Addition of Property for the Kansas City Plant Facilities, 37048-37050 [2023-11995]
Download as PDF
37048
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
inviting applications in accordance
with:
(a) Selecting recipients most likely to
be successful in delivering results based
on the program objectives through an
objective process of evaluating Federal
award applications (2 CFR 200.205);
(b) Prohibiting the purchase of certain
telecommunication and video
surveillance services or equipment in
alignment with section 889 of the
National Defense Authorization Act of
2019 (Pub. L. 115–232) (2 CFR 200.216);
(c) Providing a preference, to the
extent permitted by law, to maximize
use of goods, products, and materials
produced in the United States (2 CFR
200.322); and
(d) Terminating agreements in whole
or in part to the greatest extent
authorized by law if an award no longer
effectuates the program goals or agency
priorities (2 CFR 200.340).
VI. Award Administration Information
1. Award Notices: If your application
is successful, we notify your U.S.
Representative and U.S. Senators and
send you a Grant Award Notification
(GAN); or we may send you an email
containing a link to access an electronic
version of your GAN. We may notify
you informally, also.
If your application is not evaluated or
not selected for funding, we notify you.
2. Administrative and National Policy
Requirements: We identify
administrative and national policy
requirements in the application package
and reference these and other
requirements in the Applicable
Regulations section of this notice.
We reference the regulations outlining
the terms and conditions of an award in
the Applicable Regulations section of
this notice and include these and other
specific conditions in the GAN. The
GAN also incorporates your approved
application as part of your binding
commitments under the grant.
3. Grant Administration: Applicants
should budget for an annual meeting of
up to three days for project directors to
be held in Washington, DC.
4. Reporting: (a) If you apply for a
grant under one of the competitions
announced in this notice, you must
ensure that you have in place the
necessary processes and systems to
comply with the reporting requirements
in 2 CFR part 170 should you receive
funding under the competition. This
does not apply if you have an exception
under 2 CFR 170.110(b).
(b) At the end of your project period,
you must submit a final performance
report, including financial information,
as directed by IES. If you receive a
multiyear award, you must submit an
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
annual performance report that provides
the most current performance and
financial expenditure information as
directed by IES under 34 CFR 75.118.
IES may also require more frequent
performance reports under 34 CFR
75.720(c). For specific requirements on
reporting, please go to www.ed.gov/
fund/grant/apply/appforms/
appforms.html.
5. Performance Measures: To evaluate
the overall success of its education
research grant programs, IES annually
assesses the percentage of projects that
result in peer-reviewed publications and
the number of IES-supported
interventions with evidence of efficacy
in improving learner education
outcomes. School readiness outcomes
include pre-reading, reading, prewriting, early mathematics, early
science, and social-emotional skills that
prepare young children for school.
Student academic outcomes include
learning and achievement in academic
content areas, such as reading, writing,
math, and science, as well as outcomes
that reflect students’ successful
progression through the education
system, such as course and grade
completion; high school graduation; and
postsecondary enrollment, progress, and
completion. Social and behavioral
competencies include social and
emotional skills, attitudes, and
behaviors that are important to
academic and post-academic success.
Employment and earnings outcomes
include hours of employment, job
stability, and wages and benefits, and
may be measured in addition to student
academic outcomes.
6. Continuation Awards: In making a
continuation award under 34 CFR
75.253, IES considers, among other
things: whether a grantee has made
substantial progress in achieving the
goals and objectives of the project;
whether the grantee has expended funds
in a manner that is consistent with its
approved application and budget;
whether a grantee is in compliance with
the IES policy regarding public access to
research; and if IES has established
performance measurement
requirements, whether the grantee has
made substantial progress in achieving
the performance targets in the grantee’s
approved application.
In making a continuation award, IES
also considers whether the grantee is
operating in compliance with the
assurances in its approved application,
including those applicable to Federal
civil rights laws that prohibit
discrimination in programs or activities
receiving Federal financial assistance
from the Department (34 CFR 100.4,
104.5, 106.4, 108.8, and 110.23).
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
VII. Other Information
Accessible Format: On request to the
relevant program contact person listed
in FOR FURTHER INFORMATION CONTACT, as
well as in the relevant RFA and
application package, individuals with
disabilities can obtain this document
and a copy of the RFA in an accessible
format. The Department will provide the
requestor with an accessible format that
may include Rich Text Format (RTF) or
text format (txt), a thumb drive, an MP3
file, braille, large print, audiotape, or
compact disc, or other accessible format.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. You may access the official
edition of the Federal Register and the
Code of Federal Regulations at
www.govinfo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Portable Document Format
(PDF). To use PDF you must have
Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Mark Schneider,
Director, Institute of Education Sciences.
[FR Doc. 2023–11915 Filed 6–5–23; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
National Nuclear Security
Administration
Addition of Property for the Kansas
City Plant Facilities
National Nuclear Security
Administration (NNSA), U.S.
Department of Energy (DOE).
ACTION: Notice of addition of property
for the Kansas National Security
Campus (KCNSC) (Formerly Kansas City
Plant) Facilities.
AGENCY:
Notice is hereby given that
the U.S. Department of Energy, pursuant
to the Atomic Energy Act of 1954, as
amended, prohibits the unauthorized
entry and the unauthorized introduction
of weapons or dangerous materials into
or upon the facilities of the KCNSC
(formerly Kansas City Plant) of the
United States Department of Energy,
National Nuclear Security
SUMMARY:
E:\FR\FM\06JNN1.SGM
06JNN1
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
Administration. The facilities are
described in this notice.
DATES: This action is effective on June
6, 2023.
FOR FURTHER INFORMATION CONTACT:
Laurel I. Fetterer, Officially
Designated Federal Security Authority
(ODFSA), NNSA Kansas City Plant,
14520 Botts Road, Kansas City, MO
64147, Telephone: (816) 488–5109,
Facsimile: (816) 488–3718,
Laurel.Fetterer@nnsa.doe.gov.
Albert N. Guarino, Consultant
Counsel, NNSA Kansas City Plant,
14520 Botts Road, Kansas City, MO
64147, Telephone: (816) 488–3344,
Facsimile: (816) 488–3718,
Albert.Guarino@nnsa.doe.gov.
SUPPLEMENTARY INFORMATION: Public
notice of the section 229 boundary of
the Kansas City Plant was initially made
in the Federal Register notice published
October 19, 1965 (30 FR 13290). The
boundary was revised on November 25,
1983 (48 FR 56822–568224). The
boundary was again revised on October
26, 2012 (77 FR 65376).
Pursuant to section 229 of the Atomic
Energy Act, as implemented by DOE
regulations at 10 CFR part 860 (28 FR
8400, Aug. 26, 1963), the following
additions to the existing boundary are
made: add to the existing 229 Boundary
the tracts which comprise the U.S.
Department of Energy, National Nuclear
Security Administration, Kansas City
National Security Campus (formerly
Kansas City Plant operating area). The
additions are described in further detail
in the paragraphs that follow. DOE
regulations prohibit the unauthorized
entry (10 CFR 860.3) and the
unauthorized introduction of weapons
or dangerous materials (10 CFR 860.4)
into or upon the facilities.
Property Description
ddrumheller on DSK120RN23PROD with NOTICES1
Building 20 (KCNSC South)
15431 Andrews Rd., Kansas City,
Jackson County, MO—Building and
parking for KCNSC South Building and
parking—Building and parking for
KCNSC South Building Legal
Description: SEC–34 TWP–47 RNG–33
PT SE + & PT SW + SEC 35 TWP–47
RNG–33 DAF: BEG SE COR SE + TH N
03 DEG 35 MIN 08 SEC E 49.89′ TH N
86 DEG 23 MIN 24 SEC W 305.54′ TO
TRU POB TH N 33 DEG 38 MIN 06 SEC
E 156.59′ TH N 38 DEG 16 MIN 11 SEC
E 85.59′ TH N 54 DEG 07 MIN 48 SEC
E 73.49’ TH N 74 DEG 58 MIN 14 SEC
E 80.48’ TH S 88 DEG 32 MIN 58 SEC
E 28.96’ TH N 43 DEG 57 MIN 19 SEC
W 65.50’ TH N 46 DEG 04 MIN 57 SEC
W 403.67′ TH S 43 DEG 57 MIN 21 SEC
W 774.36′ TH S 86 DEG 21 MIN 47 SEC
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
E 478.06′ TO TRU POB containing 5.19
acres.
Building 21 (KCNSC West)
6700 W 115th Street, Overland Park,
Johnson County, KS—Building and
parking for KCNSC West Building—
Legal Description: OVERLAND PARK
PLAZA II PT LT 4LYING WITHIN IND
CR SD BLK 3 OPC 423 3 41 containing
6.44 Acres.
Building 22 (KCNSC North)
9221 Ward Parkway, Ward Parkway
Office Park Kansas City, Jackson
County, MO—Building and parking for
KCNSC North Building Legal
Description: ALL BLKS 3 & 4 EXC SELY
15 FT OF SD BLK 4, Jackson County
APN: JA48410064700000000.
Building 23 (KCNSC East)
14901 Andrews Road, Kansas City,
Jackson County, MO—Legal
Description: Lot 1, CENTERPOINT
INTERMODAL CENTER THIRD PLAT, a
subdivision in Kansas City, Jackson
County, Missouri, according to the
recorded plat thereof, recorded June 24,
2015, as Document No. 2015E0054260,
in Plat Book 49 at Page 74, lying above
the top of the Winterset Ledge of
Limestone Rock.
TA–193
18829 S Mullen Rd., Belton, Cass
County, MO—Legal Description: All
that land as described in the Judgement
Upon Declaration of taking, Civil Action
N. 9644 as recorded in Book 400 at Page
173 in the recorder of Deeds office, Cass
County, Missouri, which describes land
as it now exists in its entirety under title
to the United states of America, being
more particularly described as follows:
BEGINNING at a point common to the
South-east corner of Section 25 and the
Northeast corner of section 36, all in
Township 46 North, Range 33 West,
Cass County, Missouri, thence South
265.73 feet along the East line of the
Northeast one-quarter of said section 36;
thence North 88°26′35″ West, 2624.53
feet along the South line of the North 16
acres of the Northeast one-quarter of
said Section 36 to the South-west corner
of said North 16 acres; thence North
00°18′24″ East, 265.70 feet to the
Southwest corner of the Southeast onequarter of said Section 25, Township 46
North, Range 33 West; thence North
00°12′48″ East 1327.38 feet along the
West line of said Southeast one-quarter
to the Southeast corner of the Northeast
one-quarter of the Southwest onequarter of said Section 25; thence North
88°11′15″ West 1304.17′ (measured)
along the South line of said Northeast
one-quarter of said Southwest one-
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
37049
quarter to a 1⁄2″ inside diameter pipe
with a 60 pwt. Nail inside found in
place at the South-west corner of the
Northeast one-quarter of said Southwest
one-quarter; thence North 00°17′33″ East
along the West line of said Northeast
one-quarter, said line also being the East
line of ‘‘BROWN ACRES’’ according to
the recorded plat thereof, recorded in
Book 3 at Page 23 a distance of 1322.89
feet to the Northeast corner of said
‘‘BROWN ACRES’’ said point also
referred to as the Northwest corner of
said Northeast one-quarter of said
Southwest one-quarter; thence along the
North line of said Northeast one-quarter
South 88°22′58″ East, 1302.22 feet
(measured) to a 1⁄2″ inside diameter pipe
with a 3⁄8″ rebar inside, found in place
at the center of said Section 25,
Township 46 North, Range 33 West;
thence North 00°14′11″ East, 333.55 feet
to the Northwest corner of the South 10
acres of the Southwest one-quarter of
the Northeast one-quarter; thence South
88°18′47″ East, 1306.01 feet to the
Northeast corner of said South 10 acres;
thence South 00°07′04″ West, 333.57
feet along the East line of said
Southwest one-quarter to the Southeast
corner thereof; thence South 88°18′47″
East 1306.68 feet to the Northeast corner
of the Southeast one-quarter of said
Section 25; thence South, 2649.07 feet
to the Southeast corner there-of, also
being the point of beginning of the
herein described tract. Less the East
30.00 feet being used for country road
right-of-way. CONTAINS: 224.973 acres
Gross. Less 22.008 acres for road rightof-way = 222.965 acres Net.
This revised boundary is in addition
to the property description contained in
the Federal Register notice published
October 19, 1965 (30 FR 13290), revised
on November 25, 1983 (48 FR 56822–
56824), and again revised on October
26, 2012 (77 FR 65376). Addition of the
Kirtland Operations operating area
property does not terminate the prior
Kansas City Plant section 229 listing.
Signing Authority
This document of the Department of
Energy was signed on June 1, 2023, by
Laurel I. Fetterer, Officially Designated
Federal Security Authority (ODFSA),
NNSA Kansas City Plant, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
E:\FR\FM\06JNN1.SGM
06JNN1
37050
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on June 1,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–11995 Filed 6–5–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–131–000]
ddrumheller on DSK120RN23PROD with NOTICES1
East Tennessee Natural Gas, LLC;
Notice of Schedule for the Preparation
of an Environmental Assessment for
the System Alignment Program Project
On March 31, 2023, East Tennessee
Natural Gas, LLC (East Tennessee) filed
an application in Docket No. CP23–131–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
section 7(c) and Authorization pursuant
to section 7(b) of the Natural Gas Act to
replace, construct, and operate certain
natural gas pipeline facilities in
Tennessee, North Carolina, and
Virginia. The proposed project is known
as the System Alignment Program
Project (Project). East Tennessee states
that the Project would improve the
operational reliability of East
Tennessee’s system by minimizing the
amount of displacement in the system
design to meet customers’ shifting
needs.
On April 14, 2023, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s environmental document for the
Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA
1 40
November 17, 2023
CFR 1501.10 (2020).
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
90-day Federal Authorization Decision
Deadline 2 February 15, 2024
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
East Tennessee would construct
approximately 16.1 miles of 24-inchdiameter pipeline loop (Boyds Creek
Loop) adjacent to its existing 16-inchdiameter pipeline in Knox and Sevier
Counties, Tennessee; a new 6,000horsepower compressor station (the
Talbot Compressor Station) in Jefferson
County, Tennessee; a new 19,000horsepower compressor station in
Rockingham County, North Carolina
(the Draper Compressor Station); and
ancillary facilities in Knox County and
Sevier Counties, Tennessee and
Washington and Wythe Counties,
Virginia. East Tennessee would also
replace approximately 6.4 miles of 8inch-diameter pipeline with new 24inch-diameter pipeline within its
existing right-of-way in Washington
County, Virginia and complete a
hydrotest of an approximately 1.2 milesegment of existing pipeline in Patrick
County, Virginia.
Background
On October 19, 2022, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Planned
System Alignment Program Project
(Notice of Scoping). The Notice of
Scoping was issued during the pre-filing
review of the Project in Docket No.
PF22–8–000 and was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the
Notice of Scoping, the Commission
received comments from the North
Carolina Department of Natural and
Cultural Resources, Choctaw Nation of
Oklahoma, U.S. Department of the
Interior Bureau of Indian Affairs, State
of Tennessee Department of
Environment and Conservation:
Division of Air Pollution Control,
Commonwealth of Virginia Department
2 The Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
of Conservation and Recreation,
Environmental Protection Agency,
Appalachian Voices, Teamsters National
Pipeline Labor, Quapaw Nation, North
Carolina Department of Environmental
Quality, Tennessee Department of
Environment and Conservation:
Division of Water Resources, Virginia
Department of Environmental Quality,
and fifteen landowners. The primary
issues raised by the commenters are
impacts on cultural and natural
resources; incomplete tribal
consultations, worker trainings, and
permitting; potential groundwater
contamination; potential air and noise
pollution; and impacts on landowner
property. All substantive comments will
be addressed in the EA. No cooperating
agencies are involved in the preparation
of this EA.
Additional Information
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–131), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 88, Number 108 (Tuesday, June 6, 2023)]
[Notices]
[Pages 37048-37050]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11995]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
National Nuclear Security Administration
Addition of Property for the Kansas City Plant Facilities
AGENCY: National Nuclear Security Administration (NNSA), U.S.
Department of Energy (DOE).
ACTION: Notice of addition of property for the Kansas National Security
Campus (KCNSC) (Formerly Kansas City Plant) Facilities.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the U.S. Department of Energy,
pursuant to the Atomic Energy Act of 1954, as amended, prohibits the
unauthorized entry and the unauthorized introduction of weapons or
dangerous materials into or upon the facilities of the KCNSC (formerly
Kansas City Plant) of the United States Department of Energy, National
Nuclear Security
[[Page 37049]]
Administration. The facilities are described in this notice.
DATES: This action is effective on June 6, 2023.
FOR FURTHER INFORMATION CONTACT:
Laurel I. Fetterer, Officially Designated Federal Security
Authority (ODFSA), NNSA Kansas City Plant, 14520 Botts Road, Kansas
City, MO 64147, Telephone: (816) 488-5109, Facsimile: (816) 488-3718,
[email protected].
Albert N. Guarino, Consultant Counsel, NNSA Kansas City Plant,
14520 Botts Road, Kansas City, MO 64147, Telephone: (816) 488-3344,
Facsimile: (816) 488-3718, [email protected].
SUPPLEMENTARY INFORMATION: Public notice of the section 229 boundary of
the Kansas City Plant was initially made in the Federal Register notice
published October 19, 1965 (30 FR 13290). The boundary was revised on
November 25, 1983 (48 FR 56822-568224). The boundary was again revised
on October 26, 2012 (77 FR 65376).
Pursuant to section 229 of the Atomic Energy Act, as implemented by
DOE regulations at 10 CFR part 860 (28 FR 8400, Aug. 26, 1963), the
following additions to the existing boundary are made: add to the
existing 229 Boundary the tracts which comprise the U.S. Department of
Energy, National Nuclear Security Administration, Kansas City National
Security Campus (formerly Kansas City Plant operating area). The
additions are described in further detail in the paragraphs that
follow. DOE regulations prohibit the unauthorized entry (10 CFR 860.3)
and the unauthorized introduction of weapons or dangerous materials (10
CFR 860.4) into or upon the facilities.
Property Description
Building 20 (KCNSC South)
15431 Andrews Rd., Kansas City, Jackson County, MO--Building and
parking for KCNSC South Building and parking--Building and parking for
KCNSC South Building Legal Description: SEC-34 TWP-47 RNG-33 PT SE + &
PT SW + SEC 35 TWP-47 RNG-33 DAF: BEG SE COR SE + TH N 03 DEG 35 MIN 08
SEC E 49.89' TH N 86 DEG 23 MIN 24 SEC W 305.54' TO TRU POB TH N 33 DEG
38 MIN 06 SEC E 156.59' TH N 38 DEG 16 MIN 11 SEC E 85.59' TH N 54 DEG
07 MIN 48 SEC E 73.49' TH N 74 DEG 58 MIN 14 SEC E 80.48' TH S 88 DEG
32 MIN 58 SEC E 28.96' TH N 43 DEG 57 MIN 19 SEC W 65.50' TH N 46 DEG
04 MIN 57 SEC W 403.67' TH S 43 DEG 57 MIN 21 SEC W 774.36' TH S 86 DEG
21 MIN 47 SEC E 478.06' TO TRU POB containing 5.19 acres.
Building 21 (KCNSC West)
6700 W 115th Street, Overland Park, Johnson County, KS--Building
and parking for KCNSC West Building--Legal Description: OVERLAND PARK
PLAZA II PT LT 4LYING WITHIN IND CR SD BLK 3 OPC 423 3 41 containing
6.44 Acres.
Building 22 (KCNSC North)
9221 Ward Parkway, Ward Parkway Office Park Kansas City, Jackson
County, MO--Building and parking for KCNSC North Building Legal
Description: ALL BLKS 3 & 4 EXC SELY 15 FT OF SD BLK 4, Jackson County
APN: JA48410064700000000.
Building 23 (KCNSC East)
14901 Andrews Road, Kansas City, Jackson County, MO--Legal
Description: Lot 1, CENTERPOINT INTERMODAL CENTER THIRD PLAT, a
subdivision in Kansas City, Jackson County, Missouri, according to the
recorded plat thereof, recorded June 24, 2015, as Document No.
2015E0054260, in Plat Book 49 at Page 74, lying above the top of the
Winterset Ledge of Limestone Rock.
TA-193
18829 S Mullen Rd., Belton, Cass County, MO--Legal Description: All
that land as described in the Judgement Upon Declaration of taking,
Civil Action N. 9644 as recorded in Book 400 at Page 173 in the
recorder of Deeds office, Cass County, Missouri, which describes land
as it now exists in its entirety under title to the United states of
America, being more particularly described as follows: BEGINNING at a
point common to the South-east corner of Section 25 and the Northeast
corner of section 36, all in Township 46 North, Range 33 West, Cass
County, Missouri, thence South 265.73 feet along the East line of the
Northeast one-quarter of said section 36; thence North 88[deg]26'35''
West, 2624.53 feet along the South line of the North 16 acres of the
Northeast one-quarter of said Section 36 to the South-west corner of
said North 16 acres; thence North 00[deg]18'24'' East, 265.70 feet to
the Southwest corner of the Southeast one-quarter of said Section 25,
Township 46 North, Range 33 West; thence North 00[deg]12'48'' East
1327.38 feet along the West line of said Southeast one-quarter to the
Southeast corner of the Northeast one-quarter of the Southwest one-
quarter of said Section 25; thence North 88[deg]11'15'' West 1304.17'
(measured) along the South line of said Northeast one-quarter of said
Southwest one-quarter to a \1/2\'' inside diameter pipe with a 60 pwt.
Nail inside found in place at the South-west corner of the Northeast
one-quarter of said Southwest one-quarter; thence North 00[deg]17'33''
East along the West line of said Northeast one-quarter, said line also
being the East line of ``BROWN ACRES'' according to the recorded plat
thereof, recorded in Book 3 at Page 23 a distance of 1322.89 feet to
the Northeast corner of said ``BROWN ACRES'' said point also referred
to as the Northwest corner of said Northeast one-quarter of said
Southwest one-quarter; thence along the North line of said Northeast
one-quarter South 88[deg]22'58'' East, 1302.22 feet (measured) to a \1/
2\'' inside diameter pipe with a \3/8\'' rebar inside, found in place
at the center of said Section 25, Township 46 North, Range 33 West;
thence North 00[deg]14'11'' East, 333.55 feet to the Northwest corner
of the South 10 acres of the Southwest one-quarter of the Northeast
one-quarter; thence South 88[deg]18'47'' East, 1306.01 feet to the
Northeast corner of said South 10 acres; thence South 00[deg]07'04''
West, 333.57 feet along the East line of said Southwest one-quarter to
the Southeast corner thereof; thence South 88[deg]18'47'' East 1306.68
feet to the Northeast corner of the Southeast one-quarter of said
Section 25; thence South, 2649.07 feet to the Southeast corner there-
of, also being the point of beginning of the herein described tract.
Less the East 30.00 feet being used for country road right-of-way.
CONTAINS: 224.973 acres Gross. Less 22.008 acres for road right-of-way
= 222.965 acres Net.
This revised boundary is in addition to the property description
contained in the Federal Register notice published October 19, 1965 (30
FR 13290), revised on November 25, 1983 (48 FR 56822-56824), and again
revised on October 26, 2012 (77 FR 65376). Addition of the Kirtland
Operations operating area property does not terminate the prior Kansas
City Plant section 229 listing.
Signing Authority
This document of the Department of Energy was signed on June 1,
2023, by Laurel I. Fetterer, Officially Designated Federal Security
Authority (ODFSA), NNSA Kansas City Plant, pursuant to delegated
authority from the Secretary of Energy. That document with the original
signature and date is maintained by DOE. For administrative purposes
only, and in compliance with requirements of the Office of the Federal
Register, the undersigned DOE Federal Register Liaison Officer has been
authorized to sign and submit the document in electronic format for
publication, as an official document of
[[Page 37050]]
the Department of Energy. This administrative process in no way alters
the legal effect of this document upon publication in the Federal
Register.
Signed in Washington, DC, on June 1, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-11995 Filed 6-5-23; 8:45 am]
BILLING CODE 6450-01-P