Download as PDF 45200 Federal Register / Vol. 88, No. 134 / Friday, July 14, 2023 / Notices Seminoe Pumped Storage Project. A prior notice issued on March 31, 2023, identified an anticipated schedule for issuance of draft and final National Environmental Policy Act (NEPA) documents and a final order for the project. After the issuance of that notice, Black Canyon Hydro, LLC agreed to conduct additional studies requested by the agencies and file the study results by ‘‘November 2023,’’ and Commission staff issued a letter requiring the corresponding study reports and additional information to be filed with the Commission by November 30, 2023. To account for the additional time needed for Black Canyon Hydro, LLC to complete the studies and file the additional information, the application will be processed according to the following revised schedule. Notice of Ready for Environmental Analysis: February 2024 Draft NEPA Document: October 2024 Final NEPA Document: May 9, 2025 In addition, in accordance with Title 41 of the Fixing America’s Surface Transportation Act, enacted on December 4, 2015, agencies are to publish completion dates for all federal environmental reviews and authorizations. This notice identifies the Commission’s anticipated schedule for issuance of the final order for the project, which is based on the revised issuance date for the final NEPA document. Accordingly, we currently anticipate issuing a final order for the project no later than: Issuance of Final Order: September 18, 2025 If a schedule change becomes necessary, an additional notice will be provided so that interested parties and government agencies are kept informed of the project’s progress. Dated: July 10, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–14991 Filed 7–13–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 [Project No. 15088–000] Daybreak Power, Inc.; Notice of Surrender of Preliminary Permit Take notice that Daybreak Power, Inc., permittee for the proposed Halverson Canyon Pumped Storage Project No. 15088, has requested that its preliminary permit be terminated. The permit was issued on June 28, 2021 and VerDate Sep<11>2014 17:54 Jul 13, 2023 Jkt 259001 would have expired on May 31, 2025. The project would have been located at the U.S. Bureau of Reclamation’s Lake Roosevelt in Lincoln County, Washington. The preliminary permit for Project No. 15088 will remain in effect until the close of business, August 9, 2023. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.1 New applications for this site may not be submitted until after the permit surrender is effective. Dated: July 10, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–14988 Filed 7–13–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–506–000] National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on June 29, 2023, National Fuel Gas Supply Corporation (National Fuel), 6363 Main Street, Williamsville, New York 14221, filed a prior notice request for authorization, in accordance with 18 CFR 157.205, 157.208, and 157.216 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act and National Fuel’s blanket certificate issued in Docket No. CP83–4–000, to abandon two injection/ withdrawal storage wells, EC–463 and State Line 7405, and the associated well lines ECW463 and NSLW7405, in its Beech Hill Storage Field (Beech Hill) located in Allegany County, New York. National Fuel states the abandonment is required due to localized corrosion on the production strings of EC–463 and State Line 7405 wells. National Fuel states that the cost of the abandonment project will be $731,000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// PO 00000 1 18 CFR 385.2007(a)(2) (2020). Frm 00073 Fmt 4703 Sfmt 4703 ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. Any questions concerning this application should be directed to Meghan Emes, Senior Attorney, National Fuel Gas Supply Corporation, 6363 Main Street, Williamsville, New York 14221, by phone at (716) 857– 7004, or by email at emesm@ natfuel.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on September 5, 2023. How to file protests, motions to intervene, and comments is explained below. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and 1 18 E:\FR\FM\14JYN1.SGM CFR (Code of Federal Regulations) § 157.9. 14JYN1

Agencies

[Federal Register Volume 88, Number 134 (Friday, July 14, 2023)]
[Notices]
[Page 45200]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-14988]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15088-000]


Daybreak Power, Inc.; Notice of Surrender of Preliminary Permit

    Take notice that Daybreak Power, Inc., permittee for the proposed 
Halverson Canyon Pumped Storage Project No. 15088, has requested that 
its preliminary permit be terminated. The permit was issued on June 28, 
2021 and would have expired on May 31, 2025. The project would have 
been located at the U.S. Bureau of Reclamation's Lake Roosevelt in 
Lincoln County, Washington.
    The preliminary permit for Project No. 15088 will remain in effect 
until the close of business, August 9, 2023. But, if the Commission is 
closed on this day, then the permit remains in effect until the close 
of business on the next day in which the Commission is open.\1\ New 
applications for this site may not be submitted until after the permit 
surrender is effective.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2007(a)(2) (2020).

    Dated: July 10, 2023.
Kimberly D. Bose,
Secretary.