Combined Notice of Filings #1, 39418 [2023-12864]
Download as PDF
39418
Federal Register / Vol. 88, No. 116 / Friday, June 16, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–1439–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Response to Commission’s 5/10/23
Deficiency Letter in ER23–1439 to be
effective 5/22/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5100.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–1588–001.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Tariff Amendment: ISO
New England Inc. submits tariff filing
per 35.17(b): ISO–NE Response to
Deficiency Notice to be effective 8/4/
2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5072.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–1710–001.
Applicants: El Paso Electric Company.
Description: Tariff Amendment:
Concurrence of EPE to APS Service
Agreement No. 387, Sonoran Solar
Energy to be effective 5/7/2023.
Filed Date: 6/8/23.
Accession Number: 20230608–5152.
Comment Date: 5 p.m. ET 6/29/23.
Docket Numbers: ER23–2107–000.
Applicants: Clearwater Wind II, LLC.
Description: Baseline eTariff Filing:
Clearwater Wind II, LLC Application for
Market-Based Rate Authorization to be
effective 8/9/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5030.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2108–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Service Agreement No.
912 to be effective 5/10/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5062.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2109–000.
Applicants: RE Gaskell West 1 LLC.
Description: § 205(d) Rate Filing: RE
Gaskell West 1 Concurrence to
Amended & Restated LGIA Co-Tenancy
Agreement to be effective 6/8/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5065.
Comment Date: 5 p.m. ET 6/30/23.
VerDate Sep<11>2014
17:43 Jun 15, 2023
Jkt 259001
Docket Numbers: ER23–2110–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Amendment:
Notice of Cancellation of Service
Agreement FERC No. 820 to be effective
5/10/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5067.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2112–000.
Applicants: Sandy Ridge Wind 2,
LLC.
Description: Initial rate filing:
Reactive Rate Service as FERC Rate
Schedule No. 2 to be effective 8/8/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5130.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23–2113–000.
Applicants: ETEM Remediation Two
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application and
Request for Expedited Action to be
effective 7/24/2023.
Filed Date: 6/9/23.
Accession Number: 20230609–5159.
Comment Date: 5 p.m. ET 6/30/23.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23–5–000.
Applicants: WPPI Energy.
Description: Application of WPPI
Energy to Terminate Its Mandatory
Purchase Obligation under the Public
Utility Regulatory Policies Act of 1978.
Filed Date: 6/8/23.
Accession Number: 20230608–5169.
Comment Date: 5 p.m. ET 7/6/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: June 9, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–12864 Filed 6–15–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–492–000]
Florida Gas Transmission Company,
LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on June 2, 2023,
Florida Gas Transmission Company,
LLC, (FGT) 1300 Main St., Houston,
Texas 77002, filed an application under
section 7(c) of the Natural Gas Act
(NGA), and part 157 and 284 of the
Federal Energy Regulatory
Commission’s (Commission) requesting
the authorization to increase the
certificated capacity by increasing
certain compression station from
construct, install, modify, operate and
maintain its Louisiana Project located at
St. Landry, East Baton Rouge, and
Washington Parishes, Louisiana and
Perry County, Mississippi which will
provide an additional 100,000 million
cubic feet per day of firm transportation
service back into FGT’s Zone 2 and
provide gas to downstream customers
from power generation and local
distribution companies.
Specifically, FGT is requesting
approval to (1) uprate two existing
natural gas-fired compressor turbine
units (Units 7501 and 7502), each from
6,500 horsepower (HP); to 7,700 HP at
its Compressor station (CS) 7.5 in St.
Landry Parish, Louisiana; (2) At CS (8),
add process cooling units to support the
existing gas compressor units at FGT’s
existing Mainline in East Baton Rouge
Parish; (3) At CS 9, install one new
7,700 HP natural gas-fired turbine
compressor unit on FGT’s Mainline in
Washington Parish, Louisiana; (4) At CS
10, install one new 15,900 HP natural
gas-fired turbine compressor unit on
FGT’s Mainline in Perry County,
Mississippi; (5) The total estimated cost
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 88, Number 116 (Friday, June 16, 2023)]
[Notices]
[Page 39418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12864]
[[Page 39418]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-1439-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Response to Commission's 5/10/23
Deficiency Letter in ER23-1439 to be effective 5/22/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5100.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-1588-001.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: Tariff Amendment: ISO New England Inc. submits tariff
filing per 35.17(b): ISO-NE Response to Deficiency Notice to be
effective 8/4/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5072.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-1710-001.
Applicants: El Paso Electric Company.
Description: Tariff Amendment: Concurrence of EPE to APS Service
Agreement No. 387, Sonoran Solar Energy to be effective 5/7/2023.
Filed Date: 6/8/23.
Accession Number: 20230608-5152.
Comment Date: 5 p.m. ET 6/29/23.
Docket Numbers: ER23-2107-000.
Applicants: Clearwater Wind II, LLC.
Description: Baseline eTariff Filing: Clearwater Wind II, LLC
Application for Market-Based Rate Authorization to be effective 8/9/
2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5030.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2108-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Initial Filing of Service
Agreement No. 912 to be effective 5/10/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5062.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2109-000.
Applicants: RE Gaskell West 1 LLC.
Description: Sec. 205(d) Rate Filing: RE Gaskell West 1
Concurrence to Amended & Restated LGIA Co-Tenancy Agreement to be
effective 6/8/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5065.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2110-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Tariff Amendment: Notice of Cancellation of Service
Agreement FERC No. 820 to be effective 5/10/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5067.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2112-000.
Applicants: Sandy Ridge Wind 2, LLC.
Description: Initial rate filing: Reactive Rate Service as FERC
Rate Schedule No. 2 to be effective 8/8/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5130.
Comment Date: 5 p.m. ET 6/30/23.
Docket Numbers: ER23-2113-000.
Applicants: ETEM Remediation Two LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
and Request for Expedited Action to be effective 7/24/2023.
Filed Date: 6/9/23.
Accession Number: 20230609-5159.
Comment Date: 5 p.m. ET 6/30/23.
Take notice that the Commission received the following PURPA
210(m)(3) filings:
Docket Numbers: QM23-5-000.
Applicants: WPPI Energy.
Description: Application of WPPI Energy to Terminate Its Mandatory
Purchase Obligation under the Public Utility Regulatory Policies Act of
1978.
Filed Date: 6/8/23.
Accession Number: 20230608-5169.
Comment Date: 5 p.m. ET 7/6/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: June 9, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-12864 Filed 6-15-23; 8:45 am]
BILLING CODE 6717-01-P