Combined Notice of Filings, 41953-41954 [2023-13760]
Download as PDF
Federal Register / Vol. 88, No. 123 / Wednesday, June 28, 2023 / Notices
Interconnect.2 The extension of time for
the Mainline System was granted on
August 23, 2022.3
Mountain Valley states that
construction and completion of the
Mainline System has been delayed due
to persistent litigation and resultant
repetitive permitting processes. The
Southgate Project has experienced its
own permitting delays, some of which
is directly tied to Mainline System
permitting.4
Mountain Valley asserts that even if
the Southgate Project had all of its
permits, the Mainline System permitting
delays would have prevented Mountain
Valley from commencing construction
of the Southgate Project under the terms
of the Certificate Order. In its request
Mountain Valley avers that the
circumstances have changed because
President Biden signed legislation that
will expedite the completion of the
Mainline System.5 Mountain Valley
affirms that it is awaiting permits from
the U.S. Army Corps of Engineers and
approval from the Commission to
resume full construction of the Mainline
System. Mountain Valley is targeting to
complete construction and commence
service on the Mainline System by the
end of 2023. After resolving Mainline
System permitting, Mountain Valley
plans to resume its permitting efforts for
the Southgate Project.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Mountain Valley’s request
for an extension of time may do so. No
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
ddrumheller on DSK120RN23PROD with NOTICES1
2 Mountain
Valley Pipeline, LLC, June 24, 2022
Request for Extension of Time. The Mountain
Valley Pipeline Project was certificated in Docket
No. CP16–10–000 and amended in Docket No.
CP21–477–000. The Greene Interconnect Project
was authorized in Docket No. CP19–477–000
pursuant to Mountain Valley’s blanket certificate.
3 Mountain Valley Pipeline, LLC, 180 FERC
¶ 61,117 (2022).
4 Mountain Valley Pipeline, LLC v. N.C. Dep’t of
Env’t Quality, 990 F.3d 818, 833 (4th Cir. 2021).
5 Fiscal Responsibility Act of 2023, H.R. 3746,
118th Cong. § 324 (2023).
VerDate Sep<11>2014
18:48 Jun 27, 2023
Jkt 259001
those extension requests that are
contested,6 the Commission will aim to
issue an order acting on the request
within 45 days.7 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.8 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.9 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.10 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TTY,
(202) 502–8659.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
6 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2022).
7 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
8 Id. at P 40.
9 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
10 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
41953
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Comment Date: 5:00 p.m. Eastern
Time on July 7, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–13759 Filed 6–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–376–000.
Applicants: Florida Public Utilities
Company, Chesapeake Utilities
Corporation—Central Florida Gas
Division.
Description: Joint Request of Florida
Public Utilities Company, et al. for
Extension of Limited Waiver et al.
Filed Date: 6/22/23.
Accession Number: 20230622–5021.
Comment Date: 5 p.m. ET 7/5/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\28JNN1.SGM
28JNN1
41954
Federal Register / Vol. 88, No. 123 / Wednesday, June 28, 2023 / Notices
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: June 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–13760 Filed 6–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–355–004;
ER16–141–006; ER15–255–005; ER10–
2032–010; ER10–2033–010; ER15–190–
021; ER12–2313–007; ER10–1330–009;
ER18–2466–002; ER18–2465–002;
ER19–2343–003; ER17–2336–007;
ER18–1343–015.
Applicants: Carolina Solar Power,
LLC, Shoreham Solar Commons LLC,
2018 ESA Project Company, LLC, Potter
Road Powerhouse LLC, Federal Way
Powerhouse LLC, North Allegheny
Wind, LLC, Laurel Hill Wind Energy,
LLC, Duke Energy Renewable Services,
LLC, Duke Energy Ohio, Inc., Duke
Energy Kentucky, Inc., Duke Energy
Beckjord Storage, LLC, Conetoe II Solar,
LLC, Colonial Eagle Solar, LLC.
Description: Supplement to December
20, 2022, Triennial Market Power
Analysis for Northeast Region of Duke
MBR Sellers.
Filed Date: 6/20/23.
Accession Number: 20230620–5241.
Comment Date: 5 p.m. ET 7/11/23.
Docket Numbers: ER22–1731–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Settlement Compliance Filing of MRES
in Response to May 23 Order to be
effective 7/1/2022.
Filed Date: 6/22/23.
Accession Number: 20230622–5019.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–1653–001.
VerDate Sep<11>2014
18:48 Jun 27, 2023
Jkt 259001
Applicants: Jersey Central Power &
Light Company, PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Jersey
Central Power & Light Company submits
tariff filing per 35.17(b): JCPL Responses
to Deficiency Letter in ER23–1653 to be
effective 6/17/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5035.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–1730–001.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Amendment to Q1 2023 Quarterly Filing
of CCSF’s WDT SA (SA 275) to be
effective 3/31/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5069.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–1876–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
2023–06–22–TSGT-Fox Run Bndry
Agrmt-743—Errata Filling to be effective
7/11/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5102.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2207–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, Service
Agreement No. 5616; Queue No. AD1–
143 to be effective 8/23/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5027.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2208–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6972; Queue No. AF1–167 to be
effective 8/1/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5032.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2209–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Service Agreement No.
913 to be effective 5/30/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5034.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2210–000.
Applicants: El Paso Electric Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 361 Cost Reimbursement
Agreement between SunZia and El Rio
Sol to be effective 5/31/2023.
Filed Date: 6/22/23.
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
Accession Number: 20230622–5046.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2211–000.
Applicants: El Paso Electric Company.
Description: Tariff Amendment:
Termination of Service Agreement No.
346, EPE—La Mesa PV I LLC SGIA As
Amended to be effective 6/5/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5051.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2212–000.
Applicants: New York Independent
System Operator, Inc., Consolidated
Edison Company of New York, Inc.
Description: § 205(d) Rate Filing: New
York Independent System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Con Edison Proposed FR Template and
Protocols in Rate Schedules 10 and 19
to be effective 8/22/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5080.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2213–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2491R11 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5081.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2214–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA and ICSA, Service
Agreement Nos. 6947 and 6948; Queue
No. AD2–066 to be effective 8/21/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5099.
Comment Date: 5 p.m. ET 7/13/23.
Docket Numbers: ER23–2215–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3675R4 Doniphan Electric Cooperative
Assn, Inc. NITSA NOA to be effective 9/
1/2023.
Filed Date: 6/22/23.
Accession Number: 20230622–5106.
Comment Date: 5 p.m. ET 7/13/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 88, Number 123 (Wednesday, June 28, 2023)]
[Notices]
[Pages 41953-41954]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-13760]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas & Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23-376-000.
Applicants: Florida Public Utilities Company, Chesapeake Utilities
Corporation--Central Florida Gas Division.
Description: Joint Request of Florida Public Utilities Company, et
al. for Extension of Limited Waiver et al.
Filed Date: 6/22/23.
Accession Number: 20230622-5021.
Comment Date: 5 p.m. ET 7/5/23.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 41954]]
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: June 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-13760 Filed 6-27-23; 8:45 am]
BILLING CODE 6717-01-P