Public Hearing, 44436-44437 [2023-14676]

Download as PDF 44436 Federal Register / Vol. 88, No. 132 / Wednesday, July 12, 2023 / Notices 15. Coterra Energy Inc.; Pad ID: BishopB P1; ABR–201305013.R2; Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: June 22, 2023. 16. Chesapeake Appalachia, L.L.C.; Pad ID: Spencer Drilling Pad; ABR– 201306010.R2; Lenox Township, Susquehanna County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: June 29, 2023. 17. Seneca Resources Company, LLC; Pad ID: Fuller 826; ABR–201606005.R1; Middlebury Township, Tioga County, Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: June 29, 2023. Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. Dated: July 6, 2023. Jason E. Oyler, General Counsel and Secretary to the Commission. BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing Susquehanna River Basin Commission. ACTION: Notice. AGENCY: The Susquehanna River Basin Commission will hold a public hearing on August 10, 2023. The Commission will hold this hearing in person and telephonically. At this public hearing, the Commission will hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION section of this notice. Such projects are intended to be scheduled for Commission action at its next business meeting, tentatively scheduled for September 14, 2023, which will be noticed separately. The public should note that this public hearing will be the only opportunity to offer oral comments to the Commission for the listed projects. The deadline for the submission of written comments is August 21, 2023. DATES: The public hearing will convene on August 10, 2023, at 6:30 p.m. The public hearing will end at 9:00 p.m. or at the conclusion of public testimony, whichever is earlier. The deadline for submitting written comments is Monday, August 21, 2023. ADDRESSES: This public hearing will be conducted in person and virtually. You may attend in person at Susquehanna River Basin Commission, 4423 N. Front St., Harrisburg, Pennsylvania, or join by telephone at Toll-Free Number 1–877– lotter on DSK11XQN23PROD with NOTICES1 VerDate Sep<11>2014 17:29 Jul 11, 2023 Jkt 259001 FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423 or joyler@srbc.net. Information concerning the project applications is available at the Commission’s Water Application and Approval Viewer at https:// www.srbc.net/waav. Additional supporting documents are available to inspect and copy in accordance with the Commission’s Access to Records Policy at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009–02.pdf. SUPPLEMENTARY INFORMATION: The public hearing will cover the following projects: Projects Scheduled for Action [FR Doc. 2023–14677 Filed 7–11–23; 8:45 am] SUMMARY: 304–9269 and then enter the guest passcode 2619070 followed by #. 1. Project Sponsor and Facility: Bent Creek Country Club, Manheim Township, Lancaster County, Pa. Applications for renewal of groundwater withdrawal of up to 0.464 mgd (30-day average) from Well 1 (600 Foot Well) and consumptive use of up to 0.464 mgd (peak day) (Docket No. 19920704). 2. Project Sponsor and Facility: BKV Operating, LLC (East Branch Wyalusing Creek), Jessup Township, Susquehanna County, Pa. Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20180902). 3. Project Sponsor: Borough of Middletown. Project Facility: Middletown Water System, Middletown Borough, Dauphin County, Pa. Application for renewal of groundwater withdrawal of up to 1.070 mgd (30-day average) from Well 6 (Docket No. 19970702). 4. Project Sponsor and Facility: Coterra Energy Inc. (Tunkhannock Creek), Nicholson Township, Wyoming County, Pa. Application for renewal of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 20180903). 5. Project Sponsor and Facility: Dillsburg Area Authority, Carroll Township, York County, Pa. Application for renewal of groundwater withdrawal of up to 0.460 mgd (30-day average) from Well 7 (Docket No. 20070907). 6. Project Sponsor and Facility: Eagle Lake Community Association, Covington Township, Lackawanna County, Pa. Applications for groundwater withdrawals (30-day averages) of up to 0.233 mgd from Well 1, 0.315 mgd from Well 2, and 0.104 mgd from Well 3. 7. Project Sponsor and Facility: East Berlin Area Joint Authority, Hamilton PO 00000 Frm 00187 Fmt 4703 Sfmt 4703 Township, Adams County, Pa. Application for renewal of groundwater withdrawal of up to 0.130 mgd (30-day average) from Well 6 (Docket No. 20080950). 8. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, Pa. Application for renewal of groundwater withdrawal of up to 0.201 mgd (30-day average) from Well 14 (Docket No. 19981202). 9. Project Sponsor and Facility: EQT ARO LLC (Pine Creek), McHenry Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 0.499 mgd (peak day) (Docket No. 20180901). 10. Project Sponsor and Facility: Indian Hills Golf and Tennis Club, Shamokin Township, Northumberland County, Pa. Application for renewal of consumptive use of up to 0.099 mgd (30-day average) (Docket No. 19980504). 11. Project Sponsor and Facility: Inflection Energy (PA) LLC (Loyalsock Creek), Upper Fairfield Township, Lycoming County, Pa. Application for renewal of surface water withdrawal of up to 1.700 mgd (peak day) (Docket No. 20221214). 12. Project Sponsor: Lucky Bear, LLC. Project Facility: Liberty Forge Golf Course (Yellow Breeches Creek), Lower and Upper Allen Townships, Cumberland County, Pa. Applications for renewal of surface water withdrawal of up to 0.432 mgd (peak day) and consumptive use of up to 0.375 mgd (peak day) (Docket No. 19980906). 13. Project Sponsor and Facility: Montgomery Water Authority, Clinton Township, Lycoming County, Pa. Modification to increase groundwater withdrawal (30-day average) from Well 3 by an additional 0.098 mgd, for a total groundwater withdrawal of up to 0.318 mgd, and increase the total system withdrawal limit (30-day average) from 0.492 mgd to 0.730 mgd from Wells 1, 3, and 4 (Docket No. 20210304). 14. Project Sponsor and Facility: Nicholas Meat, LLC, Greene Township, Clinton County, Pa. Applications for groundwater withdrawals (30-day averages) of up to 0.288 mgd from Well WS–1, 0.173 mgd from Well WS–3, and 0.144 mgd from Well WS–4. 15. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Susquehanna River), Terry Township, Bradford County, Pa. Application for renewal of surface water withdrawal of up to 1.500 mgd (peak day) (Docket No. 20180909). 16. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC (Wappasening Creek), Windham Township, Bradford County, Pa. E:\FR\FM\12JYN1.SGM 12JYN1 Federal Register / Vol. 88, No. 132 / Wednesday, July 12, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 Application for renewal of surface water withdrawal of up to 0.999 mgd (peak day) (Docket No. 20180910). 17. Project Sponsor and Facility: Seneca Resources Company, LLC (Crooked Creek), Middlebury Township, Tioga County, Pa. Application for surface water withdrawal of up to 3.000 mgd (peak day). 18. Project Sponsor: South Slope Development Corporation. Project Facility: Song Mountain Ski Resort, Town of Preble, Cortland County, N.Y. Applications for renewal of surface water withdrawal of up to 0.999 mgd (30-day average) from an unnamed tributary to Crooked Lake, consumptive use of up to 0.249 mgd (30-day average), and groundwater withdrawal of up to 0.960 mgd (30-day average) from Well MW–3 (Docket No. 20070901). 19. Project Sponsor and Facility: S.T.L. Resources, LLC (Pine Creek), Pike Township, Potter County, Pa. Application for surface water withdrawal of up to 3.000 mgd (peak day). 20. Project Sponsor: T & C Mobile Home & Construction Services, LLC. Project Facility: Glezen Mine, Town of Lisle, Broome County, N.Y. Application for consumptive use of up to 0.099 mgd (30-day average). 21. Project Sponsor and Facility: Village of Hamilton, Town of Hamilton, Madison County, N.Y. Applications for renewal of groundwater withdrawals (30-day averages) of up to 1.730 mgd from Payne Brook Well 1 and 1.500 mgd from Payne Brook Well 2 (Docket Nos. 19871101 and 19970706). 22. Project Sponsor and Facility: Village of Sidney, Town of Sidney, Delaware County, N.Y. Modification to extend the approval term of the groundwater withdrawal approval (Docket No. 19860201) to provide time for development of a replacement source for existing Well 2–88. Opportunity to Appear and Comment Interested parties may call into the hearing to offer comments to the Commission on any business listed above required to be the subject of a public hearing. Given the nature of the meeting, the Commission strongly encourages those members of the public wishing to provide oral comments to pre-register with the Commission by emailing Jason Oyler at joyler@srbc.net before the hearing date. The presiding officer reserves the right to limit oral statements in the interest of time and to control the course of the hearing otherwise. Access to the hearing via telephone will begin at 6:15 p.m. Guidelines for the public hearing are posted on the Commission’s website, VerDate Sep<11>2014 17:29 Jul 11, 2023 Jkt 259001 www.srbc.net, before the hearing for review. The presiding officer reserves the right to modify or supplement such guidelines at the hearing. Written comments on any business listed above required to be the subject of a public hearing may also be mailed to Mr. Jason Oyler, Secretary to the Commission, Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, Pa. 17110–1788, or submitted electronically through https://www.srbc.net/ regulatory/public-comment/. Comments mailed or electronically submitted must be received by the Commission on or before Monday, August 21, 2023, to be considered. Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: July 6, 2023. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2023–14676 Filed 7–11–23; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Docket No.: FAA–2023–1281] Notice of Rescission of Unmanned Aircraft Systems Remote Identification Declaration of Compliance, Tracking No. RID000000111 for DJI Mavic Pro Platinum Aircraft Federal Aviation Administration, Department of Transportation. ACTION: Notice. AGENCY: This notice rescinds a declaration of compliance (DOC) for the DJI Mavic Pro Platinum unmanned aircraft with the assigned tracking number RID000000111 that the FAAaccepted on January 19, 2023, effective immediately. DATES: This action is effective July 12, 2023. FOR FURTHER INFORMATION CONTACT: Caspar Wang, Product Policy Management: GA, Rotorcraft & Emerging Aircraft Section, AIR–62B, Technical Policy Branch, Policy & Standards Division, Federal Aviation Administration. 800 Independence Ave SW, Washington DC 20591, telephone 1–844–FLY–MY–UA; email: UASHelp@ faa.gov. SUPPLEMENTARY INFORMATION: SUMMARY: Background Title 14, Code of Federal Regulations (14 CFR) part 89 establishes remote PO 00000 Frm 00188 Fmt 4703 Sfmt 4703 44437 identification (RID) requirements for unmanned aircraft operated in the airspace of the United States. With a few exceptions, unmanned aircraft produced for operation in the airspace of the United States are subject to the production requirements of part 89. A person producing a standard RID unmanned aircraft or RID broadcast module for operation in the United States must show that the unmanned aircraft or broadcast module complies with the RID performance requirements of subpart D of part 89 by following a FAA-accepted means of compliance (MOC). A DOC is the method by which a producer declares that a standard RID unmanned aircraft or RID broadcast module has been designed and produced to meet the applicable minimum performance requirements of subpart D of part 89 by using an FAAaccepted MOC. The FAA relies on the DOC to ensure the standard RID unmanned aircraft or RID broadcast module identified on the DOC is designed and produced in accordance with an FAA-accepted MOC and complies with the applicable RID requirements of part 89. On January 19, 2023, the FAA evaluated and accepted a DOC application with the assigned tracking number of RID000000111 appearing to be from DJI for the Mavic Pro Platinum unmanned aircraft. On February 16, 2023, the FAA received communication from DJI stating that the group of products listed in the DOC application with the assigned tracking number RID000000111 were, in fact, not compliant with the performance requirements of part 89. Therefore, DJI requested a rescission of the FAAaccepted DOC with tracking number RID000000111. DJI’s subsequent internal review of the incident determined that the employee listed as the contact on the DOC application no longer had RID certification responsibilities at the time the DOC was submitted, and their employee stated he did not submit the RID000000111 DOC. The FAA is continuing to investigate. Basis for Rescission In accordance with § 89.540(a)(1)(i), the Administrator may rescind a DOC under the circumstance that a standard remote identification unmanned aircraft or remote identification broadcast module listed under an FAA-accepted DOC does not meet the minimum performance requirements of §§ 89.310 or 89.320. In accordance with § 89.540(a)(1)(ii), the Administrator may also rescind acceptance of a DOC when E:\FR\FM\12JYN1.SGM 12JYN1

Agencies

[Federal Register Volume 88, Number 132 (Wednesday, July 12, 2023)]
[Notices]
[Pages 44436-44437]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-14676]


-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Public Hearing

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Susquehanna River Basin Commission will hold a public 
hearing on August 10, 2023. The Commission will hold this hearing in 
person and telephonically. At this public hearing, the Commission will 
hear testimony on the projects listed in the SUPPLEMENTARY INFORMATION 
section of this notice. Such projects are intended to be scheduled for 
Commission action at its next business meeting, tentatively scheduled 
for September 14, 2023, which will be noticed separately. The public 
should note that this public hearing will be the only opportunity to 
offer oral comments to the Commission for the listed projects. The 
deadline for the submission of written comments is August 21, 2023.

DATES: The public hearing will convene on August 10, 2023, at 6:30 p.m. 
The public hearing will end at 9:00 p.m. or at the conclusion of public 
testimony, whichever is earlier. The deadline for submitting written 
comments is Monday, August 21, 2023.

ADDRESSES: This public hearing will be conducted in person and 
virtually. You may attend in person at Susquehanna River Basin 
Commission, 4423 N. Front St., Harrisburg, Pennsylvania, or join by 
telephone at Toll-Free Number 1-877-304-9269 and then enter the guest 
passcode 2619070 followed by #.

FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423 or 
[email protected]. Information concerning the project applications is 
available at the Commission's Water Application and Approval Viewer at 
https://www.srbc.net/waav. Additional supporting documents are 
available to inspect and copy in accordance with the Commission's 
Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.

SUPPLEMENTARY INFORMATION: The public hearing will cover the following 
projects:

Projects Scheduled for Action

    1. Project Sponsor and Facility: Bent Creek Country Club, Manheim 
Township, Lancaster County, Pa. Applications for renewal of groundwater 
withdrawal of up to 0.464 mgd (30-day average) from Well 1 (600 Foot 
Well) and consumptive use of up to 0.464 mgd (peak day) (Docket No. 
19920704).
    2. Project Sponsor and Facility: BKV Operating, LLC (East Branch 
Wyalusing Creek), Jessup Township, Susquehanna County, Pa. Application 
for renewal of surface water withdrawal of up to 0.999 mgd (peak day) 
(Docket No. 20180902).
    3. Project Sponsor: Borough of Middletown. Project Facility: 
Middletown Water System, Middletown Borough, Dauphin County, Pa. 
Application for renewal of groundwater withdrawal of up to 1.070 mgd 
(30-day average) from Well 6 (Docket No. 19970702).
    4. Project Sponsor and Facility: Coterra Energy Inc. (Tunkhannock 
Creek), Nicholson Township, Wyoming County, Pa. Application for renewal 
of surface water withdrawal of up to 2.000 mgd (peak day) (Docket No. 
20180903).
    5. Project Sponsor and Facility: Dillsburg Area Authority, Carroll 
Township, York County, Pa. Application for renewal of groundwater 
withdrawal of up to 0.460 mgd (30-day average) from Well 7 (Docket No. 
20070907).
    6. Project Sponsor and Facility: Eagle Lake Community Association, 
Covington Township, Lackawanna County, Pa. Applications for groundwater 
withdrawals (30-day averages) of up to 0.233 mgd from Well 1, 0.315 mgd 
from Well 2, and 0.104 mgd from Well 3.
    7. Project Sponsor and Facility: East Berlin Area Joint Authority, 
Hamilton Township, Adams County, Pa. Application for renewal of 
groundwater withdrawal of up to 0.130 mgd (30-day average) from Well 6 
(Docket No. 20080950).
    8. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, Pa. Application for renewal 
of groundwater withdrawal of up to 0.201 mgd (30-day average) from Well 
14 (Docket No. 19981202).
    9. Project Sponsor and Facility: EQT ARO LLC (Pine Creek), McHenry 
Township, Lycoming County, Pa. Application for renewal of surface water 
withdrawal of up to 0.499 mgd (peak day) (Docket No. 20180901).
    10. Project Sponsor and Facility: Indian Hills Golf and Tennis 
Club, Shamokin Township, Northumberland County, Pa. Application for 
renewal of consumptive use of up to 0.099 mgd (30-day average) (Docket 
No. 19980504).
    11. Project Sponsor and Facility: Inflection Energy (PA) LLC 
(Loyalsock Creek), Upper Fairfield Township, Lycoming County, Pa. 
Application for renewal of surface water withdrawal of up to 1.700 mgd 
(peak day) (Docket No. 20221214).
    12. Project Sponsor: Lucky Bear, LLC. Project Facility: Liberty 
Forge Golf Course (Yellow Breeches Creek), Lower and Upper Allen 
Townships, Cumberland County, Pa. Applications for renewal of surface 
water withdrawal of up to 0.432 mgd (peak day) and consumptive use of 
up to 0.375 mgd (peak day) (Docket No. 19980906).
    13. Project Sponsor and Facility: Montgomery Water Authority, 
Clinton Township, Lycoming County, Pa. Modification to increase 
groundwater withdrawal (30-day average) from Well 3 by an additional 
0.098 mgd, for a total groundwater withdrawal of up to 0.318 mgd, and 
increase the total system withdrawal limit (30-day average) from 0.492 
mgd to 0.730 mgd from Wells 1, 3, and 4 (Docket No. 20210304).
    14. Project Sponsor and Facility: Nicholas Meat, LLC, Greene 
Township, Clinton County, Pa. Applications for groundwater withdrawals 
(30-day averages) of up to 0.288 mgd from Well WS-1, 0.173 mgd from 
Well WS-3, and 0.144 mgd from Well WS-4.
    15. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC 
(Susquehanna River), Terry Township, Bradford County, Pa. Application 
for renewal of surface water withdrawal of up to 1.500 mgd (peak day) 
(Docket No. 20180909).
    16. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC 
(Wappasening Creek), Windham Township, Bradford County, Pa.

[[Page 44437]]

Application for renewal of surface water withdrawal of up to 0.999 mgd 
(peak day) (Docket No. 20180910).
    17. Project Sponsor and Facility: Seneca Resources Company, LLC 
(Crooked Creek), Middlebury Township, Tioga County, Pa. Application for 
surface water withdrawal of up to 3.000 mgd (peak day).
    18. Project Sponsor: South Slope Development Corporation. Project 
Facility: Song Mountain Ski Resort, Town of Preble, Cortland County, 
N.Y. Applications for renewal of surface water withdrawal of up to 
0.999 mgd (30-day average) from an unnamed tributary to Crooked Lake, 
consumptive use of up to 0.249 mgd (30-day average), and groundwater 
withdrawal of up to 0.960 mgd (30-day average) from Well MW-3 (Docket 
No. 20070901).
    19. Project Sponsor and Facility: S.T.L. Resources, LLC (Pine 
Creek), Pike Township, Potter County, Pa. Application for surface water 
withdrawal of up to 3.000 mgd (peak day).
    20. Project Sponsor: T & C Mobile Home & Construction Services, 
LLC. Project Facility: Glezen Mine, Town of Lisle, Broome County, N.Y. 
Application for consumptive use of up to 0.099 mgd (30-day average).
    21. Project Sponsor and Facility: Village of Hamilton, Town of 
Hamilton, Madison County, N.Y. Applications for renewal of groundwater 
withdrawals (30-day averages) of up to 1.730 mgd from Payne Brook Well 
1 and 1.500 mgd from Payne Brook Well 2 (Docket Nos. 19871101 and 
19970706).
    22. Project Sponsor and Facility: Village of Sidney, Town of 
Sidney, Delaware County, N.Y. Modification to extend the approval term 
of the groundwater withdrawal approval (Docket No. 19860201) to provide 
time for development of a replacement source for existing Well 2-88.

Opportunity to Appear and Comment

    Interested parties may call into the hearing to offer comments to 
the Commission on any business listed above required to be the subject 
of a public hearing. Given the nature of the meeting, the Commission 
strongly encourages those members of the public wishing to provide oral 
comments to pre-register with the Commission by emailing Jason Oyler at 
[email protected] before the hearing date. The presiding officer reserves 
the right to limit oral statements in the interest of time and to 
control the course of the hearing otherwise. Access to the hearing via 
telephone will begin at 6:15 p.m. Guidelines for the public hearing are 
posted on the Commission's website, www.srbc.net, before the hearing 
for review. The presiding officer reserves the right to modify or 
supplement such guidelines at the hearing. Written comments on any 
business listed above required to be the subject of a public hearing 
may also be mailed to Mr. Jason Oyler, Secretary to the Commission, 
Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or 
electronically submitted must be received by the Commission on or 
before Monday, August 21, 2023, to be considered.
    Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: July 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-14676 Filed 7-11-23; 8:45 am]
BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.