Louisiana Street, Suite 1300, Houston, TX 77002-2700, or by
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: July 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-15428 Filed 7-19-23; 8:45 am]
BILLING CODE 6717-01-P