Kewaunee Solutions, Inc.; Kewaunee Power Station, 46195-46197 [2023-15328]
Download as PDF
Federal Register / Vol. 88, No. 137 / Wednesday, July 19, 2023 / Notices
VI. Access to Sensitive Unclassified
Non-Safeguards Information for
Contention Preparation
Any person who desires access to
proprietary, confidential commercial
information that has been redacted from
the application should contact the
applicant by emailing Drew Richards at
amrichards@stpeqs.com and David
Helker at david.helker@
constellation.com for the purpose of
negotiating a confidentiality agreement
or a proposed protective order with the
applicant. If no agreement can be
reached, persons who desire access to
this information may file a motion with
the Secretary and addressed to the
Commission that requests the issuance
of a protective order.
Dated: July 14, 2023.
For the Nuclear Regulatory Commission.
Dennis J. Galvin,
Project Manager, Plant Licensing Branch IV,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2023–15327 Filed 7–18–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–305; NRC–2023–0116]
Kewaunee Solutions, Inc.; Kewaunee
Power Station
Nuclear Regulatory
Commission.
ACTION: Exemption; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has issued an
exemption in response to a request
dated March 29, 2023, from Kewaunee
Solutions, Inc. (Kewaunee Solutions),
for the Kewaunee Power Station (KPS)
facility, that permits Kewaunee
Solutions to investigate, trace, and
report to the NRC any low-level
radioactive waste shipment or part of a
shipment for which acknowledgement
of receipt is not received by
EnergySolutions, LLC within 45 days of
transfer, rather than the 20 day
requirement that is currently delineated
in the NRC’s regulations.
DATES: The exemption was issued on
July 5, 2023.
ADDRESSES: Please refer to Docket ID
NRC–2023–0116 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0116. Address
ddrumheller on DSK120RN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
00:36 Jul 19, 2023
Jkt 259001
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, at
301–415–4737, or by email to
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced (if it is available in ADAMS)
is provided the first time that it is
mentioned in this document.
• NRC’s PDR: The PDR, where you
may examine and order copies of
publicly available documents, is open
by appointment. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Karl
J. Sturzebecher, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–8534, email:
Karl.Sturzebecher@nrc.gov.
SUPPLEMENTARY INFORMATION: The text of
the exemption is attached.
Dated: July 14, 2023.
For the Nuclear Regulatory Commission.
Shaun M. Anderson,
Chief, Reactor Decommissioning Branch,
Division of Decommissioning, Uranium
Recovery and Waste Programs, Office of
Nuclear Material Safety and Safeguards.
Attachment—Exemption
Nuclear Regulatory Commission
Docket No. 50–305
Kewaunee Solutions, Inc., Kewaunee
Power Station
Exemption From Certain Low-Level
Waste Shipment Tracking
Requirements
I. Background
The U.S. Nuclear Regulatory
Commission (NRC, the Commission)
license for Kewaunee Power Station
(KPS) facility is Renewed Facility
Operating License (RFOL) No. DPR–43.
EnergySolutions, LLC (EnergySolutions)
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
46195
is the licensed holder of No. DPR–43
and operator for decommissioning,
while its subsidiary Kewaunee
Solutions, Inc. (Kewaunee Solutions)
would continue to hold title to and
ownership of any real estate
encompassing the KPS site, any
improvements to the site, and title to
and ownership of spent nuclear fuel.
The RFOL provides, among other things,
that the facility is subject to all rules,
regulations, and orders of the NRC now
or hereafter in effect. The KPS facility is
located about 90 miles North-East of the
city of Milwaukee, Wisconsin.
Kewaunee Solutions is currently
decommissioning the KPS facility,
which consists of a permanently
shutdown and defueled pressurized
water reactor design and a dry cask
Independent Spent Fuel Storage
Installation. Inherent to the plans for
this decommissioning process, large
volumes of low-level radioactive waste
are generated. This low-level radioactive
waste requires processing and disposal
or only disposal. KPS will transport, by
truck or by mixed mode shipments (for
example, by a combination of truck and
rail), low-level radioactive waste from
the facility to locations such as the
waste disposal facility owned and
operated by EnergySolutions in Clive,
Utah.
II. Request/Action
By letter dated March 29, 2023
(Agencywide Document Access and
Management System Accession No.
ML23088A275), Kewaunee Solutions
requested an exemption from certain
requirements of title 10 of the Code of
Federal Regulations (10 CFR), part 20,
appendix G, section III.E,
‘‘Requirements for Transfers of LowLevel Radioactive Waste Intended for
Disposal at Licensed Land Disposal
Facilities and Manifests.’’ Specifically,
Kewaunee Solutions requests an
exemption from the requirement to
investigate and report to the NRC when
notification of receipt of a shipment, or
part of a shipment, of low-level
radioactive waste is not received within
20 days after transfer. Kewaunee
Solutions is requesting that the time to
receive acknowledgement that a
shipment has been received by the
intended recipient be extended from 20
days to 45 days for low-level radioactive
waste shipments from the KPS facility.
Further, Kewaunee Solutions states that
the requested exemption would be
applicable to shipments from KPS by
rail or by mixed transportation modes,
such as a combination of truck/rail
shipments.
E:\FR\FM\19JYN1.SGM
19JYN1
46196
Federal Register / Vol. 88, No. 137 / Wednesday, July 19, 2023 / Notices
III. Discussion
The NRC’s regulations at 10 CFR
20.2301, ‘‘Applications for exemptions,’’
allow the Commission to grant
exemptions from the requirements of
the regulations in 10 CFR part 20,
‘‘Standards for Protection Against
Radiation,’’ if it determines the
exemption is authorized by law and
would not result in undue hazard to life
or property.
A. The Exemption Is Authorized by Law
The requested exemption from 10
CFR part 20, appendix G, section III.E
would extend the receipt
acknowledgment period from 20 days to
45 days before Kewaunee Solutions
would have to investigate, trace, and
report on the status of a low-level
radioactive waste shipment being
transported from KPS to a licensed lowlevel radioactive waste processing or
land disposal facility. As stated above,
10 CFR 20.2301 allows the NRC to grant
exemptions from the requirements of 10
CFR part 20 when, in part, the
exemptions are authorized by law.
There are no provisions in the Atomic
Energy Act of 1954, as amended (or in
any other Federal Statute) that impose a
requirement to investigate and report on
low-level radioactive waste shipments
that have not been acknowledged by the
recipient within 20 days of transfer. The
NRC staff determined that the requested
exemption is therefore permissible
under the Atomic Energy Act of 1954,
as amended, and other regulatory
requirements. Therefore, the NRC finds
that the requested exemption is
authorized by law.
ddrumheller on DSK120RN23PROD with NOTICES1
B. The Exemption Presents No Undue
Risk to Public Health and Safety.
The purpose of 10 CFR part 20,
appendix G, section III.E is to require
licensees to investigate, trace, and report
on low-level radioactive waste
shipments that have not reached their
destination, as scheduled, for unknown
reasons. In its exemption request,
Kewaunee Solutions stated that ample
industry experience in shipping lowlevel radioactive waste in support of
decommissioning has demonstrated that
shipments often take longer than 20
days. Based on past reports and industry
experience, the NRC staff agrees that
delays due to rail scheduling are likely
to recur.
Further, Kewaunee Solutions stated
that its exemption request is similar to
others that have previously been
approved by the NRC for Fort Calhoun
Station (ML20162A155), La Crosse
Boiling Water Reactor (ML17124A210),
and Zion Nuclear Power Station
VerDate Sep<11>2014
00:36 Jul 19, 2023
Jkt 259001
(ML15008A417). The NRC staff
reviewed these other exemption
requests and notes that all of the
licensees that requested and were
granted this exemption, previously had
at least once missed 20-day receipt
notification window. The NRC staff
conclude that due to the location of KPS
to low level waste disposal facilities and
the use or the rail system, it is likely that
without the exemption, Kewaunee
Solutions would be in a similar
situation to the licensees referenced
above due to the trail transport system
practices. The NRC staff agrees that
these exemption requests are similar to
the exemption requested by Kewaunee
Solutions.
In its exemption request, Kewaunee
Solutions stated that it will be
transporting low-level radioactive waste
from the KPS facility to distant locations
such as the waste disposal facilities
owned by EnergySolutions in Clive,
Utah. KPS plans to ship most of the
waste to these disposal facilities or
intermediate processors by rail.
Kewaunee Solutions expressed that
industry experience from other
decommissioning projects shipping
large quantities of low level radwaste to
offsite disposal facilities, has shown that
rail and mixed mode shipments can
routinely take longer than 20 days,
resulting in an excessive administrative
burden due to the required
investigations and reporting. Further,
Kewaunee Solutions stated that there
are various reasons for these delays that
cannot be anticipated or avoided and
that are beyond the control of the
shipper.
Kewaunee Solutions further stated
that, for rail shipments from KPS, a
tracking system will be utilized that
allows daily monitoring of a shipment’s
progress to its destination. Shipping
procedures prescribe the expectations
for tracking and communications during
transit. Kewaunee Solutions stated that
it will request daily updates be provided
identifying the location of the shipment
from the appropriate carrier. As a result,
Kewaunee Solutions explains that it
will be unlikely that a shipment could
be lost, misdirected, or diverted without
the knowledge of the carrier or
Kewaunee Solutions personnel.
According to Kewaunee Solutions,
exceeding the 20-day requirement
results in the ‘‘excessive administrative
burden’’ of investigating and reporting,
even though the shipments continue to
be under requisite controls.
The NRC staff notes that in terms of
potential effects on a member of the
public, the primary cause of low-level
radioactive waste shipment delays is
coordination with the rail carriers.
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
When these delays happen, the
shipment is generally within a railyard
and not near a member of the public or
a public place. The only way a low-level
radioactive waste shipment would
remain in a public place for an unusual
amount of time is if there was a problem
with the transport vehicle or the rail
system itself. In that instance, the NRC
staff notes that all low-level radioactive
waste shipments from KPS are required
to be compliant with the U.S.
Department of Transportation (DOT)
and NRC requirements for
transportation of low-level radioactive
packaging, placarding, and allowable
radiation levels at the surface of the
package for health and safety purposes
during transit, including during
switchyard staging. Furthermore, the
shipments are required to be under
control of the shipper at all times,
tracked by the licensee, and periodically
monitored by the licensee, as needed.
Therefore, there are no potential health
and safety concerns associated with this
material sitting in a switchyard for an
extended period of time. In the unlikely
event that a low-level waste shipments
were to remain in a public place for an
extended period of time, adherence to
the DOT transportation requirements
would also ensure that there would be
no health and safety concerns regarding
potential dose to the public.
Based on the history of low-level
radioactive waste shipments from other
Nuclear Power Plants in
decommissioning and the lack of
potential health or safety concerns
associated with these shipments sitting
in a switchyard for an extended period
of time, the NRC staff concludes that the
need to investigate, trace, and report on
low-level radioactive waste shipments
that take longer than 45 days is
appropriate.
Additionally, as indicated in the
exemption request, for truck and rail
shipments from Kewaunee Solutions,
KPS will use a tracking system that
allows daily monitoring of a shipment’s
progress to its destination and KPS
shipping procedures prescribe the
expectations for tracking and
communications during transit. The
NRC staff notes that this will allow for
monitoring the progress of shipments on
a daily basis, if needed, in lieu of the 20day requirement, and will initiate an
investigation as provided for by 10 CFR
part 20, appendix G, section III.E after
45 days. Because of this oversight and
the ability to monitor low-level
radioactive waste shipments throughout
the entire journey from KPS to a
disposal or processing facility, the staff
concludes that it is unlikely that a
shipment could be lost, misdirected, or
E:\FR\FM\19JYN1.SGM
19JYN1
Federal Register / Vol. 88, No. 137 / Wednesday, July 19, 2023 / Notices
diverted without the knowledge of the
carrier or Kewaunee Solutions and that,
therefore, there is no potential health or
safety concern presented by the
requested exemption. Furthermore, by
extending the time for receipt
acknowledgment to 45 days before
requiring investigations, tracing, and
reporting, a reasonable upper limit on
shipment duration is maintained in the
event that a breakdown of normal
tracking systems was to occur.
Based on the above, the NRC staff
finds that the requested exemption
would not result in undue hazard to life
or property.
ddrumheller on DSK120RN23PROD with NOTICES1
C. Environmental Considerations
With respect to compliance with
section 102(2) of the National
Environmental Policy Act, as amended,
42 U.S.C. 4332(2) (NEPA), the NRC staff
has determined that the proposed
action, the approval of the Kewaunee
Solutions exemption request, is within
the scope of the categorical exclusion
listed at 10 CFR 51.22(c)(25). The
proposed granting of the exemption
from certain requirements of the NRC’s
regulations at 10 CFR part 20, appendix
G, section III.E would: (i) present no
significant hazards considerations; (ii)
would not result in a significant change
in the types or significant increase in
the amounts of any effluents that may be
released offsite; (iii) not result in a
significant increase in individual or
cumulative public or occupational
radiation exposure; (iv) have no
significant construction impact; (v) does
not present a significant increase in the
potential for or consequences from
radiological accidents. Additionally, the
requirements from which an exemption
is sought involves reporting
requirements under 10 CFR
51.22(c)(25)(vi)(B) as well as inspection
or surveillance requirements under 10
CFR 51.22(c)(25)(vi)(C). Given the
applicability of relevant categorical
exclusions, no further analysis is
required under NEPA.
IV. Conclusions
Accordingly, the Commission has
determined that, pursuant to 10 CFR
20.2301, the exemption is authorized by
law and will not result in undue hazard
to life or property. Therefore, effective
immediately, the Commission hereby
grants Kewaunee Solutions an
exemption from 10 CFR part 20,
appendix G, section III.E to extend the
receipt of notification period from 20
days to 45 days after transfer for rail or
mixed-mode shipments of low-level
radioactive waste from KPS to a
licensed land disposal or processing
facility.
VerDate Sep<11>2014
00:36 Jul 19, 2023
Jkt 259001
Dated: July 5, 2023.
For the Nuclear Regulatory Commission.
/RA/
Jane E. Marshall,
Director, Division of Decommissioning,
Uranium Recovery, and Waste Programs,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 2023–15328 Filed 7–18–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–18, 50–70, 50–73, 50–183,
70–754, 70–1113, 70–1220, 72–1, 11001075,
11001076, 11005081, 11005086,11005186,
11005555, and 11006278; NRC–2023–0119]
General Electric Company, GE-Hitachi
Nuclear Energy Americas, LLC, and
Global Nuclear Fuel-Americas, LLC;
Consideration of Approval of Indirect
Transfer of Licenses
Nuclear Regulatory
Commission.
ACTION: Application for indirect transfer
of licenses; opportunity to comment,
request a hearing, and petition for leave
to intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC, the Commission)
received and is considering approval of
an application filed by General Electric
Company (GE), GE-Hitachi Nuclear
Energy Americas, LLC (GEHA), and
Global Nuclear Fuel-Americas, LLC
(GNF–A) (together, the Applicants) on
May 30, 2023, as supplemented by
letters dated June 20 and June 26, 2023.
The application seeks NRC approval of
the indirect transfer of Facility
Operating License No. R–33 for the
Nuclear Test Reactor at the Vallecitos
Nuclear Center (VNC) in Sunol,
California; Possession Only License No.
DPR–1 for the Vallecitos Boiling Water
Reactor at the VNC; Possession Only
License No. DR–10 for the Empire State
Atomic Development Associates
Vallecitos Experimental Superheat
Reactor at the VNC; Possession Only
License No. TR–1 for the GE Test
Reactor at the VNC; Special Nuclear
Material License Nos. SNM–960 and
SNM–1270 for the VNC; Special Nuclear
Material License No. SNM–1097 for the
Wilmington Fuel Manufacturing Facility
in Wilmington, North Carolina; Special
Nuclear Material License No. SNM–
2500 for the Morris Operation
Independent Spent Fuel Storage Facility
in Grundy County, Illinois, near Morris,
Illinois; and Export License Nos. XR135,
XSNM1662, XSNM03135, XSNM3398,
XCOM1124, XSNM3785, and
XSNM3066 from GE, the parent
SUMMARY:
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
46197
company of the license holders, GEHA
and GNF–A, to a recently created
wholly-owned subsidiary of GE named
GE Vernova, LLC that will then be spunoff and will no longer be part of GE. The
application contains sensitive
unclassified non-safeguards information
(SUNSI).
Submit comments by August 18,
2023. A request for a hearing or petition
for leave to intervene must be filed by
August 8, 2023. Any potential party as
defined in § 2.4 of title 10 of the Code
of Federal Regulations (10 CFR), who
believes access to SUNSI is necessary to
respond to this notice must follow the
instructions in Section VI of the
SUPPLEMENTARY INFORMATION section of
this notice.
DATES:
You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website:
• Federal rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0119. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Email comments to:
Hearing.Docket@nrc.gov. If you do not
receive an automatic email reply
confirming receipt, then contact us at
301–415–1677.
• Fax comments to: Secretary, U.S.
Nuclear Regulatory Commission at 301–
415–1101.
• Mail comments to: Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, ATTN:
Rulemakings and Adjudications Staff.
• Hand deliver comments to: 11555
Rockville Pike, Rockville, Maryland
20852, between 7:30 a.m. and 4:15 p.m.
eastern time (ET) Federal workdays;
telephone: 301–415–1677.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Osiris Siurano-Pe´rez, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–7827; email: Osiris.SiuranoPerez@nrc.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\19JYN1.SGM
19JYN1
Agencies
[Federal Register Volume 88, Number 137 (Wednesday, July 19, 2023)]
[Notices]
[Pages 46195-46197]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-15328]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-305; NRC-2023-0116]
Kewaunee Solutions, Inc.; Kewaunee Power Station
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemption; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued an
exemption in response to a request dated March 29, 2023, from Kewaunee
Solutions, Inc. (Kewaunee Solutions), for the Kewaunee Power Station
(KPS) facility, that permits Kewaunee Solutions to investigate, trace,
and report to the NRC any low-level radioactive waste shipment or part
of a shipment for which acknowledgement of receipt is not received by
EnergySolutions, LLC within 45 days of transfer, rather than the 20 day
requirement that is currently delineated in the NRC's regulations.
DATES: The exemption was issued on July 5, 2023.
ADDRESSES: Please refer to Docket ID NRC-2023-0116 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0116. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the For Further Information
Contact section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. The ADAMS accession number for
each document referenced (if it is available in ADAMS) is provided the
first time that it is mentioned in this document.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Karl J. Sturzebecher, Office of
Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001; telephone: 301-415-8534, email:
[email protected].
SUPPLEMENTARY INFORMATION: The text of the exemption is attached.
Dated: July 14, 2023.
For the Nuclear Regulatory Commission.
Shaun M. Anderson,
Chief, Reactor Decommissioning Branch, Division of Decommissioning,
Uranium Recovery and Waste Programs, Office of Nuclear Material Safety
and Safeguards.
Attachment--Exemption
Nuclear Regulatory Commission
Docket No. 50-305
Kewaunee Solutions, Inc., Kewaunee Power Station
Exemption From Certain Low-Level Waste Shipment Tracking Requirements
I. Background
The U.S. Nuclear Regulatory Commission (NRC, the Commission)
license for Kewaunee Power Station (KPS) facility is Renewed Facility
Operating License (RFOL) No. DPR-43. EnergySolutions, LLC
(EnergySolutions) is the licensed holder of No. DPR-43 and operator for
decommissioning, while its subsidiary Kewaunee Solutions, Inc.
(Kewaunee Solutions) would continue to hold title to and ownership of
any real estate encompassing the KPS site, any improvements to the
site, and title to and ownership of spent nuclear fuel. The RFOL
provides, among other things, that the facility is subject to all
rules, regulations, and orders of the NRC now or hereafter in effect.
The KPS facility is located about 90 miles North-East of the city of
Milwaukee, Wisconsin.
Kewaunee Solutions is currently decommissioning the KPS facility,
which consists of a permanently shutdown and defueled pressurized water
reactor design and a dry cask Independent Spent Fuel Storage
Installation. Inherent to the plans for this decommissioning process,
large volumes of low-level radioactive waste are generated. This low-
level radioactive waste requires processing and disposal or only
disposal. KPS will transport, by truck or by mixed mode shipments (for
example, by a combination of truck and rail), low-level radioactive
waste from the facility to locations such as the waste disposal
facility owned and operated by EnergySolutions in Clive, Utah.
II. Request/Action
By letter dated March 29, 2023 (Agencywide Document Access and
Management System Accession No. ML23088A275), Kewaunee Solutions
requested an exemption from certain requirements of title 10 of the
Code of Federal Regulations (10 CFR), part 20, appendix G, section
III.E, ``Requirements for Transfers of Low-Level Radioactive Waste
Intended for Disposal at Licensed Land Disposal Facilities and
Manifests.'' Specifically, Kewaunee Solutions requests an exemption
from the requirement to investigate and report to the NRC when
notification of receipt of a shipment, or part of a shipment, of low-
level radioactive waste is not received within 20 days after transfer.
Kewaunee Solutions is requesting that the time to receive
acknowledgement that a shipment has been received by the intended
recipient be extended from 20 days to 45 days for low-level radioactive
waste shipments from the KPS facility. Further, Kewaunee Solutions
states that the requested exemption would be applicable to shipments
from KPS by rail or by mixed transportation modes, such as a
combination of truck/rail shipments.
[[Page 46196]]
III. Discussion
The NRC's regulations at 10 CFR 20.2301, ``Applications for
exemptions,'' allow the Commission to grant exemptions from the
requirements of the regulations in 10 CFR part 20, ``Standards for
Protection Against Radiation,'' if it determines the exemption is
authorized by law and would not result in undue hazard to life or
property.
A. The Exemption Is Authorized by Law
The requested exemption from 10 CFR part 20, appendix G, section
III.E would extend the receipt acknowledgment period from 20 days to 45
days before Kewaunee Solutions would have to investigate, trace, and
report on the status of a low-level radioactive waste shipment being
transported from KPS to a licensed low-level radioactive waste
processing or land disposal facility. As stated above, 10 CFR 20.2301
allows the NRC to grant exemptions from the requirements of 10 CFR part
20 when, in part, the exemptions are authorized by law. There are no
provisions in the Atomic Energy Act of 1954, as amended (or in any
other Federal Statute) that impose a requirement to investigate and
report on low-level radioactive waste shipments that have not been
acknowledged by the recipient within 20 days of transfer. The NRC staff
determined that the requested exemption is therefore permissible under
the Atomic Energy Act of 1954, as amended, and other regulatory
requirements. Therefore, the NRC finds that the requested exemption is
authorized by law.
B. The Exemption Presents No Undue Risk to Public Health and Safety.
The purpose of 10 CFR part 20, appendix G, section III.E is to
require licensees to investigate, trace, and report on low-level
radioactive waste shipments that have not reached their destination, as
scheduled, for unknown reasons. In its exemption request, Kewaunee
Solutions stated that ample industry experience in shipping low-level
radioactive waste in support of decommissioning has demonstrated that
shipments often take longer than 20 days. Based on past reports and
industry experience, the NRC staff agrees that delays due to rail
scheduling are likely to recur.
Further, Kewaunee Solutions stated that its exemption request is
similar to others that have previously been approved by the NRC for
Fort Calhoun Station (ML20162A155), La Crosse Boiling Water Reactor
(ML17124A210), and Zion Nuclear Power Station (ML15008A417). The NRC
staff reviewed these other exemption requests and notes that all of the
licensees that requested and were granted this exemption, previously
had at least once missed 20-day receipt notification window. The NRC
staff conclude that due to the location of KPS to low level waste
disposal facilities and the use or the rail system, it is likely that
without the exemption, Kewaunee Solutions would be in a similar
situation to the licensees referenced above due to the trail transport
system practices. The NRC staff agrees that these exemption requests
are similar to the exemption requested by Kewaunee Solutions.
In its exemption request, Kewaunee Solutions stated that it will be
transporting low-level radioactive waste from the KPS facility to
distant locations such as the waste disposal facilities owned by
EnergySolutions in Clive, Utah. KPS plans to ship most of the waste to
these disposal facilities or intermediate processors by rail. Kewaunee
Solutions expressed that industry experience from other decommissioning
projects shipping large quantities of low level radwaste to offsite
disposal facilities, has shown that rail and mixed mode shipments can
routinely take longer than 20 days, resulting in an excessive
administrative burden due to the required investigations and reporting.
Further, Kewaunee Solutions stated that there are various reasons for
these delays that cannot be anticipated or avoided and that are beyond
the control of the shipper.
Kewaunee Solutions further stated that, for rail shipments from
KPS, a tracking system will be utilized that allows daily monitoring of
a shipment's progress to its destination. Shipping procedures prescribe
the expectations for tracking and communications during transit.
Kewaunee Solutions stated that it will request daily updates be
provided identifying the location of the shipment from the appropriate
carrier. As a result, Kewaunee Solutions explains that it will be
unlikely that a shipment could be lost, misdirected, or diverted
without the knowledge of the carrier or Kewaunee Solutions personnel.
According to Kewaunee Solutions, exceeding the 20-day requirement
results in the ``excessive administrative burden'' of investigating and
reporting, even though the shipments continue to be under requisite
controls.
The NRC staff notes that in terms of potential effects on a member
of the public, the primary cause of low-level radioactive waste
shipment delays is coordination with the rail carriers. When these
delays happen, the shipment is generally within a railyard and not near
a member of the public or a public place. The only way a low-level
radioactive waste shipment would remain in a public place for an
unusual amount of time is if there was a problem with the transport
vehicle or the rail system itself. In that instance, the NRC staff
notes that all low-level radioactive waste shipments from KPS are
required to be compliant with the U.S. Department of Transportation
(DOT) and NRC requirements for transportation of low-level radioactive
packaging, placarding, and allowable radiation levels at the surface of
the package for health and safety purposes during transit, including
during switchyard staging. Furthermore, the shipments are required to
be under control of the shipper at all times, tracked by the licensee,
and periodically monitored by the licensee, as needed. Therefore, there
are no potential health and safety concerns associated with this
material sitting in a switchyard for an extended period of time. In the
unlikely event that a low-level waste shipments were to remain in a
public place for an extended period of time, adherence to the DOT
transportation requirements would also ensure that there would be no
health and safety concerns regarding potential dose to the public.
Based on the history of low-level radioactive waste shipments from
other Nuclear Power Plants in decommissioning and the lack of potential
health or safety concerns associated with these shipments sitting in a
switchyard for an extended period of time, the NRC staff concludes that
the need to investigate, trace, and report on low-level radioactive
waste shipments that take longer than 45 days is appropriate.
Additionally, as indicated in the exemption request, for truck and
rail shipments from Kewaunee Solutions, KPS will use a tracking system
that allows daily monitoring of a shipment's progress to its
destination and KPS shipping procedures prescribe the expectations for
tracking and communications during transit. The NRC staff notes that
this will allow for monitoring the progress of shipments on a daily
basis, if needed, in lieu of the 20-day requirement, and will initiate
an investigation as provided for by 10 CFR part 20, appendix G, section
III.E after 45 days. Because of this oversight and the ability to
monitor low-level radioactive waste shipments throughout the entire
journey from KPS to a disposal or processing facility, the staff
concludes that it is unlikely that a shipment could be lost,
misdirected, or
[[Page 46197]]
diverted without the knowledge of the carrier or Kewaunee Solutions and
that, therefore, there is no potential health or safety concern
presented by the requested exemption. Furthermore, by extending the
time for receipt acknowledgment to 45 days before requiring
investigations, tracing, and reporting, a reasonable upper limit on
shipment duration is maintained in the event that a breakdown of normal
tracking systems was to occur.
Based on the above, the NRC staff finds that the requested
exemption would not result in undue hazard to life or property.
C. Environmental Considerations
With respect to compliance with section 102(2) of the National
Environmental Policy Act, as amended, 42 U.S.C. 4332(2) (NEPA), the NRC
staff has determined that the proposed action, the approval of the
Kewaunee Solutions exemption request, is within the scope of the
categorical exclusion listed at 10 CFR 51.22(c)(25). The proposed
granting of the exemption from certain requirements of the NRC's
regulations at 10 CFR part 20, appendix G, section III.E would: (i)
present no significant hazards considerations; (ii) would not result in
a significant change in the types or significant increase in the
amounts of any effluents that may be released offsite; (iii) not result
in a significant increase in individual or cumulative public or
occupational radiation exposure; (iv) have no significant construction
impact; (v) does not present a significant increase in the potential
for or consequences from radiological accidents. Additionally, the
requirements from which an exemption is sought involves reporting
requirements under 10 CFR 51.22(c)(25)(vi)(B) as well as inspection or
surveillance requirements under 10 CFR 51.22(c)(25)(vi)(C). Given the
applicability of relevant categorical exclusions, no further analysis
is required under NEPA.
IV. Conclusions
Accordingly, the Commission has determined that, pursuant to 10 CFR
20.2301, the exemption is authorized by law and will not result in
undue hazard to life or property. Therefore, effective immediately, the
Commission hereby grants Kewaunee Solutions an exemption from 10 CFR
part 20, appendix G, section III.E to extend the receipt of
notification period from 20 days to 45 days after transfer for rail or
mixed-mode shipments of low-level radioactive waste from KPS to a
licensed land disposal or processing facility.
Dated: July 5, 2023.
For the Nuclear Regulatory Commission.
/RA/
Jane E. Marshall,
Director, Division of Decommissioning, Uranium Recovery, and Waste
Programs, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2023-15328 Filed 7-18-23; 8:45 am]