East Tennessee Natural Gas, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 33609-33610 [2023-11033]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 100 / Wednesday, May 24, 2023 / Notices
Queue No. Y2–109 (amend) to be
effective 7/18/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5038.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1910–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6915; Queue
No. AF2–039/AF2–088 to be effective 7/
18/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5040.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1911–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6907; Queue No.
AF2–154 to be effective 4/28/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5044.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1912–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 224, Amendment No. 3 to
be effective 7/18/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5045.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1913–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6909; Queue No.
AF2–156 to be effective 4/28/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5053.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1914–000.
Applicants: New York Independent
System Operator, Inc.
Description: Tariff Amendment:
Notice of Cancellation of Scnd Amnd
LGIA SA 2535 among NYISO, Con
Edison and NRG to be effective 7/18/
2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5054.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1915–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 4062
Southwestern Power Admin/City of
Poplar Bluff MOInt Agr to be effective
4/1/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5082.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1916–000.
Applicants: CPV Canton Mountain
Wind, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession to Market-Based
Rate Tariff to be effective 5/19/2023.
VerDate Sep<11>2014
18:38 May 23, 2023
Jkt 259001
Filed Date: 5/18/23.
Accession Number: 20230518–5095.
Comment Date: 5 p.m. ET 6/8/23.
Docket Numbers: ER23–1917–000.
Applicants: CPV Saddleback Ridge
Wind, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession to Market-Based
Rate Tariff to be effective 5/19/2023.
Filed Date: 5/18/23.
Accession Number: 20230518–5108.
Comment Date: 5 p.m. ET 6/8/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–11035 Filed 5–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–480–000]
East Tennessee Natural Gas, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on May 12, 2023,
East Tennessee Natural Gas, LLC (East
Tennessee) filed a prior notice request
for authorization, in accordance with
Sections 157.205 and 157.208, of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act and East
Tennessee’s blanket certificate issued in
Docket No. CP82–412–000,1 to
implement its Ridgetop to Dixon
Springs Replacement Project, or
1 East Tennessee Natural Gas, LLC., 20 FERC
¶ 62,413 (1982).
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
33609
Replacement Project. The Replacement
Project will allow East Tennessee to
reconfigure and replace a segment of 22inch-diameter pipeline, including the
installation of appurtenant facilities, in
Sumner County, Tennessee between
East Tennessee’s Ridgetop and Dixon
Springs Compressor Stations. East
Tennessee states that the Replacement
will have no impact on the certificated
design capacity of its system, and that
there will be no abandonment or
permanent reduction in service to any
customer of East Tennessee as a result
of the Replacement Project. East
Tennessee estimates the cost of the
Replacement Project to be
approximately $16 million, all as more
fully set forth in its request which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to: Estela D. Lozano,
Director, Regulatory, East Tennessee
Natural Gas, LLC, 915 North Eldridge
Parkway, Suite 1100, Houston, Texas
77079, by telephone at (713) 627–4522
or by email at estela.lozano@
enbridge.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on July 17, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
E:\FR\FM\24MYN1.SGM
24MYN1
33610
Federal Register / Vol. 88, No. 100 / Wednesday, May 24, 2023 / Notices
ddrumheller on DSK120RN23PROD with NOTICES1
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is July 17,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is July 17, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
2 18
CFR 157.205.
3 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
5 18 CFR 385.214.
6 18 CFR 157.10.
VerDate Sep<11>2014
18:38 May 23, 2023
Jkt 259001
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before July 17,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–480–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–480–
000.
To file via USPS:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
To file via any other method:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville,
Maryland 20852
The Commission encourages
electronic filing of submissions (option
7 Additionally,
you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: Estela D. Lozano,
Director, Regulatory, East Tennessee
Natural Gas, LLC, 915 North Eldridge
Parkway, Suite 1100, Houston, Texas
77079, or by email at estela.lozano@
enbridge.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: May 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–11033 Filed 5–23–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1897–000]
Digital Power USA, Inc.; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Digital
Power USA, Inc.’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 88, Number 100 (Wednesday, May 24, 2023)]
[Notices]
[Pages 33609-33610]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11033]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-480-000]
East Tennessee Natural Gas, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on May 12, 2023, East Tennessee Natural Gas, LLC
(East Tennessee) filed a prior notice request for authorization, in
accordance with Sections 157.205 and 157.208, of the Federal Energy
Regulatory Commission's (Commission) regulations under the Natural Gas
Act and East Tennessee's blanket certificate issued in Docket No. CP82-
412-000,\1\ to implement its Ridgetop to Dixon Springs Replacement
Project, or Replacement Project. The Replacement Project will allow
East Tennessee to reconfigure and replace a segment of 22-inch-diameter
pipeline, including the installation of appurtenant facilities, in
Sumner County, Tennessee between East Tennessee's Ridgetop and Dixon
Springs Compressor Stations. East Tennessee states that the Replacement
will have no impact on the certificated design capacity of its system,
and that there will be no abandonment or permanent reduction in service
to any customer of East Tennessee as a result of the Replacement
Project. East Tennessee estimates the cost of the Replacement Project
to be approximately $16 million, all as more fully set forth in its
request which is on file with the Commission and open to public
inspection.
---------------------------------------------------------------------------
\1\ East Tennessee Natural Gas, LLC., 20 FERC ] 62,413 (1982).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions concerning this request should be directed to: Estela
D. Lozano, Director, Regulatory, East Tennessee Natural Gas, LLC, 915
North Eldridge Parkway, Suite 1100, Houston, Texas 77079, by telephone
at (713) 627-4522 or by email at [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on July 17, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the
[[Page 33610]]
NGA,\2\ any person \3\ or the Commission's staff may file a protest to
the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is July 17, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is July 17, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 17, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-480-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-480-000.
To file via USPS:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426
To file via any other method:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Estela D.
Lozano, Director, Regulatory, East Tennessee Natural Gas, LLC, 915
North Eldridge Parkway, Suite 1100, Houston, Texas 77079, or by email
at [email protected]. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: May 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-11033 Filed 5-23-23; 8:45 am]