Air Plan Revisions; California; Yolo-Solano Air Quality Management District, 42252-42258 [2023-13754]

Download as PDF 42252 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations (1) Reasonably Available Control Technology (RACT) State Implementation Plan (SIP) for the 2008 8-Hour Ozone National Ambient Air Quality Standards (NAAQS) (‘‘Demonstration of Reasonably Available Control Technology for the 2008 Ozone NAAQS’’), as adopted on March 23, 2017, except the RACT 3. Section 52.222 is amended by revising paragraph (a)(2)(v) to read as follows: ■ § 52.222 * * * * (a) * * * (2) * * * (v) The following negative declarations for the 2008 ozone NAAQS were adopted by the Sacramento Metropolitan Air Quality Management District. Title (A) EPA–450/2–77–008 ..... Control of Volatile Organic Emissions from Existing Stationary Sources— Volume II: Surface Coating of Coils. Control of Volatile Organic Emissions from Existing Stationary Sources— Volume II: Surface Coating of Paper. Control of Volatile Organic Emissions from Existing Stationary Sources— Volume II: Surface Coating of Fabrics. Control of Volatile Organic Emissions from Existing Stationary Sources— Volume II: Surface Coating of Automobiles and Light-Duty Trucks. Control of Refinery Vacuum Producing Systems, Wastewater Separators, and Process Unit Turnarounds. Control of Volatile Organic Emissions from Existing Stationary Sources— Volume IV: Surface Coating of Insulation of Magnet Wire. Control of Volatile Organic Emissions from Existing Stationary Sources— Volume V: Surface Coating of Large Appliances. Manufacture of Pneumatic Rubber Tires ....................................................... Factory Surface Coating of Flat Wood Paneling ............................................ Graphic Arts—Rotogravure and Flexography (Rotogravure only) ................. Leaks from Petroleum Refinery Equipment ................................................... Large Petroleum Dry Cleaners ....................................................................... Leaks from Natural Gas/Gasoline Processing Plants .................................... Manufacture of High-Density Polyethylene, Polypropylene, and Polystyrene Resins. Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry. Alternative Control Technology Document—Surface Coating Operations at Shipbuilding and Ship Repair Facilities. Shipbuilding and Ship Repair Operations (Surface Coating), see the Federal Register of 08/27/96. Control of Volatile Organic Compound Emissions from Coating Operations at Aerospace Manufacturing and Rework Operations. Aerospace MACT, see the Federal Register of 06/06/94. Flat Wood Paneling Coatings ......................................................................... Paper, Film, and Foil Coatings ....................................................................... Large Appliance Coatings .............................................................................. Miscellaneous Metal and Plastic Parts Coatings (Table 5—Pleasure Craft Surface Coating). Fiberglass Boat Manufacturing Materials ....................................................... Miscellaneous Industrial Adhesives ................................................................ Automobile and Light-Duty Truck Assembly Coatings ................................... (C) EPA–450/2–77–008 ..... (D) EPA–450/2–77–008 ..... (E) EPA–450/2–77–025 ..... (F) EPA–450/2–77–033 ...... (G) EPA–450/2–77–034 ..... (H) EPA–450/2–78–030 ..... (I) EPA–450/2–78–032 ....... (J) EPA–450/2–78–033 ...... (K) EPA–450/2–78–03 ....... (L) EPA–450/3–82–009 ...... (M) EPA–450/3–83–007 ..... (N) EPA–450/3–83–008 ..... (O) EPA–450/3–84–015 ..... (P) EPA–453/R–94–032 ..... (Q) EPA–453/R–97–004 .... (R) EPA–453/R–06–004 ..... (S) EPA 453/R–07–003 ...... (T) EPA 453/R–07–004 ...... (U) EPA 453/R–08–003 ..... (V) EPA 453/R–08–004 ...... (W) EPA 453/R–08–005 ..... (X) EPA 453/R–08–006 ...... * * * * * 4. Section 52.237 is amended by removing and reserving paragraph (b)(1)(i), and adding paragraph (b)(1)(iii) to read as follows: ■ § 52.237 Control Technology for the 2008 Ozone NAAQS’’, as adopted on March 23, 2017, and submitted on May 5, 2017. * * * * * [FR Doc. 2023–13744 Filed 6–29–23; 8:45 am] BILLING CODE 6560–50–P Part D disapproval. * * * * * (b) * * * (1) * * * (iii) RACT determination for non-CTG major sources of Nitrogen Oxides (NOX) for the 2008 ozone NAAQS, as contained in the submittal titled ‘‘Demonstration of Reasonably Available VerDate Sep<11>2014 16:27 Jun 29, 2023 Jkt 259001 PO 00000 Negative declarations. * CTG document No. (B) EPA–450/2–77–008 ..... ddrumheller on DSK120RN23PROD with RULES1 determination for non-CTG major sources of NOX. (2) [Reserved] * * * * * Adopted: 3/22/2018 Submitted: 6/11/2018 SIP approved: 11/19/2020 Adopted: 3/23/2017 Submitted: 5/5/2017 SIP approved: 6/30/2023 ............................ X ............................ X ............................ X ............................ X ............................ X ............................ X ............................ X ............................ ............................ ............................ ............................ ............................ ............................ ............................ X X X X X X X ............................ X ............................ X ............................ X ............................ ............................ ............................ X X X X ............................ ............................ ............................ ............................ X X X ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R09–OAR–2018–0160; FRL–10867– 02–R9] Air Plan Revisions; California; YoloSolano Air Quality Management District Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: Frm 00026 Fmt 4700 Sfmt 4700 E:\FR\FM\30JNR1.SGM 30JNR1 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations The Environmental Protection Agency (EPA) is taking final action to partially approve and partially disapprove a revision to the YoloSolano Air Quality Management District (YSAQMD) portion of the California State Implementation Plan (SIP). The revision concerns the YSAQMD’s demonstration regarding reasonably available control technology (RACT) requirements for the 2008 8-hour ozone National Ambient Air Quality Standards (NAAQS or ‘‘standards’’) in the portion of the Sacramento Metropolitan nonattainment area under the jurisdiction of the YSAQMD. DATES: This rule is effective July 31, 2023. ADDRESSES: The EPA has established a docket for this action under Docket ID No. EPA–R09–OAR–2018–0160. All documents in the docket are listed on the https://www.regulations.gov SUMMARY: website. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through https:// www.regulations.gov, or please contact the person identified in the FOR FURTHER INFORMATION CONTACT section for additional availability information. If you need assistance in a language other than English or if you are a person with a disability who needs a reasonable accommodation at no cost to you, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section. FOR FURTHER INFORMATION CONTACT: Eugene Chen, EPA Region IX, 75 42253 Hawthorne St., San Francisco, CA 94105. By phone: (415) 947–4304 or by email at chen.eugene@epa.gov. SUPPLEMENTARY INFORMATION: Throughout this document, ‘‘we,’’ ‘‘us’’ and ‘‘our’’ refer to the EPA. Table of Contents I. Proposed Action II. Public Comments and EPA Responses III. EPA Action IV. Statutory and Executive Order Reviews I. Proposed Action On April 11, 2023 (88 FR 21572), the EPA proposed to partially approve and partially disapprove the California Air Resources Board’s (CARB) submittal of the YSAQMD’s RACT SIP for the 2008 Ozone National Ambient Air Quality Standards (NAAQS), as listed in Table 1 below. ddrumheller on DSK120RN23PROD with RULES1 TABLE 1—SUBMITTED DOCUMENT Local agency Document YSAQMD .......... Reasonably Available Control Technology (RACT) State Implementation Plan (SIP) Analysis for the 2008 Federal Ozone Standard (‘‘2017 RACT SIP’’). We proposed to partially approve YSAQMD’s 2017 RACT SIP because we determined that, except for the RACT elements for non-control technique guideline (CTG) major sources of nitrogen oxides (NOX) and volatile organic compounds (VOC), it complied with the relevant Clean Air Act (CAA or ‘‘Act’’) requirements. We proposed to partially disapprove YSAQMD’s 2017 RACT SIP because we identified two deficiencies that would preclude us from fully approving the submittal. First, we found that District Rule 2.38, ‘‘Standards for Municipal Solid Waste Landfills,’’ which is relied upon to implement RACT for non-CTG major sources of VOC, has not been submitted for approval into the SIP, and therefore cannot be used to satisfy RACT requirements. Second, we found that District Rule 2.43, ‘‘Biomass Boilers,’’ which the District relied upon to implement RACT for non-CTG major sources of NOX, contains a provision that explicitly exempts affected units from complying with rule standards during periods of startup and shutdown and does not provide for an alternative emissions limitation during such periods. This provision is inconsistent with the EPA’s Startup, Shutdown, and Malfunction (SSM) Policy as defined in VerDate Sep<11>2014 16:27 Jun 29, 2023 Jkt 259001 Adopted the EPA’s 2015 SSM SIP Action.1 The deficiencies are discussed in more detail in our proposed action. II. Public Comments and EPA Responses The EPA’s proposed action provided a 30-day public comment period, which concluded on May 11, 2023 (April 11, 2023 (88 FR 21572)). We received one comment letter regarding our proposed action, from the YSAQMD and dated May 10, 2023. We have summarized substantive adverse comments included in this comment letter and provided our responses below. In addition to the substantive comments summarized below, the District’s letter includes information about recent progress it has made to address deficiencies related to SSM exemptions identified in Rule 2.43, and comments regarding the EPA’s communication to the District about the identified deficiencies leading up to publication of the proposed rulemaking.2 The District’s letter is included in the docket for this action. 1 ‘‘State Implementation Plans: Response to Petition for Rulemaking; Restatement and Update of EPA’s SSM Policy Applicable to SIPs; Findings of Substantial Inadequacy; and SIP Calls to Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown and Malfunction,’’ 80 FR 33839 (June 12, 2015). 2 The District’s revisions to Rule 2.43 were submitted by CARB to the EPA on June 8, 2023 via the State Plan electronic Collection System (SPeCS). PO 00000 Frm 00027 Fmt 4700 Sfmt 4700 09/13/2017 Submitted 11/13/2017 Comment 1: The YSAQMD asserts that the District’s 2017 RACT SIP identified the Recology Hay Road Landfill and the Yolo County Central Landfill as major sources of VOC in error. The District states that the VOC potential to emit (PTE) of each landfill is below the 25 tons per year (tpy) major source threshold for Severe nonattainment areas, and therefore not subject to VOC RACT requirements for major sources. Response 1: On May 17, 2023, the EPA emailed the District with a request for further clarification and documentation demonstrating that the VOC PTE of each landfill was below major source thresholds.3 On May 19, 2023, the District replied with permitting information for each facility and indicated that, when excluding fugitive landfill emissions in accordance with EPA guidance, the VOC PTE of the Recology Hay Road Landfill and Yolo County Central Landfill is 13.04 tpy and 24.7 tpy respectively, which are below major source thresholds.4 Based on this additional documentation, and for the reasons discussed below, we agree with the District that the Recology Hay Road 3 Email dated May 17, 2023, from Eugene Chen (EPA) to Paul Hensleigh (YSAQMD), Subject: ‘‘RACT SIP Comment Letter follow up.’’ 4 Email dated May 19, 2023, from Paul Hensleigh (YSAQMD) to Eugene Chen (EPA), Subject: ‘‘Re: RACT SIP Comment Letter follow up.’’ E:\FR\FM\30JNR1.SGM 30JNR1 42254 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations Landfill and Yolo County Central Landfill are not major sources of VOC, and are therefore not required to implement RACT for VOC. The EPA defines fugitive emissions as ‘‘those emissions which could not reasonably pass through a stack, chimney, vent, or other functionallyequivalent opening.’’ 5 A source’s fugitive emissions must be included when determining whether it qualifies as a major source if the source falls within one of 27 listed source categories.6 Municipal solid waste landfills are not included in this list of source categories, and as a result are not required to include fugitive emissions toward major source applicability. Under additional EPA guidance related to landfills, if a landfill gas collection system is in operation, or if a landfill gas collection system could reasonably be designed to collect a landfill’s gas emissions, then those collected emissions are not fugitive and shall be considered in determining facility PTE.7 Both Recology Hay Road and Yolo County Central Landfill operate with active gas collection systems, and therefore only the portion of landfill gas that is not collected can be considered fugitive and excluded from consideration in determining VOC PTE. The current title V operating permit (Permit No. F–01059–18, issued November 10, 2022) and statement of basis for the Recology Hay Road Landfill lists the following emission units and corresponding VOC PTE: 8 TABLE 1—RECOLOGY HAY ROAD LANDFILL VOC PTE VOC PTE (tpy) Unit ID Equipment description P–13–16 ........... P–14–16(a) ....... P–28–98(a) ....... 124-horsepower (hp) Caterpillar IC engine (Certified Tier IV engine) ................................................................. 124-hp Caterpillar IC engine (Certified Tier IV engine) ....................................................................................... One (1) 500-gallon aboveground gasoline storage tank, one gasoline dispenser (1 nozzle), and one gasoline pressure/vacuum vent valve. Various equipment including two (2) portable crushers, two (2) portable screens, and two (2) stackers, powered by Off-road engines that also provide propulsion. Petroleum contaminated soil handling for daily and intermediate cover material ............................................... 7-acre lined containment pond and drying areas ................................................................................................. Municipal Solid Waste landfill not to exceed a total maximum design capacity of 35.6 million cubic yards (17.0 million megagrams). 174-hp Caterpillar Engine (Certified Tier IV engine) ............................................................................................ P–51–17 ........... P–64–00 ........... P–81–10 ........... P–85–06(a8) ..... P–59–21 ........... 0.01 0.01 0.04 0.01 13.00 0.01 24.62 0.01 Total ............................................................................................................................................................... 37.66 Total (excluding Unit ID P–85–06(a8)) .......................................................................................................... 13.04 The YSAQMD asserts that the municipal solid waste landfill’s 24.62 tpy VOC PTE (Unit ID P–85–06(a8)) consists of landfill fugitive emissions. Excluding these emissions from consideration towards major source applicability would result in a facilitywide VOC PTE of 13.04 tpy. Based upon a review of permitting information, we note that while Unit ID P–86–06(a8) includes fugitive VOC emissions from the landfill, it also includes VOC emissions from the flaring of landfill gas captured by the collection system.9 We do not consider it appropriate for VOC emissions from flaring activities to be considered fugitive since they represent the destruction of collected landfill gas. The title V permit and statement of basis do not identify the portion of VOC PTE attributable only to flaring activities, but based on the physical design and enforceable emission limits applicable to flaring activities, we estimate the VOC PTE to be 3.67 tpy.10 Including this 3.67 tpy VOC PTE results in a facility wide VOC PTE of 16.71 tpy, which is below the Severe nonattainment area major source threshold of 25 tpy. As a result, we agree that the Recology Hay Road Landfill is not a major source of VOC, and is not required to implement RACT for VOC. The current title V operating permit (Permit No. F–01392–8, issued March 13, 2018) and statement of basis for the Yolo County Central Landfill lists the following emission units and corresponding VOC PTE: 11 ddrumheller on DSK120RN23PROD with RULES1 TABLE 2—YOLO COUNTY CENTRAL LANDFILL VOC PTE Unit ID Equipment description VOC PTE (tpy) P–15–05(a) ....... P–25–07 ........... P–31–10 ........... P–71–06(t) ........ P–49–14 ........... P–90–18 ........... P–26–98(t2) ...... P–78–98(t) ........ P–79–98(t) ........ Landfill not to exceed max design capacity of 49 million cubic yards ................................................................. 317-hp emergency engine (Certified Tier III engine) ........................................................................................... Various equipment for dewatering and aeration of non hazardous liquid waste with odor potential (NHLWOP) 157-hp emergency engine (Certified Tier II engine) ............................................................................................ Receiving Storage and use of NHLWOP ............................................................................................................. In Vessel Digester Operation ............................................................................................................................... Negative pressure landfill gas collection system, landfill gas flare ...................................................................... Engine 1A, 805-hp landfill gas IC engine ............................................................................................................ Engine 2, 805-hp landfill gas IC engine ............................................................................................................... 51.03 0.01 ........................ 0.01 ........................ 0.93 2.73 4.11 4.11 5 40 CFR 70.1; 70.2 (title V definitions). This definition also applies under the NSR program. See 40 CFR 51.165(a)(1)(ix). 6 40 CFR 70.2; 40 CFR 51.165(a)(1)(iv)(C). 7 Memorandum dated October 21, 1994, from John S. Seitz, Director, Office of Air Quality Planning and Standards, U.S. EPA, to EPA Regional Air Directors, Regions I–X, Subject: ‘‘Classification VerDate Sep<11>2014 16:27 Jun 29, 2023 Jkt 259001 of Emissions from Landfills for NSR Applicability Purposes.’’ 8 See Permit No. F–01059–18, Recology Hay Road Landfill title V permit, Permit No. F–01059–18, Statement of Basis, and Permit to Operate, Unit ID P–86–06(a8). 9 Id. PO 00000 Frm 00028 Fmt 4700 Sfmt 4700 10 Based upon a flare VOC permit limit of 14.1 ppm (@3% O2) and maximum flare heat rate of 45.6 MMBtu/hr. 11 See Permit F–01392–8, Yolo County Central Landfill title V permit, Permit No. F–01392–8, Statement of Basis, and Emission Evaluation C–07– 164. E:\FR\FM\30JNR1.SGM 30JNR1 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations 42255 ddrumheller on DSK120RN23PROD with RULES1 TABLE 2—YOLO COUNTY CENTRAL LANDFILL VOC PTE—Continued Unit ID Equipment description VOC PTE (tpy) P–80–98(t) ........ P–81–98(t) ........ P–87–98(t) ........ P–28–17 ........... P–29–17 ........... P–30–17 ........... Engine 3, 805-hp landfill gas IC engine ............................................................................................................... Engine 4A, 805-hp landfill gas IC engine ............................................................................................................ Engine 5A, 805-hp landfill gas IC engine ............................................................................................................ Concrete crushing plant ....................................................................................................................................... Screening of waste and wood debris ................................................................................................................... Grinding and shredding of waste and wood debris ............................................................................................. 4.25 4.22 4.22 ........................ ........................ 0.09 Total ............................................................................................................................................................... 75.7 Total (excluding Unit P–15–05(a)) ................................................................................................................ 24.7 The District asserts that the municipal solid waste landfill’s 51.03 tpy VOC PTE (Unit ID P–15–05(a)) consists of landfill fugitive emissions. Excluding these emissions from consideration towards major source applicability would result in a facility-wide VOC PTE of 24.7 tpy. Based upon a review of permitting information, we agree that the 51.03 VOC PTE attributable to P–15– 05(a) are fugitive landfill emissions, and note that the gas collection system and landfill flare are accounted for separately as Unit ID P–26–98(t2). With regard to the other permitted emission units, and in particular the landfill gas engines that comprise the majority of the non-fugitive VOC PTE, we note that the facility’s title V permit establishes several emission and operating limits on a per-engine basis, including annual VOC tpy limits, VOC concentration limits expressed in parts per million (ppm), and landfill gas fuel usage limitations expressed in million standard cubic feet per year (MMCF/yr). The title V permit also contains requirements for annual source testing, recordkeeping of fuel usage and operating hours, and reporting requirements to ensure the practical enforceability of emission and operating limits. In addition, the title V permit establishes a landfill flare VOC emission limit and landfill gas fuel usage limit for Unit ID P–26–98(t2), and also requires an annual source test, recordkeeping of landfill gas fuel usage, and for the flare to be operated within the parameter ranges established during the most recent source test. We consider these monitoring, reporting, and recordkeeping requirements to ensure the practical enforceability of emission limits for the landfill flare. Based upon this information, we agree with the District that the VOC PTE of the Yolo County Central Landfill is 24.7 tpy, which is below the Severe nonattainment area major source VerDate Sep<11>2014 16:27 Jun 29, 2023 Jkt 259001 threshold of 25 tpy.12 As a result, we agree that the Yolo County Central Landfill is not a major source of VOC, and is not required to implement RACT for VOC. For this reason, as described below, we are issuing a final approval of the RACT element for non-CTG major sources of VOC. Comment 2: The YSAQMD asserts that even if the landfills subject to its regulatory authority were major sources of VOC, they are subject to federally enforceable requirements that implement RACT through a combination of California’s statewide landfill methane regulation (LMR) and an EPA Federal implementation plan (FIP). The District notes that the 2017 RACT SIP identifies landfill requirements as federally enforceable through California’s CAA section 111(d) State Plan approved by the EPA on September 23, 1999. The District asserts that California later adopted and submitted its statewide LMR for SIP approval and that the EPA proposed to partially approve the LMR in 2020, and in May 2021 proposed a FIP in 40 CFR part 62 subpart OOO to cover identified deficiencies in the LMR. Response 2: As discussed in our response to the previous comment, we agree with the District that the Recology Hay Road Landfill and Yolo County Central Landfill are not major sources of 12 The 24.7 tpy VOC PTE relies on conservative assumptions regarding landfill gas usage and accordingly represents an overestimate of the facility’s potential VOC emissions. For example, the aggregated landfill gas usage limits for the flare and engines (1,154 MMCF/yr) is greater than the total amount of landfill gas that is permitted to be collected from the landfill (997.1 MMCF/yr), per title V Permit No. F–01392–8, Conditions B.69 through B.80. Since the sum of destroyed landfill gas cannot exceed the total amount of collected landfill gas, the facility VOC PTE reflects a certain amount of double-counting. The amount of doublecounting would be difficult to quantify precisely given the variety of landfill gas destruction scenarios, but as an example, if the entirety of the collected landfill gas were destroyed by the engines and not by the landfill flare, then the landfill flare VOC PTE of 2.73 tpy would represent an additional margin between facility PTE and the major source threshold. PO 00000 Frm 00029 Fmt 4700 Sfmt 4700 VOC, and are therefore not required to implement RACT for VOC. As a result, we do not consider it necessary to address issues regarding implementation of RACT at these sources. However, we wish to clarify that the EPA’s approval of a performance standards plan under CAA section 111(d) is different from approval of a SIP submittal under CAA section 110. Thus, while we have issued both a final partial approval/partial disapproval of the California LMR 13 and a final rule promulgating a partial Federal plan for municipal solid waste landfills under CAA section 111(d),14 we have not approved these landfill rules as a SIP revision under CAA section 110(k) or issued a FIP under CAA section 110(c), and we are unaware of any pending state submittal of the LMR or District landfill VOC RACT rules for SIP approval. The EPA’s SIP approval of RACT-level control rules for landfills regulated by the District would ensure that any future major source landfills in the area meet RACT requirements. We invite the District or CARB to discuss this option further with the EPA. III. EPA Action As discussed in Section II of this preamble above, we received a public comment from the YSAQMD providing additional information relevant to our proposed disapproval of the RACT element for non-CTG major sources of VOC. The basis for our proposed disapproval was the lack of enforceable SIP requirements implementing VOC RACT for two municipal solid waste landfills that the 2017 RACT SIP identified as non-CTG major sources of VOC. Based upon the District’s comment letter and additional information, we no longer consider these two municipal solid waste landfills to be major VOC sources, and therefore find that these sources are not 13 85 14 86 E:\FR\FM\30JNR1.SGM FR 1121 (January 8, 2020). FR 27756 (May 21, 2021). 30JNR1 42256 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations required to implement VOC RACT. As a result, the only District rule relied upon to implement RACT for non-CTG major sources of VOC is Rule 2.41, ‘‘Expandable Polystyrene Manufacturing Operations,’’ which implements limits VOC emissions from manufacture of expandable polystyrene products. As discussed in our April 11, 2023 (88 FR 21572) proposed action, Rule 2.41 implements RACT. We are therefore issuing a final approval of the RACT element for non-CTG major sources of VOC. This represents the only change from our proposed action, as summarized in Table 3 of this preamble below. TABLE 3—LIST OF RACT ELEMENTS—2008 OZONE NAAQS CTG document No. RACT element District rule implementing RACT Negative declaration submitted EPA proposed action EPA–450/R–75–102 ... Design Criteria for Stage I Vapor Control—Gasoline Service Stations. Surface Coating of Cans ....................................... Surface Coating of Coils ....................................... Surface Coating of Paper ...................................... Surface Coating of Fabric ..................................... Surface Coating of Automobiles and Light-Duty Trucks. Solvent Metal Cleaning ......................................... 2.22 (Gasoline Dispensing Facilities) ...................... Approval ...... Approval. ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ Yes Yes Yes Yes Yes None a None a None a None a None a None.a None.a None.a None.a None.a 2.31 (Solvent Cleaning and Degreasing). ............................................................ ...................... Approval ...... Approval. Yes ............... None a ......... None.a ...................... Approval ...... Approval. Yes ............... Yes ............... Yes ............... ...................... None a ......... None a ......... None a ......... Approval ...... None.a None.a None.a Approval. Yes ............... None a ......... None.a ...................... Approval ...... Approval. ...................... Approval ...... Approval. Yes ............... None a ......... None.a Yes ............... Yes ............... Yes ............... Yes ............... ...................... None a ......... None a ......... None a ......... None a ......... Approval ...... None.a None.a None.a None.a Approval. EPA–450/2–77–008 EPA–450/2–77–008 EPA–450/2–77–008 EPA–450/2–77–008 EPA–450/2–77–008 .... .... .... .... .... EPA–450/2–77–022 .... EPA–450/2–77–025 .... EPA–450/2–77–026 .... Refinery Vacuum Producing Systems, Wastewater Separators, and Process Unit Turnarounds. Tank Truck Gasoline Loading Terminals .............. EPA–450/2–77–032 EPA–450/2–77–033 EPA–450/2–77–034 EPA–450/2–77–035 .... .... .... .... Surface Coating of Metal Furniture ....................... Surface Coating of Insulation of Magnet Wire ...... Surface Coating of Large Appliances ................... Bulk Gasoline Plants ............................................. EPA–450/2–77–036 .... Storage of Petroleum Liquids in Fixed-Roof Tanks. Cutback Asphalt .................................................... EPA–450/2–77–037 .... EPA–450/2–78–015 .... EPA–450/2–78–029 .... EPA–450/2–78–030 EPA–450/2–78–032 EPA–450/2–78–033 EPA–450/2–78–036 EPA–450/2–78–047 .... .... .... .... .... EPA–450/2–78–051 .... EPA–450/3–82–009 .... EPA–450/3–83–006 .... EPA–450/3–83–007 .... EPA–450/3–83–008 .... EPA–450/3–84–015 .... EPA–450/4–91–031 .... EPA–453/R–96–007 ... EPA–453/R–94–032, 61 FR 44050; 8/27/ 96. EPA–453/R–97–004, 59 FR 29216; 6/06/ 94. EPA–453/R–06–001 ... ddrumheller on DSK120RN23PROD with RULES1 EPA–453/R–06–002 ... EPA–453/R–06–003 ... EPA–453/R–06–004 ... EPA 453/R–07–003 .... EPA 453/R–07–004 .... EPA 453/R–07–005 .... EPA 453/R–08–003 .... EPA 453/R–08–003 .... EPA 453/R–08–003 .... VerDate Sep<11>2014 Surface Coating of Miscellaneous Metal Parts and Products. Manufacture of Synthesized Pharmaceutical Products. Manufacture of Pneumatic Rubber Tires .............. Factory Surface Coating of Flat Wood Paneling .. Graphic Arts-Rotogravure and Flexography ......... Leaks from Petroleum Refinery Equipment .......... Petroleum Liquid Storage in External Floating Roof Tanks. Leaks from Gasoline Tank Trucks and Vapor Collection Systems. Large Petroleum Dry Cleaners .............................. Leaks from Synthetic Organic Chemical Polymer and Resin Manufacturing Equipment. Leaks from Natural Gas/Gasoline Processing Plants. Manufacture of High-Density Polyethylene, Polypropylene, and Polystyrene Resins. Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry. Reactor Processes and Distillation Operations in Synthetic Organic Chemical Manufacturing Industry. Wood Furniture Manufacturing Operations ........... ACT Surface Coating at Shipbuilding and Ship Repair Facilities Shipbuilding and Ship Repair Operations (Surface Coating). Aerospace MACT and Aerospace (CTG & MACT) Industrial Cleaning Solvents .................................. Offset Lithographic Printing and Letterpress Printing. Flexible Package Printing ...................................... Flat Wood Paneling Coatings ................................ Paper, Film, and Foil Coatings .............................. Large Appliance Coatings ..................................... Metal Furniture Coatings ....................................... Miscellaneous Metal Parts Coatings, Table 2— Metal Parts and Products. Miscellaneous Plastic Parts Coatings, Table 3— Plastic Parts and Products. Miscellaneous Plastic Parts Coatings, Table 4— Automotive/Transportation and Business Machine Plastic Parts. 19:14 Jun 29, 2023 Jkt 259001 PO 00000 Frm 00030 2.21 (Organic Liquid Storage and Transfer). ............................................................ ............................................................ ............................................................ 2.21 (Organic Liquid Storage and Transfer). ............................................................ 2.28 (Cutback and Emulsified Asphalts). 2.25 (Metal Parts and Products Coating Operations). ............................................................ ............... ............... ............... ............... ............... ......... ......... ......... ......... ......... EPA final action ............................................................ ............................................................ ............................................................ ............................................................ 2.21 (Organic Liquid Storage and Transfer). 2.21 (Organic Liquid Storage and Transfer). ............................................................ ............................................................ ...................... Approval ...... Approval. Yes ............... Yes ............... None a ......... None a ......... None.a None.a ............................................................ Yes ............... None a ......... None.a ............................................................ Yes ............... None a ......... None.a ............................................................ Yes ............... None a ......... None.a ............................................................ Yes ............... None a ......... None.a ............................................................ ............................................................ Yes ............... Yes ............... None a ......... None a ......... None.a None.a ............................................................ Yes ............... None a ......... None.a 2.31 (Solvent Cleaning and Degreasing). 2.29 (Graphic Arts Printing Operations). ............................................................ ............................................................ ............................................................ ............................................................ ............................................................ 2.25 (Metal Parts and Products Coating Operations). ............................................................ ...................... Approval ...... Approval. ...................... Approval ...... Approval. Yes ............... Yes ............... Yes ............... Yes ............... Yes ............... ...................... None a ......... None a ......... None a ......... None a ......... None a ......... Approval ...... None.a None.a None.a None.a None.a Approval. Yes ............... None a ......... None.a Yes ............... None a ......... None.a ............................................................ Fmt 4700 Sfmt 4700 E:\FR\FM\30JNR1.SGM 30JNR1 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations 42257 TABLE 3—LIST OF RACT ELEMENTS—2008 OZONE NAAQS—Continued CTG document No. RACT element District rule implementing RACT Negative declaration submitted EPA proposed action EPA 453/R–08–003 .... Miscellaneous Plastic Parts Coatings, Table 5— Pleasure Craft Surface Coating. Miscellaneous Plastic Parts Coatings, Table 6— Motor Vehicle Materials. Fiberglass Boat Manufacturing Materials .............. Miscellaneous Industrial Adhesives ...................... Automobile and Light-Duty Truck Assembly Coatings. Non-CTG Major Sources of NOX .......................... ............................................................ Yes ............... None a ......... None.a ............................................................ Yes ............... None a ......... None.a 2.30 (Polyester Resin Operations) .... 2.33 (Adhesive Operations) .............. ............................................................ ...................... ...................... Yes ............... Approval ...... Approval ...... None a ......... Approval. Approval. None.a 2.27 (Large Boilers) ........................... 2.32 (Stationary Internal Combustion Engines). 2.43 (Biomass Boilers) ...................... 2.41 (Expandable Polystyrene Manufacturing Operations). ...................... Disapproval b Disapproval.b ...................... Disapproval c Approval.d EPA 453/R–08–003 .... EPA 453/R–08–004 .... EPA 453/R–08–005 .... EPA 453/R–08–006 .... Non-CTG Major Sources of VOC .......................... EPA final action a Previously approved on April 5, 2018 (83 FR 14754). described in greater detail in the Technical Support Document (TSD), the proposed disapproval for the non-CTG major sources of NOX element is based in the deficiencies noted in Rule 2.43 (Biomass Boilers). c As described in greater detail in our TSD, the proposed disapproval for the non-CTG major sources of VOC element is based on the deficiencies noted in Rule 2.38 (Standards for Municipal Solid Waste Landfills). d As described in greater detail in Section II of this preamble, our final action approving the non-CTG major sources of VOC element is based upon the fact that Rule 2.41 implements RACT, and that Rule 2.38 is no longer relied upon to implement RACT. b As As authorized in section 110(k)(3) of the Act, the EPA is partially disapproving the 2017 RACT SIP with respect to the RACT element for nonCTG major sources of NOX, and partially approving the remainder of the 2017 RACT SIP. IV. Statutory and Executive Order Reviews Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 740(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA’s role is to review state choices, and approve those choices if they meet the minimum criteria of the Act. Accordingly, this final action partially approves and partially disapproves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by State law. Additional information about these statutes and Executive Orders can be found at https://www.epa.gov/lawsregulations/laws-and-executive-orders. ddrumheller on DSK120RN23PROD with RULES1 A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review This action is not a significant regulatory action and was therefore not submitted to the Office of Management and Budget (OMB) for review. B. Paperwork Reduction Act (PRA) This action does not impose an information collection burden under the PRA because this action does not impose additional requirements beyond those imposed by state law. VerDate Sep<11>2014 19:14 Jun 29, 2023 Jkt 259001 C. Regulatory Flexibility Act (RFA) I certify that this action will not have a significant economic impact on a substantial number of small entities under the RFA. This action will not impose any requirements on small entities beyond those imposed by state law. D. Unfunded Mandates Reform Act (UMRA) This action does not contain any unfunded mandate as described in UMRA, 2 U.S.C. 1531–1538, and does not significantly or uniquely affect small governments. This action does not impose additional requirements beyond those imposed by state law. Accordingly, no additional costs to state, local, or tribal governments, or to the private sector, will result from this action. E. Executive Order 13132: Federalism This action does not have federalism implications. It will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government. F. Executive Order 13175: Coordination With Indian Tribal Governments This action does not have tribal implications, as specified in Executive Order 13175, because the SIP is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction, and will not impose substantial direct costs on tribal governments or preempt tribal law. PO 00000 Frm 00031 Fmt 4700 Sfmt 4700 Thus, Executive Order 13175 does not apply to this action. G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks The EPA interprets Executive Order 13045 as applying only to those regulatory actions that concern environmental health or safety risks that the EPA has reason to believe may disproportionately affect children, per the definition of ‘‘covered regulatory action’’ in section 2–202 of the Executive Order. Therefore, this action is not subject to Executive Order 13045 because it merely partially approves and partially disapproves state law as meeting Federal requirements. Furthermore, the EPA’s Policy on Children’s Health does not apply to this action. H. Executive Order 13211: Actions That Significantly Affect Energy Supply, Distribution, or Use This action is not subject to Executive Order 13211, because it is not a significant regulatory action under Executive Order 12866. I. National Technology Transfer and Advancement Act (NTTAA) Section 12(d) of the NTTAA directs the EPA to use voluntary consensus standards in its regulatory activities unless to do so would be inconsistent with applicable law or otherwise impractical. The EPA believes that this action is not subject to the requirements of section 12(d) of the NTTAA because application of those requirements would be inconsistent with the CAA. E:\FR\FM\30JNR1.SGM 30JNR1 42258 Federal Register / Vol. 88, No. 125 / Friday, June 30, 2023 / Rules and Regulations J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Population Executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 59 FR 7629, February 16, 1994) directs Federal agencies to identify and address ‘‘disproportionately high and adverse human health or environmental effects’’ of their actions on minority populations and low-income populations to the greatest extent practicable and permitted by law. The EPA defines environmental justice (EJ) as ‘‘the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies.’’ The EPA further defines the term fair treatment to mean that ‘‘no group of people should bear a disproportionate burden of environmental harms and risks, including those resulting from the negative environmental consequences of industrial, governmental, and commercial operations or programs and policies.’’ The District did not evaluate environmental justice considerations as part of its SIP submittal; the CAA and applicable implementing regulations neither prohibit nor require such an evaluation. The EPA did not perform an EJ analysis and did not consider EJ in this action. Consideration of EJ is not required as part of this action, and there is no information in the record inconsistent with the stated goals of Executive Order 12898 of achieving environmental justice for people of color, low-income populations, and Indigenous peoples. K. Congressional Review Act (CRA) This action is subject to the CRA, and the EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). ddrumheller on DSK120RN23PROD with RULES1 L. Petitions for Judicial Review Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by August 29, 2023. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this rule for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and VerDate Sep<11>2014 16:27 Jun 29, 2023 Jkt 259001 shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements (see section 307(b)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen oxides, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds. Authority: 42 U.S.C. 7401 et seq. Dated: June 22, 2023. Martha Guzman Aceves, Regional Administrator, Region IX. For the reasons stated in the preamble, the Environmental Protection Agency amends part 52, chapter I, title 40 of the Code of Federal Regulations as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Authority: 42 U.S.C. 7401 et seq. Subpart F—California 2. Section 52.220 is amended by adding paragraph (c)(505)(ii)(A)(2) to read as follows: ■ Identification of plan—in part. * * * * * (c) * * * (505) * * * (ii) * * * (A) * * * (2) Reasonably Available Control Technology (RACT) State Implementation Plan (SIP) for the 2008 8-Hour Ozone National Ambient Air Quality Standards (NAAQS) (‘‘Reasonably Available Control Technology (RACT) State Implementation Plan (SIP) Analysis’’), as adopted on September 13, 2017, except the RACT determination for nonCTG major sources of NOX. * * * * * ■ 3. Section 52.237 is amended by adding paragraph (b)(6)(ii) to read as follows: § 52.237 Part D disapproval. * * * * * (b) * * * (6) * * * (ii) RACT determination for non-CTG major sources of Nitrogen Oxides (NOX) for the 2008 ozone NAAQS, as contained in the submittal titled ‘‘Reasonably Available Control PO 00000 Frm 00032 Fmt 4700 Sfmt 4700 [FR Doc. 2023–13754 Filed 6–29–23; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R09–OAR–2022–0338; FRL–10269– 02–R9] Approval, Limited Approval and Limited Disapproval of California Air Plan Revisions; Mojave Desert Air Quality Management District; Stationary Source Permits Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: The Environmental Protection Agency (EPA) is finalizing an approval and a limited approval and limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD or ‘‘District’’) portion of the California State Implementation Plan (SIP). These revisions concern the District’s New Source Review (NSR) permitting program for new and modified sources of air pollution under part D of title I of the Clean Air Act (CAA or ‘‘Act’’). This action updates the District’s portion of the California SIP with ten revised rules. Under the authority of the CAA, this action simultaneously approves local rules that regulate emission sources and directs the District to correct rule deficiencies. DATES: This rule is effective July 31, 2023. SUMMARY: 1. The authority citation for part 52 continues to read as follows: ■ § 52.220 Technology (RACT) State Implementation Plan (SIP) Analysis for the 2008 Federal Ozone Standard,’’ as adopted on September 13, 2017, and submitted on November 13, 2017. * * * * * The EPA has established a docket for this action under Docket ID No. EPA–R09–OAR–2022–0338. All documents in the docket are listed on the https://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through https:// www.regulations.gov, or please contact the person identified in the FOR FURTHER INFORMATION CONTACT section for additional availability information. If ADDRESSES: E:\FR\FM\30JNR1.SGM 30JNR1

Agencies

[Federal Register Volume 88, Number 125 (Friday, June 30, 2023)]
[Rules and Regulations]
[Pages 42252-42258]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-13754]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R09-OAR-2018-0160; FRL-10867-02-R9]


Air Plan Revisions; California; Yolo-Solano Air Quality 
Management District

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

[[Page 42253]]

SUMMARY: The Environmental Protection Agency (EPA) is taking final 
action to partially approve and partially disapprove a revision to the 
Yolo-Solano Air Quality Management District (YSAQMD) portion of the 
California State Implementation Plan (SIP). The revision concerns the 
YSAQMD's demonstration regarding reasonably available control 
technology (RACT) requirements for the 2008 8-hour ozone National 
Ambient Air Quality Standards (NAAQS or ``standards'') in the portion 
of the Sacramento Metropolitan nonattainment area under the 
jurisdiction of the YSAQMD.

DATES: This rule is effective July 31, 2023.

ADDRESSES: The EPA has established a docket for this action under 
Docket ID No. EPA-R09-OAR-2018-0160. All documents in the docket are 
listed on the https://www.regulations.gov website. Although listed in 
the index, some information is not publicly available, e.g., 
Confidential Business Information (CBI) or other information whose 
disclosure is restricted by statute. Certain other material, such as 
copyrighted material, is not placed on the internet and will be 
publicly available only in hard copy form. Publicly available docket 
materials are available through https://www.regulations.gov, or please 
contact the person identified in the FOR FURTHER INFORMATION CONTACT 
section for additional availability information. If you need assistance 
in a language other than English or if you are a person with a 
disability who needs a reasonable accommodation at no cost to you, 
please contact the person identified in the FOR FURTHER INFORMATION 
CONTACT section.

FOR FURTHER INFORMATION CONTACT: Eugene Chen, EPA Region IX, 75 
Hawthorne St., San Francisco, CA 94105. By phone: (415) 947-4304 or by 
email at chen.eugene[email protected].

SUPPLEMENTARY INFORMATION: Throughout this document, ``we,'' ``us'' and 
``our'' refer to the EPA.

Table of Contents

I. Proposed Action
II. Public Comments and EPA Responses
III. EPA Action
IV. Statutory and Executive Order Reviews

I. Proposed Action

    On April 11, 2023 (88 FR 21572), the EPA proposed to partially 
approve and partially disapprove the California Air Resources Board's 
(CARB) submittal of the YSAQMD's RACT SIP for the 2008 Ozone National 
Ambient Air Quality Standards (NAAQS), as listed in Table 1 below.

                                           Table 1--Submitted Document
----------------------------------------------------------------------------------------------------------------
              Local agency                               Document                     Adopted        Submitted
----------------------------------------------------------------------------------------------------------------
YSAQMD.................................  Reasonably Available Control Technology      09/13/2017      11/13/2017
                                          (RACT) State Implementation Plan (SIP)
                                          Analysis for the 2008 Federal Ozone
                                          Standard (``2017 RACT SIP'').
----------------------------------------------------------------------------------------------------------------

    We proposed to partially approve YSAQMD's 2017 RACT SIP because we 
determined that, except for the RACT elements for non-control technique 
guideline (CTG) major sources of nitrogen oxides (NOX) and 
volatile organic compounds (VOC), it complied with the relevant Clean 
Air Act (CAA or ``Act'') requirements. We proposed to partially 
disapprove YSAQMD's 2017 RACT SIP because we identified two 
deficiencies that would preclude us from fully approving the submittal. 
First, we found that District Rule 2.38, ``Standards for Municipal 
Solid Waste Landfills,'' which is relied upon to implement RACT for 
non-CTG major sources of VOC, has not been submitted for approval into 
the SIP, and therefore cannot be used to satisfy RACT requirements. 
Second, we found that District Rule 2.43, ``Biomass Boilers,'' which 
the District relied upon to implement RACT for non-CTG major sources of 
NOX, contains a provision that explicitly exempts affected 
units from complying with rule standards during periods of startup and 
shutdown and does not provide for an alternative emissions limitation 
during such periods. This provision is inconsistent with the EPA's 
Startup, Shutdown, and Malfunction (SSM) Policy as defined in the EPA's 
2015 SSM SIP Action.\1\ The deficiencies are discussed in more detail 
in our proposed action.
---------------------------------------------------------------------------

    \1\ ``State Implementation Plans: Response to Petition for 
Rulemaking; Restatement and Update of EPA's SSM Policy Applicable to 
SIPs; Findings of Substantial Inadequacy; and SIP Calls to Amend 
Provisions Applying to Excess Emissions During Periods of Startup, 
Shutdown and Malfunction,'' 80 FR 33839 (June 12, 2015).
---------------------------------------------------------------------------

II. Public Comments and EPA Responses

    The EPA's proposed action provided a 30-day public comment period, 
which concluded on May 11, 2023 (April 11, 2023 (88 FR 21572)). We 
received one comment letter regarding our proposed action, from the 
YSAQMD and dated May 10, 2023. We have summarized substantive adverse 
comments included in this comment letter and provided our responses 
below. In addition to the substantive comments summarized below, the 
District's letter includes information about recent progress it has 
made to address deficiencies related to SSM exemptions identified in 
Rule 2.43, and comments regarding the EPA's communication to the 
District about the identified deficiencies leading up to publication of 
the proposed rulemaking.\2\ The District's letter is included in the 
docket for this action.
---------------------------------------------------------------------------

    \2\ The District's revisions to Rule 2.43 were submitted by CARB 
to the EPA on June 8, 2023 via the State Plan electronic Collection 
System (SPeCS).
---------------------------------------------------------------------------

    Comment 1: The YSAQMD asserts that the District's 2017 RACT SIP 
identified the Recology Hay Road Landfill and the Yolo County Central 
Landfill as major sources of VOC in error. The District states that the 
VOC potential to emit (PTE) of each landfill is below the 25 tons per 
year (tpy) major source threshold for Severe nonattainment areas, and 
therefore not subject to VOC RACT requirements for major sources.
    Response 1: On May 17, 2023, the EPA emailed the District with a 
request for further clarification and documentation demonstrating that 
the VOC PTE of each landfill was below major source thresholds.\3\ On 
May 19, 2023, the District replied with permitting information for each 
facility and indicated that, when excluding fugitive landfill emissions 
in accordance with EPA guidance, the VOC PTE of the Recology Hay Road 
Landfill and Yolo County Central Landfill is 13.04 tpy and 24.7 tpy 
respectively, which are below major source thresholds.\4\ Based on this 
additional documentation, and for the reasons discussed below, we agree 
with the District that the Recology Hay Road

[[Page 42254]]

Landfill and Yolo County Central Landfill are not major sources of VOC, 
and are therefore not required to implement RACT for VOC.
---------------------------------------------------------------------------

    \3\ Email dated May 17, 2023, from Eugene Chen (EPA) to Paul 
Hensleigh (YSAQMD), Subject: ``RACT SIP Comment Letter follow up.''
    \4\ Email dated May 19, 2023, from Paul Hensleigh (YSAQMD) to 
Eugene Chen (EPA), Subject: ``Re: RACT SIP Comment Letter follow 
up.''
---------------------------------------------------------------------------

    The EPA defines fugitive emissions as ``those emissions which could 
not reasonably pass through a stack, chimney, vent, or other 
functionally-equivalent opening.'' \5\ A source's fugitive emissions 
must be included when determining whether it qualifies as a major 
source if the source falls within one of 27 listed source 
categories.\6\ Municipal solid waste landfills are not included in this 
list of source categories, and as a result are not required to include 
fugitive emissions toward major source applicability. Under additional 
EPA guidance related to landfills, if a landfill gas collection system 
is in operation, or if a landfill gas collection system could 
reasonably be designed to collect a landfill's gas emissions, then 
those collected emissions are not fugitive and shall be considered in 
determining facility PTE.\7\ Both Recology Hay Road and Yolo County 
Central Landfill operate with active gas collection systems, and 
therefore only the portion of landfill gas that is not collected can be 
considered fugitive and excluded from consideration in determining VOC 
PTE.
---------------------------------------------------------------------------

    \5\ 40 CFR 70.1; 70.2 (title V definitions). This definition 
also applies under the NSR program. See 40 CFR 51.165(a)(1)(ix).
    \6\ 40 CFR 70.2; 40 CFR 51.165(a)(1)(iv)(C).
    \7\ Memorandum dated October 21, 1994, from John S. Seitz, 
Director, Office of Air Quality Planning and Standards, U.S. EPA, to 
EPA Regional Air Directors, Regions I-X, Subject: ``Classification 
of Emissions from Landfills for NSR Applicability Purposes.''
---------------------------------------------------------------------------

    The current title V operating permit (Permit No. F-01059-18, issued 
November 10, 2022) and statement of basis for the Recology Hay Road 
Landfill lists the following emission units and corresponding VOC PTE: 
\8\
---------------------------------------------------------------------------

    \8\ See Permit No. F-01059-18, Recology Hay Road Landfill title 
V permit, Permit No. F-01059-18, Statement of Basis, and Permit to 
Operate, Unit ID P-86-06(a8).

               Table 1--Recology Hay Road Landfill VOC PTE
------------------------------------------------------------------------
          Unit ID               Equipment description     VOC PTE  (tpy)
------------------------------------------------------------------------
P-13-16....................  124-horsepower (hp)                    0.01
                              Caterpillar IC engine
                              (Certified Tier IV engine).
P-14-16(a).................  124-hp Caterpillar IC                  0.01
                              engine (Certified Tier IV
                              engine).
P-28-98(a).................  One (1) 500-gallon                     0.04
                              aboveground gasoline
                              storage tank, one gasoline
                              dispenser (1 nozzle), and
                              one gasoline pressure/
                              vacuum vent valve.
P-51-17....................  Various equipment including            0.01
                              two (2) portable crushers,
                              two (2) portable screens,
                              and two (2) stackers,
                              powered by Off-road
                              engines that also provide
                              propulsion.
P-64-00....................  Petroleum contaminated soil           13.00
                              handling for daily and
                              intermediate cover
                              material.
P-81-10....................  7-acre lined containment               0.01
                              pond and drying areas.
P-85-06(a8)................  Municipal Solid Waste                 24.62
                              landfill not to exceed a
                              total maximum design
                              capacity of 35.6 million
                              cubic yards (17.0 million
                              megagrams).
P-59-21....................  174-hp Caterpillar Engine              0.01
                              (Certified Tier IV engine).
                                                         ---------------
                                Total...................           37.66
                                                         ---------------
                                Total (excluding Unit ID           13.04
                                 P-85-06(a8)).
------------------------------------------------------------------------

    The YSAQMD asserts that the municipal solid waste landfill's 24.62 
tpy VOC PTE (Unit ID P-85-06(a8)) consists of landfill fugitive 
emissions. Excluding these emissions from consideration towards major 
source applicability would result in a facility-wide VOC PTE of 13.04 
tpy. Based upon a review of permitting information, we note that while 
Unit ID P-86-06(a8) includes fugitive VOC emissions from the landfill, 
it also includes VOC emissions from the flaring of landfill gas 
captured by the collection system.\9\ We do not consider it appropriate 
for VOC emissions from flaring activities to be considered fugitive 
since they represent the destruction of collected landfill gas. The 
title V permit and statement of basis do not identify the portion of 
VOC PTE attributable only to flaring activities, but based on the 
physical design and enforceable emission limits applicable to flaring 
activities, we estimate the VOC PTE to be 3.67 tpy.\10\ Including this 
3.67 tpy VOC PTE results in a facility wide VOC PTE of 16.71 tpy, which 
is below the Severe nonattainment area major source threshold of 25 
tpy. As a result, we agree that the Recology Hay Road Landfill is not a 
major source of VOC, and is not required to implement RACT for VOC.
---------------------------------------------------------------------------

    \9\ Id.
    \10\ Based upon a flare VOC permit limit of 14.1 ppm (@3% 
O2) and maximum flare heat rate of 45.6 MMBtu/hr.
---------------------------------------------------------------------------

    The current title V operating permit (Permit No. F-01392-8, issued 
March 13, 2018) and statement of basis for the Yolo County Central 
Landfill lists the following emission units and corresponding VOC PTE: 
\11\
---------------------------------------------------------------------------

    \11\ See Permit F-01392-8, Yolo County Central Landfill title V 
permit, Permit No. F-01392-8, Statement of Basis, and Emission 
Evaluation C-07-164.

              Table 2--Yolo County Central Landfill VOC PTE
------------------------------------------------------------------------
          Unit ID               Equipment description     VOC PTE  (tpy)
------------------------------------------------------------------------
P-15-05(a).................  Landfill not to exceed max            51.03
                              design capacity of 49
                              million cubic yards.
P-25-07....................  317-hp emergency engine                0.01
                              (Certified Tier III
                              engine).
P-31-10....................  Various equipment for        ..............
                              dewatering and aeration of
                              non hazardous liquid waste
                              with odor potential
                              (NHLWOP).
P-71-06(t).................  157-hp emergency engine                0.01
                              (Certified Tier II engine).
P-49-14....................  Receiving Storage and use    ..............
                              of NHLWOP.
P-90-18....................  In Vessel Digester                     0.93
                              Operation.
P-26-98(t2)................  Negative pressure landfill             2.73
                              gas collection system,
                              landfill gas flare.
P-78-98(t).................  Engine 1A, 805-hp landfill             4.11
                              gas IC engine.
P-79-98(t).................  Engine 2, 805-hp landfill              4.11
                              gas IC engine.

[[Page 42255]]

 
P-80-98(t).................  Engine 3, 805-hp landfill              4.25
                              gas IC engine.
P-81-98(t).................  Engine 4A, 805-hp landfill             4.22
                              gas IC engine.
P-87-98(t).................  Engine 5A, 805-hp landfill             4.22
                              gas IC engine.
P-28-17....................  Concrete crushing plant....  ..............
P-29-17....................  Screening of waste and wood  ..............
                              debris.
P-30-17....................  Grinding and shredding of              0.09
                              waste and wood debris.
                                                         ---------------
                                Total...................            75.7
                                                         ---------------
                                Total (excluding Unit P-            24.7
                                 15-05(a)).
------------------------------------------------------------------------

    The District asserts that the municipal solid waste landfill's 
51.03 tpy VOC PTE (Unit ID P-15-05(a)) consists of landfill fugitive 
emissions. Excluding these emissions from consideration towards major 
source applicability would result in a facility-wide VOC PTE of 24.7 
tpy. Based upon a review of permitting information, we agree that the 
51.03 VOC PTE attributable to P-15-05(a) are fugitive landfill 
emissions, and note that the gas collection system and landfill flare 
are accounted for separately as Unit ID P-26-98(t2). With regard to the 
other permitted emission units, and in particular the landfill gas 
engines that comprise the majority of the non-fugitive VOC PTE, we note 
that the facility's title V permit establishes several emission and 
operating limits on a per-engine basis, including annual VOC tpy 
limits, VOC concentration limits expressed in parts per million (ppm), 
and landfill gas fuel usage limitations expressed in million standard 
cubic feet per year (MMCF/yr). The title V permit also contains 
requirements for annual source testing, recordkeeping of fuel usage and 
operating hours, and reporting requirements to ensure the practical 
enforceability of emission and operating limits. In addition, the title 
V permit establishes a landfill flare VOC emission limit and landfill 
gas fuel usage limit for Unit ID P-26-98(t2), and also requires an 
annual source test, recordkeeping of landfill gas fuel usage, and for 
the flare to be operated within the parameter ranges established during 
the most recent source test. We consider these monitoring, reporting, 
and recordkeeping requirements to ensure the practical enforceability 
of emission limits for the landfill flare. Based upon this information, 
we agree with the District that the VOC PTE of the Yolo County Central 
Landfill is 24.7 tpy, which is below the Severe nonattainment area 
major source threshold of 25 tpy.\12\ As a result, we agree that the 
Yolo County Central Landfill is not a major source of VOC, and is not 
required to implement RACT for VOC. For this reason, as described 
below, we are issuing a final approval of the RACT element for non-CTG 
major sources of VOC.
---------------------------------------------------------------------------

    \12\ The 24.7 tpy VOC PTE relies on conservative assumptions 
regarding landfill gas usage and accordingly represents an 
overestimate of the facility's potential VOC emissions. For example, 
the aggregated landfill gas usage limits for the flare and engines 
(1,154 MMCF/yr) is greater than the total amount of landfill gas 
that is permitted to be collected from the landfill (997.1 MMCF/yr), 
per title V Permit No. F-01392-8, Conditions B.69 through B.80. 
Since the sum of destroyed landfill gas cannot exceed the total 
amount of collected landfill gas, the facility VOC PTE reflects a 
certain amount of double-counting. The amount of double-counting 
would be difficult to quantify precisely given the variety of 
landfill gas destruction scenarios, but as an example, if the 
entirety of the collected landfill gas were destroyed by the engines 
and not by the landfill flare, then the landfill flare VOC PTE of 
2.73 tpy would represent an additional margin between facility PTE 
and the major source threshold.
---------------------------------------------------------------------------

    Comment 2: The YSAQMD asserts that even if the landfills subject to 
its regulatory authority were major sources of VOC, they are subject to 
federally enforceable requirements that implement RACT through a 
combination of California's statewide landfill methane regulation (LMR) 
and an EPA Federal implementation plan (FIP). The District notes that 
the 2017 RACT SIP identifies landfill requirements as federally 
enforceable through California's CAA section 111(d) State Plan approved 
by the EPA on September 23, 1999. The District asserts that California 
later adopted and submitted its statewide LMR for SIP approval and that 
the EPA proposed to partially approve the LMR in 2020, and in May 2021 
proposed a FIP in 40 CFR part 62 subpart OOO to cover identified 
deficiencies in the LMR.
    Response 2: As discussed in our response to the previous comment, 
we agree with the District that the Recology Hay Road Landfill and Yolo 
County Central Landfill are not major sources of VOC, and are therefore 
not required to implement RACT for VOC. As a result, we do not consider 
it necessary to address issues regarding implementation of RACT at 
these sources. However, we wish to clarify that the EPA's approval of a 
performance standards plan under CAA section 111(d) is different from 
approval of a SIP submittal under CAA section 110. Thus, while we have 
issued both a final partial approval/partial disapproval of the 
California LMR \13\ and a final rule promulgating a partial Federal 
plan for municipal solid waste landfills under CAA section 111(d),\14\ 
we have not approved these landfill rules as a SIP revision under CAA 
section 110(k) or issued a FIP under CAA section 110(c), and we are 
unaware of any pending state submittal of the LMR or District landfill 
VOC RACT rules for SIP approval. The EPA's SIP approval of RACT-level 
control rules for landfills regulated by the District would ensure that 
any future major source landfills in the area meet RACT requirements. 
We invite the District or CARB to discuss this option further with the 
EPA.
---------------------------------------------------------------------------

    \13\ 85 FR 1121 (January 8, 2020).
    \14\ 86 FR 27756 (May 21, 2021).
---------------------------------------------------------------------------

III. EPA Action

    As discussed in Section II of this preamble above, we received a 
public comment from the YSAQMD providing additional information 
relevant to our proposed disapproval of the RACT element for non-CTG 
major sources of VOC. The basis for our proposed disapproval was the 
lack of enforceable SIP requirements implementing VOC RACT for two 
municipal solid waste landfills that the 2017 RACT SIP identified as 
non-CTG major sources of VOC. Based upon the District's comment letter 
and additional information, we no longer consider these two municipal 
solid waste landfills to be major VOC sources, and therefore find that 
these sources are not

[[Page 42256]]

required to implement VOC RACT. As a result, the only District rule 
relied upon to implement RACT for non-CTG major sources of VOC is Rule 
2.41, ``Expandable Polystyrene Manufacturing Operations,'' which 
implements limits VOC emissions from manufacture of expandable 
polystyrene products. As discussed in our April 11, 2023 (88 FR 21572) 
proposed action, Rule 2.41 implements RACT. We are therefore issuing a 
final approval of the RACT element for non-CTG major sources of VOC. 
This represents the only change from our proposed action, as summarized 
in Table 3 of this preamble below.

                                                    Table 3--List of RACT Elements--2008 Ozone NAAQS
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                   District rule      Negative declaration
        CTG document No.                 RACT element            implementing RACT          submitted        EPA proposed action     EPA final action
--------------------------------------------------------------------------------------------------------------------------------------------------------
EPA-450/R-75-102...............  Design Criteria for Stage I  2.22 (Gasoline          ....................  Approval............  Approval.
                                  Vapor Control--Gasoline      Dispensing
                                  Service Stations.            Facilities).
EPA-450/2-77-008...............  Surface Coating of Cans....  ......................  Yes.................  None \a\............  None.\a\
EPA-450/2-77-008...............  Surface Coating of Coils...  ......................  Yes.................  None \a\............  None.\a\
EPA-450/2-77-008...............  Surface Coating of Paper...  ......................  Yes.................  None \a\............  None.\a\
EPA-450/2-77-008...............  Surface Coating of Fabric..  ......................  Yes.................  None \a\............  None.\a\
EPA-450/2-77-008...............  Surface Coating of           ......................  Yes.................  None \a\............  None.\a\
                                  Automobiles and Light-Duty
                                  Trucks.
EPA-450/2-77-022...............  Solvent Metal Cleaning.....  2.31 (Solvent Cleaning  ....................  Approval............  Approval.
                                                               and Degreasing).
EPA-450/2-77-025...............  Refinery Vacuum Producing    ......................  Yes.................  None \a\............  None.\a\
                                  Systems, Wastewater
                                  Separators, and Process
                                  Unit Turnarounds.
EPA-450/2-77-026...............  Tank Truck Gasoline Loading  2.21 (Organic Liquid    ....................  Approval............  Approval.
                                  Terminals.                   Storage and Transfer).
EPA-450/2-77-032...............  Surface Coating of Metal     ......................  Yes.................  None \a\............  None.\a\
                                  Furniture.
EPA-450/2-77-033...............  Surface Coating of           ......................  Yes.................  None \a\............  None.\a\
                                  Insulation of Magnet Wire.
EPA-450/2-77-034...............  Surface Coating of Large     ......................  Yes.................  None \a\............  None.\a\
                                  Appliances.
EPA-450/2-77-035...............  Bulk Gasoline Plants.......  2.21 (Organic Liquid    ....................  Approval............  Approval.
                                                               Storage and Transfer).
EPA-450/2-77-036...............  Storage of Petroleum         ......................  Yes.................  None \a\............  None.\a\
                                  Liquids in Fixed-Roof
                                  Tanks.
EPA-450/2-77-037...............  Cutback Asphalt............  2.28 (Cutback and       ....................  Approval............  Approval.
                                                               Emulsified Asphalts).
EPA-450/2-78-015...............  Surface Coating of           2.25 (Metal Parts and   ....................  Approval............  Approval.
                                  Miscellaneous Metal Parts    Products Coating
                                  and Products.                Operations).
EPA-450/2-78-029...............  Manufacture of Synthesized   ......................  Yes.................  None \a\............  None.\a\
                                  Pharmaceutical Products.
EPA-450/2-78-030...............  Manufacture of Pneumatic     ......................  Yes.................  None \a\............  None.\a\
                                  Rubber Tires.
EPA-450/2-78-032...............  Factory Surface Coating of   ......................  Yes.................  None \a\............  None.\a\
                                  Flat Wood Paneling.
EPA-450/2-78-033...............  Graphic Arts-Rotogravure     ......................  Yes.................  None \a\............  None.\a\
                                  and Flexography.
EPA-450/2-78-036...............  Leaks from Petroleum         ......................  Yes.................  None \a\............  None.\a\
                                  Refinery Equipment.
EPA-450/2-78-047...............  Petroleum Liquid Storage in  2.21 (Organic Liquid    ....................  Approval............  Approval.
                                  External Floating Roof       Storage and Transfer).
                                  Tanks.
EPA-450/2-78-051...............  Leaks from Gasoline Tank     2.21 (Organic Liquid    ....................  Approval............  Approval.
                                  Trucks and Vapor             Storage and Transfer).
                                  Collection Systems.
EPA-450/3-82-009...............  Large Petroleum Dry          ......................  Yes.................  None \a\............  None.\a\
                                  Cleaners.
EPA-450/3-83-006...............  Leaks from Synthetic         ......................  Yes.................  None \a\............  None.\a\
                                  Organic Chemical Polymer
                                  and Resin Manufacturing
                                  Equipment.
EPA-450/3-83-007...............  Leaks from Natural Gas/      ......................  Yes.................  None \a\............  None.\a\
                                  Gasoline Processing Plants.
EPA-450/3-83-008...............  Manufacture of High-Density  ......................  Yes.................  None \a\............  None.\a\
                                  Polyethylene,
                                  Polypropylene, and
                                  Polystyrene Resins.
EPA-450/3-84-015...............  Air Oxidation Processes in   ......................  Yes.................  None \a\............  None.\a\
                                  Synthetic Organic Chemical
                                  Manufacturing Industry.
EPA-450/4-91-031...............  Reactor Processes and        ......................  Yes.................  None \a\............  None.\a\
                                  Distillation Operations in
                                  Synthetic Organic Chemical
                                  Manufacturing Industry.
EPA-453/R-96-007...............  Wood Furniture               ......................  Yes.................  None \a\............  None.\a\
                                  Manufacturing Operations.
EPA-453/R-94-032, 61 FR 44050;   ACT Surface Coating at       ......................  Yes.................  None \a\............  None.\a\
 8/27/96.                         Shipbuilding and Ship
                                  Repair Facilities
                                  Shipbuilding and Ship
                                  Repair Operations (Surface
                                  Coating).
EPA-453/R-97-004, 59 FR 29216;   Aerospace MACT and           ......................  Yes.................  None \a\............  None.\a\
 6/06/94.                         Aerospace (CTG & MACT).
EPA-453/R-06-001...............  Industrial Cleaning          2.31 (Solvent Cleaning  ....................  Approval............  Approval.
                                  Solvents.                    and Degreasing).
EPA-453/R-06-002...............  Offset Lithographic          2.29 (Graphic Arts      ....................  Approval............  Approval.
                                  Printing and Letterpress     Printing Operations).
                                  Printing.
EPA-453/R-06-003...............  Flexible Package Printing..  ......................  Yes.................  None \a\............  None.\a\
EPA-453/R-06-004...............  Flat Wood Paneling Coatings  ......................  Yes.................  None \a\............  None.\a\
EPA 453/R-07-003...............  Paper, Film, and Foil        ......................  Yes.................  None \a\............  None.\a\
                                  Coatings.
EPA 453/R-07-004...............  Large Appliance Coatings...  ......................  Yes.................  None \a\............  None.\a\
EPA 453/R-07-005...............  Metal Furniture Coatings...  ......................  Yes.................  None \a\............  None.\a\
EPA 453/R-08-003...............  Miscellaneous Metal Parts    2.25 (Metal Parts and   ....................  Approval............  Approval.
                                  Coatings, Table 2--Metal     Products Coating
                                  Parts and Products.          Operations).
EPA 453/R-08-003...............  Miscellaneous Plastic Parts  ......................  Yes.................  None \a\............  None.\a\
                                  Coatings, Table 3--Plastic
                                  Parts and Products.
EPA 453/R-08-003...............  Miscellaneous Plastic Parts  ......................  Yes.................  None \a\............  None.\a\
                                  Coatings, Table 4--
                                  Automotive/Transportation
                                  and Business Machine
                                  Plastic Parts.

[[Page 42257]]

 
EPA 453/R-08-003...............  Miscellaneous Plastic Parts  ......................  Yes.................  None \a\............  None.\a\
                                  Coatings, Table 5--
                                  Pleasure Craft Surface
                                  Coating.
EPA 453/R-08-003...............  Miscellaneous Plastic Parts  ......................  Yes.................  None \a\............  None.\a\
                                  Coatings, Table 6--Motor
                                  Vehicle Materials.
EPA 453/R-08-004...............  Fiberglass Boat              2.30 (Polyester Resin   ....................  Approval............  Approval.
                                  Manufacturing Materials.     Operations).
EPA 453/R-08-005...............  Miscellaneous Industrial     2.33 (Adhesive          ....................  Approval............  Approval.
                                  Adhesives.                   Operations).
EPA 453/R-08-006...............  Automobile and Light-Duty    ......................  Yes.................  None \a\............  None.\a\
                                  Truck Assembly Coatings.
                                 Non-CTG Major Sources of     2.27 (Large Boilers)..  ....................  Disapproval \b\       Disapproval.\b\
                                  NOX.                        2.32 (Stationary
                                                               Internal Combustion
                                                               Engines).
                                                              2.43 (Biomass Boilers)
                                 Non-CTG Major Sources of     2.41 (Expandable        ....................  Disapproval \c\       Approval.\d\
                                  VOC.                         Polystyrene
                                                               Manufacturing
                                                               Operations).
--------------------------------------------------------------------------------------------------------------------------------------------------------
\a\ Previously approved on April 5, 2018 (83 FR 14754).
\b\ As described in greater detail in the Technical Support Document (TSD), the proposed disapproval for the non-CTG major sources of NOX element is
  based in the deficiencies noted in Rule 2.43 (Biomass Boilers).
\c\ As described in greater detail in our TSD, the proposed disapproval for the non-CTG major sources of VOC element is based on the deficiencies noted
  in Rule 2.38 (Standards for Municipal Solid Waste Landfills).
\d\ As described in greater detail in Section II of this preamble, our final action approving the non-CTG major sources of VOC element is based upon the
  fact that Rule 2.41 implements RACT, and that Rule 2.38 is no longer relied upon to implement RACT.

    As authorized in section 110(k)(3) of the Act, the EPA is partially 
disapproving the 2017 RACT SIP with respect to the RACT element for 
non-CTG major sources of NOX, and partially approving the 
remainder of the 2017 RACT SIP.

IV. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP 
submission that complies with the provisions of the Act and applicable 
Federal regulations. 42 U.S.C. 740(k); 40 CFR 52.02(a). Thus, in 
reviewing SIP submissions, the EPA's role is to review state choices, 
and approve those choices if they meet the minimum criteria of the Act. 
Accordingly, this final action partially approves and partially 
disapproves state law as meeting Federal requirements and does not 
impose additional requirements beyond those imposed by State law.
    Additional information about these statutes and Executive Orders 
can be found at https://www.epa.gov/laws-regulations/laws-and-executive-orders.

A. Executive Order 12866: Regulatory Planning and Review and Executive 
Order 13563: Improving Regulation and Regulatory Review

    This action is not a significant regulatory action and was 
therefore not submitted to the Office of Management and Budget (OMB) 
for review.

B. Paperwork Reduction Act (PRA)

    This action does not impose an information collection burden under 
the PRA because this action does not impose additional requirements 
beyond those imposed by state law.

C. Regulatory Flexibility Act (RFA)

    I certify that this action will not have a significant economic 
impact on a substantial number of small entities under the RFA. This 
action will not impose any requirements on small entities beyond those 
imposed by state law.

D. Unfunded Mandates Reform Act (UMRA)

    This action does not contain any unfunded mandate as described in 
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect 
small governments. This action does not impose additional requirements 
beyond those imposed by state law. Accordingly, no additional costs to 
state, local, or tribal governments, or to the private sector, will 
result from this action.

E. Executive Order 13132: Federalism

    This action does not have federalism implications. It will not have 
substantial direct effects on the states, on the relationship between 
the national government and the states, or on the distribution of power 
and responsibilities among the various levels of government.

F. Executive Order 13175: Coordination With Indian Tribal Governments

    This action does not have tribal implications, as specified in 
Executive Order 13175, because the SIP is not approved to apply on any 
Indian reservation land or in any other area where the EPA or an Indian 
tribe has demonstrated that a tribe has jurisdiction, and will not 
impose substantial direct costs on tribal governments or preempt tribal 
law. Thus, Executive Order 13175 does not apply to this action.

G. Executive Order 13045: Protection of Children From Environmental 
Health Risks and Safety Risks

    The EPA interprets Executive Order 13045 as applying only to those 
regulatory actions that concern environmental health or safety risks 
that the EPA has reason to believe may disproportionately affect 
children, per the definition of ``covered regulatory action'' in 
section 2-202 of the Executive Order. Therefore, this action is not 
subject to Executive Order 13045 because it merely partially approves 
and partially disapproves state law as meeting Federal requirements. 
Furthermore, the EPA's Policy on Children's Health does not apply to 
this action.

H. Executive Order 13211: Actions That Significantly Affect Energy 
Supply, Distribution, or Use

    This action is not subject to Executive Order 13211, because it is 
not a significant regulatory action under Executive Order 12866.

I. National Technology Transfer and Advancement Act (NTTAA)

    Section 12(d) of the NTTAA directs the EPA to use voluntary 
consensus standards in its regulatory activities unless to do so would 
be inconsistent with applicable law or otherwise impractical. The EPA 
believes that this action is not subject to the requirements of section 
12(d) of the NTTAA because application of those requirements would be 
inconsistent with the CAA.

[[Page 42258]]

J. Executive Order 12898: Federal Actions To Address Environmental 
Justice in Minority Populations and Low-Income Population

    Executive Order 12898 (Federal Actions to Address Environmental 
Justice in Minority Populations and Low-Income Populations, 59 FR 7629, 
February 16, 1994) directs Federal agencies to identify and address 
``disproportionately high and adverse human health or environmental 
effects'' of their actions on minority populations and low-income 
populations to the greatest extent practicable and permitted by law. 
The EPA defines environmental justice (EJ) as ``the fair treatment and 
meaningful involvement of all people regardless of race, color, 
national origin, or income with respect to the development, 
implementation, and enforcement of environmental laws, regulations, and 
policies.'' The EPA further defines the term fair treatment to mean 
that ``no group of people should bear a disproportionate burden of 
environmental harms and risks, including those resulting from the 
negative environmental consequences of industrial, governmental, and 
commercial operations or programs and policies.''
    The District did not evaluate environmental justice considerations 
as part of its SIP submittal; the CAA and applicable implementing 
regulations neither prohibit nor require such an evaluation. The EPA 
did not perform an EJ analysis and did not consider EJ in this action. 
Consideration of EJ is not required as part of this action, and there 
is no information in the record inconsistent with the stated goals of 
Executive Order 12898 of achieving environmental justice for people of 
color, low-income populations, and Indigenous peoples.

K. Congressional Review Act (CRA)

    This action is subject to the CRA, and the EPA will submit a rule 
report to each House of the Congress and to the Comptroller General of 
the United States. This action is not a ``major rule'' as defined by 5 
U.S.C. 804(2).

L. Petitions for Judicial Review

    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by August 29, 2023. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this rule for the purposes of judicial 
review nor does it extend the time within which a petition for judicial 
review may be filed, and shall not postpone the effectiveness of such 
rule or action. This action may not be challenged later in proceedings 
to enforce its requirements (see section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Nitrogen oxides, Ozone, 
Reporting and recordkeeping requirements, Volatile organic compounds.

    Authority: 42 U.S.C. 7401 et seq.

    Dated: June 22, 2023.
Martha Guzman Aceves,
Regional Administrator, Region IX.

    For the reasons stated in the preamble, the Environmental 
Protection Agency amends part 52, chapter I, title 40 of the Code of 
Federal Regulations as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart F--California

0
2. Section 52.220 is amended by adding paragraph (c)(505)(ii)(A)(2) to 
read as follows:


Sec.  52.220  Identification of plan--in part.

* * * * *
    (c) * * *
    (505) * * *
    (ii) * * *
    (A) * * *
    (2) Reasonably Available Control Technology (RACT) State 
Implementation Plan (SIP) for the 2008 8-Hour Ozone National Ambient 
Air Quality Standards (NAAQS) (``Reasonably Available Control 
Technology (RACT) State Implementation Plan (SIP) Analysis''), as 
adopted on September 13, 2017, except the RACT determination for non-
CTG major sources of NOX.
* * * * *

0
3. Section 52.237 is amended by adding paragraph (b)(6)(ii) to read as 
follows:


Sec.  52.237  Part D disapproval.

* * * * *
    (b) * * *
    (6) * * *
    (ii) RACT determination for non-CTG major sources of Nitrogen 
Oxides (NOX) for the 2008 ozone NAAQS, as contained in the 
submittal titled ``Reasonably Available Control Technology (RACT) State 
Implementation Plan (SIP) Analysis for the 2008 Federal Ozone 
Standard,'' as adopted on September 13, 2017, and submitted on November 
13, 2017.
* * * * *
[FR Doc. 2023-13754 Filed 6-29-23; 8:45 am]