In calculating the information
collection burdens, BOEM accounted for
decreases in the number of plans
submitted annually and for the changes
resulting from the GOM BiOp. BOEM
currently requires monthly marine
mammal observation and monitoring
reports and a final report within 90 days
of the completion of a lessee’s OCS
survey, consistent with GOM BiOp
Appendix A, ‘‘Seismic Survey
Mitigation and Protected Species
Observer Protocols.’’ The GOM BiOp
requirements supersede BOEM’s Notice
to Lessees and Operators 2016–G02,
which had required two reports each
month. Therefore, BOEM estimates an
overall decrease in the burden related to
these monitoring reports.
The GOM BiOp requires additional
reporting if one or more individuals
from a protected species are observed
within an enclosed moon pool, which is
an opening in the bottom of a marine
platform, drill ship, or vessel through
which drilling is done. The operator
must report the observation within 24
hours and daily thereafter as long as any
individual from a protected species
remains within the moon pool. With
this new requirement, BOEM estimates
a slight increase in annual reporting.
While the GOM BiOp increased
certain reporting burdens for lessees and
operators in the Gulf of Mexico, the
overall burdens are estimated to
decrease slightly due to the anticipated
reduction in the number of plans
submitted to BOEM.
A Federal Register notice with a 60day public comment period on this
proposed ICR was published on March
3, 2023 (88 FR 13459). BOEM received
one comment during the 60-day
comment period, which was supportive
of the Federal Government’s reporting
and burden updates. No burdens were
changed in connection with the public
comment.
BOEM is again soliciting comments
on the proposed ICR. BOEM is
especially interested in public
comments addressing the following
issues: (1) is the collection necessary to
the proper functions of BOEM; (2) what
can BOEM do to ensure that this
information is processed and used in a
timely manner; (3) is the burden
estimate accurate; (4) how might BOEM
enhance the quality, utility, and clarity
of the information to be collected; and
(5) how might BOEM minimize the
burden of this collection on the
respondents, including minimizing the
burden through the use of information
technology?
Comments submitted in response to
this notice are a matter of public record
and will be available for public review
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
on www.reginfo.gov. BOEM will include
or summarize each comment in its ICR
to OMB for approval of this information
collection. You should be aware that
your entire comment—including your
address, phone number, email address,
or other personally identifiable
information included in your
comment—may be made publicly
available at any time. Even if BOEM
withholds your information in the
context of this ICR, your comment is
subject to the Freedom of Information
Act (FOIA). If your submission is
requested under FOIA, your information
will only be withheld if a determination
is made that one of the FOIA
exemptions to disclosure applies. Such
a determination will be made in
accordance with the Department’s FOIA
regulations (43 CFR part 2) and
applicable law.
In order for BOEM to consider
withholding from disclosure your
personal identifying information, you
must identify, in a cover letter, any
information contained in your comment
that, if released, would constitute a
clearly unwarranted invasion of your
personal privacy. You must also briefly
describe any possible harmful
consequences of the disclosure of
information, such as embarrassment,
injury, or other harm. Note that BOEM
will make available for public
inspection all comments in their
entirety (except for proprietary
information submitted by organizations
and businesses, or by individuals
identifying themselves as
representatives of organizations or
businesses).
BOEM protects proprietary
information in accordance with FOIA (5
U.S.C. 552), the DOI’s implementing
regulations (43 CFR part 2), and 30 CFR
part 550.
An agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a valid OMB control
number.
The authority for this action is the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.).
Karen Thundiyil,
Chief, Office of Regulations, Bureau of Ocean
Energy Management.
[FR Doc. 2023–14822 Filed 7–12–23; 8:45 am]
BILLING CODE 4340–98–P
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental
Enforcement
[Docket ID BSEE–2023–0013; EEEE500000
234E1700D2 ET1SF0000.EAQ000; OMB
Control Number 1014–0034]
Agency Information Collection
Activities; Renewable Energy and
Alternate Uses of Existing Facilities on
the Outer Continental Shelf
Bureau of Safety and
Environmental Enforcement, Interior.
ACTION: Notice of information collection;
request for comment.
AGENCY:
In accordance with the
Paperwork Reduction Act (PRA) of
1995, the Bureau of Safety and
Environmental Enforcement (BSEE)
proposes to renew an information
collection with revisions.
DATES: Interested persons are invited to
submit comments on or before
September 11, 2023.
ADDRESSES: Send your comments on
this information collection request (ICR)
by either of the following methods listed
below:
• Electronically go to https://
www.regulations.gov. In the Search box,
enter BSEE–2023–0013 then click
search. Follow the instructions to
submit public comments and view all
related materials. We will post all
comments.
• Email nikki.mason@bsee.gov, fax
(703) 787–1546, or mail or hand-carry
comments to the Department of the
Interior; Bureau of Safety and
Environmental Enforcement;
Regulations and Standards Branch;
ATTN: Nikki Mason; 45600 Woodland
Road, Sterling, VA 20166. Please
reference OMB Control Number 1014–
0034 in the subject line of your
comments.
SUMMARY:
To
request additional information about
this ICR, contact Nikki Mason by email
at nikki.mason@bsee.gov or by
telephone at (703) 787–1607.
Individuals in the United States who are
deaf, deafblind, hard of hearing, or have
a speech disability may dial 711 (TTY,
TDD, or TeleBraille) to access
telecommunications relay services.
Individuals outside the United States
should use the relay services offered
within their country to make
international calls to the point-ofcontact in the United States. You may
also view the ICR at https://
www.reginfo.gov/public/do/PRAMain.
SUPPLEMENTARY INFORMATION: In
accordance with the PRA and 5 CFR
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\13JYN1.SGM
13JYN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
1320.8(d)(1), all information collections
require approval under the PRA. We
may not conduct, or sponsor and you
are not required to respond to a
collection of information unless it
displays a currently valid OMB control
number.
As part of our continuing effort to
reduce paperwork and respondent
burdens, we invite the public and other
Federal agencies to comment on new,
proposed, revised, and continuing
collections of information. This helps us
assess the impact of our information
collection requirements and minimize
the public’s reporting burden. It also
helps the public understand our
information collection requirements and
provide the requested data in the
desired format.
We are especially interested in public
comment addressing the following:
(1) Whether or not the collection of
information is necessary for the proper
performance of the functions of the
agency, including whether or not the
information will have practical utility;
(2) The accuracy of our estimate of the
burden for this collection of
information, including the validity of
the methodology and assumptions used;
(3) Ways to enhance the quality,
utility, and clarity of the information to
be collected; and
(4) How might the agency minimize
the burden of the collection of
information on those who are to
respond, including through the use of
appropriate automated, electronic,
mechanical, or other technological
collection techniques or other forms of
information technology, e.g., permitting
electronic submission of response.
Comments that you submit in
response to this notice are a matter of
public record. We will include or
summarize each comment in our request
to OMB to approve this ICR. Before
including your address, phone number,
email address, or other personal
identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your comment
to withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Abstract: BSEE will use the
information to oversee facility design,
fabrication, installation, and safety
management systems; ensure the safety
of operations, including inspection
programs and incident reporting and
investigations; enforce compliance with
all applicable safety, environmental,
and other laws and regulations through
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
enforcement actions (such as
noncompliance notices, cessation
orders, and certain lease suspensions);
and oversee decommissioning activities.
These responsibilities include
enforcement provisions under the
existing part 285, subpart D, various
information submittal requirements
under Subpart F, as well as provisions
governing activities conducted under an
approved plan, including the design,
construction, operation, and
decommissioning of facilities under
subparts G, H, and I. The requirements
for and standards of review regarding
the Facility Design Report (FDR) and
Facility Fabrication and Installation
Report (FIR) are unchanged: the FDR
and FIR will continue to be evaluated
for consistency with the Construction
and Operations Plan (COP) and
applicable engineering standards.
Decommissioning requirements related
to rights-of-use and easement for
alternate uses of existing OCS facilities
(Alternate Use RUE) have also been
transferred from the existing subpart J to
part 285.
BSEE assumes the responsibility for
ordering a lease or grant suspension
when continued activities pose an
imminent threat of serious or irreparable
harm or damage to natural resources,
life, property, the marine coastal, or
human environment, or sites, structures,
or objects of historical or archaeological
significance. BSEE may also order a
suspension when necessary to comply
with a judicial decree. Under the rule,
BSEE also assumes authority to issue
cessation orders to address
noncompliance on the part of the
grantee or lessee.
The Department does not issue
Suspensions for Alternate Use RUEs
upon the grantee’s request, but only by
order. BOEM will retain authority to
order suspensions required for National
security, and BSEE will assume
authority to order suspensions to
address a threat of harm from continued
operations. Either bureau may order a
suspension when necessary to comply
with a judicial decree. BSEE will order
suspensions when operations are halted
on the existing facility and BSEE
determines continuation of the alternate
use is unsafe or causes undue
interference with the facility.
Part 285, subpart D, Lease and Grant
Administration, includes the authority
to issue notices of noncompliance
(NONCs) and cessation orders, and to
pursue civil penalties and recommend
criminal penalties. BSEE assumes
authority for oversight and enforcement
of the design, construction, operation,
and decommissioning phases of offshore
wind development, as well as
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
44835
enforcement of requirements related to
Alternate Use RUEs.
This ICR includes a new form:
Form BSEE–1835, Notification of
Noncompliance (NONC).
BSEE will use the information to
determine that respondents have
corrected all Notifications of
Noncompliance (NONCs) identified
during inspections. Everything on the
NONC form is filled out by a BSEE
inspector/representative. The only thing
industry does with this form is sign the
document upon receipt and respond to
BSEE when each NONC has been
corrected. Dependent on the severity of
the non-compliance identified by the
BSEE inspector, the responses are
assigned different intervals and are
described in the form table titled
Enforcement Timeline:
1—At Time of Inspection
14—Within 14 Days
30—Within 30 Days
50—Prior to Returning to Service/
Operation
60—Prior to Next Scheduled
Maintenance
70—During Next Scheduled
Maintenance
80—Prior to Next scheduled Audit
90—During Next Scheduled Audit
Title of Collection: 30 CFR part 285,
Renewable Energy and Alternate Uses of
Existing Facilities on the Outer
Continental Shelf.
OMB Control Number: 1014–0034.
Form Number: Form BSEE–1835,
Notice(s) of Noncompliance.
Type of Review: Revision of a
currently approved collection.
Respondents/Affected Public: Primary
respondents comprise Federal OCS
companies that submit unsolicited
proposals or responses to Federal
Register notices; or are lessees,
designated operators, and ROW or RUE
grant holders. Other potential
respondents are companies or state and
local governments that submit
information or comments relative to
alternative energy-related uses of the
OCS; certified verification agents
(CVAs); and surety or third-party
guarantors.
Total Estimated Number of Annual
Respondents: Currently there are
approximately 47 Lessees in the OCS.
Not all the potential respondents will
submit information in any given year,
and some may submit multiple times.
Total Estimated Number of Annual
Responses: 103.
Estimated Completion Time per
Response: Varies from 30 minutes to
6,000 hours, depending on activity.
Total Estimated Number of Annual
Burden Hours: 8,908.
E:\FR\FM\13JYN1.SGM
13JYN1
44836
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
Respondent’s Obligation: Responses
are mandatory and are required to
obtain or retain a benefit.
Frequency of Collection: generally
occasional or annual.
Total Estimated Annual Nonhour
Burden Cost: $1,908,000.
BURDEN TABLE
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour burden
Average number of
annual responses
Annual burden
hours
Non-hour cost burdens
Subpart A—General Provisions
102; 105; 110 ................................
These sections contain general references to submitting comments, requests, applications, plans, notices, reports, and/or supplemental information for BSEE approval—burdens covered under specific requirements.
103; 904 ........................................
Request general departures not specifically covered elsewhere in
part 285.
.5 .......................
6 requests .............
3
105(c) ............................................
Make oral requests or notifications and submit written follow up
within 3 business days not specifically covered elsewhere in part
285.
1 ........................
2 requests .............
2
1016 ..............................................
Request reconsideration and/or hearing. ...........................................
Requirement not considered IC under
5 CFR 1320.3(h)(9).
0
111(b)(3); (b)(5); (b)(6) .................
Within 30 days of receiving bill, submit processing fee payments for
BSEE document or study preparation to process applications and
other requests.
.5 .......................
1
2 submissions .......
2 payments × $4,000 = $8,000.
111(b)(2), (3) .................................
Submit comments on proposed processing fee or request approval
to perform or directly pay contractors for all or part of any document, study, or other activity, to reduce BSEE processing costs.
2 ........................
2 requests .............
4
111(b)(3) .......................................
Perform, conduct, develop, etc., all or part of any document, study,
or other activity; and provide results to BSEE to reduce BSEE
processing fee. Pay processing fee for all or part of any document, study, or other activity, and provide results to BSEE to reduce BSEE processing costs.
6,000 .................
1 submission .........
6,000
1 contractor payment × $950,000 =
$950,000.
111(b)(7) .......................................
Appeal BSEE estimated processing costs, decisions, or orders pursuant to 30 CFR 290.
Exempt under 5 CFR 1320.4(a)(2), (c).
0
115 ................................................
Request approval to use later edition of a document incorporated
by reference or alternative compliance.
1 ........................
1
118 ................................................
Request appeal within 15 days of bid rejection, request reconsideration of bid decision or rejection.
Requirement not considered IC under
5 CFR 1320.3(h)(9).
0
400; 401; 402 NONCs ..................
These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 285.
0
401(b) ............................................
Take measures directed by BSEE in cessation order and submit
reports to resume activities.
100 ....................
1 report ..................
100
417(b) ............................................
Conduct, and if required pay for, site-specific study to evaluate
cause of harm or damage; and submit copies of study and results, in format specified.
110 ....................
1 study/submission
110
437 ................................................
Provide information for reconsideration of BSEE decision to contract or cancel lease or grant area.
Requirement not considered IC under
5 CFR 1320.3(h)(9).
1 request ...............
Subpart B—Reserved
Subpart C—Reserved
Subpart D—Lease and Grant Administration
ddrumheller on DSK120RN23PROD with NOTICES1
1 study × $950,000 = $950,000.
VerDate Sep<11>2014
19:40 Jul 12, 2023
Jkt 259001
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
0
44837
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour burden
Average number of
annual responses
Annual burden
hours
Subpart E—Reserved
Subpart F—Plans and Information Requirements
ddrumheller on DSK120RN23PROD with NOTICES1
** indicate the primary cites for
Site Assessment Plans (SAPs),
Construction and Operations
Plans (COPs), and General Activities Plans (GAPs); and the
burdens include any previous or
subsequent references throughout part 285 to submission and
approval. This subpart contains
references to other information
submissions, approvals, requests, applications, plans, etc.,
the burdens for which are covered elsewhere in part 285.
** 606; 614; 810 ............................
Within time specified after issuance of a competitive lease or grant,
or within time specified after determination of no competitive interest, submit copies of SAP, including required information to
assist BSEE to comply with NEPA/CZMA such as hazard info, air
quality, SMS, and all required information, certifications, requests, etc., in format specified.
48 ......................
2 SAPs ..................
96
** 621; 632; 637; 810 ....................
If requesting an operations term for commercial lease, within time
specified before the end of site assessment term, submit copies
of COP, or FERC license application, including required information to assist BSEE to comply with NEPA/CZMA such as hazard
info, air quality, SMS, and all required information, surveys and/
or their results, reports, certifications, project easements, supporting data and information, requests, etc., in format specified.
200 ....................
2 COPs ..................
400
** 641; 651; 810 ............................
Within time specified after issuance of a competitive lease or grant,
or within time specified after determination of no competitive interest, submit copies of GAP, including required information to
assist BSEE to comply with NEPA/CZMA such as hazard info, air
quality, SMS, and all required information, surveys and reports,
certifications, project easements, requests, etc., in format specified.
48 ......................
2 GAPs ..................
96
** 632(c); 907 ................................
Submit revised or modified COPs, including project easements,
and all required additional information.
10 ......................
1 revised or modified COP.
10
602 ................................................
Until BSEE releases financial assurance, respondents must maintain, and provide to BSEE if requested, all data and information
related to compliance with required terms and conditions of SAP,
COP, or GAP.2
2 ........................
9 records/submissions.
18
615; 800(b) ...................................
Submit annual, or at other time periods as BSEE determines, SAP
compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc.
40 ......................
4 certifications .......
160
633; 800(b) ...................................
Submit annual, or at other time periods as BOEM/BSEE determines, COP compliance certification, effectiveness statement,
recommendations, reports, supporting documentation, etc.
45 ......................
9 certifications .......
405
636(a) ............................................
Notify BSEE in writing no later than 30 days after commencing activities associated with placement of facilities on lease area.
1 ........................
2 notices ................
2
636(b) ............................................
Notify BSEE in writing no later than 30 days after completion of
construction and installation activities.
1 ........................
2 notices ................
2
636(c) ............................................
Notify BSEE in writing at least 7 days before commencing commercial operations.
1 ........................
1 notice ..................
1
651 ................................................
Before beginning construction of OCS facility described in GAP,
demonstrate operational SMS identified in GAP, submit initial
findings.
27.5 ...................
2 notices ................
55
653(a), (b); 800(b) ........................
Submit annual, or at other time periods as BSEE determines, GAP
compliance certification, recommendations, reports, etc.
40 ......................
4 certifications .......
160
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
44838
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour burden
Average number of
annual responses
Annual burden
hours
Subpart G—Facility Design, Fabrication, and Installation
*** indicate the primary cites for
the reports discussed in this
subpart, and the burdens include any previous or subsequent references throughout
part 285 to submitting and obtaining approval. This subpart
contains references to other information submissions, approvals, requests, applications,
plans, etc., the burdens for
which are covered elsewhere in
part 285.
*** 700(a) (1), (c); 701 ...................
Submit Facility Design Report, including copies of the cover letter,
certification statement, and all required information (1–3 paper or
electronic copies as specified).
200 ....................
1 report ..................
200
*** 700(a)(2), (c); 702 ....................
Submit Fabrication and Installation Report, including copies of the
cover letter, certification statement, and all required information,
in format specified.
160 ....................
1 report ..................
160
705(a); 707(a); 712 .......................
Certified Verification Agent (CVA) conducts independent assessment of the facility design and submits copies of all reports/certifications to lessee or grant holder and BSEE—interim reports if
required, in format specified.
100 ....................
100 ....................
1 interim report ......
1 final report ..........
100
100
705(a); 707(b); 708; 709; 710;
712; 637.
CVA conducts independent assessments/inspections on the fabrication and installation activities, informs lessee or grant holder if
procedures are changed or design specifications are modified;
and submits copies of all reports/certifications to lessee or grant
holder and BSEE—interim reports if required, in format specified.
100 ....................
100 ....................
1 interim report ......
1 final report ..........
100
100
*** 703; 705(a); 712; 815 ..............
CVA/project engineer monitors major project modifications and repairs and submits copies of all reports/certifications to lessee or
grant holder and BSEE—interim reports if required, in format
specified.
20 ......................
15 ......................
1 interim report ......
1 final report ..........
20
15
705(b), (c) .....................................
Request waiver of CVA requirement in writing; lessee must demonstrate standard design and best practices.
16 ......................
1 waiver .................
16
706 ................................................
Submit for approval with SAP, COP, or GAP, initial nominations for
a CVA or new replacement CVA nomination and required information.
6.5 .....................
2 nominations ........
13
708(b)(2) .......................................
Notify BSEE if modifications identified by CVA/project engineer are
accepted.
1 ........................
1 notice ..................
1
709(a); 710 ...................................
Make fabrication quality control, installation towing, and other
records available to CVA/project engineer for review (retention
required by § 285.714).
1 ........................
3 records ...............
3
713 ................................................
Notify BSEE within 10 business days after commencing commercial operations.
1 ........................
1 notice ..................
1
714; 703(b) ...................................
Until BOEM releases financial assurance, compile, retain, and
make available to BSEE and/or CVA the as-built drawings, design assumptions/analyses, summary of fabrication and installation examination records, inspection results, and records of repairs not covered in inspection report. Record original and relevant material test results of all primary structural materials; retain records during all stages of construction 2.
100 ....................
1 lessee .................
100
ddrumheller on DSK120RN23PROD with NOTICES1
Subpart H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs, and GAPs
802(a); 902(e) ...............................
Notify BSEE of archaeological resource within 72 hours of discovery.
3 ........................
1 notice ..................
3
802(d) ............................................
If applicable, submit payment for BSEE costs in carrying out National Historic Preservation Act responsibilities.
.5 .......................
1 payment .............
1
810; 614(b); 632(b); 651 ...............
Submit safety management system description with the SAP, COP,
or GAP.
30 ......................
2 submissions .......
60
813(b)(1) .......................................
Report within 24 hours when any required equipment taken out of
service for more than 12 hours; provide written confirmation if reported orally.
.5 .......................
1 ........................
2 reports ................
1 written confirmation.
1
1
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
44839
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
BURDEN TABLE—Continued
Reporting and recordkeeping requirement 1
Citations in 30 CFR 285
Hour burden
Average number of
annual responses
Annual burden
hours
813(b)(3) .......................................
Notify BSEE when equipment returned to service; provide written
confirmation if reported orally.
.5 .......................
2 notices ................
1
815 ................................................
When required, analyze cable, P/L, or facility damage or failures to
determine cause and as soon as available submit comprehensive written report.
1.5 .....................
1 report ..................
2
816 ................................................
Submit plan of corrective action report on observed detrimental effects on cable, P/L, or facility within 30 days of discovery; take
remedial action and submit report of remedial action within 30
days after completion.
2 ........................
1 plan/report ..........
2
822 ................................................
Maintain records of design, construction, operation, maintenance,
repairs, and investigation on or related to lease or ROW/RUE
area; make available to BSEE for inspection 2.
1 ........................
4 records retention
4
823 ................................................
Request reimbursement within 90 days for food, quarters, and
transportation provided to BSEE reps during inspection.
2 ........................
1 request ...............
2
824(a) ............................................
Develop annual self-inspection plan covering all facilities; retain
with records and make available to BSEE upon request.
24 ......................
2 plans ...................
48
824(b) ............................................
Conduct annual self-inspection and submit report by November 1 ..
36 ......................
2 reports ................
72
825 ................................................
Based on API RP 2A–WSD, perform assessment of structures, initiate mitigation actions for structures that do not pass assessment process, retain information, and make available to BSEE
upon request..
60 ......................
2 assessments/actions.
120
830(a), (c); 831 thru 833 ..............
Immediately report incidents to BSEE via oral communications,
submit written follow-up report within 15 business days after the
incident, and submit any required additional information..
.5 Oral ...............
4 Written ............
2 incidents .............
1 incident ...............
1
4
830(d) ............................................
Report oil spills as required by BSEE 30 CFR part 254. ..................
2 ........................
1 report ..................
2
Subpart I—Decommissioning
**** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for
which are covered elsewhere in parts 285.
**** 902; 905, 906; 907; 908(b),
(c); 909; 638(a).
Submit for approval, in format specified, copies of the SAP, COP,
or GAP decommissioning application and site clearance plan at
least 2 years before decommissioning activities begin, 90 days
after completion of activities, or 90 days after cancellation, relinquishment, or other termination of lease or grant. Include documentation of coordination efforts regarding requests that certain
facilities remain in place for other activities, be converted to an
artificial reef, or be toppled in place. Submit additional information/evidence requested or modify and resubmit application.
19 ......................
1 application ..........
19
902(d); 908(a) ...............................
Notify BSEE at least 60 days before commencing decommissioning
activities.
1 ........................
1 notice ..................
1
910(b) ............................................
Within 60 days after removing a facility, verify to BSEE that site is
cleared.
1 ........................
1 verification ..........
1
912 ................................................
Within 60 days after removing a facility, cable, or pipeline, submit a
written report.
8 ........................
1 report ..................
8
BSEE does not anticipate decommissioning activities for at least 5 years, so the requirements have been given a minimal burden.
Total Burden
103 Responses .....
8,908 Hours.
ddrumheller on DSK120RN23PROD with NOTICES1
$1,908,000 Non-Hour Costs Burdens.
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
PO 00000
Frm 00065
Fmt 4703
Sfmt 9990
E:\FR\FM\13JYN1.SGM
13JYN1
44840
Federal Register / Vol. 88, No. 133 / Thursday, July 13, 2023 / Notices
An agency may not conduct, or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
The authority for this action is the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.).
Kirk Malstrom,
Chief, Regulations and Standards Branch.
[FR Doc. 2023–14812 Filed 7–12–23; 8:45 am]
BILLING CODE 4310–VH–P
INTERNATIONAL TRADE
COMMISSION
[Investigation No. 337–TA–1347]
Certain Location-Sharing Systems,
Related Software, Components
Thereof, and Products Containing
Same; Notice of Commission
Determination Not To Review Three
Initial Determinations Terminating the
Investigation as to Certain
Respondents and in Its Entirety;
Termination of the Investigation
U.S. International Trade
Commission.
ACTION: Notice.
AGENCY:
Notice is hereby given that
the U.S. International Trade
Commission has determined not to
review three initial determinations
(‘‘IDs’’) of the presiding administrative
law judge (‘‘ALJ’’) that terminate the
above-captioned investigation as to: (1)
respondent OnePlus Technology
(Shenzhen) Co., Ltd. based on
settlement (Order No. 24); (2)
respondents Xiaomi Corporation,
Xiaomi H.K. Ltd., Xiaomi
Communications Co., Ltd., and Xiaomi
Inc. based on settlement (Order No. 25);
and (3) the remaining respondents based
on withdrawal of the complaint (Order
No. 26). The investigation is terminated.
FOR FURTHER INFORMATION CONTACT:
Richard P. Hadorn, Esq., Office of the
General Counsel, U.S. International
Trade Commission, 500 E Street SW,
Washington, DC 20436, telephone (202)
205–3179. Copies of non-confidential
documents filed in connection with this
investigation may be viewed on the
Commission’s electronic docket (EDIS)
at https://edis.usitc.gov. For help
accessing EDIS, please email
EDIS3Help@usitc.gov. General
information concerning the Commission
may also be obtained by accessing its
internet server at https://www.usitc.gov.
Hearing-impaired persons are advised
that information on this matter can be
obtained by contacting the
ddrumheller on DSK120RN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
17:24 Jul 12, 2023
Jkt 259001
Commission’s TDD terminal, telephone
(202) 205–1810.
SUPPLEMENTARY INFORMATION: The
Commission instituted this investigation
on December 30, 2022, based on a
complaint filed by Advanced Ground
Information Systems, Inc. of Jupiter,
Florida and AGIS Software
Development LLC of Marshall, Texas
(collectively, ‘‘AGIS’’). 87 FR 80568–69
(Dec. 30, 2022). The complaint, as
supplemented, alleges violations of
section 337 of the Tariff Act of 1930, as
amended, 19 U.S.C. 1337, based on the
importation into the United States, the
sale for importation, and the sale within
the United States after importation of
certain location-sharing systems, related
software, components thereof, and
products containing same by reason of
the infringement of certain claims of
U.S. Patent Nos. 8,213,970 (‘‘the ’970
patent’’); 9,445,251 (‘‘the ’251 patent’’);
9,467,838 (‘‘the ’838 patent’’); 9,749,829
(‘‘the ’829 patent’’); and 9,820,123 (‘‘the
’123 patent’’). Id. at 80568. The
complaint further alleges that a
domestic industry exists. Id.
The notice of investigation named 26
respondents: (1) Kyocera Corporation
(‘‘Kyocera’’) of Kyoto, Japan; (2)
OnePlus Technology (Shenzhen) Co.,
Ltd. (‘‘OnePlus’’) of Shenzhen,
Guangdong, China; (3) Xiaomi
Corporation of Grand Cayman, Cayman
Islands; Xiaomi H.K. Ltd. of Kowloon
City, Hong Kong; Xiaomi
Communications Co., Ltd. of Beijing,
China; and Xiaomi Inc. of Beijing, China
(collectively, ‘‘Xiaomi’’); and (4) Google
LLC of Mountain View, California;
Samsung Electronics, Co., Ltd. of
Suwon, Republic of Korea; Samsung
Electronics America, Inc. of Ridgefield
Park, New Jersey; TCL Technology
Group Corporation of Huizhou,
Guangdong, China; TCL Electronics
Holdings Limited of Hong Kong Science
Park, Hong Kong; TCL Communication
Technology Holdings Limited of Hong
Kong Science Park, Hong Kong; TCT
Mobile (US) Inc. of Irvine, California;
Lenovo Group Ltd. of Beijing, China;
Lenovo (United States) Inc. of
Morrisville, North Carolina; Motorola
Mobility LLC of Chicago, Illinois; HMD
Global of Espoo, Finland; HMD Global
OY of Espoo, Finland; HMD America,
Inc. of Miami, Florida; Sony
Corporation of Tokyo, Japan; Sony
Mobile Communications, Inc. of Tokyo,
Japan; ASUSTek Computer Inc. of
Taipei, Taiwan; ASUS Computer
International of Fremont, California;
BLU Products of Doral, Florida;
Panasonic Corporation of Osaka, Japan;
Panasonic Corporation of North
America of Secaucus, New Jersey
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
(collectively, the ‘‘Remaining
Respondents’’). Id. at 80569. The Office
of Unfair Import Investigations (‘‘OUII’’)
is also named as a party. Id.
On February 17, 2023, the
Commission amended the complaint
and notice of investigation to substitute
Panasonic Holdings Corporation of
Osaka, Japan, in place of named
respondent Panasonic Corporation.
Order No. 7 (Feb. 1, 2023), unreviewed
by 88 FR 11477 (Feb. 23, 2023).
On June 6, 2023, the Commission
terminated the investigation as to the
following asserted claims based on
withdrawal: (i) claim 2 of the ’970
patent; (ii) claims 1–2, 7–8, 23, 25, 29–
30, and 35 of the ’251 patent; (iii) claims
3, 5–8, 10, 16, 19, 38, 40, 55–56, 61–64,
68, 71–72, 80 and 84 of the ’838 patent;
(iv) claims 1, 8, 34, and 41 of the ’829
patent; and (v) claim 14 of the ’123
patent. Order No. 16 (May 17, 2023),
unreviewed by Comm’n Notice (June 6,
2023).
On June 27, 2023, the Commission
terminated the investigation as to
Kyocera based on settlement. Order No.
19, unreviewed by Comm’n Notice (June
27, 2023).
On June 14, 2023, AGIS and OnePlus
filed a joint motion to terminate the
investigation as to OnePlus based on a
settlement agreement. On June 16, 2023,
OUII filed a response supporting the
motion. No other responses to the
motion were filed.
On June 15, 2023, AGIS and Xiaomi
filed a joint motion to terminate the
investigation as to Xiaomi based on a
settlement agreement. On June 16, 2023,
OUII filed a response supporting the
motion. No other responses to the
motion were filed.
On June 15, 2023, AGIS filed a motion
to terminate the investigation as to the
Remaining Respondents based on
withdrawal of the complaint. On June
16, 2023, OUII filed a response
supporting the motion. On June 20,
2023, the Remaining Respondents filed
a response stating that they do not
oppose the motion. No other responses
to the motion were filed.
On June 20, 2023, the ALJ issued all
three subject IDs (Order Nos. 24, 25, and
26). Order Nos. 24 and 25 grant the
unopposed joint motions to terminate
the investigation as to OnePlus and
Xiaomi, respectively, finding that the
motions comply with the requirements
of Commission Rule 210.21(b)(1) (19
CFR 210.21(b)(1)), and that the proposed
settlements do not adversely affect the
public interest in accordance with
Commission Rule 210.50(b)(2) (19 CFR
210.50(b)(2)). Order No. 24 at 2–3; Order
No. 25 at 2–3. Order No. 26 grants the
unopposed motion to terminate the
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
- DEPARTMENT OF THE INTERIOR
- Bureau of Safety and Environmental Enforcement
[Federal Register Volume 88, Number 133 (Thursday, July 13, 2023)]
[Notices]
[Pages 44834-44840]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-14812]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental Enforcement
[Docket ID BSEE-2023-0013; EEEE500000 234E1700D2 ET1SF0000.EAQ000; OMB
Control Number 1014-0034]
Agency Information Collection Activities; Renewable Energy and
Alternate Uses of Existing Facilities on the Outer Continental Shelf
AGENCY: Bureau of Safety and Environmental Enforcement, Interior.
ACTION: Notice of information collection; request for comment.
-----------------------------------------------------------------------
SUMMARY: In accordance with the Paperwork Reduction Act (PRA) of 1995,
the Bureau of Safety and Environmental Enforcement (BSEE) proposes to
renew an information collection with revisions.
DATES: Interested persons are invited to submit comments on or before
September 11, 2023.
ADDRESSES: Send your comments on this information collection request
(ICR) by either of the following methods listed below:
Electronically go to https://www.regulations.gov. In the
Search box, enter BSEE-2023-0013 then click search. Follow the
instructions to submit public comments and view all related materials.
We will post all comments.
Email [email protected], fax (703) 787-1546, or mail or
hand-carry comments to the Department of the Interior; Bureau of Safety
and Environmental Enforcement; Regulations and Standards Branch; ATTN:
Nikki Mason; 45600 Woodland Road, Sterling, VA 20166. Please reference
OMB Control Number 1014-0034 in the subject line of your comments.
FOR FURTHER INFORMATION CONTACT: To request additional information
about this ICR, contact Nikki Mason by email at [email protected] or
by telephone at (703) 787-1607. Individuals in the United States who
are deaf, deafblind, hard of hearing, or have a speech disability may
dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay
services. Individuals outside the United States should use the relay
services offered within their country to make international calls to
the point-of-contact in the United States. You may also view the ICR at
https://www.reginfo.gov/public/do/PRAMain.
SUPPLEMENTARY INFORMATION: In accordance with the PRA and 5 CFR
[[Page 44835]]
1320.8(d)(1), all information collections require approval under the
PRA. We may not conduct, or sponsor and you are not required to respond
to a collection of information unless it displays a currently valid OMB
control number.
As part of our continuing effort to reduce paperwork and respondent
burdens, we invite the public and other Federal agencies to comment on
new, proposed, revised, and continuing collections of information. This
helps us assess the impact of our information collection requirements
and minimize the public's reporting burden. It also helps the public
understand our information collection requirements and provide the
requested data in the desired format.
We are especially interested in public comment addressing the
following:
(1) Whether or not the collection of information is necessary for
the proper performance of the functions of the agency, including
whether or not the information will have practical utility;
(2) The accuracy of our estimate of the burden for this collection
of information, including the validity of the methodology and
assumptions used;
(3) Ways to enhance the quality, utility, and clarity of the
information to be collected; and
(4) How might the agency minimize the burden of the collection of
information on those who are to respond, including through the use of
appropriate automated, electronic, mechanical, or other technological
collection techniques or other forms of information technology, e.g.,
permitting electronic submission of response.
Comments that you submit in response to this notice are a matter of
public record. We will include or summarize each comment in our request
to OMB to approve this ICR. Before including your address, phone
number, email address, or other personal identifying information in
your comment, you should be aware that your entire comment--including
your personal identifying information--may be made publicly available
at any time. While you can ask us in your comment to withhold your
personal identifying information from public review, we cannot
guarantee that we will be able to do so.
Abstract: BSEE will use the information to oversee facility design,
fabrication, installation, and safety management systems; ensure the
safety of operations, including inspection programs and incident
reporting and investigations; enforce compliance with all applicable
safety, environmental, and other laws and regulations through
enforcement actions (such as noncompliance notices, cessation orders,
and certain lease suspensions); and oversee decommissioning activities.
These responsibilities include enforcement provisions under the
existing part 285, subpart D, various information submittal
requirements under Subpart F, as well as provisions governing
activities conducted under an approved plan, including the design,
construction, operation, and decommissioning of facilities under
subparts G, H, and I. The requirements for and standards of review
regarding the Facility Design Report (FDR) and Facility Fabrication and
Installation Report (FIR) are unchanged: the FDR and FIR will continue
to be evaluated for consistency with the Construction and Operations
Plan (COP) and applicable engineering standards. Decommissioning
requirements related to rights-of-use and easement for alternate uses
of existing OCS facilities (Alternate Use RUE) have also been
transferred from the existing subpart J to part 285.
BSEE assumes the responsibility for ordering a lease or grant
suspension when continued activities pose an imminent threat of serious
or irreparable harm or damage to natural resources, life, property, the
marine coastal, or human environment, or sites, structures, or objects
of historical or archaeological significance. BSEE may also order a
suspension when necessary to comply with a judicial decree. Under the
rule, BSEE also assumes authority to issue cessation orders to address
noncompliance on the part of the grantee or lessee.
The Department does not issue Suspensions for Alternate Use RUEs
upon the grantee's request, but only by order. BOEM will retain
authority to order suspensions required for National security, and BSEE
will assume authority to order suspensions to address a threat of harm
from continued operations. Either bureau may order a suspension when
necessary to comply with a judicial decree. BSEE will order suspensions
when operations are halted on the existing facility and BSEE determines
continuation of the alternate use is unsafe or causes undue
interference with the facility.
Part 285, subpart D, Lease and Grant Administration, includes the
authority to issue notices of noncompliance (NONCs) and cessation
orders, and to pursue civil penalties and recommend criminal penalties.
BSEE assumes authority for oversight and enforcement of the design,
construction, operation, and decommissioning phases of offshore wind
development, as well as enforcement of requirements related to
Alternate Use RUEs.
This ICR includes a new form:
Form BSEE-1835, Notification of Noncompliance (NONC).
BSEE will use the information to determine that respondents have
corrected all Notifications of Noncompliance (NONCs) identified during
inspections. Everything on the NONC form is filled out by a BSEE
inspector/representative. The only thing industry does with this form
is sign the document upon receipt and respond to BSEE when each NONC
has been corrected. Dependent on the severity of the non-compliance
identified by the BSEE inspector, the responses are assigned different
intervals and are described in the form table titled Enforcement
Timeline:
1--At Time of Inspection
14--Within 14 Days
30--Within 30 Days
50--Prior to Returning to Service/Operation
60--Prior to Next Scheduled Maintenance
70--During Next Scheduled Maintenance
80--Prior to Next scheduled Audit
90--During Next Scheduled Audit
Title of Collection: 30 CFR part 285, Renewable Energy and
Alternate Uses of Existing Facilities on the Outer Continental Shelf.
OMB Control Number: 1014-0034.
Form Number: Form BSEE-1835, Notice(s) of Noncompliance.
Type of Review: Revision of a currently approved collection.
Respondents/Affected Public: Primary respondents comprise Federal
OCS companies that submit unsolicited proposals or responses to Federal
Register notices; or are lessees, designated operators, and ROW or RUE
grant holders. Other potential respondents are companies or state and
local governments that submit information or comments relative to
alternative energy-related uses of the OCS; certified verification
agents (CVAs); and surety or third-party guarantors.
Total Estimated Number of Annual Respondents: Currently there are
approximately 47 Lessees in the OCS. Not all the potential respondents
will submit information in any given year, and some may submit multiple
times.
Total Estimated Number of Annual Responses: 103.
Estimated Completion Time per Response: Varies from 30 minutes to
6,000 hours, depending on activity.
Total Estimated Number of Annual Burden Hours: 8,908.
[[Page 44836]]
Respondent's Obligation: Responses are mandatory and are required
to obtain or retain a benefit.
Frequency of Collection: generally occasional or annual.
Total Estimated Annual Nonhour Burden Cost: $1,908,000.
Burden Table
----------------------------------------------------------------------------------------------------------------
Reporting and
Citations in 30 CFR 285 recordkeeping Hour burden Average number of Annual burden
requirement \1\ annual responses hours
----------------------------------------------------------------------------------------------------------------
Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102; 105; 110............... These sections contain general references to submitting comments, requests,
applications, plans, notices, reports, and/or supplemental information for BSEE
approval--burdens covered under specific requirements.
----------------------------------------------------------------------------------------------------------------
103; 904.................... Request general .5................ 6 requests.......... 3
departures not
specifically
covered elsewhere
in part 285.
----------------------------------------------------------------------------------------------------------------
105(c)...................... Make oral requests 1................. 2 requests.......... 2
or notifications
and submit written
follow up within 3
business days not
specifically
covered elsewhere
in part 285.
----------------------------------------------------------------------------------------------------------------
1016........................ Request Requirement not considered IC under 5 0
reconsideration and/ CFR 1320.3(h)(9).
or hearing..
----------------------------------------------------------------------------------------------------------------
111(b)(3); (b)(5); (b)(6)... Within 30 days of .5................ 2 submissions....... 1
receiving bill,
submit processing
fee payments for
BSEE document or
study preparation
to process
applications and
other requests.
-----------------------------------------
2 payments x $4,000 = $8,000.
----------------------------------------------------------------------------------------------------------------
111(b)(2), (3).............. Submit comments on 2................. 2 requests.......... 4
proposed processing
fee or request
approval to perform
or directly pay
contractors for all
or part of any
document, study, or
other activity, to
reduce BSEE
processing costs.
----------------------------------------------------------------------------------------------------------------
111(b)(3)................... Perform, conduct, 6,000............. 1 submission........ 6,000
develop, etc., all
or part of any
document, study, or
other activity; and
provide results to
BSEE to reduce BSEE
processing fee. Pay
processing fee for
all or part of any
document, study, or
other activity, and
provide results to
BSEE to reduce BSEE
processing costs.
-----------------------------------------
1 contractor payment x $950,000 =
$950,000.
----------------------------------------------------------------------------------------------------------------
111(b)(7)................... Appeal BSEE Exempt under 5 CFR 1320.4(a)(2), (c). 0
estimated
processing costs,
decisions, or
orders pursuant to
30 CFR 290.
----------------------------------------------------------------------------------------------------------------
115......................... Request approval to 1................. 1 request........... 1
use later edition
of a document
incorporated by
reference or
alternative
compliance.
----------------------------------------------------------------------------------------------------------------
118......................... Request appeal Requirement not considered IC under 5 0
within 15 days of CFR 1320.3(h)(9).
bid rejection,
request
reconsideration of
bid decision or
rejection.
----------------------------------------------------------------------------------------------------------------
Subpart B--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart C--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart D--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 401; 402 NONCs......... These sections contain references to information submissions, 0
approvals, requests, applications, plans, payments, etc., the
burdens for which are covered elsewhere in part 285.
----------------------------------------------------------------------------------------------------------------
401(b)...................... Take measures 100............... 1 report............ 100
directed by BSEE in
cessation order and
submit reports to
resume activities.
----------------------------------------------------------------------------------------------------------------
417(b)...................... Conduct, and if 110............... 1 study/submission.. 110
required pay for,
site-specific study
to evaluate cause
of harm or damage;
and submit copies
of study and
results, in format
specified.
-----------------------------------------
1 study x $950,000 = $950,000.
----------------------------------------------------------------------------------------------------------------
437......................... Provide information Requirement not considered IC under 5 0
for reconsideration CFR 1320.3(h)(9).
of BSEE decision to
contract or cancel
lease or grant area.
----------------------------------------------------------------------------------------------------------------
[[Page 44837]]
Subpart E--Reserved
----------------------------------------------------------------------------------------------------------------
Subpart F--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
** indicate the primary
cites for Site Assessment
Plans (SAPs), Construction
and Operations Plans
(COPs), and General
Activities Plans (GAPs);
and the burdens include any
previous or subsequent
references throughout part
285 to submission and
approval. This subpart
contains references to
other information
submissions, approvals,
requests, applications,
plans, etc., the burdens
for which are covered
elsewhere in part 285.
----------------------------------------------------------------------------------------------------------------
** 606; 614; 810............ Within time 48................ 2 SAPs.............. 96
specified after
issuance of a
competitive lease
or grant, or within
time specified
after determination
of no competitive
interest, submit
copies of SAP,
including required
information to
assist BSEE to
comply with NEPA/
CZMA such as hazard
info, air quality,
SMS, and all
required
information,
certifications,
requests, etc., in
format specified.
----------------------------------------------------------------------------------------------------------------
** 621; 632; 637; 810....... If requesting an 200............... 2 COPs.............. 400
operations term for
commercial lease,
within time
specified before
the end of site
assessment term,
submit copies of
COP, or FERC
license
application,
including required
information to
assist BSEE to
comply with NEPA/
CZMA such as hazard
info, air quality,
SMS, and all
required
information,
surveys and/or
their results,
reports,
certifications,
project easements,
supporting data and
information,
requests, etc., in
format specified.
----------------------------------------------------------------------------------------------------------------
** 641; 651; 810............ Within time 48................ 2 GAPs.............. 96
specified after
issuance of a
competitive lease
or grant, or within
time specified
after determination
of no competitive
interest, submit
copies of GAP,
including required
information to
assist BSEE to
comply with NEPA/
CZMA such as hazard
info, air quality,
SMS, and all
required
information,
surveys and
reports,
certifications,
project easements,
requests, etc., in
format specified.
----------------------------------------------------------------------------------------------------------------
** 632(c); 907.............. Submit revised or 10................ 1 revised or 10
modified COPs, modified COP.
including project
easements, and all
required additional
information.
----------------------------------------------------------------------------------------------------------------
602......................... Until BSEE releases 2................. 9 records/ 18
financial submissions.
assurance,
respondents must
maintain, and
provide to BSEE if
requested, all data
and information
related to
compliance with
required terms and
conditions of SAP,
COP, or GAP.\2\
----------------------------------------------------------------------------------------------------------------
615; 800(b)................. Submit annual, or at 40................ 4 certifications.... 160
other time periods
as BSEE determines,
SAP compliance
certification,
effectiveness
statement,
recommendations,
reports, supporting
documentation, etc.
----------------------------------------------------------------------------------------------------------------
633; 800(b)................. Submit annual, or at 45................ 9 certifications.... 405
other time periods
as BOEM/BSEE
determines, COP
compliance
certification,
effectiveness
statement,
recommendations,
reports, supporting
documentation, etc.
----------------------------------------------------------------------------------------------------------------
636(a)...................... Notify BSEE in 1................. 2 notices........... 2
writing no later
than 30 days after
commencing
activities
associated with
placement of
facilities on lease
area.
----------------------------------------------------------------------------------------------------------------
636(b)...................... Notify BSEE in 1................. 2 notices........... 2
writing no later
than 30 days after
completion of
construction and
installation
activities.
----------------------------------------------------------------------------------------------------------------
636(c)...................... Notify BSEE in 1................. 1 notice............ 1
writing at least 7
days before
commencing
commercial
operations.
----------------------------------------------------------------------------------------------------------------
651......................... Before beginning 27.5.............. 2 notices........... 55
construction of OCS
facility described
in GAP, demonstrate
operational SMS
identified in GAP,
submit initial
findings.
----------------------------------------------------------------------------------------------------------------
653(a), (b); 800(b)......... Submit annual, or at 40................ 4 certifications.... 160
other time periods
as BSEE determines,
GAP compliance
certification,
recommendations,
reports, etc.
----------------------------------------------------------------------------------------------------------------
[[Page 44838]]
Subpart G--Facility Design, Fabrication, and Installation
----------------------------------------------------------------------------------------------------------------
*** indicate the primary
cites for the reports
discussed in this subpart,
and the burdens include any
previous or subsequent
references throughout part
285 to submitting and
obtaining approval. This
subpart contains references
to other information
submissions, approvals,
requests, applications,
plans, etc., the burdens
for which are covered
elsewhere in part 285.
----------------------------------------------------------------------------------------------------------------
*** 700(a) (1), (c); 701.... Submit Facility 200............... 1 report............ 200
Design Report,
including copies of
the cover letter,
certification
statement, and all
required
information (1-3
paper or electronic
copies as
specified).
----------------------------------------------------------------------------------------------------------------
*** 700(a)(2), (c); 702..... Submit Fabrication 160............... 1 report............ 160
and Installation
Report, including
copies of the cover
letter,
certification
statement, and all
required
information, in
format specified.
----------------------------------------------------------------------------------------------------------------
705(a); 707(a); 712......... Certified 100............... 1 interim report.... 100
Verification Agent 100............... 1 final report...... 100
(CVA) conducts
independent
assessment of the
facility design and
submits copies of
all reports/
certifications to
lessee or grant
holder and BSEE--
interim reports if
required, in format
specified.
----------------------------------------------------------------------------------------------------------------
705(a); 707(b); 708; 709; CVA conducts 100............... 1 interim report.... 100
710; 712; 637. independent 100............... 1 final report...... 100
assessments/
inspections on the
fabrication and
installation
activities, informs
lessee or grant
holder if
procedures are
changed or design
specifications are
modified; and
submits copies of
all reports/
certifications to
lessee or grant
holder and BSEE--
interim reports if
required, in format
specified.
----------------------------------------------------------------------------------------------------------------
*** 703; 705(a); 712; 815... CVA/project engineer 20................ 1 interim report.... 20
monitors major 15................ 1 final report...... 15
project
modifications and
repairs and submits
copies of all
reports/
certifications to
lessee or grant
holder and BSEE--
interim reports if
required, in format
specified.
----------------------------------------------------------------------------------------------------------------
705(b), (c)................. Request waiver of 16................ 1 waiver............ 16
CVA requirement in
writing; lessee
must demonstrate
standard design and
best practices.
----------------------------------------------------------------------------------------------------------------
706......................... Submit for approval 6.5............... 2 nominations....... 13
with SAP, COP, or
GAP, initial
nominations for a
CVA or new
replacement CVA
nomination and
required
information.
----------------------------------------------------------------------------------------------------------------
708(b)(2)................... Notify BSEE if 1................. 1 notice............ 1
modifications
identified by CVA/
project engineer
are accepted.
----------------------------------------------------------------------------------------------------------------
709(a); 710................. Make fabrication 1................. 3 records........... 3
quality control,
installation
towing, and other
records available
to CVA/project
engineer for review
(retention required
by Sec. 285.714).
----------------------------------------------------------------------------------------------------------------
713......................... Notify BSEE within 1................. 1 notice............ 1
10 business days
after commencing
commercial
operations.
----------------------------------------------------------------------------------------------------------------
714; 703(b)................. Until BOEM releases 100............... 1 lessee............ 100
financial
assurance, compile,
retain, and make
available to BSEE
and/or CVA the as-
built drawings,
design assumptions/
analyses, summary
of fabrication and
installation
examination
records, inspection
results, and
records of repairs
not covered in
inspection report.
Record original and
relevant material
test results of all
primary structural
materials; retain
records during all
stages of
construction \2\.
----------------------------------------------------------------------------------------------------------------
Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
802(a); 902(e).............. Notify BSEE of 3................. 1 notice............ 3
archaeological
resource within 72
hours of discovery.
----------------------------------------------------------------------------------------------------------------
802(d)...................... If applicable, .5................ 1 payment........... 1
submit payment for
BSEE costs in
carrying out
National Historic
Preservation Act
responsibilities.
----------------------------------------------------------------------------------------------------------------
810; 614(b); 632(b); 651.... Submit safety 30................ 2 submissions....... 60
management system
description with
the SAP, COP, or
GAP.
----------------------------------------------------------------------------------------------------------------
813(b)(1)................... Report within 24 .5................ 2 reports........... 1
hours when any 1................. 1 written 1
required equipment confirmation.
taken out of
service for more
than 12 hours;
provide written
confirmation if
reported orally.
----------------------------------------------------------------------------------------------------------------
[[Page 44839]]
813(b)(3)................... Notify BSEE when .5................ 2 notices........... 1
equipment returned
to service; provide
written
confirmation if
reported orally.
----------------------------------------------------------------------------------------------------------------
815......................... When required, 1.5............... 1 report............ 2
analyze cable, P/L,
or facility damage
or failures to
determine cause and
as soon as
available submit
comprehensive
written report.
----------------------------------------------------------------------------------------------------------------
816......................... Submit plan of 2................. 1 plan/report....... 2
corrective action
report on observed
detrimental effects
on cable, P/L, or
facility within 30
days of discovery;
take remedial
action and submit
report of remedial
action within 30
days after
completion.
----------------------------------------------------------------------------------------------------------------
822......................... Maintain records of 1................. 4 records retention. 4
design,
construction,
operation,
maintenance,
repairs, and
investigation on or
related to lease or
ROW/RUE area; make
available to BSEE
for inspection \2\.
----------------------------------------------------------------------------------------------------------------
823......................... Request 2................. 1 request........... 2
reimbursement
within 90 days for
food, quarters, and
transportation
provided to BSEE
reps during
inspection.
----------------------------------------------------------------------------------------------------------------
824(a)...................... Develop annual self- 24................ 2 plans............. 48
inspection plan
covering all
facilities; retain
with records and
make available to
BSEE upon request.
----------------------------------------------------------------------------------------------------------------
824(b)...................... Conduct annual self- 36................ 2 reports........... 72
inspection and
submit report by
November 1.
----------------------------------------------------------------------------------------------------------------
825......................... Based on API RP 2A- 60................ 2 assessments/ 120
WSD, perform actions.
assessment of
structures,
initiate mitigation
actions for
structures that do
not pass assessment
process, retain
information, and
make available to
BSEE upon request..
----------------------------------------------------------------------------------------------------------------
830(a), (c); 831 thru 833... Immediately report .5 Oral........... 2 incidents......... 1
incidents to BSEE 4 Written......... 1 incident.......... 4
via oral
communications,
submit written
follow-up report
within 15 business
days after the
incident, and
submit any required
additional
information..
----------------------------------------------------------------------------------------------------------------
830(d)...................... Report oil spills as 2................. 1 report............ 2
required by BSEE 30
CFR part 254..
----------------------------------------------------------------------------------------------------------------
Subpart I--Decommissioning
----------------------------------------------------------------------------------------------------------------
**** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous
or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains
references to other information submissions, approvals, requests, applications, plans, etc., the burdens for
which are covered elsewhere in parts 285.
----------------------------------------------------------------------------------------------------------------
**** 902; 905, 906; 907; Submit for approval, 19................ 1 application....... 19
908(b), (c); 909; 638(a). in format
specified, copies
of the SAP, COP, or
GAP decommissioning
application and
site clearance plan
at least 2 years
before
decommissioning
activities begin,
90 days after
completion of
activities, or 90
days after
cancellation,
relinquishment, or
other termination
of lease or grant.
Include
documentation of
coordination
efforts regarding
requests that
certain facilities
remain in place for
other activities,
be converted to an
artificial reef, or
be toppled in
place. Submit
additional
information/
evidence requested
or modify and
resubmit
application.
----------------------------------------------------------------------------------------------------------------
902(d); 908(a).............. Notify BSEE at least 1................. 1 notice............ 1
60 days before
commencing
decommissioning
activities.
----------------------------------------------------------------------------------------------------------------
910(b)...................... Within 60 days after 1................. 1 verification...... 1
removing a
facility, verify to
BSEE that site is
cleared.
----------------------------------------------------------------------------------------------------------------
912......................... Within 60 days after 8................. 1 report............ 8
removing a
facility, cable, or
pipeline, submit a
written report.
----------------------------------------------------------------------------------------------------------------
BSEE does not anticipate decommissioning activities for at least 5 years, so the requirements have been given a
minimal burden.
----------------------------------------------------------------------------------------------------------------
Total Burden 103 Responses....... 8,908 Hours.
-----------------------------------------------------------------------------------
$1,908,000 Non-Hour Costs Burdens.
----------------------------------------------------------------------------------------------------------------
[[Page 44840]]
An agency may not conduct, or sponsor and a person is not required
to respond to a collection of information unless it displays a
currently valid OMB control number.
The authority for this action is the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).
Kirk Malstrom,
Chief, Regulations and Standards Branch.
[FR Doc. 2023-14812 Filed 7-12-23; 8:45 am]