Combined Notice of Filings # 2, 43113-43114 [2023-14252]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 88, No. 128 / Thursday, July 6, 2023 / Notices
vertical access tunnel from ground level
to the powerhouse; (5) a vertical intake
structure and breakwater of
undetermined size and design to lead
from the tailrace to the powerhouse and
to dissipate discharge energy; (6) a 500foot-long, 250-foot-wide concrete-lined
tailrace; and (7) a 0.5-mile-long, 69kilovolt line extending from the
powerhouse to a planned AC–DC
converter station. The estimated annual
energy production of the project would
be approximately 3,714,406 megawatthours.
Applicant Contact: Mr. Wayne
Krouse, HGE Energy Storage 3 LLC,
2901 4th Avenue South, #B 253,
Birmingham, AL 35233; email: wayne@
hgenergy.com; phone: (877) 556–6566 X
709.
FERC Contact: Shannon Archuleta;
email; shannon.archuleta@ferc.gov;
phone (503) 552–2739.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov. Comments, motions to
intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications
should be submitted within 60 days
from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters without prior
registration using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please get in touch with
FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll-free), or (202) 502–8659
(TTY). Instead of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
VerDate Sep<11>2014
17:07 Jul 05, 2023
Jkt 259001
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15287–000.
More information about this project,
including a copy of the application, can
be viewed on the Commission’s website
(https://www.ferc.gov) using the
‘‘eLibrary’’ link. Enter the docket
number (P–15287) in the docket number
field to access the document. For
assistance, do not hesitate to get in
touch with FERC Online Support.
Dated: June 29, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–14258 Filed 7–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2290–122]
Southern California Edison; Notice of
Environmental Site Review
On August 1, 2023, at 1:00 p.m.
(Pacific Standard Time), Commission
staff and Southern California Edison
(SCE), the licensee for the Kern River
No. 3 Hydroelectric Project No. 2290
(project), will conduct an environmental
site review of the project. All interested
individuals, agencies, Tribes, and nongovernmental organizations are invited
to attend.
The site review will include the
project powerhouse, Corral Creek
Diversion, Salmon Creek Diversion, and
commence at Fairview Dam. Please note
that all participants are responsible for
their own transportation to/from the
project and during the site review tour.
If you are interested in attending, or
have questions regarding the site
review, please RSVP David Moore with
SCE at David.Moore@sce.com or (626)
302–9494 on or before July 28, 2023.
Participants will meet at the put-in/
take-out recreation site just downstream
of the project’s powerhouse located at:
15171 Sierra Way, Kernville, CA 93238.
Participants should arrive early for
coordination purposes and to begin the
tour promptly at 1:00 p.m. Additionally,
participants must wear sturdy, closedtoe shoes, or boots.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
43113
Dated: June 29, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–14259 Filed 7–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 2
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–57–002.
Applicants: Lee County Generating
Station, LLC v. PJM Interconnection,
L.L.C.
Description: Joint Request of PJM
Interconnection, L.L.C. and Lee County
Generating Station, LLC for Waiver of
Tariff Provisions, Expedited
Consideration and Shortened Comment
Period.
Filed Date: 6/28/23.
Accession Number: 20230628–5195.
Comment Date: 5 p.m. ET 7/3/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–1770–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.17(b): AMEA Revised
NITSA Amendment Filing (DNR LOC)
to be effective 8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5043.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2295–000.
Applicants: Invenergy Solar Project
Development LLC.
Description: Petition of Invenergy
Solar Project Development LLC for
Prospective One-Time Limited Waiver
Request of the Deadline Set in Section
212.4(C) of PJM Interconnection, L.L.C.
OATT.
Filed Date: 6/28/23.
Accession Number: 20230628–5184.
Comment Date: 5 p.m. ET 7/12/23.
Docket Numbers: ER23–2298–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Union Electric Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2023–06–29_Union
Electric d/b/a Ameren Missouri
Depreciation Rates to be effective 7/1/
2023.
E:\FR\FM\06JYN1.SGM
06JYN1
lotter on DSK11XQN23PROD with NOTICES1
43114
Federal Register / Vol. 88, No. 128 / Thursday, July 6, 2023 / Notices
Filed Date: 6/29/23.
Accession Number: 20230629–5045.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2299–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–Central NITSA–SA 447 to be
effective 8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5054.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2300–000.
Applicants: Kentucky Utilities
Company.
Description: § 205(d) Rate Filing:
Amended APCO Borderline Service
Agreement Appendix B to be effective
8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5072.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2301–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2023–06–29—Aurora Solar APSISA—
741—0.0.0 to be effective 6/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5081.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2302–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6970; Queue No. AE1–227 to be
effective 5/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5088.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2303–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Amendment:
Notice of Cancellation of Rate Schedule
No. 310 and Rate Schedule No. 318 to
be effective 8/28/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5108.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23–2304–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2023–06–29—TSGT—E&P—EIM
Metering—746—Concurrence to be
effective 5/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629–5109.
Comment Date: 5 p.m. ET 7/20/23.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
VerDate Sep<11>2014
17:07 Jul 05, 2023
Jkt 259001
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: June 29, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–14252 Filed 7–5–23; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Federal Advisory Committee Act;
Technological Advisory Council
Compatibility Division 202–418–2435;
martin.doczkat@fcc.gov.
SUPPLEMENTARY INFORMATION: At the
August 17th meeting, the TAC will
continue to consider and advise the
Commission on topics such as 6G,
artificial intelligence, advanced
spectrum sharing technologies, and
emerging wireless technologies. This
agenda may be modified at the
discretion of the TAC Chair and the
Designated Federal Officer (DFO).
Meetings are broadcast live with open
captioning over the internet from the
FCC Live web page at https://
www.fcc.gov/live/. The public may
submit written comments before the
meeting to Martin Doczkat, the FCC’s
Designated Federal Officer for
Technological Advisory Council by
email: martin.doczkat@fcc.gov or U.S.
Postal Service Mail (Martin Doczkat,
Federal Communications Commission,
45 L Street NE, Washington, DC 20554).
Open captioning will be provided for
this event. Other reasonable
accommodations for people with
disabilities are available upon request.
Requests for such accommodations
should be submitted via email to
fcc504@fcc.gov or by calling the Office
of Engineering and Technology at 202–
418–2470 (voice), (202) 418–1944 (fax).
Such requests should include a detailed
description of the accommodation
needed. In addition, please include your
contact information. Please allow at
least five days advance notice; last
minute requests will be accepted but
may not be possible to fill.
Federal Communications Commission.
Ronald T. Repasi,
Chief, Office of Engineering and Technology.
Federal Communications
Commission.
ACTION: Notice of public meeting.
[FR Doc. 2023–14226 Filed 7–5–23; 8:45 am]
In accordance with the
Federal Advisory Committee Act, this
notice advises interested persons that
the Federal Communications
Commission’s (FCC) Technological
Advisory Council will hold a meeting
on Thursday, August 17, 2023 in the
Commission Meeting Room from 10:00
a.m. to 3 p.m. at the Federal
Communications Commission, 45 L
Street NE, Washington, DC 20554.
Additionally, the meeting will be
available to the public for viewing via
the internet at https://www.fcc.gov/live.
DATES: Thursday August 17, 2023.
ADDRESSES: Federal Communications
Commission, 45 L Street NE,
Washington, DC 20554.
FOR FURTHER INFORMATION CONTACT:
Martin Doczkat, Chief, Electromagnetic
FEDERAL MARITIME COMMISSION
AGENCY:
SUMMARY:
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
BILLING CODE 6712–01–P
Notice of Agreements Filed
The Commission hereby gives notice
of filing of the following agreements
under the Shipping Act of 1984.
Interested parties may submit
comments, relevant information, or
documents regarding the agreements to
the Secretary by email at Secretary@
fmc.gov, or by mail, Federal Maritime
Commission, 800 North Capitol Street,
Washington, DC 20573. Comments will
be most helpful to the Commission if
received within 12 days of the date this
notice appears in the Federal Register,
and the Commission requests that
comments be submitted within 7 days
on agreements that request expedited
review. Copies of agreements are
E:\FR\FM\06JYN1.SGM
06JYN1
Agencies
[Federal Register Volume 88, Number 128 (Thursday, July 6, 2023)]
[Notices]
[Pages 43113-43114]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-14252]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings # 2
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL23-57-002.
Applicants: Lee County Generating Station, LLC v. PJM
Interconnection, L.L.C.
Description: Joint Request of PJM Interconnection, L.L.C. and Lee
County Generating Station, LLC for Waiver of Tariff Provisions,
Expedited Consideration and Shortened Comment Period.
Filed Date: 6/28/23.
Accession Number: 20230628-5195.
Comment Date: 5 p.m. ET 7/3/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-1770-001.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment: Alabama Power Company submits tariff
filing per 35.17(b): AMEA Revised NITSA Amendment Filing (DNR LOC) to
be effective 8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5043.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2295-000.
Applicants: Invenergy Solar Project Development LLC.
Description: Petition of Invenergy Solar Project Development LLC
for Prospective One-Time Limited Waiver Request of the Deadline Set in
Section 212.4(C) of PJM Interconnection, L.L.C. OATT.
Filed Date: 6/28/23.
Accession Number: 20230628-5184.
Comment Date: 5 p.m. ET 7/12/23.
Docket Numbers: ER23-2298-000.
Applicants: Midcontinent Independent System Operator, Inc., Union
Electric Company.
Description: Sec. 205(d) Rate Filing: Midcontinent Independent
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
06-29_Union Electric d/b/a Ameren Missouri Depreciation Rates to be
effective 7/1/2023.
[[Page 43114]]
Filed Date: 6/29/23.
Accession Number: 20230629-5045.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2299-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-Central NITSA-SA 447 to
be effective 8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5054.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2300-000.
Applicants: Kentucky Utilities Company.
Description: Sec. 205(d) Rate Filing: Amended APCO Borderline
Service Agreement Appendix B to be effective 8/1/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5072.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2301-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2023-06-29--Aurora Solar
APSISA--741--0.0.0 to be effective 6/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5081.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2302-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 6970; Queue No. AE1-227 to be effective 5/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5088.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2303-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Tariff Amendment: Notice of Cancellation of Rate
Schedule No. 310 and Rate Schedule No. 318 to be effective 8/28/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5108.
Comment Date: 5 p.m. ET 7/20/23.
Docket Numbers: ER23-2304-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: 2023-06-29--TSGT--E&P--EIM
Metering--746--Concurrence to be effective 5/30/2023.
Filed Date: 6/29/23.
Accession Number: 20230629-5109.
Comment Date: 5 p.m. ET 7/20/23.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or [email protected].
Dated: June 29, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-14252 Filed 7-5-23; 8:45 am]