Draft Interim Staff Guidance: Advanced Reactor Content of Application Project, “Risk-informed Inservice Inspection/Inservice Testing”, 33938-33940 [2023-11180]
Download as PDF
33938
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
can be found in the ‘‘Availability of
Documents’’ section of this FRN.
III. Request for Comment
The ARCAP draft ISG titled, ‘‘Chapter
10, ‘Control of Occupational Dose,’ ’’
that is the subject of this FRN for which
the staff is seeking comment, was
developed because the current
application and review guidance related
to control of occupational doses is
directly applicable only to light water
reactors and may not fully (or
efficiently) identify the information to
be included in a technology-inclusive,
guidance and staff review guidance is
warranted. If finalized, this ISG will
serve as the non-LWR application and
review guidance for control of
occupational dose.
IV. Availability of Documents
The table in this notice provides the
document description, ADAMS
accession number, and, if appropriate,
the docket identification number
referencing the request for public
comment on supporting documents
associated with the document that is the
subject of this FRN.
Document description
ADAMS
accession No.
Regulations.gov
docket ID No.
Draft Interim Staff Guidance DANU–ISG–2022–01 ‘‘Advanced Reactor Content of Application Project, ‘Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications—Roadmap’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–02, ‘‘Advanced Reactor Content of Application Project
Chapter 2, ‘Site Information’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–03, ‘‘Advanced Reactor Content of Application Project
Chapter 9, ‘Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–04, ‘‘Advanced Reactor Content of Application Project
Chapter 10, ‘Control of Occupational Dose’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–05, ‘‘Advanced Reactor Content of Application Project
Chapter 11, ‘Organization and Human-System Considerations’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–06, ‘‘Advanced Reactor Content of Application Project
Chapter 12, ‘Post-Construction Inspection, Testing, and Analysis Program’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–07, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Inservice Inspection/Inservice Testing’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–08, ‘‘Advanced Reactor Content of Application Project,
‘Risk-Informed Technical Specifications’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–09, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Performance-based Fire Protection Program (for Operations)’ ’’.
DG–1404, ‘‘Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water
Reactors’’.
Regulatory Analysis for ARCAP ISGs ...............................................................................................................
ML22048B546
NRC–2022–0074
ML22048B541
NRC–2022–0075
ML22048B543
NRC–2022–0076
ML22048B544
NRC–2022–0077
ML22048B542
NRC–2022–0078
ML22048B545
NRC–2022–0079
ML22048B549
NRC–2022–0080
ML22048B548
NRC–2022–0081
ML22048B547
NRC–2022–0082
ML22076A003
NRC–2022–0073
ML23093A099
NRC–2022–0074
V. Backfitting, Forward Fitting, and
Issue Finality
lotter on DSK11XQN23PROD with NOTICES1
risk-informed, and performance-based
application or provide a review
approach for such an application. The
Chapter 10 draft ISG also refers to
several NRC-issued, approved, or
endorsed documents and the NRC is
requesting comment on this proposed
ISG’s use of those documents.
Additionally, the staff is issuing for
public comment a draft regulatory
analysis. The staff developed a
regulatory analysis to assess the value of
issuing or revising a regulatory guide as
well as alternative courses of action.
The development of both application
DANU–ISG–2022–04, if finalized,
would not constitute backfitting as
defined in 10 CFR 50.109, ‘‘Backfitting,’’
and as described in Management
Directive (MD) 8.4, ‘‘Management of
Backfitting, Forward Fitting, Issue
Finality, and Information Requests’’;
constitute forward fitting as that term is
defined and described in MD 8.4; or
affect the issue finality of any approval
issued under 10 CFR part 52. The
guidance would not apply to any
current licensees or applicants or
existing or requested approvals under
10 CFR part 52, and therefore its
issuance cannot be a backfit or forward
fit or affect issue finality. Further, as
explained in DANU–ISG–2022–04,
applicants and licensees would not be
required to comply with the positions
set forth in DANU–ISG–2022–04.
Dated: May 22, 2023.
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch,
Division of Advanced Reactors and NonPower Production and Utilization Facilities,
Office of Nuclear Reactor Regulation.
[FR Doc. 2023–11181 Filed 5–24–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0080]
Draft Interim Staff Guidance: Advanced
Reactor Content of Application Project,
‘‘Risk-informed Inservice Inspection/
Inservice Testing’’
Nuclear Regulatory
Commission.
ACTION: Draft guidance; request for
comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is soliciting public
comment on its draft Interim Staff
Guidance (ISG) DANU–ISG–2022–07,
SUMMARY:
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
‘‘Risk-informed Inservice Inspection/
Inservice Testing.’’ The purpose of this
proposed ISG is to provide guidance to
assist the NRC staff in determining
whether an application for a non-light
water reactor (non-LWR) design that
uses the Licensing Modernization
Project (LMP) process meets the
minimum requirements for construction
permits, operating licenses, combined
license, manufacturing licenses,
standard design approval, or design
certifications.
Submit comments by July 10,
2023. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website.
• Federal rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0080. Address
DATES:
E:\FR\FM\25MYN1.SGM
25MYN1
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Michael Orenak, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
3229, email: Michael.Orenak@nrc.gov.
SUPPLEMENTARY INFORMATION:
lotter on DSK11XQN23PROD with NOTICES1
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2022–
0080 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0080.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to
PDR.Resource@nrc.gov. For the
convenience of the reader, instructions
about obtaining materials referenced in
this document are provided in the
‘‘Availability of Documents’’ section.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2022–0080 in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Background
The NRC anticipates the submission
of advanced power-reactor applications
within the next few years based on
preapplication engagement initiated by
several prospective applicants. Because
many of these designs are non-LWRs,
the NRC is developing technologyinclusive, risk-informed, performancebased guidance to support the
development and review of these nonLWR applications. The proposed
guidance will facilitate the development
and review of non-LWR reactor
applications for construction permits or
operating licenses under part 50 of title
10 of the Code of Federal Regulations
(10 CFR), ‘‘Domestic Licensing of
Production and Utilization Facilities,’’
or combined licenses, manufacturing
licenses, standard design approval, or
design certifications under 10 CFR part
52, ‘‘Licenses, Certifications, and
Approvals for Nuclear Power Plants.’’
The NRC is developing a rule to amend
10 CFR parts 50 and 52 (RIN 3150–
Al66). The NRC staff notes this
proposed ISG may need to be updated
to conform to changes to 10 CFR parts
50 and 52, if any, adopted through that
rulemaking. Further, as of the date of
this draft ISG, the NRC is developing an
optional performance-based,
technology-inclusive regulatory
framework for licensing nuclear power
plants designated as 10 CFR part 53,
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
33939
‘‘Licensing and Regulation of Advanced
Nuclear Reactors,’’ (RIN 3150–AK31).
The NRC intends to revise this proposed
guidance as a part of the ongoing
rulemaking for 10 CFR part 53.
To standardize the development of
content of a non-LWR application, the
staff focused on two activities: the
Advanced Reactor Content of
Application Project (ARCAP) and the
Technology-Inclusive Content of
Application Project (TICAP). The
ARCAP is an NRC-led activity that is
intended to result in guidance for a
complete non-LWR application for
review under 10 CFR part 50 or 10 CFR
part 52, and which the staff would
update, as appropriate, pending the
issuance of the 10 CFR part 50 and 10
CFR part 52 rulemaking as previously
mentioned in this notice, or if the
Commission issues a final 10 CFR part
53 rule. As a result, the ARCAP is broad
and encompasses several industry-led
and NRC-led guidance document
development activities aimed at
facilitating a consistent approach to the
development of application documents.
The TICAP is an industry-led activity
that is focused on providing guidance
on the appropriate scope and depth of
information related to the specific
portions of the safety analysis report
that describe the fundamental safety
functions of the design and document
the safety analysis of the facility using
LMP-based approach. The LMP-based
approach is described in Regulatory
Guide (RG) 1.233, ‘‘Guidance for a
Technology-Inclusive, Risk-Informed,
and Performance-Based Methodology to
Inform the Licensing Basis and Content
of Applications for Licenses,
Certifications, and Approvals for NonLight-Water Reactors,’’ (ADAMS
Accession No. ML20091L698).
The ARCAP draft ISG titled ‘‘Review
of Risk-Informed, Technology Inclusive
Advanced Reactor Applications—
Roadmap’’ (ARCAP Roadmap ISG)
provides a general overview of the
information that should be included in
a non-LWR application. The ARCAP
Roadmap ISG also provides a review
roadmap for the NRC staff with the
principal purpose of ensuring
consistency, quality, and uniformity of
NRC staff reviews. The ARCAP
Roadmap ISG includes references to
eight other ARCAP draft ISGs and a
TICAP draft regulatory guide (DG) that
are the subject of separate Federal
Register notices (FRNs) requesting
comment on these guidance documents.
Information regarding the eight other
ARCAP draft ISGs and the TICAP DG
can be found in the ‘‘Availability of
Documents’’ section of this FRN.
E:\FR\FM\25MYN1.SGM
25MYN1
33940
Federal Register / Vol. 88, No. 101 / Thursday, May 25, 2023 / Notices
III. Request for Comment
The ARCAP draft ISG titled, ‘‘Riskinformed Inservice Inspection/Inservice
Testing [ISI/IST],’’ that is the subject of
this FRN for which the staff is seeking
comment, was developed because the
current application and review guidance
related to ISI and IST programs are
based on requirements found in 10 CFR
50.55a, ‘‘Codes and standards,’’ that are
only applicable to, and focus on, large
light water reactor (LWR) technologies.
In addition, the current application and
review guidance for large LWR ISI and
IST programs may not fully (or
efficiently) identify the information to
be included in a technology-inclusive,
risk-informed, and performance-based
application or provide a review
approach for an application using nonLWR technologies. The Risk-informed
ISI/IST draft ISG also refers to several
NRC-issued, approved, or endorsed
documents and the NRC is requesting
comment on this proposed ISG’s use of
those documents.
Additionally, the staff is issuing for
public comment a draft regulatory
analysis. The staff developed a
regulatory analysis to assess the value of
issuing or revising a regulatory guide as
well as alternative courses of action.
The development of both application
guidance and staff review guidance is
warranted. If finalized, this ISG will
serve as the non-LWR application and
review guidance for risk-informed ISI
and IST programs.
IV. Availability of Documents
The table in this notice provides the
document description, ADAMS
accession number, and, if appropriate,
the docket identification number
referencing the request for public
comment on supporting documents
associated with the document that is the
subject of this FRN.
ADAMS
accession No.
Document description
Draft Interim Staff Guidance DANU–ISG–2022–01 ‘‘Advanced Reactor Content of Application Project,
‘Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications—Roadmap’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–02, ‘‘Advanced Reactor Content of Application Project
Chapter 2, ‘Site Information’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–03, ‘‘Advanced Reactor Content of Application Project
Chapter 9, ‘Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–04, ‘‘Advanced Reactor Content of Application Project
Chapter 10, ‘Control of Occupational Dose’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–05, ‘‘Advanced Reactor Content of Application Project
Chapter 11, ‘Organization and Human-System Considerations’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–06, ‘‘Advanced Reactor Content of Application Project
Chapter 12, ‘Post-Construction Inspection, Testing, and Analysis Program’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–07, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Inservice Inspection/Inservice Testing’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–08, ‘‘Advanced Reactor Content of Application Project,
‘Risk-Informed Technical Specifications’ ’’.
Draft Interim Staff Guidance DANU–ISG–2022–09, ‘‘Advanced Reactor Content of Application Project,
‘Risk-informed Performance-based Fire Protection Program (for Operations)’ ’’.
DG–1404, ‘‘Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-LightWater Reactors’’.
Regulatory Analysis for ARCAP ISGs ........................................................................................................
lotter on DSK11XQN23PROD with NOTICES1
V. Backfitting, Forward Fitting, and
Issue Finality
DANU–ISG–2022–07, if finalized,
would not constitute backfitting as
defined in 10 CFR 50.109, ‘‘Backfitting,’’
and as described in Management
Directive (MD) 8.4, ‘‘Management of
Backfitting, Forward Fitting, Issue
Finality, and Information Requests’’;
constitute forward fitting as that term is
defined and described in MD 8.4; or
affect the issue finality of any approval
issued under 10 CFR part 52. The
guidance would not apply to any
current licensees or applicants or
existing or requested approvals under
10 CFR part 52, and therefore its
issuance cannot be a backfit or forward
fit or affect issue finality. Further, as
explained in DANU–ISG–2022–07,
applicants and licensees would not be
required to comply with the positions
set forth in DANU–ISG–2022–07.
Dated: May 22, 2023.
VerDate Sep<11>2014
18:04 May 24, 2023
Jkt 259001
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch,
Division of Advanced Reactors and NonPower Production and Utilization Facilities,
Office of Nuclear Reactor Regulation.
[FR Doc. 2023–11180 Filed 5–24–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2022–0075]
Draft Interim Staff Guidance: Advanced
Reactor Content of Application Project
Chapter 2, ‘‘Site Information’’
Nuclear Regulatory
Commission.
ACTION: Draft guidance; request for
comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is soliciting public
comment on its draft Interim Staff
Guidance (ISG) DANU–ISG–2022–02,
SUMMARY:
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
Regulations.gov
docket ID No.
ML22048B546
NRC–2022–0074
ML22048B541
NRC–2022–0075
ML22048B543
NRC–2022–0076
ML22048B544
NRC–2022–0077
ML22048B542
NRC–2022–0078
ML22048B545
NRC–2022–0079
ML22048B549
NRC–2022–0080
ML22048B548
NRC–2022–0081
ML22048B547
NRC–2022–0082
ML22076A003
NRC–2022–0073
ML23093A099
NRC–2022–0074
Chapter 2, ‘‘Site Information.’’ The
purpose of this proposed ISG is to
provide guidance to assist the NRC staff
in determining whether an application
for a non-light water reactor (non-LWR)
design that uses the Licensing
Modernization Project (LMP) process
meets the minimum requirements for
construction permits, operating licenses,
combined licenses, manufacturing
licenses, standard design approval, or
design certifications.
DATES: Submit comments by July 10,
2023. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website.
• Federal rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2022–0075. Address
E:\FR\FM\25MYN1.SGM
25MYN1
Agencies
[Federal Register Volume 88, Number 101 (Thursday, May 25, 2023)]
[Notices]
[Pages 33938-33940]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11180]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2022-0080]
Draft Interim Staff Guidance: Advanced Reactor Content of
Application Project, ``Risk-informed Inservice Inspection/Inservice
Testing''
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft guidance; request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is soliciting
public comment on its draft Interim Staff Guidance (ISG) DANU-ISG-2022-
07, ``Risk-informed Inservice Inspection/Inservice Testing.'' The
purpose of this proposed ISG is to provide guidance to assist the NRC
staff in determining whether an application for a non-light water
reactor (non-LWR) design that uses the Licensing Modernization Project
(LMP) process meets the minimum requirements for construction permits,
operating licenses, combined license, manufacturing licenses, standard
design approval, or design certifications.
DATES: Submit comments by July 10, 2023. Comments received after this
date will be considered if it is practical to do so, but the Commission
is able to ensure consideration only for comments received on or before
this date.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal rulemaking website.
Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0080. Address
[[Page 33939]]
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Michael Orenak, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, telephone: 301-415-3229, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2022-0080 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0080.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. For the convenience of the reader,
instructions about obtaining materials referenced in this document are
provided in the ``Availability of Documents'' section.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2022-0080 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov as well as enter the comment submissions
into ADAMS. The NRC does not routinely edit comment submissions to
remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
The NRC anticipates the submission of advanced power-reactor
applications within the next few years based on preapplication
engagement initiated by several prospective applicants. Because many of
these designs are non-LWRs, the NRC is developing technology-inclusive,
risk-informed, performance-based guidance to support the development
and review of these non-LWR applications. The proposed guidance will
facilitate the development and review of non-LWR reactor applications
for construction permits or operating licenses under part 50 of title
10 of the Code of Federal Regulations (10 CFR), ``Domestic Licensing of
Production and Utilization Facilities,'' or combined licenses,
manufacturing licenses, standard design approval, or design
certifications under 10 CFR part 52, ``Licenses, Certifications, and
Approvals for Nuclear Power Plants.'' The NRC is developing a rule to
amend 10 CFR parts 50 and 52 (RIN 3150-Al66). The NRC staff notes this
proposed ISG may need to be updated to conform to changes to 10 CFR
parts 50 and 52, if any, adopted through that rulemaking. Further, as
of the date of this draft ISG, the NRC is developing an optional
performance-based, technology-inclusive regulatory framework for
licensing nuclear power plants designated as 10 CFR part 53,
``Licensing and Regulation of Advanced Nuclear Reactors,'' (RIN 3150-
AK31). The NRC intends to revise this proposed guidance as a part of
the ongoing rulemaking for 10 CFR part 53.
To standardize the development of content of a non-LWR application,
the staff focused on two activities: the Advanced Reactor Content of
Application Project (ARCAP) and the Technology-Inclusive Content of
Application Project (TICAP). The ARCAP is an NRC-led activity that is
intended to result in guidance for a complete non-LWR application for
review under 10 CFR part 50 or 10 CFR part 52, and which the staff
would update, as appropriate, pending the issuance of the 10 CFR part
50 and 10 CFR part 52 rulemaking as previously mentioned in this
notice, or if the Commission issues a final 10 CFR part 53 rule. As a
result, the ARCAP is broad and encompasses several industry-led and
NRC-led guidance document development activities aimed at facilitating
a consistent approach to the development of application documents.
The TICAP is an industry-led activity that is focused on providing
guidance on the appropriate scope and depth of information related to
the specific portions of the safety analysis report that describe the
fundamental safety functions of the design and document the safety
analysis of the facility using LMP-based approach. The LMP-based
approach is described in Regulatory Guide (RG) 1.233, ``Guidance for a
Technology-Inclusive, Risk-Informed, and Performance-Based Methodology
to Inform the Licensing Basis and Content of Applications for Licenses,
Certifications, and Approvals for Non-Light-Water Reactors,'' (ADAMS
Accession No. ML20091L698).
The ARCAP draft ISG titled ``Review of Risk-Informed, Technology
Inclusive Advanced Reactor Applications--Roadmap'' (ARCAP Roadmap ISG)
provides a general overview of the information that should be included
in a non-LWR application. The ARCAP Roadmap ISG also provides a review
roadmap for the NRC staff with the principal purpose of ensuring
consistency, quality, and uniformity of NRC staff reviews. The ARCAP
Roadmap ISG includes references to eight other ARCAP draft ISGs and a
TICAP draft regulatory guide (DG) that are the subject of separate
Federal Register notices (FRNs) requesting comment on these guidance
documents. Information regarding the eight other ARCAP draft ISGs and
the TICAP DG can be found in the ``Availability of Documents'' section
of this FRN.
[[Page 33940]]
III. Request for Comment
The ARCAP draft ISG titled, ``Risk-informed Inservice Inspection/
Inservice Testing [ISI/IST],'' that is the subject of this FRN for
which the staff is seeking comment, was developed because the current
application and review guidance related to ISI and IST programs are
based on requirements found in 10 CFR 50.55a, ``Codes and standards,''
that are only applicable to, and focus on, large light water reactor
(LWR) technologies. In addition, the current application and review
guidance for large LWR ISI and IST programs may not fully (or
efficiently) identify the information to be included in a technology-
inclusive, risk-informed, and performance-based application or provide
a review approach for an application using non-LWR technologies. The
Risk-informed ISI/IST draft ISG also refers to several NRC-issued,
approved, or endorsed documents and the NRC is requesting comment on
this proposed ISG's use of those documents.
Additionally, the staff is issuing for public comment a draft
regulatory analysis. The staff developed a regulatory analysis to
assess the value of issuing or revising a regulatory guide as well as
alternative courses of action. The development of both application
guidance and staff review guidance is warranted. If finalized, this ISG
will serve as the non-LWR application and review guidance for risk-
informed ISI and IST programs.
IV. Availability of Documents
The table in this notice provides the document description, ADAMS
accession number, and, if appropriate, the docket identification number
referencing the request for public comment on supporting documents
associated with the document that is the subject of this FRN.
----------------------------------------------------------------------------------------------------------------
Document description ADAMS accession No. Regulations.gov docket ID No.
----------------------------------------------------------------------------------------------------------------
Draft Interim Staff Guidance DANU-ISG- ML22048B546 NRC-2022-0074
2022-01 ``Advanced Reactor Content of
Application Project, `Review of Risk-
Informed, Technology Inclusive Advanced
Reactor Applications--Roadmap' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B541 NRC-2022-0075
2022-02, ``Advanced Reactor Content of
Application Project Chapter 2, `Site
Information' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B543 NRC-2022-0076
2022-03, ``Advanced Reactor Content of
Application Project Chapter 9, `Control
of Routine Plant Radioactive Effluents,
Plant Contamination and Solid Waste' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B544 NRC-2022-0077
2022-04, ``Advanced Reactor Content of
Application Project Chapter 10,
`Control of Occupational Dose' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B542 NRC-2022-0078
2022-05, ``Advanced Reactor Content of
Application Project Chapter 11,
`Organization and Human-System
Considerations' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B545 NRC-2022-0079
2022-06, ``Advanced Reactor Content of
Application Project Chapter 12, `Post-
Construction Inspection, Testing, and
Analysis Program' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B549 NRC-2022-0080
2022-07, ``Advanced Reactor Content of
Application Project, `Risk-informed
Inservice Inspection/Inservice Testing'
''.
Draft Interim Staff Guidance DANU-ISG- ML22048B548 NRC-2022-0081
2022-08, ``Advanced Reactor Content of
Application Project, `Risk-Informed
Technical Specifications' ''.
Draft Interim Staff Guidance DANU-ISG- ML22048B547 NRC-2022-0082
2022-09, ``Advanced Reactor Content of
Application Project, `Risk-informed
Performance-based Fire Protection
Program (for Operations)' ''.
DG-1404, ``Guidance for a Technology- ML22076A003 NRC-2022-0073
Inclusive Content of Application
Methodology to Inform the Licensing
Basis and Content of Applications for
Licenses, Certifications, and Approvals
for Non-Light-Water Reactors''.
Regulatory Analysis for ARCAP ISGs...... ML23093A099 NRC-2022-0074
----------------------------------------------------------------------------------------------------------------
V. Backfitting, Forward Fitting, and Issue Finality
DANU-ISG-2022-07, if finalized, would not constitute backfitting as
defined in 10 CFR 50.109, ``Backfitting,'' and as described in
Management Directive (MD) 8.4, ``Management of Backfitting, Forward
Fitting, Issue Finality, and Information Requests''; constitute forward
fitting as that term is defined and described in MD 8.4; or affect the
issue finality of any approval issued under 10 CFR part 52. The
guidance would not apply to any current licensees or applicants or
existing or requested approvals under 10 CFR part 52, and therefore its
issuance cannot be a backfit or forward fit or affect issue finality.
Further, as explained in DANU-ISG-2022-07, applicants and licensees
would not be required to comply with the positions set forth in DANU-
ISG-2022-07.
Dated: May 22, 2023.
For the Nuclear Regulatory Commission.
Steven T. Lynch,
Chief, Advanced Reactor Policy Branch, Division of Advanced Reactors
and Non-Power Production and Utilization Facilities, Office of Nuclear
Reactor Regulation.
[FR Doc. 2023-11180 Filed 5-24-23; 8:45 am]
BILLING CODE 7590-01-P