Combined Notice of Filings #1, 39421-39422 [2023-12967]
Download as PDF
Federal Register / Vol. 88, No. 116 / Friday, June 16, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–95–000.
Applicants: Quantum Pleasants, LLC,
ETEM Remediation Two LLC, Pleasants
LLC, Energy Harbor LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Quantum
Pleasants, et al.
Filed Date: 6/8/23.
Accession Number: 20230608–5174.
Comment Date: 5 p.m. ET 6/29/23.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–191–000.
Applicants: ETEM Remediation Two
LLC.
Description: ETEM Remediation Two
LLC submits Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 6/9/23.
Accession Number: 20230609–5206.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: EG23–192–000.
Applicants: Glover Creek Solar, LLC.
Description: Glover Creek Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 6/12/23.
Accession Number: 20230612–5107.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: EG23–193–000.
Applicants: PGR 2022 Lessee 9, LLC.
Description: PGR 2022 Lessee 9, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 6/12/23.
Accession Number: 20230612–5109.
Comment Date: 5 p.m. ET 7/3/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1298–005.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2023–
06–12_MISO TO’s Order 864 Additional
Deficiency Response to be effective N/
A.
Filed Date: 6/12/23.
Accession Number: 20230612–5129.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–1407–001.
Applicants: Transource Pennsylvania,
LLC, PJM Interconnection, L.L.C.
Description: Tariff Amendment:
Transource Pennsylvania, LLC submits
tariff filing per 35.17(b): Transource
VerDate Sep<11>2014
17:43 Jun 15, 2023
Jkt 259001
Responses to Deficiency Letter in ER23–
1407 to be effective 5/16/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5104.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–1731–001.
Applicants: GSG 6, LLC.
Description: Tariff Amendment:
Supplement to SFA with Shady Oaks 2
with Waivers to be effective 4/28/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5098.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2111–000;
TS23–7–000.
Applicants: Umbriel Solar, LLC,
Umbriel Solar, LLC.
Description: Request for Waiver, et al.
of Umbriel Solar, LLC.
Filed Date: 6/9/23.
Accession Number: 20230609–5115.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2114–000.
Applicants: Energy Harbor LLC.
Description: Request for Waiver and
Expedited Consideration of Energy
Harbor LLC.
Filed Date: 6/8/23.
Accession Number: 20230608–5172.
Comment Date: 5 p.m. ET 6/29/23.
Docket Numbers: ER23–2115–000.
Applicants: ITC Midwest LLC.
Description: Tariff Amendment:
Cancellation of Agreements with CIPCO
to be effective 6/20/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5039.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2116–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, Service Agreement No.
5472; Queue No. AD2–194 to be
effective 5/11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5058.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2117–000.
Applicants: NSTAR Electric
Company.
Description: Tariff Amendment:
Cancellation of Medway Grid, LLC—
Engineering, Design and Procurement
Agreement to be effective 6/13/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5068.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2118–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original UCSA, Service Agreement No.
6946; Queue Position J1464 to be
effective 5/12/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5069.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
39421
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2119–000.
Applicants: SP Cimarron I, LLC.
Description: § 205(d) Rate Filing: SP
Cimarron I MBR Tariff Amendment
Filing (Seller Category) to be effective 8/
11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5089.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2120–000.
Applicants: Campo Verde Solar, LLC.
Description: § 205(d) Rate Filing:
Campo Verde MBR Tariff Amendment
Filing (Seller Category) to be effective 8/
11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5091.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2121–000.
Applicants: Freeport-McMoRan
Copper & Gold Energy Services, LLC.
Description: Compliance filing: WECC
Soft Price Cap September 2022 Sale to
be effective N/A.
Filed Date: 6/12/23.
Accession Number: 20230612–5094.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2122–000.
Applicants: Jersey Central Power &
Light Company.
Description: Jersey Central Power &
Light Submits A Notice of Cancellation
of the Interchange Agreement between
Central Hudson Gas & Electric
Corporation and Jersey Central Power &
Light Company, designated as JCP&L
Rate Schedule FPC 34.
Filed Date: 6/9/23.
Accession Number: 20230609–5215.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2123–000.
Applicants: Silver Run Electric, LLC,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Silver Run Electric, LLC submits tariff
filing per 35.13(a)(2)(iii: Silver Run
Incentive Rate Abandonment Recovery
And Formula Rate Updates to be
effective 8/14/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5113.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23–2124–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to NSA, SA No. 6376;
Queue Nos. AC2–100/AD1–131 (amend)
to be effective 8/12/2023.
Filed Date: 6/12/23.
Accession Number: 20230612–5114.
Comment Date: 5 p.m. ET 7/3/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
E:\FR\FM\16JNN1.SGM
16JNN1
39422
Federal Register / Vol. 88, No. 116 / Friday, June 16, 2023 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: June 12, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–12967 Filed 6–15–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–194–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Transcontinental Gas Pipe Line
Company, LLC; Notice of Schedule for
the Preparation of an Environmental
Assessment for the Alabama Georgia
Connector Project
On April 19, 2023, Transcontinental
Gas Pipe Line Company, LLC (Transco)
filed an application in Docket No.
CP23–194–000 requesting a Certificate
of Public Convenience and Necessity
pursuant to section 7(c) of the Natural
Gas Act to construct and operate certain
natural gas pipeline facilities. The
proposed project is known as the
Alabama Georgia Connector Project
(Project), and would provide Transco’s
Project Customers with firm access to
63,800 dekatherms per day of
incremental natural gas supply, increase
overall system reliability, and add
VerDate Sep<11>2014
17:43 Jun 15, 2023
Jkt 259001
natural gas infrastructure to meet
growing demand in Georgia.
On May 3, 2023, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s environmental document for the
Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA—November 27, 2023
90-day Federal Authorization Decision
Deadline 2—February 25, 2024
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Transco proposes to construct and
operate various modifications at five
existing compressor stations in Marengo
and Randolph Counties, Alabama, and
Coweta, Henry, and Walton Counties,
Georgia. These modifications include rewheeling two existing compressors at
Compressor Station 90 in Marengo
County; increasing horsepower (hp) of
two natural gas-fired compressor units
from 35,500 hp to 39,365 hp at
Compressor Station 110 in Randolph
County; re-wheeling three compressor
units at Compressor Station 115 in
Coweta County; replacing a 12,000 hp
compressor unit with a 22,500 hp unit
at Compressor Station 120 in Henry
County; and increasing the hp of
Compressor Station 125 in Walton
County from 49,800 hp to 55,800 hp.
Background
On June 2, 2023, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
Alabama Georgia Connector Project
(Notice of Scoping). The Notice of
1 40
CFR 1501.10 (2020).
2 The
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
PO 00000
Frm 00031
Fmt 4703
Sfmt 9990
Scoping was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. All substantive
comments received in response to the
Notice of Scoping will be addressed in
the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members, and
others access publicly available
information and navigate the
Commission processes. For public
inquiries and assistance with making
filings such as interventions, comments,
or requests for rehearing, the public is
encouraged to contact OPP at (202)502–
6595 or OPP@ferc.gov.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ (i.e., CP23–194), and follow
the instructions. For assistance with
access to eLibrary, the helpline can be
reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: June 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–12945 Filed 6–15–23; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 88, Number 116 (Friday, June 16, 2023)]
[Notices]
[Pages 39421-39422]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12967]
[[Page 39421]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-95-000.
Applicants: Quantum Pleasants, LLC, ETEM Remediation Two LLC,
Pleasants LLC, Energy Harbor LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Quantum Pleasants, et al.
Filed Date: 6/8/23.
Accession Number: 20230608-5174.
Comment Date: 5 p.m. ET 6/29/23.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-191-000.
Applicants: ETEM Remediation Two LLC.
Description: ETEM Remediation Two LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 6/9/23.
Accession Number: 20230609-5206.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: EG23-192-000.
Applicants: Glover Creek Solar, LLC.
Description: Glover Creek Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 6/12/23.
Accession Number: 20230612-5107.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: EG23-193-000.
Applicants: PGR 2022 Lessee 9, LLC.
Description: PGR 2022 Lessee 9, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 6/12/23.
Accession Number: 20230612-5109.
Comment Date: 5 p.m. ET 7/3/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-1298-005.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2023-06-12_MISO TO's Order 864
Additional Deficiency Response to be effective N/A.
Filed Date: 6/12/23.
Accession Number: 20230612-5129.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-1407-001.
Applicants: Transource Pennsylvania, LLC, PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Transource Pennsylvania, LLC submits
tariff filing per 35.17(b): Transource Responses to Deficiency Letter
in ER23-1407 to be effective 5/16/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5104.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-1731-001.
Applicants: GSG 6, LLC.
Description: Tariff Amendment: Supplement to SFA with Shady Oaks 2
with Waivers to be effective 4/28/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5098.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2111-000; TS23-7-000.
Applicants: Umbriel Solar, LLC, Umbriel Solar, LLC.
Description: Request for Waiver, et al. of Umbriel Solar, LLC.
Filed Date: 6/9/23.
Accession Number: 20230609-5115.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2114-000.
Applicants: Energy Harbor LLC.
Description: Request for Waiver and Expedited Consideration of
Energy Harbor LLC.
Filed Date: 6/8/23.
Accession Number: 20230608-5172.
Comment Date: 5 p.m. ET 6/29/23.
Docket Numbers: ER23-2115-000.
Applicants: ITC Midwest LLC.
Description: Tariff Amendment: Cancellation of Agreements with
CIPCO to be effective 6/20/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5039.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2116-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, Service
Agreement No. 5472; Queue No. AD2-194 to be effective 5/11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5058.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2117-000.
Applicants: NSTAR Electric Company.
Description: Tariff Amendment: Cancellation of Medway Grid, LLC--
Engineering, Design and Procurement Agreement to be effective 6/13/
2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5068.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2118-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original UCSA, Service
Agreement No. 6946; Queue Position J1464 to be effective 5/12/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5069.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2119-000.
Applicants: SP Cimarron I, LLC.
Description: Sec. 205(d) Rate Filing: SP Cimarron I MBR Tariff
Amendment Filing (Seller Category) to be effective 8/11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5089.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2120-000.
Applicants: Campo Verde Solar, LLC.
Description: Sec. 205(d) Rate Filing: Campo Verde MBR Tariff
Amendment Filing (Seller Category) to be effective 8/11/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5091.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2121-000.
Applicants: Freeport-McMoRan Copper & Gold Energy Services, LLC.
Description: Compliance filing: WECC Soft Price Cap September 2022
Sale to be effective N/A.
Filed Date: 6/12/23.
Accession Number: 20230612-5094.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2122-000.
Applicants: Jersey Central Power & Light Company.
Description: Jersey Central Power & Light Submits A Notice of
Cancellation of the Interchange Agreement between Central Hudson Gas &
Electric Corporation and Jersey Central Power & Light Company,
designated as JCP&L Rate Schedule FPC 34.
Filed Date: 6/9/23.
Accession Number: 20230609-5215.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2123-000.
Applicants: Silver Run Electric, LLC, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Silver Run Electric, LLC
submits tariff filing per 35.13(a)(2)(iii: Silver Run Incentive Rate
Abandonment Recovery And Formula Rate Updates to be effective 8/14/
2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5113.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: ER23-2124-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to NSA, SA No.
6376; Queue Nos. AC2-100/AD1-131 (amend) to be effective 8/12/2023.
Filed Date: 6/12/23.
Accession Number: 20230612-5114.
Comment Date: 5 p.m. ET 7/3/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
[[Page 39422]]
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: June 12, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-12967 Filed 6-15-23; 8:45 am]
BILLING CODE 6717-01-P