PJM Capacity Market Forum; Second Supplemental Notice of Forum, 39417 [2023-12863]

Download as PDF Federal Register / Vol. 88, No. 116 / Friday, June 16, 2023 / Notices Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Issue Scoping Document 1 for comments—August 2023 Request Additional Information (if necessary)—October 2023 Issue Scoping Document 2—November 2023 Issue Notice of Ready for Environmental Analysis—November 2023 Dated: June 12, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–12943 Filed 6–15–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD23–7–000] PJM Capacity Market Forum; Second Supplemental Notice of Forum As announced in the April 19, 2023 Notice in this proceeding, the Federal Energy Regulatory Commission (Commission) will convene a Commissioner-led forum to examine the PJM Interconnection, L.L.C. (PJM) capacity market in the above-captioned proceeding on June 15, 2023 from approximately 12:00 p.m. to 5:00 p.m. Eastern Time, following the Commission’s scheduled open meeting. The forum will be held in-person at the Commission headquarters at 888 First Street NE, Washington, DC 20426 in the Commission Meeting Room. The purpose of this forum is to solicit varied perspectives on the current state of the PJM capacity market, potential improvements to the market, and to consider related proposals to address resource adequacy. The forum will include three panels that will explore whether the PJM capacity market is achieving its objective of ensuring resource adequacy at just and reasonable rates, discuss potential market design reforms that may be needed to achieve this objective, and discuss state Commissioners’ and state representatives’ views on these issues. A finalized agenda for this forum is attached to this Supplemental Notice, which includes the forum program and expected panelists. While the forum is not for the purpose of discussing any specific matters before the Commission, some forum discussions may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ ddrumheller on DSK120RN23PROD with NOTICES1 PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ PJM Interconnection, L.L.C ................................................................................................................................ SOO Green HVDC Link ProjectCo, LLC v. PJM Interconnection, L.L.C .......................................................... Roy J. Shanker v. PJM Interconnection LLC .................................................................................................... Essential Power OPP, LLC, et al v. PJM Interconnection, L.L.C ...................................................................... Aurora Generation, LLC, et al. v. PJM Interconnection, L.L.C .......................................................................... Coalition of PJM Capacity Resources v. PJM Interconnection, L.L.C .............................................................. Talen Energy Marketing, LLC v. PJM Interconnection, L.L.C ........................................................................... Lee County Generating Station, LLC v. PJM Interconnection, L.L.C ................................................................ SunEnergy1, LLC v. PJM Interconnection, L.L.C .............................................................................................. Lincoln Generating Facility, LLC v. PJM Interconnection, L.L.C ....................................................................... Parkway Generation Keys Energy Center LLC v. PJM Interconnection, L.L.C ................................................ Old Dominion Electric Cooperative v. PJM Interconnection, L.L.C ................................................................... Energy Harbor LLC v. PJM Interconnection, L.L.C ........................................................................................... Calpine Corp. v. PJM Interconnection, L.L.C .................................................................................................... Invenergy Nelson LLC v. PJM Interconnection, L.L.C ...................................................................................... East Kentucky Power Cooperative, Inc. v. PJM Interconnection, L.L.C ........................................................... LSP University Park, LLC .................................................................................................................................. The forum will be open to the public and there is no fee for attendance. Information will also be posted on the Calendar of Events on the Commission’s website, www.ferc.gov, prior to the event. The forum will be transcribed and webcast. Transcripts will be available for a fee from Ace Reporting (202–347– 3700). A free webcast of this event is available through the Commission’s website. Anyone with internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The Federal VerDate Sep<11>2014 17:43 Jun 15, 2023 Jkt 259001 Energy Regulatory Commission provides technical support for the free webcasts. Please call (202) 502–8680 or email customer@ferc.gov if you have any questions. Commission forums are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, call toll-free (866) 208–3372 (voice) or (202) 208– 8659 (TTY), or send a fax to (202) 208– 2106 with the required accommodations. For more information about this forum, please contact Katherine Scott at PO 00000 Frm 00026 Fmt 4703 Sfmt 9990 39417 Docket Nos. ER22–962, et al. Docket Nos. ER23–729, et al.; EL23–19, et al. Docket No. ER23–1038–001. Docket No. ER23–1067–000. Docket No. ER23–1609–000. Docket No. ER23–1700–000. Docket No. EL21–78–000. Docket No. ER23–1996–000. Docket No. EL21–103–000. Docket No. EL23–13–000. Docket No. EL23–53–000. Docket No. EL23–54–000. Docket No. EL23–55–000. Docket No. EL23–56–000. Docket Nos. EL23–57, et al. Docket No. EL23–58–000. Docket No. EL23–59–000. Docket No. EL23–60–000. Docket No. EL23–61–000. Docket No. EL23–63–000. Docket No. EL23–66–000. Docket No. EL23–67–000. Docket No. EL23–74–000. Docket No. RP23–809–000. katherine.scott@ferc.gov or (202) 502– 8190. For information related to logistics, please contact Sarah McKinley at sarah.mckinley@ferc.gov or (202) 502–8368. Dated: June 9, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–12863 Filed 6–15–23; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 88, Number 116 (Friday, June 16, 2023)]
[Notices]
[Page 39417]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12863]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD23-7-000]


PJM Capacity Market Forum; Second Supplemental Notice of Forum

    As announced in the April 19, 2023 Notice in this proceeding, the 
Federal Energy Regulatory Commission (Commission) will convene a 
Commissioner-led forum to examine the PJM Interconnection, L.L.C. (PJM) 
capacity market in the above-captioned proceeding on June 15, 2023 from 
approximately 12:00 p.m. to 5:00 p.m. Eastern Time, following the 
Commission's scheduled open meeting. The forum will be held in-person 
at the Commission headquarters at 888 First Street NE, Washington, DC 
20426 in the Commission Meeting Room.
    The purpose of this forum is to solicit varied perspectives on the 
current state of the PJM capacity market, potential improvements to the 
market, and to consider related proposals to address resource adequacy. 
The forum will include three panels that will explore whether the PJM 
capacity market is achieving its objective of ensuring resource 
adequacy at just and reasonable rates, discuss potential market design 
reforms that may be needed to achieve this objective, and discuss state 
Commissioners' and state representatives' views on these issues.
    A finalized agenda for this forum is attached to this Supplemental 
Notice, which includes the forum program and expected panelists.
    While the forum is not for the purpose of discussing any specific 
matters before the Commission, some forum discussions may involve 
issues raised in proceedings that are currently pending before the 
Commission. These proceedings include, but are not limited to:

------------------------------------------------------------------------
 
------------------------------------------------------------------------
PJM Interconnection, L.L.C.................  Docket Nos. ER22-962, et
                                              al.
PJM Interconnection, L.L.C.................  Docket Nos. ER23-729, et
                                              al.; EL23-19, et al.
PJM Interconnection, L.L.C.................  Docket No. ER23-1038-001.
PJM Interconnection, L.L.C.................  Docket No. ER23-1067-000.
PJM Interconnection, L.L.C.................  Docket No. ER23-1609-000.
PJM Interconnection, L.L.C.................  Docket No. ER23-1700-000.
PJM Interconnection, L.L.C.................  Docket No. EL21-78-000.
PJM Interconnection, L.L.C.................  Docket No. ER23-1996-000.
SOO Green HVDC Link ProjectCo, LLC v. PJM    Docket No. EL21-103-000.
 Interconnection, L.L.C.
Roy J. Shanker v. PJM Interconnection LLC..  Docket No. EL23-13-000.
Essential Power OPP, LLC, et al v. PJM       Docket No. EL23-53-000.
 Interconnection, L.L.C.
Aurora Generation, LLC, et al. v. PJM        Docket No. EL23-54-000.
 Interconnection, L.L.C.
Coalition of PJM Capacity Resources v. PJM   Docket No. EL23-55-000.
 Interconnection, L.L.C.
Talen Energy Marketing, LLC v. PJM           Docket No. EL23-56-000.
 Interconnection, L.L.C.
Lee County Generating Station, LLC v. PJM    Docket Nos. EL23-57, et al.
 Interconnection, L.L.C.
SunEnergy1, LLC v. PJM Interconnection,      Docket No. EL23-58-000.
 L.L.C.
Lincoln Generating Facility, LLC v. PJM      Docket No. EL23-59-000.
 Interconnection, L.L.C.
Parkway Generation Keys Energy Center LLC    Docket No. EL23-60-000.
 v. PJM Interconnection, L.L.C.
Old Dominion Electric Cooperative v. PJM     Docket No. EL23-61-000.
 Interconnection, L.L.C.
Energy Harbor LLC v. PJM Interconnection,    Docket No. EL23-63-000.
 L.L.C.
Calpine Corp. v. PJM Interconnection, L.L.C  Docket No. EL23-66-000.
Invenergy Nelson LLC v. PJM                  Docket No. EL23-67-000.
 Interconnection, L.L.C.
East Kentucky Power Cooperative, Inc. v.     Docket No. EL23-74-000.
 PJM Interconnection, L.L.C.
LSP University Park, LLC...................  Docket No. RP23-809-000.
------------------------------------------------------------------------

    The forum will be open to the public and there is no fee for 
attendance. Information will also be posted on the Calendar of Events 
on the Commission's website, www.ferc.gov, prior to the event.
    The forum will be transcribed and webcast. Transcripts will be 
available for a fee from Ace Reporting (202-347-3700). A free webcast 
of this event is available through the Commission's website. Anyone 
with internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The Federal Energy Regulatory Commission provides 
technical support for the free webcasts. Please call (202) 502-8680 or 
email [email protected] if you have any questions.
    Commission forums are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an email to [email protected], call toll-free (866) 208-3372 
(voice) or (202) 208-8659 (TTY), or send a fax to (202) 208-2106 with 
the required accommodations.
    For more information about this forum, please contact Katherine 
Scott at [email protected] or (202) 502-8190. For information 
related to logistics, please contact Sarah McKinley at 
[email protected] or (202) 502-8368.

    Dated: June 9, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-12863 Filed 6-15-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.