Download as PDF 38106 Federal Register / Vol. 88, No. 112 / Monday, June 12, 2023 / Notices ddrumheller on DSK120RN23PROD with NOTICES1 a collection of information by the Agency. Under the Paperwork Reduction Act of 1995 (PRA), Federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information, and to allow 60 days for public comment in response to the notice. This notice solicits comments on renewing an existing collection by the Agency. DATES: Submit comments on or before: August 11, 2023. FOR FURTHER INFORMATION CONTACT: Suzanne H. Plimpton, Reports Clearance Officer, National Science Foundation, 2415 Eisenhower Avenue, Suite E7400, Alexandria, Virginia 22314; telephone (703) 292–7556; or send email to splimpto@nsf.gov. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1– 800–877–8339, which is accessible 24 hours a day, 7 days a week, 365 days a year (including Federal holidays). SUPPLEMENTARY INFORMATION: A. Purpose Under the PRA, (44 U.S.C. 3501– 3520) Federal agencies must obtain approval from the Office of Management and Budget (OMB) for each collection of information they conduct or sponsor. ‘‘Collection of information’’ is defined in 44 U.S.C. 3502(3) and 5 CFR 1320.3(c) and includes Agency requests or requirements that members of the public submit reports, keep records, or provide information to a third party. Section 3506(c)(2)(A) of the PRA requires Federal agencies to provide a 60-day notice in the Federal Register concerning each proposed collection of information, including each proposed extension of an existing collection of information, before submitting the collection to OMB for approval. To comply with this requirement, GSA is publishing notice of the proposed collection of information set forth in this document. Whether seeking a loan, Social Security benefits, veterans benefits, or other services provided by the Federal Government, individuals and businesses expect Government customer services to be efficient and intuitive, just like services from leading private-sector organizations. Yet the 2016 American Consumer Satisfaction Index and the 2017 Forrester Federal Customer Experience Index show that, on average, Government services lag nine percentage points behind the private sector. A modern, streamlined and responsive customer experience means: raising government-wide customer VerDate Sep<11>2014 17:39 Jun 09, 2023 Jkt 259001 experience to the average of the private sector service industry; developing indicators for high-impact Federal programs to monitor progress towards excellent customer experience and mature digital services; and providing the structure (including increasing transparency) and resources to ensure customer experience is a focal point for agency leadership. To support this, OMB Circular A–11 Section 280 established Government-wide standards for mature customer experience organizations in Government and measurement. To enable Federal programs to deliver the experience taxpayers deserve, they must undertake three general categories of activities: conduct ongoing customer research, gather and share customer feedback, and test services and digital products. These data collection efforts may be either qualitative or quantitative in nature or may consist of mixed methods. Additionally, data may be collected via a variety of means, including but not limited to electronic or social media, direct or indirect observation (i.e., in person, video and audio collections), interviews, questionnaires, surveys, and focus groups. DHS will limit its inquiries to data collections that solicit strictly voluntary opinions or responses. Steps will be taken to ensure anonymity of respondents in each activity covered by this request. The results of the data collected will be used to improve the delivery of Federal services and programs. It will include the creation of personas, customer journey maps, and reports and summaries of customer feedback data and user insights. It will also provide government-wide data on customer experience that can be displayed on performance.gov to help build transparency and accountability of Federal programs to the customers they serve. Method of Collection: NSF will collect this information by electronic means when possible, as well as by mail, fax, telephone, technical discussions, and in-person interviews. NSF also may utilize observational techniques to collect this information. Data: OMB Clearance Number: 3145–0254. Form Number(s): None. Type of Review: Renewal. B. Annual Reporting Burden Affected Public: Collections will be targeted to the solicitation of opinions from respondents who have experience with the program or may have experience with the program in the near future. For the purposes of this request, PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 ‘‘customers’’ are individuals, businesses, and organizations that interact with a Federal Government agency or program, either directly or via a Federal contractor. This could include individuals or households; businesses or other for-profit organizations; not-forprofit institutions; State, local or Tribal governments; Federal Government; and universities. Estimated Number of Respondents: 2,001,550. Estimated Time per Response: Varied, dependent upon the data collection method used. The possible response time to complete a questionnaire or survey may be 3 minutes or up to 2 hours to participate in an interview. Estimated Total Annual Burden Hours: 101,125. Estimated Total Annual Cost to Public: $0. C. Public Comments NSF invites comments on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility; (b) the accuracy of the agency’s estimate of the burden (including hours and cost) of the proposed collection of information; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology. Comments submitted in response to this notice will be summarized and/or included in the request for OMB approval of this information collection; they also will become a matter of public record. Dated: June 7, 2023. Suzanne H. Plimpton, Reports Clearance Officer, National Science Foundation. [FR Doc. 2023–12501 Filed 6–9–23; 8:45 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [NRC–2023–0033] Information Collection: Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy) Nuclear Regulatory Commission. AGENCY: E:\FR\FM\12JNN1.SGM 12JNN1 Federal Register / Vol. 88, No. 112 / Monday, June 12, 2023 / Notices Renewal of existing information collection; request for comment. ACTION: The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ‘‘Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy).’’ DATES: Submit comments by August 11, 2023. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website: • Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2023–0033. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: David C. Cullison, Office of the Chief Information Officer, Mail Stop: T–6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: David C. Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2084; email: Infocollects.Resource@ nrc.gov. SUPPLEMENTARY INFORMATION: SUMMARY: ddrumheller on DSK120RN23PROD with NOTICES1 I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2023– 0033 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2023–0033. A copy of the collection of information and related instructions may be obtained VerDate Sep<11>2014 17:39 Jun 09, 2023 Jkt 259001 without charge by accessing Docket ID NRC–2023–0033 on this website. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to PDR.Resource@nrc.gov. A copy of the collection of information and related instructions may be obtained without charge by accessing ADAMS Accession ML22056A177 and ML19193A023. The supporting statement is available in ADAMS under Accession No. ML23027A030. • NRC’s PDR: You may examine and purchase copies of public documents, by appointment, at the NRC’s PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. • NRC’s Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting the NRC’s Clearance Officer, David C. Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2084; email: Infocollects.Resource@nrc.gov. B. Submitting Comments The NRC encourages electronic comment submission through the Federal rulemaking website (https:// www.regulations.gov). Please include Docket ID NRC–2023–0033, in your comment submission. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at https:// www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 38107 Your request should state that comment submissions are not routinely edited to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35), the NRC is requesting public comment on its intention to request the OMB’s approval for the information collection summarized below. 1. The title of the information collection: Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy). 2. OMB approval number: 3150–0136. 3. Type of submission: Extension. 4. The form number, if applicable: Not applicable. 5. How often the collection is required or requested: On occasion. 6. Who will be required or asked to respond: Those licensees that voluntarily request enforcement discretion through the NOED process. 7. The estimated number of annual responses: 8 (4 reporting responses + 4 recordkeepers). 8. The estimated number of annual respondents: 4. 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 680 (600 reporting + 80 recordkeeping). 10. Abstract: The NRC’s Enforcement Policy includes the circumstances in which the NRC may grant a NOED. On occasion, circumstances arise when a power plant licensee’s compliance with a Technical Specification (TS) Limiting Condition for Operation or any other license condition would involve an unnecessary plant shutdown or transient. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement (TSR) or other condition would unnecessarily call for a total plant shutdown, or compliance would unnecessarily place the plant in a condition where safety, safeguards, or security features were degraded or inoperable. In these circumstances, a licensee or certificate holder may request that the NRC exercise enforcement discretion, and the NRC staff may choose not to enforce the applicable TS, TSR, or other license or certificate condition. This enforcement discretion is designated as a NOED. A licensee or certificate holder seeking the issuance of a NOED must justify, in accordance with NRC Enforcement E:\FR\FM\12JNN1.SGM 12JNN1 38108 Federal Register / Vol. 88, No. 112 / Monday, June 12, 2023 / Notices Manual (ADAMS Accession No. ML22056A177), the safety basis for the request, including an evaluation of the safety significance and potential consequences of the proposed request, a description of proposed compensatory measures, a justification for the duration of the request, the basis for the licensee’s or certificate holder’s conclusion that the request does not have a potential adverse impact on the public health and safety, and does not involve adverse consequences to the environment, and any other information the NRC staff deems necessary before making a decision to exercise discretion. III. Specific Requests for Comments The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? Please explain your answer. 2. Is the estimate of the burden of the information collection accurate? Please explain your answer. 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated: June 6, 2023. For the Nuclear Regulatory Commission. David C. Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2023–12403 Filed 6–9–23; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2022–0145] Information Collection: Reporting of Defects and Noncompliance Nuclear Regulatory Commission. ACTION: Notice of submission to the Office of Management and Budget; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, ‘‘Reporting of Defects and Noncompliance.’’ DATES: Submit comments by July 12, 2023. Comments received after this date ddrumheller on DSK120RN23PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 17:39 Jun 09, 2023 Jkt 259001 will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to https://www.reginfo.gov/ public/do/PRAMain. Find this particular information collection by selecting ‘‘Currently under Review— Open for Public Comments’’ or by using the search function. FOR FURTHER INFORMATION CONTACT: David Cullison, NRC Clearance Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2084; email: Infocollects.Resource@nrc.gov. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2022– 0145 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2022–0145. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to PDR.Resource@nrc.gov. The supporting statement and burden spreadsheet are available in ADAMS under Accession Nos. ML23045A049 and ML22206A217. • NRC’s PDR: You may examine and purchase copies of public documents, by appointment, at the NRC’s PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1–800–397–4209 or 301–415– 4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. • NRC’s Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting the NRC’s Clearance Officer, David C. Cullison, Office of the Chief Information Officer, PO 00000 Frm 00094 Fmt 4703 Sfmt 4703 U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2084; email: Infocollects.Resource@nrc.gov. B. Submitting Comments Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to https://www.reginfo.gov/ public/do/PRAMain. Find this particular information collection by selecting ‘‘Currently under Review— Open for Public Comments’’ or by using the search function. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at https:// www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the OMB, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that comment submissions are not routinely edited to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Background Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35), the NRC recently submitted a request for renewal of an existing collection of information to OMB for review entitled, ‘‘Reporting of Defects and Noncompliance.’’ The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The NRC published a Federal Register notice with a 60-day comment period on this information collection on February 2, 2023, 88 FR 7110. 1. The title of the information collection: 10 CFR part 21, Reporting of Defects and Noncompliance. 2. OMB approval number: 3150–0035. 3. Type of submission: Extension. 4. The form number, if applicable: Not applicable. 5. How often the collection is required or requested: On occasion. Defects and noncompliances are reportable as they occur. E:\FR\FM\12JNN1.SGM 12JNN1

Agencies

[Federal Register Volume 88, Number 112 (Monday, June 12, 2023)]
[Notices]
[Pages 38106-38108]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12403]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2023-0033]


Information Collection: Notices of Enforcement Discretion (NOEDs) 
for Operating Power Reactors and Gaseous Diffusion Plants (NRC 
Enforcement Policy)

AGENCY: Nuclear Regulatory Commission.

[[Page 38107]]


ACTION: Renewal of existing information collection; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) invites public 
comment on the renewal of Office of Management and Budget (OMB) 
approval for an existing collection of information. The information 
collection is entitled, ``Notices of Enforcement Discretion (NOEDs) for 
Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement 
Policy).''

DATES: Submit comments by August 11, 2023. Comments received after this 
date will be considered if it is practical to do so, but the Commission 
is able to ensure consideration only for comments received on or before 
this date.

ADDRESSES: You may submit comments by any of the following methods; 
however, the NRC encourages electronic comment submission through the 
Federal rulemaking website:
     Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0033. Address 
questions about Docket IDs in Regulations.gov to Stacy Schumann; 
telephone: 301-415-0624; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     Mail comments to: David C. Cullison, Office of the Chief 
Information Officer, Mail Stop: T-6 A10M, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: David C. Cullison, Office of the Chief 
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2084; email: 
[email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2023-0033 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0033. A copy of 
the collection of information and related instructions may be obtained 
without charge by accessing Docket ID NRC-2023-0033 on this website.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. A copy of the collection of 
information and related instructions may be obtained without charge by 
accessing ADAMS Accession ML22056A177 and ML19193A023. The supporting 
statement is available in ADAMS under Accession No. ML23027A030.
     NRC's PDR: You may examine and purchase copies of public 
documents, by appointment, at the NRC's PDR, Room P1 B35, One White 
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make 
an appointment to visit the PDR, please send an email to 
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8 
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except 
Federal holidays.
     NRC's Clearance Officer: A copy of the collection of 
information and related instructions may be obtained without charge by 
contacting the NRC's Clearance Officer, David C. Cullison, Office of 
the Chief Information Officer, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-2084; email: 
[email protected].

B. Submitting Comments

    The NRC encourages electronic comment submission through the 
Federal rulemaking website (https://www.regulations.gov). Please 
include Docket ID NRC-2023-0033, in your comment submission.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed in your comment submission. All comment submissions are 
posted at https://www.regulations.gov and entered into ADAMS. Comment 
submissions are not routinely edited to remove identifying or contact 
information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that comment submissions are not routinely edited to remove such 
information before making the comment submissions available to the 
public or entering the comment into ADAMS.

II. Background

    In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 
chapter 35), the NRC is requesting public comment on its intention to 
request the OMB's approval for the information collection summarized 
below.
    1. The title of the information collection: Notices of Enforcement 
Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion 
Plants (NRC Enforcement Policy).
    2. OMB approval number: 3150-0136.
    3. Type of submission: Extension.
    4. The form number, if applicable: Not applicable.
    5. How often the collection is required or requested: On occasion.
    6. Who will be required or asked to respond: Those licensees that 
voluntarily request enforcement discretion through the NOED process.
    7. The estimated number of annual responses: 8 (4 reporting 
responses + 4 recordkeepers).
    8. The estimated number of annual respondents: 4.
    9. The estimated number of hours needed annually to comply with the 
information collection requirement or request: 680 (600 reporting + 80 
recordkeeping).
    10. Abstract: The NRC's Enforcement Policy includes the 
circumstances in which the NRC may grant a NOED. On occasion, 
circumstances arise when a power plant licensee's compliance with a 
Technical Specification (TS) Limiting Condition for Operation or any 
other license condition would involve an unnecessary plant shutdown or 
transient. Similarly, for a gaseous diffusion plant, circumstances may 
arise where compliance with a Technical Safety Requirement (TSR) or 
other condition would unnecessarily call for a total plant shutdown, or 
compliance would unnecessarily place the plant in a condition where 
safety, safeguards, or security features were degraded or inoperable. 
In these circumstances, a licensee or certificate holder may request 
that the NRC exercise enforcement discretion, and the NRC staff may 
choose not to enforce the applicable TS, TSR, or other license or 
certificate condition. This enforcement discretion is designated as a 
NOED. A licensee or certificate holder seeking the issuance of a NOED 
must justify, in accordance with NRC Enforcement

[[Page 38108]]

Manual (ADAMS Accession No. ML22056A177), the safety basis for the 
request, including an evaluation of the safety significance and 
potential consequences of the proposed request, a description of 
proposed compensatory measures, a justification for the duration of the 
request, the basis for the licensee's or certificate holder's 
conclusion that the request does not have a potential adverse impact on 
the public health and safety, and does not involve adverse consequences 
to the environment, and any other information the NRC staff deems 
necessary before making a decision to exercise discretion.

III. Specific Requests for Comments

    The NRC is seeking comments that address the following questions:
    1. Is the proposed collection of information necessary for the NRC 
to properly perform its functions? Does the information have practical 
utility? Please explain your answer.
    2. Is the estimate of the burden of the information collection 
accurate? Please explain your answer.
    3. Is there a way to enhance the quality, utility, and clarity of 
the information to be collected?
    4. How can the burden of the information collection on respondents 
be minimized, including the use of automated collection techniques or 
other forms of information technology?

    Dated: June 6, 2023.

    For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2023-12403 Filed 6-9-23; 8:45 am]
BILLING CODE 7590-01-P