MountainWest Overthrust Pipeline, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 34144-34146 [2023-11293]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
34144
Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices
the proposed Amendment, with
appropriate mitigating measures, would
not constitute a major Federal action
significantly affecting the quality of the
human environment.
The EA incorporates by reference the
Commission staff’s May 2019 Final
Environmental Impact Statement issued
in Docket Nos. CP17–66–000 and CP17–
67–000 for the Plaquemines LNG
Project, and the Commission’s findings
and conclusions in its September 30,
2019 Order. The EA addresses the
potential environmental effects of the
Amendment on water and wetlands
resources, vegetation and wildlife,
socioeconomics, environmental justice,
visual resources, cultural resources, air
quality, and noise. The EA also
addresses cumulative impacts,
including climate change, and
alternatives to the proposed action.
The Commission mailed a copy of the
Notice of Availability for the EA to
Federal, State, and local government
representatives and agencies; Native
American tribes; potentially affected
landowners; and other interested
individuals and groups. The EA is only
available in electronic format. It may be
viewed and downloaded from the
FERC’s website (www.ferc.gov), on the
natural gas environmental documents
page (https://www.ferc.gov/industriesdata/natural-gas/environment/
environmental-documents). In addition,
the EA may be accessed by using the
eLibrary link on the FERC’s website.
Click on the eLibrary link (https://
elibrary.ferc.gov/eLibrary/search), select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field
(i.e. CP17–66 or CP17–67). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at FercOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659.
The EA is not a decision document.
It presents Commission staff’s
independent analysis of the
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the EA may do so. Your
comments should focus on the EA’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this Amendment,
it is important that we receive your
comments in Washington, DC on or
VerDate Sep<11>2014
18:14 May 25, 2023
Jkt 259001
before 5:00 p.m. Eastern Time on June
20, 2023.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You must select the type of
filing you are making. If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address using the U.S. Postal
Service. Be sure to reference the project
docket numbers (CP17–66–001and
CP17–67–001) with your submission:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent through
carriers other than the U.S. Postal
Service must be sent to 12225 Wilkins
Avenue, Rockville, Maryland 20852 for
processing.
Filing environmental comments will
not give you intervenor status, but you
do not need intervenor status to have
your comments considered. Only
intervenors have the right to seek
rehearing or judicial review of the
Commission’s decision. At this point in
this proceeding, the timeframe for filing
timely intervention requests has
expired. Any person seeking to become
a party to the proceeding must file a
motion to intervene out-of-time
pursuant to Rule 214(b)(3) and (d) of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/ferc-online/ferconline/how-guides.
Additional information about the
Plaquemines LNG Amendment is
available from the Commission’s Office
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
of External Affairs, at (866) 208–FERC,
or on the FERC website (www.ferc.gov)
using eLibrary. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription, which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: May 19, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–11237 Filed 5–25–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–478–000]
MountainWest Overthrust Pipeline,
LLC; Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on May 12, 2023,
MountainWest Overthrust Pipeline, LLC
(Overthrust), 333 South State Street, Salt
Lake City, Utah 84111, filed a prior
notice request for authorization, in
accordance with 18 CFR 157.205,
157.208(b), and 157.211 of the Federal
Energy Regulatory Commission’s
(Commission) regulations under the
Natural Gas Act and Overthrust’s
blanket certificate issued in Docket No.
CP82–493–000, to construct, own and
maintain additional piping, metering
and valves to provide delivery service to
an Electric Generation facility within
the state of Wyoming. The Jim Bridger
Delivery Project (Project) would
facilitate the delivery of 267,000
dekatherms per day from various
receipts on Overthrust’s mainline to a
new delivery site 25 miles outside of the
City of Rock Springs, Wyoming.
Overthrust states that the cost of the
Project will be $12,677,000, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
E:\FR\FM\26MYN1.SGM
26MYN1
Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll free, (886) 208–3676 or TTY
(202) 502–8659.
Any questions concerning this
application should be directed to Greg
Williams, Supervisor, Rates and
Regulatory, MountainWest Pipeline,
LLC, 333 South State Street, Salt Lake
City, Utah 84111, by phone at (801)
209–6764 or by email at greg.williams@
mwpipe.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
ddrumheller on DSK120RN23PROD with NOTICES1
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on July 21, 2023. How to
file protests, motions to intervene, and
comments is explained below.
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
5 18 CFR 385.214.
6 18 CFR 157.10.
3 Persons
Pursuant to section 157.205 of the
Commission’s regulations under the
CFR (Code of Federal Regulations) 157.9.
VerDate Sep<11>2014
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is July 21, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
2 18
Protests
1 18
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is July 21,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
18:14 May 25, 2023
Jkt 259001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
34145
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before July 21,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–478–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–478–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\26MYN1.SGM
26MYN1
34146
Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Greg Williams,
Supervisor, Rates and Regulatory,
MountainWest Pipeline, LLC, 333 South
State Street, Salt Lake City, Utah 84111,
by phone at (801) 209–6764 or by email
at greg.williams@mwpipe.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: May 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–11293 Filed 5–25–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
[Docket No. ER23–1928–000]
Appaloosa Solar I, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Appaloosa Solar I, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
VerDate Sep<11>2014
18:14 May 25, 2023
Jkt 259001
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is June 12,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Dated: May 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–11344 Filed 5–25–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP17–40–000, CP17–40–001]
Spire STL Pipeline LLC; Notice of
Onsite Environmental Review
On May 31, 2023, Federal Energy
Regulatory Commission (Commission)
staff will conduct a restoration
inspection of the Spire STL Pipeline
Project (Spire Project) right-of-way in
Greene, Jersey, and Scott Counties,
Illinois. The purpose of the inspection
is to assess the existing condition of
right-of-way restoration along a portion
of the Spire Project in Illinois and to
evaluate Spire STL Pipeline LLC’s
(Spire) compliance with the restoration
conditions of the Commission’s August
3, 2018 Order Issuing Certificate, March
18, 2021 Order on Environmental
Compliance, and December 15, 2022
Order on Remand and Reissuing
Certificates. Other Commission staff,
Spire’s representatives, and the
landowner’s representatives will
accompany the Office of Energy Projects
staff during the inspection and will
view the right-of-way from public access
points and where landowners have
granted Spire access outside of the
permanent right-of-way easement. For
additional information or questions,
please contact the Office of External
Affairs at (866) 208–FERC or email
DG2E@ferc.gov.
Dated: May 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–11288 Filed 5–25–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at North
American Electric Reliability
Corporation Standard Drafting Team
Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meeting:
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 88, Number 102 (Friday, May 26, 2023)]
[Notices]
[Pages 34144-34146]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11293]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-478-000]
MountainWest Overthrust Pipeline, LLC; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on May 12, 2023, MountainWest Overthrust Pipeline,
LLC (Overthrust), 333 South State Street, Salt Lake City, Utah 84111,
filed a prior notice request for authorization, in accordance with 18
CFR 157.205, 157.208(b), and 157.211 of the Federal Energy Regulatory
Commission's (Commission) regulations under the Natural Gas Act and
Overthrust's blanket certificate issued in Docket No. CP82-493-000, to
construct, own and maintain additional piping, metering and valves to
provide delivery service to an Electric Generation facility within the
state of Wyoming. The Jim Bridger Delivery Project (Project) would
facilitate the delivery of 267,000 dekatherms per day from various
receipts on Overthrust's mainline to a new delivery site 25 miles
outside of the City of Rock Springs, Wyoming. Overthrust states that
the cost of the Project will be $12,677,000, all as more fully set
forth in the application which is on file with the Commission and open
to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to
[[Page 34145]]
view and/or print the contents of this document via the internet
through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact FERC at
[email protected] or call toll free, (886) 208-3676 or TTY
(202) 502-8659.
Any questions concerning this application should be directed to
Greg Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline,
LLC, 333 South State Street, Salt Lake City, Utah 84111, by phone at
(801) 209-6764 or by email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on July 21, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is July 21, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is July 21, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 21, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-478-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-478-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available
[[Page 34146]]
to assist you at (202) 502-8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Greg
Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline, LLC,
333 South State Street, Salt Lake City, Utah 84111, by phone at (801)
209-6764 or by email at [email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: May 22, 2023.
Kimberly D. Bose,
Secretary.