Description: § 205(d) Rate Filing:
Modification Bulk Solicitation to be
effective 6/1/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5298.
Comment Date: 5 p.m. ET 6/21/23.
Docket Numbers: ER23–2022–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
2382 to be effective 6/1/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5301.
Comment Date: 5 p.m. ET 6/21/23.
Docket Numbers: ER23–2023–000.
Applicants: Buckeye Power, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Buckeye Power, Inc. submits tariff filing
per 35.13(a)(2)(iii: Revised SA No.
4753—NITSA Among PJM and Buckeye
Power, Inc. to be effective 6/1/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5302.
Comment Date: 5 p.m. ET 6/21/23.
Docket Numbers: ER23–2024–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Notice of Cancellation of ISA, SA No.
4123 to be effective 6/1/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5304.
Comment Date: 5 p.m. ET 6/21/23.
Docket Numbers: ER23–2025–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: Jun
2023 Membership Filing to be effective
5/1/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5305.
Comment Date: 5 p.m. ET 6/21/23.
Docket Numbers: ER23–2026–000.
Applicants: Michigan Electric
Transmission Company, LLC.
Description: § 205(d) Rate Filing:
Amended and Restated—Blendon IFA
to be effective 7/31/2023.
Filed Date: 5/31/23.
Accession Number: 20230531–5306.
Comment Date: 5 p.m. ET 6/21/23.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR23–2–000.
Applicants: North American Electric
Reliability Corporation.
Description: North American Electric
Reliability Corporation’s Report of
Comparisons of Budgeted to Actual
Costs for 2022 for NERC and the
Regional Entities.
Filed Date: 5/31/23.
Accession Number: 20230531–5120.
Comment Date: 5 p.m. ET 6/21/23.
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 31, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–12034 Filed 6–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–82–000]
Columbia Gas Transmission, LLC;
Notice of Schedule for the Preparation
of an Environmental Assessment for
the Lucas and Pavonia Wells
Abandonment Project
On March 2, 2023, Columbia Gas
Transmission, LLC (Columbia) filed an
application in Docket No. CP23–82–000
requesting an Authorization pursuant to
section 7(b) of the Natural Gas Act to
abandon certain natural gas pipeline
facilities. The proposed project is
known as the Lucas and Pavonia Wells
Abandonment Project (Project), and
would result in abandonment of 37
injection/withdrawal wells and
associated pipelines and appurtenances
at Columbia’s existing certificated Lucas
and Pavonia Storage Fields in Ashland
and Richland Counties, Ohio.
On March 15, 2023, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
Schedule for Environmental Review
Issuance of EA September 8, 2023
90-day Federal Authorization Decision
Deadline 2 December 7, 2023
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Project would consist of the
following facilities and activities in
Ashland and Richland Counties, Ohio:
• abandonment of 37 injection/
withdrawal wells at the Lucas and
Pavonia Storage Fields by permanently
plugging and abandoning the wells in
place;
• abandonment of approximately
41,423 feet of associated 3- to 6-inchdiameter pipeline, of which 39,402 feet
would be capped and abandoned in
place and 2,021 feet would be
abandoned by removal; and
• abandonment by removal of all
associated aboveground appurtenances,
including, but not limited to, tie-in
valves, pipeline markers, cathodic
protection test stations, rectifiers, casing
vents, and above-ground pipeline
blowdown vents.
Background
On April 14, 2023, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
Lucas and Pavonia Wells Abandonment
Project and Notice of Public Scoping
Session (Notice of Scoping). The Notice
of Scoping was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. In response to the Notice of
Scoping, the Commission received
comments from the Ohio Farm Bureau
Federation and one landowner. The
1 40
CFR 1501.10 (2020).
2 The
Commission’s deadline applies to the
decisions of other federal agencies, and state
agencies acting under federally delegated authority,
that are responsible for federal authorizations,
permits, and other approvals necessary for
proposed projects under the Natural Gas Act. Per
18 CFR 157.22(a), the Commission’s deadline for
other agency’s decisions applies unless a schedule
is otherwise established by federal law.
E:\FR\FM\06JNN1.SGM
06JNN1
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
primary issues raised by the
commenters concerned impacts of the
Project on agricultural property and
agricultural operations. All substantive
environmental comments will be
addressed in the EA.
Additional Information
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–82), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
ddrumheller on DSK120RN23PROD with NOTICES1
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
Dated: May 31, 2023.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2023–12076 Filed 6–5–23; 8:45 am]
[Project No. 7189–015]
BILLING CODE 6717–01–P
Green Lake Water Power Company;
Notice of Intent To Prepare an
Environmental Assessment
DEPARTMENT OF ENERGY
On March 31, 2022, Green Lake Water
Power Company filed a relicense
application for the 500-kilowatt Green
Lake Hydroelectric Project No. 7189
(project). The project is located on
Green Lake and Reeds Brook in Hancock
County, Maine.
In accordance with the Commission’s
regulations, on March 23, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
November 2023.1
December 2023.
[FR Doc. 2023–11933 Filed 6–5–23; 8:45 am]
Any questions regarding this notice
may be directed to Amanda Gill at (202)
502–6773 or amanda.gill@ferc.gov.
BILLING CODE 6717–01–P
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
37063
Federal Energy Regulatory
Commission
[Project No. 7189–015]
Green Lake Water Power Company;
Notice of Waiver Period for Water
Quality Certification Application
On May 19, 2023, Green Lake Water
Power Company submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with the
Maine Department of Environmental
Protection (Maine DEP), in conjunction
with the above captioned project.
Pursuant to 40 CFR 121.6 and section
5.23(b) of the Commission’s
regulations,1 we hereby notify the
Maine DEP of the following:
Date of Receipt of the Certification
Request: May 19, 2023.
Reasonable Period of Time to Act on
the Certification Request: One year, May
19, 2024.
If Maine DEP fails or refuses to act on
the water quality certification request on
or before the above date, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: May 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–12075 Filed 6–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD23–8–000]
Moulton Niguel Water District; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On May 23, 2023, Moulton Niguel
Water District filed a notice of intent to
notice establishes the Commission’s intent to
prepare an EA for the Green Lake Hydroelectric
Project. Therefore, in accordance with CEQ’s
regulations, the EA must be issued within 1 year of
the issuance date of this notice.
1 18 CFR 5.23(b).
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 88, Number 108 (Tuesday, June 6, 2023)]
[Notices]
[Pages 37062-37063]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11933]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-82-000]
Columbia Gas Transmission, LLC; Notice of Schedule for the
Preparation of an Environmental Assessment for the Lucas and Pavonia
Wells Abandonment Project
On March 2, 2023, Columbia Gas Transmission, LLC (Columbia) filed
an application in Docket No. CP23-82-000 requesting an Authorization
pursuant to section 7(b) of the Natural Gas Act to abandon certain
natural gas pipeline facilities. The proposed project is known as the
Lucas and Pavonia Wells Abandonment Project (Project), and would result
in abandonment of 37 injection/withdrawal wells and associated
pipelines and appurtenances at Columbia's existing certificated Lucas
and Pavonia Storage Fields in Ashland and Richland Counties, Ohio.
On March 15, 2023, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
environmental document for the Project.
This notice identifies Commission staff's intention to prepare an
environmental assessment (EA) for the Project and the planned schedule
for the completion of the environmental review.\1\
---------------------------------------------------------------------------
\1\ 40 CFR 1501.10 (2020).
---------------------------------------------------------------------------
Schedule for Environmental Review
Issuance of EA September 8, 2023
90-day Federal Authorization Decision Deadline \2\ December 7, 2023
\2\ The Commission's deadline applies to the decisions of other
federal agencies, and state agencies acting under federally
delegated authority, that are responsible for federal
authorizations, permits, and other approvals necessary for proposed
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the
Commission's deadline for other agency's decisions applies unless a
schedule is otherwise established by federal law.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The Project would consist of the following facilities and
activities in Ashland and Richland Counties, Ohio:
abandonment of 37 injection/withdrawal wells at the Lucas
and Pavonia Storage Fields by permanently plugging and abandoning the
wells in place;
abandonment of approximately 41,423 feet of associated 3-
to 6-inch-diameter pipeline, of which 39,402 feet would be capped and
abandoned in place and 2,021 feet would be abandoned by removal; and
abandonment by removal of all associated aboveground
appurtenances, including, but not limited to, tie-in valves, pipeline
markers, cathodic protection test stations, rectifiers, casing vents,
and above-ground pipeline blowdown vents.
Background
On April 14, 2023, the Commission issued a Notice of Scoping Period
Requesting Comments on Environmental Issues for the Proposed Lucas and
Pavonia Wells Abandonment Project and Notice of Public Scoping Session
(Notice of Scoping). The Notice of Scoping was sent to affected
landowners; federal, state, and local government agencies; elected
officials; Native American tribes; other interested parties; and local
libraries and newspapers. In response to the Notice of Scoping, the
Commission received comments from the Ohio Farm Bureau Federation and
one landowner. The
[[Page 37063]]
primary issues raised by the commenters concerned impacts of the
Project on agricultural property and agricultural operations. All
substantive environmental comments will be addressed in the EA.
Additional Information
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
In order to receive notification of the issuance of the EA and to
keep track of formal issuances and submittals in specific dockets, the
Commission offers a free service called eSubscription. This service
provides automatic notification of filings made to subscribed dockets,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP23-82), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11933 Filed 6-5-23; 8:45 am]
BILLING CODE 6717-01-P