Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications-Roadmap, 33924-33926 [2023-11186]
Download as PDF
33924
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
Document description
ADAMS
accession No.
Regulations.gov
docket ID No.
Draft Interim Staff Guidance DANU–ISG–2022–08, ‘‘Advanced Reactor Content of Application Project,
‘Risk-Informed Technical Specifications’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–09, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Performance-based Fire Protection Program (for Operations)’ ’’.
DG–1404, ‘‘Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water
Reactors’’.
Regulatory Analysis for ARCAP ISGs ...............................................................................................................
ML22048B548
NRC–2022–0081
ML22048B547
NRC–2022–0082
ML22076A003
NRC–2022–0073
ML23093A099
NRC–2022–0074
V. Backfitting, Forward Fitting, and
Issue Finality
DANU–ISG–2022–09, if finalized,
would not constitute backfitting as
defined in 10 CFR 50.109, ‘‘Backfitting,’’
and as described in Management
Directive (MD) 8.4, ‘‘Management of
Backfitting, Forward Fitting, Issue
Finality, and Information Requests’’;
constitute forward fitting as that term is
defined and described in MD 8.4; or
affect the issue finality of any approval
issued under 10 CFR part 52. The
guidance would not apply to any
current licensees or applicants or
existing or requested approvals under
10 CFR part 52, and therefore its
issuance cannot be a backfit or forward
fit or affect issue finality. Further, as
explained in DANU–ISG–2022–09,
applicants and licensees would not be
required to comply with the positions
set forth in DANU–ISG–2022–09.
Dated: May 22, 2023.
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch,
Division of Advanced Reactors and NonPower Production and Utilization Facilities,
Office of Nuclear Reactor Regulation.
[FR Doc. 2023–11184 Filed 5–24–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0074]
Draft Interim Staff Guidance: Review of
Risk-Informed, Technology Inclusive
Advanced Reactor Applications—
Roadmap
Nuclear Regulatory
Commission.
ACTION: Draft guidance; request for
comment.
AGENCY:
lotter on DSK11XQN23PROD with NOTICES1
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
Submit comments by July 10,
2023. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
DATES:
You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website.
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0074. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
The U.S. Nuclear Regulatory
Commission (NRC) is soliciting public
comment on its draft Interim Staff
Guidance (ISG) DANU–ISG–2022–01,
‘‘Review of Risk-Informed, Technology
Inclusive Advanced Reactor
Applications—Roadmap.’’ The purpose
of this proposed ISG is to provide
SUMMARY:
guidance to assist the NRC staff in
determining whether an application for
a non-light water reactor (non-LWR)
design that uses the Licensing
Modernization Project (LMP) process
meets the minimum requirements for
construction permits, operating licenses,
combined licenses, manufacturing
licenses, standard design approval, or
design certifications.
Joseph Sebrosky, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
1132, email: Joseph.Sebrosky@nrc.gov.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
I. Obtaining information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2022–
0074 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0074.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. For the
convenience of the reader, instructions
about obtaining materials referenced in
this document are provided in the
‘‘Availability of Documents’’ section.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2022–0074 in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
E:\FR\FM\25MYN1.SGM
25MYN1
33925
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
lotter on DSK11XQN23PROD with NOTICES1
II. Background
The NRC anticipates the submission
of advanced power-reactor applications
within the next few years based on
preapplication engagement initiated by
several prospective applicants. Because
many of these designs are non-LWRs,
the NRC is developing technologyinclusive, risk-informed, performancebased guidance to support the
development and review of these nonLWR applications. The proposed
guidance will facilitate the development
and review of non-LWR applications for
construction permits or operating
licenses under part 50 of title 10 of the
Code of Federal Regulations (10 CFR),
‘‘Domestic Licensing of Production and
Utilization Facilities,’’ or combined
licenses, manufacturing licenses,
standard design approval, or design
certifications under 10 CFR part 52,
‘‘Licenses, Certifications, and Approvals
for Nuclear Power Plants.’’ The NRC is
developing a rule to amend 10 CFR
parts 50 and 52 (RIN 3150-Al66). The
NRC staff notes this proposed ISG may
need to be updated to conform to
changes to 10 CFR parts 50 and 52, if
any, adopted through that rulemaking.
Further, as of the date of this draft ISG,
the NRC is developing an optional
performance-based, technologyinclusive regulatory framework for
licensing nuclear power plants
designated as 10 CFR part 53,
‘‘Licensing and Regulation of Advanced
Nuclear Reactors,’’ (RIN 3150–AK31).
The NRC intends to revise this proposed
guidance as a part of the ongoing
rulemaking for 10 CFR part 53.
To standardize the development of
content of a non-LWR application, the
staff focused on two activities: the
Advanced Reactor Content of
Application Project (ARCAP) and the
Technology-Inclusive Content of
Application Project (TICAP). The
ARCAP is an NRC-led activity that is
intended to result in guidance for a
complete non-LWR application for
review under 10 CFR part 50 or 10 CFR
part 52, and which the staff would
update, as appropriate, pending the
issuance of the 10 CFR part 50 and 10
CFR part 52 rulemaking as previously
mentioned in this notice, or if the
Commission issues a final 10 CFR part
53 rule. As a result, the ARCAP is broad
and encompasses several industry-led
and NRC-led guidance document
development activities aimed at
facilitating a consistent approach to the
development of application documents.
The TICAP is an industry-led activity
that is focused on providing guidance
on the appropriate scope and depth of
information related to the specific
portions of the safety analysis report
that describe the fundamental safety
functions of the design and document
the safety analysis of the facility using
the LMP-based approach. The LMPbased approach is described in
Regulatory Guide (RG) 1.233, ‘‘Guidance
for a Technology-Inclusive, RiskInformed, and Performance-Based
Methodology to Inform the Licensing
Basis and Content of Applications for
Licenses, Certifications, and Approvals
for Non-Light-Water Reactors,’’
(ADAMS Accession No. ML20091L698).
III. Request for Comment
The ARCAP draft ISG titled ‘‘Review
of Risk-Informed, Technology Inclusive
Advanced Reactor Applications—
Roadmap’’ (ARCAP Roadmap ISG) that
is the subject of this Federal Register
notice (FRN) for which the staff is
seeking comment, was developed to
provide a general overview of the
information that should be included in
a non-LWR application. The ARCAP
Roadmap ISG also provides a review
roadmap for the NRC staff with the
principal purpose of ensuring
consistency, quality, and uniformity of
NRC staff reviews. The ARCAP
Roadmap ISG includes references to
eight other ARCAP draft ISGs and a
TICAP draft regulatory guide (DG) that
are the subject of separate FRNs
requesting comment on these guidance
documents. Information regarding the
eight other ARCAP draft ISGs and the
TICAP DG can be found in the
‘‘Availability of Documents’’ section of
this FRN. The ARCAP Roadmap ISG
also refers to a wide variety of NRCissued, approved, or endorsed
documents and the NRC is requesting
comment on this proposed ISG’s use of
those documents.
Additionally, the staff is issuing for
public comment a draft regulatory
analysis. The staff developed a
regulatory analysis to assess the value of
issuing or revising a regulatory guide as
well as alternative courses of action.
The NRC staff is not seeking public
comment on the italicized text found in
ARCAP Roadmap ISG, Appendix C,
‘‘Construction Permit Guidance.’’ The
italicized text found in Appendix C is
applicable to both light water reactors
(LWR) and non-LWRs and is based on
guidance found in DNRL–ISG–2022–01,
‘‘Safety Review of Light-Water Power
Reactor Construction Permit
Applications,’’ (ADAMS Accession No.
ML22189A099). The staff sought public
comment on this LWR Construction
Permit (CP) ISG as documented in the
Federal Register on December 14, 2021
(86 FR 71101) and May 6, 2022 (87 FR
27195). The final ISG was issued on
November 14, 2022 (87 FR 68202).
Details regarding the status of the LWR
CP ISG can be found at https://
www.regulations.gov under Docket ID
NRC–2021–0162.
In addition, the staff plans to update
the ARCAP Roadmap ISG upon
completing other documents under
development and listed in ARCAP
Roadmap ISG, Appendix D. The staff is
not requesting comment on any of those
documents at this time. The NRC staff
will request comment on the documents
in Appendix D to the extent normal
NRC processes call for publication of
any one of these documents for public
comment.
IV. Availability of Documents
The table in this notice provides the
document description, ADAMS
accession number, and, if appropriate,
the docket identification number
referencing the request for public
comment on supporting documents
associated with the document that is the
subject of this FRN.
ADAMS
accession No.
Document description
Draft Interim Staff Guidance DANU–ISG–2022–01 ‘‘Advanced Reactor Content of Application Project,
‘Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications—Roadmap’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–02, ‘‘Advanced Reactor Content of Application Project
Chapter 2, ‘Site Information’ ’’.
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
E:\FR\FM\25MYN1.SGM
Regulations.gov
docket ID No.
ML22048B546
NRC–2022–0074.
ML22048B541
NRC–2022–0075.
25MYN1
33926
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
ADAMS
accession No.
Document description
Draft Interim Staff Guidance DANU–ISG–2022–03, ‘‘Advanced Reactor Content of Application Project
Chapter 9, ‘Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–04, ‘‘Advanced Reactor Content of Application Project
Chapter 10, ‘Control of Occupational Dose’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–05, ‘‘Advanced Reactor Content of Application Project
Chapter 11, ‘Organization and Human-System Considerations’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–06, ‘‘Advanced Reactor Content of Application Project
Chapter 12, ‘Post-Construction Inspection, Testing, and Analysis Program’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–07, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Inservice Inspection/Inservice Testing’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–08, ‘‘Advanced Reactor Content of Application Project,
‘Risk-Informed Technical Specifications’.
Draft Interim Staff Guidance DANU–ISG–2022–09, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Performance-based Fire Protection Program (for Operations)’ ’’.
DG–1404, ‘‘Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-LightWater Reactors’’.
Regulatory Analysis for ARCAP ISGs ........................................................................................................
V. Backfitting, Forward Fitting, and
Issue Finality
ACTION:
Draft guidance; request for
comment.
DANU–ISG–2022–01, if finalized,
would not constitute backfitting as
defined in 10 CFR 50.109, ‘‘Backfitting,’’
and as described in Management
Directive (MD) 8.4, ‘‘Management of
Backfitting, Forward Fitting, Issue
Finality, and Information Requests’’;
constitute forward fitting as that term is
defined and described in MD 8.4; or
affect the issue finality of any approval
issued under 10 CFR part 52. The
guidance would not apply to any
current licensees or applicants or
existing or requested approvals under
10 CFR part 52, and therefore its
issuance cannot be a backfit or forward
fit or affect issue finality. Further, as
explained in DANU–ISG–2022–01,
applicants and licensees would not be
required to comply with the positions
set forth in DANU–ISG–2022–01.
The U.S. Nuclear Regulatory
Commission (NRC) is soliciting public
comment on its draft Interim Staff
Guidance (ISG) DANU–ISG–2022–08,
‘‘Risk-informed Technical
Specifications.’’ The purpose of this
proposed ISG is to provide guidance to
assist the NRC staff in determining
whether an application for a non-light
water reactor (non-LWR) design that
uses the Licensing Modernization
Project (LMP) process meets the
minimum requirements for construction
permits, operating licenses, combined
licenses, manufacturing licenses,
standard design approval, or design
certifications.
DATES: Submit comments by July 10,
2023. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website.
• Federal rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0081. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
Dated: May 22, 2023.
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch,
Division of Advanced Reactors and NonPower Production and Utilization Facilities,
Office of Nuclear Reactor Regulation.
[FR Doc. 2023–11186 Filed 5–24–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
lotter on DSK11XQN23PROD with NOTICES1
[NRC–2022–0081]
Draft Interim Staff Guidance: Advanced
Reactor Content of Application Project,
‘‘Risk-informed Technical
Specifications’’
Nuclear Regulatory
Commission.
AGENCY:
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
SUMMARY:
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
Regulations.gov
docket ID No.
ML22048B543
NRC–2022–0076.
ML22048B544
NRC–2022–0077.
ML22048B542
NRC–2022–0078.
ML22048B545
NRC–2022–0079.
ML22048B549
NRC–2022–0080.
ML22048B548
NRC–2022–0081.
ML22048B547
NRC–2022–0082.
ML22076A003
NRC–2022–0073.
ML23093A099
NRC–2022–0074.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Michael Orenak, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
3229, email: Michael.Orenak@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2022–
0081 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0081.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. For the
convenience of the reader, instructions
about obtaining materials referenced in
this document are provided in the
‘‘Availability of Documents’’ section.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
E:\FR\FM\25MYN1.SGM
25MYN1
Agencies
[Federal Register Volume 88, Number 101 (Thursday, May 25, 2023)]
[Notices]
[Pages 33924-33926]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11186]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2022-0074]
Draft Interim Staff Guidance: Review of Risk-Informed, Technology
Inclusive Advanced Reactor Applications--Roadmap
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft guidance; request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting
public comment on its draft Interim Staff Guidance (ISG) DANU-ISG-2022-
01, ``Review of Risk-Informed, Technology Inclusive Advanced Reactor
Applications--Roadmap.'' The purpose of this proposed ISG is to provide
guidance to assist the NRC staff in determining whether an application
for a non-light water reactor (non-LWR) design that uses the Licensing
Modernization Project (LMP) process meets the minimum requirements for
construction permits, operating licenses, combined licenses,
manufacturing licenses, standard design approval, or design
certifications.
DATES: Submit comments by July 10, 2023. Comments received after this
date will be considered if it is practical to do so, but the Commission
is able to ensure consideration only for comments received on or before
this date.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal rulemaking website.
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0074. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the For Further Information
Contact section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Joseph Sebrosky, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, telephone: 301-415-1132, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2022-0074 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0074.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2022-0074 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the
[[Page 33925]]
comment submissions into ADAMS. The NRC does not routinely edit comment
submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
The NRC anticipates the submission of advanced power-reactor
applications within the next few years based on preapplication
engagement initiated by several prospective applicants. Because many of
these designs are non-LWRs, the NRC is developing technology-inclusive,
risk-informed, performance-based guidance to support the development
and review of these non-LWR applications. The proposed guidance will
facilitate the development and review of non-LWR applications for
construction permits or operating licenses under part 50 of title 10 of
the Code of Federal Regulations (10 CFR), ``Domestic Licensing of
Production and Utilization Facilities,'' or combined licenses,
manufacturing licenses, standard design approval, or design
certifications under 10 CFR part 52, ``Licenses, Certifications, and
Approvals for Nuclear Power Plants.'' The NRC is developing a rule to
amend 10 CFR parts 50 and 52 (RIN 3150-Al66). The NRC staff notes this
proposed ISG may need to be updated to conform to changes to 10 CFR
parts 50 and 52, if any, adopted through that rulemaking. Further, as
of the date of this draft ISG, the NRC is developing an optional
performance-based, technology-inclusive regulatory framework for
licensing nuclear power plants designated as 10 CFR part 53,
``Licensing and Regulation of Advanced Nuclear Reactors,'' (RIN 3150-
AK31). The NRC intends to revise this proposed guidance as a part of
the ongoing rulemaking for 10 CFR part 53.
To standardize the development of content of a non-LWR application,
the staff focused on two activities: the Advanced Reactor Content of
Application Project (ARCAP) and the Technology-Inclusive Content of
Application Project (TICAP). The ARCAP is an NRC-led activity that is
intended to result in guidance for a complete non-LWR application for
review under 10 CFR part 50 or 10 CFR part 52, and which the staff
would update, as appropriate, pending the issuance of the 10 CFR part
50 and 10 CFR part 52 rulemaking as previously mentioned in this
notice, or if the Commission issues a final 10 CFR part 53 rule. As a
result, the ARCAP is broad and encompasses several industry-led and
NRC-led guidance document development activities aimed at facilitating
a consistent approach to the development of application documents.
The TICAP is an industry-led activity that is focused on providing
guidance on the appropriate scope and depth of information related to
the specific portions of the safety analysis report that describe the
fundamental safety functions of the design and document the safety
analysis of the facility using the LMP-based approach. The LMP-based
approach is described in Regulatory Guide (RG) 1.233, ``Guidance for a
Technology-Inclusive, Risk-Informed, and Performance-Based Methodology
to Inform the Licensing Basis and Content of Applications for Licenses,
Certifications, and Approvals for Non-Light-Water Reactors,'' (ADAMS
Accession No. ML20091L698).
III. Request for Comment
The ARCAP draft ISG titled ``Review of Risk-Informed, Technology
Inclusive Advanced Reactor Applications--Roadmap'' (ARCAP Roadmap ISG)
that is the subject of this Federal Register notice (FRN) for which the
staff is seeking comment, was developed to provide a general overview
of the information that should be included in a non-LWR application.
The ARCAP Roadmap ISG also provides a review roadmap for the NRC staff
with the principal purpose of ensuring consistency, quality, and
uniformity of NRC staff reviews. The ARCAP Roadmap ISG includes
references to eight other ARCAP draft ISGs and a TICAP draft regulatory
guide (DG) that are the subject of separate FRNs requesting comment on
these guidance documents. Information regarding the eight other ARCAP
draft ISGs and the TICAP DG can be found in the ``Availability of
Documents'' section of this FRN. The ARCAP Roadmap ISG also refers to a
wide variety of NRC-issued, approved, or endorsed documents and the NRC
is requesting comment on this proposed ISG's use of those documents.
Additionally, the staff is issuing for public comment a draft
regulatory analysis. The staff developed a regulatory analysis to
assess the value of issuing or revising a regulatory guide as well as
alternative courses of action.
The NRC staff is not seeking public comment on the italicized text
found in ARCAP Roadmap ISG, Appendix C, ``Construction Permit
Guidance.'' The italicized text found in Appendix C is applicable to
both light water reactors (LWR) and non-LWRs and is based on guidance
found in DNRL-ISG-2022-01, ``Safety Review of Light-Water Power Reactor
Construction Permit Applications,'' (ADAMS Accession No. ML22189A099).
The staff sought public comment on this LWR Construction Permit (CP)
ISG as documented in the Federal Register on December 14, 2021 (86 FR
71101) and May 6, 2022 (87 FR 27195). The final ISG was issued on
November 14, 2022 (87 FR 68202). Details regarding the status of the
LWR CP ISG can be found at https://www.regulations.gov under Docket ID
NRC-2021-0162.
In addition, the staff plans to update the ARCAP Roadmap ISG upon
completing other documents under development and listed in ARCAP
Roadmap ISG, Appendix D. The staff is not requesting comment on any of
those documents at this time. The NRC staff will request comment on the
documents in Appendix D to the extent normal NRC processes call for
publication of any one of these documents for public comment.
IV. Availability of Documents
The table in this notice provides the document description, ADAMS
accession number, and, if appropriate, the docket identification number
referencing the request for public comment on supporting documents
associated with the document that is the subject of this FRN.
________________________________________________________
Document description ADAMS accession No. Regulations.gov docket ID No.
----------------------------------------------------------------------------------------------------------------
Draft Interim Staff Guidance DANU-ISG- ML22048B546 NRC-2022-0074.
2022-01 ``Advanced Reactor Content of
Application Project, `Review of Risk-
Informed, Technology Inclusive Advanced
Reactor Applications--Roadmap' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B541 NRC-2022-0075.
2022-02, ``Advanced Reactor Content of
Application Project Chapter 2, `Site
Information' ''.
[[Page 33926]]
Draft Interim Staff Guidance DANU-ISG- ML22048B543 NRC-2022-0076.
2022-03, ``Advanced Reactor Content of
Application Project Chapter 9, `Control
of Routine Plant Radioactive Effluents,
Plant Contamination and Solid Waste' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B544 NRC-2022-0077.
2022-04, ``Advanced Reactor Content of
Application Project Chapter 10,
`Control of Occupational Dose' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B542 NRC-2022-0078.
2022-05, ``Advanced Reactor Content of
Application Project Chapter 11,
`Organization and Human-System
Considerations' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B545 NRC-2022-0079.
2022-06, ``Advanced Reactor Content of
Application Project Chapter 12, `Post-
Construction Inspection, Testing, and
Analysis Program' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B549 NRC-2022-0080.
2022-07, ``Advanced Reactor Content of
Application Project, `Risk-informed
Inservice Inspection/Inservice Testing'
''.
Draft Interim Staff Guidance DANU-ISG- ML22048B548 NRC-2022-0081.
2022-08, ``Advanced Reactor Content of
Application Project, `Risk-Informed
Technical Specifications'.
Draft Interim Staff Guidance DANU-ISG- ML22048B547 NRC-2022-0082.
2022-09, ``Advanced Reactor Content of
Application Project, `Risk-informed
Performance-based Fire Protection
Program (for Operations)' ''.
DG-1404, ``Guidance for a Technology- ML22076A003 NRC-2022-0073.
Inclusive Content of Application
Methodology to Inform the Licensing
Basis and Content of Applications for
Licenses, Certifications, and Approvals
for Non-Light-Water Reactors''.
Regulatory Analysis for ARCAP ISGs...... ML23093A099 NRC-2022-0074.
----------------------------------------------------------------------------------------------------------------
V. Backfitting, Forward Fitting, and Issue Finality
DANU-ISG-2022-01, if finalized, would not constitute backfitting as
defined in 10 CFR 50.109, ``Backfitting,'' and as described in
Management Directive (MD) 8.4, ``Management of Backfitting, Forward
Fitting, Issue Finality, and Information Requests''; constitute forward
fitting as that term is defined and described in MD 8.4; or affect the
issue finality of any approval issued under 10 CFR part 52. The
guidance would not apply to any current licensees or applicants or
existing or requested approvals under 10 CFR part 52, and therefore its
issuance cannot be a backfit or forward fit or affect issue finality.
Further, as explained in DANU-ISG-2022-01, applicants and licensees
would not be required to comply with the positions set forth in DANU-
ISG-2022-01.
Dated: May 22, 2023.
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch, Division of Advanced Reactors
and Non-Power Production and Utilization Facilities, Office of Nuclear
Reactor Regulation.
[FR Doc. 2023-11186 Filed 5-24-23; 8:45 am]
BILLING CODE 7590-01-P