Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Texas to Louisiana Energy Pathway Project, 39249-39250 [2023-12815]
Download as PDF
Federal Register / Vol. 88, No. 115 / Thursday, June 15, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP22–495–000]
lotter on DSK11XQN23PROD with NOTICES1
Transcontinental Gas Pipe Line
Company, LLC; Notice of Availability
of the Environmental Assessment for
the Proposed Texas to Louisiana
Energy Pathway Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
Texas to Louisiana Energy Pathway
Project (Project), proposed by
Transcontinental Gas Pipe Line
Company, LLC (Transco) in the abovereferenced docket.
Transco requests authorization to
construct and operate one new 15,900horsepower compressor station in Fort
Bend County, Texas (Compressor
Station 33); modify six existing
compressors at Compressor Station 40
in Hardin County, Texas; and perform
programming updates at existing
Compressor Station 23 in Victoria
County, Texas. Transco’s stated purpose
for this Project is to provide 364,000
dekatherms per day (Dth/day) of firm
transportation service from the Valley
Crossing Interconnection to the Station
65 Pooling Point. Transco would
provide this service through
incremental capacity as a result of
Project construction, the conversion of
‘‘IT Feeder System’’ capacity to firm
capacity, the ‘‘turnback’’ of certain firm
transportation capacity by customers of
Transco, and unsubscribed capacity on
Transco’s system. According to Transco,
its Project would provide year-round
firm transportation capacity on
Transco’s mainline from the Valley
Crossing Interconnection to the Station
65 Pooling Point.
The EA assesses the potential
environmental effects of the Project in
accordance with the requirements of the
National Environmental Policy Act
(NEPA). The FERC staff concludes that
approval of the proposed Project, with
appropriate mitigating measures, would
not constitute a major Federal action
significantly affecting the quality of the
human environment.
The Commission mailed a copy of the
Notice of Availability of the EA to
Federal, State, and local government
representatives and agencies; elected
officials; environmental and public
interest groups; Native American Tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The EA is only available in
VerDate Sep<11>2014
17:54 Jun 14, 2023
Jkt 259001
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the natural gas
environmental documents page (https://
www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be
accessed by using the eLibrary link on
the FERC’s website. Click on the
eLibrary link (https://elibrary.ferc.gov/
eLibrary/search), select ‘‘General
Search’’ and enter the docket number in
the ‘‘Docket Number’’ field (i.e., CP22–
495–000). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
The EA is not a decision document.
It presents Commission staff’s
independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the EA may do so. Your
comments should focus on the EA’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC, on or
before 5:00 p.m. Eastern Time on July
10, 2023.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You must select the type of
filing you are making. If you are filing
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
39249
a comment on a particular project,
please select ‘‘Comment on a Filing;’’ or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP22–495–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Filing environmental comments will
not give you intervenor status, but you
do not need intervenor status to have
your comments considered. Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. At this point in
this proceeding, the time frame for filing
timely intervention requests has
expired. Any person seeking to become
a party to the proceeding must file a
motion to intervene out-of-time
pursuant to Rule 214(b)(3) and (d) of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/how-intervene.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings. In addition, the
Commission offers a free service called
eSubscription which allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
E:\FR\FM\15JNN1.SGM
15JNN1
39250
Federal Register / Vol. 88, No. 115 / Thursday, June 15, 2023 / Notices
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: June 9, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–12815 Filed 6–14–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–375–000]
lotter on DSK11XQN23PROD with NOTICES1
Elba Liquefaction Company, LLC and
Southern LNG Company, LLC; Notice
of Scoping Period Requesting
Comments on Environmental Issues
for the Proposed Elba Liquefaction
Optimization Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document that will
discuss the environmental impacts of
the Elba Liquefaction Optimization
Project (Project), involving new
installations and modifications to
existing liquefaction facilities, by Elba
Liquefaction Company, L.L.C. and
Southern LNG Company, L.L.C.
(Companies), at Southern LNG
Company, LLC’s existing terminal in
Chatham County, Georgia. The
Companies seek permission under
section 3 of the Natural Gas Act to
amend existing authorizations under
CP14–103–00, et al., originally approved
by the Commission on June 1, 2016.1
The Commission will use this
environmental document in its
decision-making process to determine
whether the project is in the public
interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of an authorization. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
1 Elba Liquefaction Company, L.L.C., 155 FERC
¶ 61,219, (2016).
VerDate Sep<11>2014
17:54 Jun 14, 2023
Jkt 259001
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on July
10, 2023. Comments may be submitted
in written form. Further details on how
to submit comments are provided in the
Public Participation section of this
notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on May 10, 2023,
you will need to file those comments in
Docket No. CP23–375–000 to ensure
they are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP23–375–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project
The Companies propose to amend its
June 1, 2016 Order (2016 Order) to
modify certain Movable Modular
Liquefaction System (MMLS)
Dehydration and Heavies Removal units
that will reduce the fouling rate in the
liquefaction units, reduce the resultant
flaring events associated with cold box
deriming, and therefore allow the
MMLS to operate in an optimized
condition for longer periods of time
without fouling, all within the existing
Terminal. Specifically, the Companies
would make modifications to ten
Movable Modular Liquefaction System
(MMLS) Dehydration and Heavies
Removal units; construct and operate a
new condensate plant; install three new
liquid nitrogen vaporizers; and increase
the total liquefaction capacity of the
MMLS units up approximately 0.4
million tonnes per annum (MTPA) from
2.5 to 2.9 MTPA.
The general location of the project
facilities is shown in appendix 1.2
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
E:\FR\FM\15JNN1.SGM
15JNN1
Agencies
[Federal Register Volume 88, Number 115 (Thursday, June 15, 2023)]
[Notices]
[Pages 39249-39250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12815]
[[Page 39249]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-495-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Availability of the Environmental Assessment for the Proposed Texas to
Louisiana Energy Pathway Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Texas
to Louisiana Energy Pathway Project (Project), proposed by
Transcontinental Gas Pipe Line Company, LLC (Transco) in the above-
referenced docket.
Transco requests authorization to construct and operate one new
15,900-horsepower compressor station in Fort Bend County, Texas
(Compressor Station 33); modify six existing compressors at Compressor
Station 40 in Hardin County, Texas; and perform programming updates at
existing Compressor Station 23 in Victoria County, Texas. Transco's
stated purpose for this Project is to provide 364,000 dekatherms per
day (Dth/day) of firm transportation service from the Valley Crossing
Interconnection to the Station 65 Pooling Point. Transco would provide
this service through incremental capacity as a result of Project
construction, the conversion of ``IT Feeder System'' capacity to firm
capacity, the ``turnback'' of certain firm transportation capacity by
customers of Transco, and unsubscribed capacity on Transco's system.
According to Transco, its Project would provide year-round firm
transportation capacity on Transco's mainline from the Valley Crossing
Interconnection to the Station 65 Pooling Point.
The EA assesses the potential environmental effects of the Project
in accordance with the requirements of the National Environmental
Policy Act (NEPA). The FERC staff concludes that approval of the
proposed Project, with appropriate mitigating measures, would not
constitute a major Federal action significantly affecting the quality
of the human environment.
The Commission mailed a copy of the Notice of Availability of the
EA to Federal, State, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American Tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
project area. The EA is only available in electronic format. It may be
viewed and downloaded from the FERC's website (www.ferc.gov), on the
natural gas environmental documents page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In
addition, the EA may be accessed by using the eLibrary link on the
FERC's website. Click on the eLibrary link (https://elibrary.ferc.gov/eLibrary/search), select ``General Search'' and enter the docket number
in the ``Docket Number'' field (i.e., CP22-495-000). Be sure you have
selected an appropriate date range. For assistance, please contact FERC
Online Support at [email protected] or toll free at (866) 208-
3676, or for TTY, contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
Any person wishing to comment on the EA may do so. Your comments should
focus on the EA's disclosure and discussion of potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that the Commission has the opportunity to
consider your comments prior to making its decision on this project, it
is important that we receive your comments in Washington, DC, on or
before 5:00 p.m. Eastern Time on July 10, 2023.
For your convenience, there are three methods you can use to file
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (www.ferc.gov) under the
link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing;'' or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP22-
495-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status,
but you do not need intervenor status to have your comments considered.
Only intervenors have the right to seek rehearing or judicial review of
the Commission's decision. At this point in this proceeding, the time
frame for filing timely intervention requests has expired. Any person
seeking to become a party to the proceeding must file a motion to
intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time limitation should be waived.
Motions to intervene are more fully described at https://www.ferc.gov/how-intervene.
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings. In addition, the
Commission offers a free service called eSubscription which allows you
to keep track of all formal issuances and submittals in specific
dockets. This can reduce the amount of time you spend researching
proceedings by automatically providing you with notification of these
filings, document summaries, and direct links to the documents. Go to
https://www.ferc.gov/ferc-online/overview to register for
eSubscription.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
[[Page 39250]]
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: June 9, 2023.
Kimberly D. Bose,
Secretary.