MountainWest Overthrust Pipeline, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 34144-34146 [2023-11293]

Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 34144 Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices the proposed Amendment, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The EA incorporates by reference the Commission staff’s May 2019 Final Environmental Impact Statement issued in Docket Nos. CP17–66–000 and CP17– 67–000 for the Plaquemines LNG Project, and the Commission’s findings and conclusions in its September 30, 2019 Order. The EA addresses the potential environmental effects of the Amendment on water and wetlands resources, vegetation and wildlife, socioeconomics, environmental justice, visual resources, cultural resources, air quality, and noise. The EA also addresses cumulative impacts, including climate change, and alternatives to the proposed action. The Commission mailed a copy of the Notice of Availability for the EA to Federal, State, and local government representatives and agencies; Native American tribes; potentially affected landowners; and other interested individuals and groups. The EA is only available in electronic format. It may be viewed and downloaded from the FERC’s website (www.ferc.gov), on the natural gas environmental documents page (https://www.ferc.gov/industriesdata/natural-gas/environment/ environmental-documents). In addition, the EA may be accessed by using the eLibrary link on the FERC’s website. Click on the eLibrary link (https:// elibrary.ferc.gov/eLibrary/search), select ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field (i.e. CP17–66 or CP17–67). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The EA is not a decision document. It presents Commission staff’s independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA’s disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this Amendment, it is important that we receive your comments in Washington, DC on or VerDate Sep<11>2014 18:14 May 25, 2023 Jkt 259001 before 5:00 p.m. Eastern Time on June 20, 2023. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address using the U.S. Postal Service. Be sure to reference the project docket numbers (CP17–66–001and CP17–67–001) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent through carriers other than the U.S. Postal Service must be sent to 12225 Wilkins Avenue, Rockville, Maryland 20852 for processing. Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only intervenors have the right to seek rehearing or judicial review of the Commission’s decision. At this point in this proceeding, the timeframe for filing timely intervention requests has expired. Any person seeking to become a party to the proceeding must file a motion to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the Commission’s Rules of Practice and Procedures (18 CFR 385.214(b)(3) and (d)) and show good cause why the time limitation should be waived. Motions to intervene are more fully described at https://www.ferc.gov/ferc-online/ferconline/how-guides. Additional information about the Plaquemines LNG Amendment is available from the Commission’s Office PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using eLibrary. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription, which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Dated: May 19, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–11237 Filed 5–25–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–478–000] MountainWest Overthrust Pipeline, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on May 12, 2023, MountainWest Overthrust Pipeline, LLC (Overthrust), 333 South State Street, Salt Lake City, Utah 84111, filed a prior notice request for authorization, in accordance with 18 CFR 157.205, 157.208(b), and 157.211 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act and Overthrust’s blanket certificate issued in Docket No. CP82–493–000, to construct, own and maintain additional piping, metering and valves to provide delivery service to an Electric Generation facility within the state of Wyoming. The Jim Bridger Delivery Project (Project) would facilitate the delivery of 267,000 dekatherms per day from various receipts on Overthrust’s mainline to a new delivery site 25 miles outside of the City of Rock Springs, Wyoming. Overthrust states that the cost of the Project will be $12,677,000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to E:\FR\FM\26MYN1.SGM 26MYN1 Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. Any questions concerning this application should be directed to Greg Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline, LLC, 333 South State Street, Salt Lake City, Utah 84111, by phone at (801) 209–6764 or by email at greg.williams@ mwpipe.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. ddrumheller on DSK120RN23PROD with NOTICES1 Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on July 21, 2023. How to file protests, motions to intervene, and comments is explained below. CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 5 18 CFR 385.214. 6 18 CFR 157.10. 3 Persons Pursuant to section 157.205 of the Commission’s regulations under the CFR (Code of Federal Regulations) 157.9. VerDate Sep<11>2014 Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is July 21, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the 2 18 Protests 1 18 NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is July 21, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. 18:14 May 25, 2023 Jkt 259001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 34145 time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before July 21, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–478–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–478– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. E:\FR\FM\26MYN1.SGM 26MYN1 34146 Federal Register / Vol. 88, No. 102 / Friday, May 26, 2023 / Notices to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Greg Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline, LLC, 333 South State Street, Salt Lake City, Utah 84111, by phone at (801) 209–6764 or by email at greg.williams@mwpipe.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: May 22, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–11293 Filed 5–25–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES1 [Docket No. ER23–1928–000] Appaloosa Solar I, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Appaloosa Solar I, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR VerDate Sep<11>2014 18:14 May 25, 2023 Jkt 259001 part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is June 12, 2023. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Dated: May 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–11344 Filed 5–25–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP17–40–000, CP17–40–001] Spire STL Pipeline LLC; Notice of Onsite Environmental Review On May 31, 2023, Federal Energy Regulatory Commission (Commission) staff will conduct a restoration inspection of the Spire STL Pipeline Project (Spire Project) right-of-way in Greene, Jersey, and Scott Counties, Illinois. The purpose of the inspection is to assess the existing condition of right-of-way restoration along a portion of the Spire Project in Illinois and to evaluate Spire STL Pipeline LLC’s (Spire) compliance with the restoration conditions of the Commission’s August 3, 2018 Order Issuing Certificate, March 18, 2021 Order on Environmental Compliance, and December 15, 2022 Order on Remand and Reissuing Certificates. Other Commission staff, Spire’s representatives, and the landowner’s representatives will accompany the Office of Energy Projects staff during the inspection and will view the right-of-way from public access points and where landowners have granted Spire access outside of the permanent right-of-way easement. For additional information or questions, please contact the Office of External Affairs at (866) 208–FERC or email DG2E@ferc.gov. Dated: May 22, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–11288 Filed 5–25–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at North American Electric Reliability Corporation Standard Drafting Team Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the following meeting: E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 88, Number 102 (Friday, May 26, 2023)]
[Notices]
[Pages 34144-34146]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11293]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-478-000]


MountainWest Overthrust Pipeline, LLC; Notice of Request Under 
Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on May 12, 2023, MountainWest Overthrust Pipeline, 
LLC (Overthrust), 333 South State Street, Salt Lake City, Utah 84111, 
filed a prior notice request for authorization, in accordance with 18 
CFR 157.205, 157.208(b), and 157.211 of the Federal Energy Regulatory 
Commission's (Commission) regulations under the Natural Gas Act and 
Overthrust's blanket certificate issued in Docket No. CP82-493-000, to 
construct, own and maintain additional piping, metering and valves to 
provide delivery service to an Electric Generation facility within the 
state of Wyoming. The Jim Bridger Delivery Project (Project) would 
facilitate the delivery of 267,000 dekatherms per day from various 
receipts on Overthrust's mainline to a new delivery site 25 miles 
outside of the City of Rock Springs, Wyoming. Overthrust states that 
the cost of the Project will be $12,677,000, all as more fully set 
forth in the application which is on file with the Commission and open 
to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to

[[Page 34145]]

view and/or print the contents of this document via the internet 
through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact FERC at 
[email protected] or call toll free, (886) 208-3676 or TTY 
(202) 502-8659.
    Any questions concerning this application should be directed to 
Greg Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline, 
LLC, 333 South State Street, Salt Lake City, Utah 84111, by phone at 
(801) 209-6764 or by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on July 21, 2023. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is July 21, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is July 21, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before July 21, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-478-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------

    \7\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-478-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available

[[Page 34146]]

to assist you at (202) 502-8258 or [email protected]
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Greg 
Williams, Supervisor, Rates and Regulatory, MountainWest Pipeline, LLC, 
333 South State Street, Salt Lake City, Utah 84111, by phone at (801) 
209-6764 or by email at [email protected].
    Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: May 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11293 Filed 5-25-23; 8:45 am]
BILLING CODE 6717-01-P