Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 120 / Friday, June 23, 2023 / Notices (1) an existing 56.2-foot-high, 23-footwide steel support structure comprising a platform mounted to three piles embedded in the Cape Cod Canal; (2) an existing vertical turbine mounting pole that is attached to the platform and equipped with an electric lift; (3) a tidal turbine-generator unit that would have a maximum installed capacity of 50 kilowatts (kW); (4) a 50-kW inverter that would be located on the support structure and used to convert the generated power from Direct Current to Alternating Current; (5) an approximately 775-foot-long, 13.2kilovolt overhead transmission line that would connect the project to the regional grid; (6) an onshore station consisting of a 20-foot-long, 8-foot-wide modular steel structure that would house power control and data management equipment; and (7) appurtenant facilities. A variety of turbine-generator units would be tested at the project, but only one will be tested at a time. m. A copy of the application may be viewed on the Commission’s website at (https://www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those VerDate Sep<11>2014 18:01 Jun 22, 2023 Jkt 259001 who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ’’ FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Filing of response comments ..... Commission issues EA ............... Comments on EA ....................... July 16, 2023. August 15, 2023. September 2023. October 2023. p. Waiver of deadline to file competing applications filed pursuant to a notice of intent (NOI): Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application or an NOI to file such an application. Section 4.36(b)(2) of the Commission’s regulations, which allows 120 days from the specified intervention deadline date for interested parties to file competing development applications in which timely NOIs have been submitted, is hereby waived. Due to the expedited PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 41097 nature of the pilot project licensing procedures, an interested person who submits a timely NOI must file the competing development application no later than 30 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. An NOI must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. An NOI must be served on the applicant named in this public notice. Dated: June 16, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–13381 Filed 6–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas & Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: CP23–498–000. Applicants: Columbia Gas Transmission, LLC, Millennium Pipeline Company, L.L.C. Description: Joint Application of Columbia Gas Transmission, LLC, and Millennium Pipeline Company, LLC to Amend Certificates of Public Convenience and Necessity and Authorization to Abandon by Lease. Filed Date: 6/15/23. Accession Number: 20230615–5123. Comment Date: 5 p.m. ET 7/6/23. Docket Numbers: PR23–56–000. Applicants: The Narragansett Electric Company. Description: § 284.123(g) Rate Filing: RIE_284 Certification Periodic Rate Review_Amended SOC to be effective 6/ 16/2023. Filed Date: 6/16/23. Accession Number: 20230616–5015. Comment Date: 5 p.m. ET 7/7/23. Protest Date: 5 p.m. ET 8/15/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. E:\FR\FM\23JNN1.SGM 23JNN1 41098 Federal Register / Vol. 88, No. 120 / Friday, June 23, 2023 / Notices The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: June 16, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–13382 Filed 6–22–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2362–001. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2023– 06–16 Revisions to Comply with Order No. 881 to be effective 12/31/9998. Filed Date: 6/16/23. Accession Number: 20230616–5056. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–1732–001. Applicants: Shady Oaks Wind 2, LLC. Description: Tariff Amendment: Amendment to Certificate of Concurrence Filing (ER23–1732–) to be effective 4/28/2023. Filed Date: 6/16/23. Accession Number: 20230616–5038. Comment Date: 5 p.m. ET 6/26/23. Docket Numbers: ER23–1895–000. Applicants: Solar Partners XI, LLC. Description: Supplement to May 16, 2023, Solar Partners XI, LLC tariff filing. Filed Date: 6/15/23. VerDate Sep<11>2014 18:01 Jun 22, 2023 Jkt 259001 Accession Number: 20230615–5162. Comment Date: 5 p.m. ET 6/26/23. Docket Numbers: ER23–2151–000. Applicants: Connecticut Gas & Electric, Inc. Description: § 205(d) Rate Filing: CG&E Notice of Succession and MBR Tariff Revisions to be effective 6/17/2023. Filed Date: 6/16/23. Accession Number: 20230616–5016. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2152–000. Applicants: Energy Services Providers, Inc. Description: § 205(d) Rate Filing: ESP Notice of Succession and MBR Tariff Revisions to be effective 6/17/2023. Filed Date: 6/16/23. Accession Number: 20230616–5018. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2153–000. Applicants: Illinois Power Marketing Company. Description: § 205(d) Rate Filing: IPMC Notice of Succession and MBR Tariff Revisions to be effective 6/17/ 2023. Filed Date: 6/16/23. Accession Number: 20230616–5019. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2154–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Notice of Cancellation of WMPA, SA No. 6424; Queue No. AG1–246 re: Breach to be effective 8/15/2022. Filed Date: 6/16/23. Accession Number: 20230616–5021. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2155–000. Applicants: Massachusetts Gas & Electric, Inc. Description: § 205(d) Rate Filing: MG&E Notice of Succession and MBR Tariff Revisions to be effective 6/17/2023. Filed Date: 6/16/23. Accession Number: 20230616–5024. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2156–000. Applicants: Public Power & Utility of NY, Inc. Description: § 205(d) Rate Filing: PP&U NY Notice of Succession and MBR Tariff Revisions to be effective 6/17/2023. Filed Date: 6/16/23. Accession Number: 20230616–5025. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2157–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1887R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Filed Date: 6/16/23. Accession Number: 20230616–5027. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2158–000. Applicants: Northern Indiana Public Service Company LLC. Description: § 205(d) Rate Filing: Morgan CIAC Agreement to be effective 10/1/2023. Filed Date: 6/16/23. Accession Number: 20230616–5028. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2159–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1889R12 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 6/16/23. Accession Number: 20230616–5037. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2160–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1891R12 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 6/16/23. Accession Number: 20230616–5043. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2161–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Pachuta Solar A (Solar & ESS) LGIA Filing to be effective 6/5/2023. Filed Date: 6/16/23. Accession Number: 20230616–5069. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2162–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.15: Three Rocks Solar Amended & Restated LGIA Termination Filing to be effective 6/16/2023. Filed Date: 6/16/23. Accession Number: 20230616–5070. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2163–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1897R13 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2023. Filed Date: 6/16/23. Accession Number: 20230616–5071. Comment Date: 5 p.m. ET 7/7/23. Docket Numbers: ER23–2164–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. E:\FR\FM\23JNN1.SGM 23JNN1

Agencies

[Federal Register Volume 88, Number 120 (Friday, June 23, 2023)]
[Notices]
[Pages 41097-41098]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-13382]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas & Oil Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: CP23-498-000.
    Applicants: Columbia Gas Transmission, LLC, Millennium Pipeline 
Company, L.L.C.
    Description: Joint Application of Columbia Gas Transmission, LLC, 
and Millennium Pipeline Company, LLC to Amend Certificates of Public 
Convenience and Necessity and Authorization to Abandon by Lease.
    Filed Date: 6/15/23.
    Accession Number: 20230615-5123.
    Comment Date: 5 p.m. ET 7/6/23.

    Docket Numbers: PR23-56-000.
    Applicants: The Narragansett Electric Company.
    Description: Sec.  284.123(g) Rate Filing: RIE_284 Certification 
Periodic Rate Review_Amended SOC to be effective 6/16/2023.
    Filed Date: 6/16/23.
    Accession Number: 20230616-5015.
    Comment Date: 5 p.m. ET 7/7/23.
    Protest Date: 5 p.m. ET 8/15/23.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

[[Page 41098]]

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: June 16, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-13382 Filed 6-22-23; 8:45 am]
BILLING CODE 6717-01-P