Great Basin Gas Transmission Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Great Basin 2024 Expansion Project, 40807-40809 [2023-13265]

Download as PDF Federal Register / Vol. 88, No. 119 / Thursday, June 22, 2023 / Notices landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: June 15, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–13261 Filed 6–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–466–000] ddrumheller on DSK120RN23PROD with NOTICES1 Great Basin Gas Transmission Company; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Great Basin 2024 Expansion Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document, that will discuss the environmental impacts of the Great Basin 2024 Expansion Project (Project) involving construction and operation of facilities by Great Basin Gas Transmission Company (Great Basin) in Douglas, Lyon, and Storey Counties, Nevada. The Commission will use this environmental document in its decision-making process to determine whether the Project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the Project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and Environmental Document section of this notice. VerDate Sep<11>2014 18:01 Jun 21, 2023 Jkt 259001 By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC, on or before 5:00 p.m. Eastern Time on July 17, 2023. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written comments during the preparation of the environmental document. If you submitted comments on this Project to the Commission before the opening of this docket on May 1, 2023, you will need to file those comments in Docket No. CP23–466–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this Project. State and local government representatives should notify their constituents of this proposed Project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the Project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters. Great Basin provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 40807 To Know?’’ which addresses typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas, Landowner Topics link. Public Participation There are three methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the Project docket number (CP23–466–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Additionally, the Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// E:\FR\FM\22JNN1.SGM 22JNN1 40808 Federal Register / Vol. 88, No. 119 / Thursday, June 22, 2023 / Notices www.ferc.gov/ferc-online/overview to register for eSubscription. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. ddrumheller on DSK120RN23PROD with NOTICES1 Summary of the Proposed Project Great Basin proposes to expand its certificated natural gas transportation capacity downstream of its existing Wadsworth Receipt Point in Douglas, Lyon, and Storey Counties, Nevada. According to Great Basin, the Project would provide 5.7 million standard cubic feet (MMscf) per day of incremental firm transportation service to meet the growth requirements of two existing firm transportation shippers (Southwest Gas-NN and Southwest GasNC). The expansion would require construction of approximately 3.41 miles of upsized or looped pipeline in three segments along Great Basin’s Carson and South Tahoe Laterals. The Project would consist of the following facilities and activities: • installation of approximately 0.25 miles of new 20-inch-diameter steel pipeline loop (Truckee Canal segment) 1 along the Carson Lateral in Storey County, Nevada; • abandonment and replacement of approximately 2.88 miles of existing 10inch-diameter steel pipeline with new 20-inch-diameter steel pipeline (Silver Springs segment) along the Carson Lateral in Lyon County, Nevada; • installation of approximately 0.28 miles of 12-inch-diameter steel pipeline loop (Kingsbury segment) along the South Tahoe Lateral in Douglas County, Nevada; and • installation and abandonment of associated auxiliary or appurtenant facilities. The general location of the Project facilities is shown in appendix 1.2 1 A pipeline loop is a segment of pipe constructed parallel to an existing pipeline to increase capacity. 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’. For instructions on connecting to eLibrary, refer to the last page of this notice. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at VerDate Sep<11>2014 18:01 Jun 21, 2023 Jkt 259001 Land Requirements for Construction Construction of the Project would disturb about 54.3 acres of land. Following construction, Great Basin would maintain 21.0 acres for permanent operation of the Project’s facilities; the remaining acreage would be restored and revert to former uses. About 48.5% (26.3 acres) of the construction footprint would overlap with existing pipeline rights-of-way or existing Great Basin facilities. Approximately 90.0% (18.89 acres) of the operational footprint for the Project would overlap with existing operational footprints of other Great Basin facilities. NEPA Process and the Environmental Document Any environmental document issued by the Commission will discuss impacts that could occur as a result of the construction and operation of the proposed Project under the relevant general resource areas: • geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use and visual resources; • socioeconomics and traffic; • environmental justice; • air quality and noise; and • reliability and safety. Commission staff will also evaluate reasonable alternatives to the proposed Project or portions of the Project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document. Following this scoping period, Commission staff will determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff’s independent analysis of the issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed Project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/ Notice of Schedule will be issued, which will open an additional comment FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 period. Staff will then prepare a draft EIS which will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary 3 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the environmental document is issued. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this Project to formally cooperate in the preparation of the environmental document.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the Project’s potential effects on historic properties.5 The environmental document for this Project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other 3 For instructions on connecting to eLibrary, refer to the last page of this notice. 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at title 40, Code of Federal Regulations, section 1501.8. 5 The Advisory Council on Historic Preservation’s regulations are at title 36, Code of Federal Regulations, part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\22JNN1.SGM 22JNN1 Federal Register / Vol. 88, No. 119 / Thursday, June 22, 2023 / Notices interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for Project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the Project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed Project. If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps: (1) Send an email to GasProjectAddressChange@ferc.gov stating your request. You must include the docket number CP23–466–0000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments. OR (2) Return the attached ‘‘Mailing List Update Form’’ (appendix 2). ddrumheller on DSK120RN23PROD with NOTICES1 Additional Information Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. VerDate Sep<11>2014 18:01 Jun 21, 2023 Jkt 259001 Dated: June 15, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–13265 Filed 6–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2188–284] NorthWestern Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-capacity Amendment of License. b. Project No: 2188–284. c. Date Filed: June 2, 2023, and supplemented June 9, 2023. d. Applicant: NorthWestern Corporation (licensee). e. Name of Project: Missouri-Madison Hydroelectric Project. f. Location: The project consists of nine hydroelectric developments located on the Madison and Missouri Rivers in Gallatin, Madison, Lewis and Clark, and Cascade counties, in southwestern Montana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Carrie Harris, Manager Hydro Engineering, Northwestern Corporation, 11 East Park Street, Butte, Montana 59701, (406) 497–3429, carrie.harris@ northwestern.com and John Tabaracci, Senior Corporate Counsel, Northwestern Corporation, 208 North Montana Avenue, Suite 205, Helena, Montana 59601 (406) 443–8983, john.tabaracci@ northwestern.com. i. FERC Contact: Jeremy Jessup, (202) 502–6779, Jeremy.Jessup@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: July 17, 2023. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 40809 FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–2188–284. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee proposes to replace the Unit 1 turbine and generator at the Hauser Development. The proposed upgrade would result in a 0.58 megawatt (MW) increase in the authorized installed capacity of the development, to 19.32 MW, and would result in an increase to the hydraulic capacity of the development of 1.43%, from 4,496 cubic feet per second (cfs) to 4,560 cfs. The total authorized installed capacity for the entire project would increase from 318.47 MW to 319.05 MW. The licensee states that the proposed amendment would not cause any change in the operation of the project or have quantifiable environmental effects, and only a minor effect on hydraulic flows. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/esubscription. asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. E:\FR\FM\22JNN1.SGM 22JNN1

Agencies

[Federal Register Volume 88, Number 119 (Thursday, June 22, 2023)]
[Notices]
[Pages 40807-40809]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-13265]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-466-000]


Great Basin Gas Transmission Company; Notice of Scoping Period 
Requesting Comments on Environmental Issues for the Proposed Great 
Basin 2024 Expansion Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document, that will discuss 
the environmental impacts of the Great Basin 2024 Expansion Project 
(Project) involving construction and operation of facilities by Great 
Basin Gas Transmission Company (Great Basin) in Douglas, Lyon, and 
Storey Counties, Nevada. The Commission will use this environmental 
document in its decision-making process to determine whether the 
Project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the Project. As part of the National Environmental 
Policy Act (NEPA) review process, the Commission takes into account 
concerns the public may have about proposals and the environmental 
impacts that could result from its action whenever it considers the 
issuance of a Certificate of Public Convenience and Necessity. This 
gathering of public input is referred to as ``scoping.'' The main goal 
of the scoping process is to focus the analysis in the environmental 
document on the important environmental issues. Additional information 
about the Commission's NEPA process is described below in the NEPA 
Process and Environmental Document section of this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC, on or 
before 5:00 p.m. Eastern Time on July 17, 2023. Comments may be 
submitted in written form. Further details on how to submit comments 
are provided in the Public Participation section of this notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written comments during the preparation of the 
environmental document.
    If you submitted comments on this Project to the Commission before 
the opening of this docket on May 1, 2023, you will need to file those 
comments in Docket No. CP23-466-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this Project. State and local government 
representatives should notify their constituents of this proposed 
Project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the Project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law. The Commission does 
not subsequently grant, exercise, or oversee the exercise of that 
eminent domain authority. The courts have exclusive authority to handle 
eminent domain cases; the Commission has no jurisdiction over these 
matters.
    Great Basin provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' which addresses typically asked questions, including 
the use of eminent domain and how to participate in the Commission's 
proceedings. This fact sheet along with other landowner topics of 
interest are available for viewing on the FERC website (www.ferc.gov) 
under the Natural Gas, Landowner Topics link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the Project docket number (CP23-
466-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Additionally, the Commission offers a free service called 
eSubscription which makes it easy to stay informed of all issuances and 
submittals regarding the dockets/projects to which you subscribe. These 
instant email notifications are the fastest way to receive notification 
and provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://

[[Page 40808]]

www.ferc.gov/ferc-online/overview to register for eSubscription.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

Summary of the Proposed Project

    Great Basin proposes to expand its certificated natural gas 
transportation capacity downstream of its existing Wadsworth Receipt 
Point in Douglas, Lyon, and Storey Counties, Nevada. According to Great 
Basin, the Project would provide 5.7 million standard cubic feet 
(MMscf) per day of incremental firm transportation service to meet the 
growth requirements of two existing firm transportation shippers 
(Southwest Gas-NN and Southwest Gas-NC). The expansion would require 
construction of approximately 3.41 miles of upsized or looped pipeline 
in three segments along Great Basin's Carson and South Tahoe Laterals.
    The Project would consist of the following facilities and 
activities:
     installation of approximately 0.25 miles of new 20-inch-
diameter steel pipeline loop (Truckee Canal segment) \1\ along the 
Carson Lateral in Storey County, Nevada;
---------------------------------------------------------------------------

    \1\ A pipeline loop is a segment of pipe constructed parallel to 
an existing pipeline to increase capacity.
---------------------------------------------------------------------------

     abandonment and replacement of approximately 2.88 miles of 
existing 10-inch-diameter steel pipeline with new 20-inch-diameter 
steel pipeline (Silver Springs segment) along the Carson Lateral in 
Lyon County, Nevada;
     installation of approximately 0.28 miles of 12-inch-
diameter steel pipeline loop (Kingsbury segment) along the South Tahoe 
Lateral in Douglas County, Nevada; and
     installation and abandonment of associated auxiliary or 
appurtenant facilities.
    The general location of the Project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary''. For instructions on 
connecting to eLibrary, refer to the last page of this notice. At 
this time, the Commission has suspended access to the Commission's 
Public Reference Room. For assistance, contact FERC at 
[email protected] or call toll free, (886) 208-3676 or TTY 
(202) 502-8659.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the Project would disturb about 54.3 acres of land. 
Following construction, Great Basin would maintain 21.0 acres for 
permanent operation of the Project's facilities; the remaining acreage 
would be restored and revert to former uses. About 48.5% (26.3 acres) 
of the construction footprint would overlap with existing pipeline 
rights-of-way or existing Great Basin facilities. Approximately 90.0% 
(18.89 acres) of the operational footprint for the Project would 
overlap with existing operational footprints of other Great Basin 
facilities.

NEPA Process and the Environmental Document

    Any environmental document issued by the Commission will discuss 
impacts that could occur as a result of the construction and operation 
of the proposed Project under the relevant general resource areas:
     geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use and visual resources;
     socioeconomics and traffic;
     environmental justice;
     air quality and noise; and
     reliability and safety.
    Commission staff will also evaluate reasonable alternatives to the 
proposed Project or portions of the Project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or the EIS will present Commission 
staff's independent analysis of the issues. If Commission staff 
prepares an EA, a Notice of Schedule for the Preparation of an 
Environmental Assessment will be issued. The EA may be issued for an 
allotted public comment period. The Commission would consider timely 
comments on the EA before making its decision regarding the proposed 
Project. If Commission staff prepares an EIS, a Notice of Intent to 
Prepare an EIS/Notice of Schedule will be issued, which will open an 
additional comment period. Staff will then prepare a draft EIS which 
will be issued for public comment. Commission staff will consider all 
timely comments received during the comment period on the draft EIS and 
revise the document, as necessary, before issuing a final EIS. Any EA 
or draft and final EIS will be available in electronic format in the 
public record through eLibrary \3\ and the Commission's natural gas 
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you 
will receive instant email notification when the environmental document 
is issued.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this Project to formally cooperate in the 
preparation of the environmental document.\4\ Agencies that would like 
to request cooperating agency status should follow the instructions for 
filing comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at title 40, Code of Federal 
Regulations, section 1501.8.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the Project's potential 
effects on historic properties.\5\ The environmental document for this 
Project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at title 36, Code of Federal Regulations, part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other

[[Page 40809]]

interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for Project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the Project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed Project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to [email protected] stating your 
request. You must include the docket number CP23-466-0000 in your 
request. If you are requesting a change to your address, please be sure 
to include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments.
    OR
    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at [email protected] or (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: June 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-13265 Filed 6-21-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.