Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 32765-32767 [2023-10831]

Download as PDF Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 16, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–10829 Filed 5–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM93–11–000] Revisions to Oil Pipeline Regulations Pursuant to the Energy Policy Act of 1992; Notice of Annual Change in the Producer Price Index for Finished Goods ddrumheller on DSK120RN23PROD with NOTICES1 The Commission’s regulations include a methodology for oil pipelines to change their rates through use of an index system that establishes ceiling levels for such rates. The Commission bases the index system, found at 18 CFR 342.3, on the annual change in the Producer Price Index for Finished Goods (PPI–FG), minus point two one percent (PPI–FG—0.21%). The Commission determined in the January 2022 Order 1 that PPI–FG—0.21% is the appropriate oil pricing index factor for pipelines to use for this period. The regulations provide that the Commission will publish annually an index figure reflecting the final change in the PPI–FG after the Bureau of Labor Statistics publishes the final PPI–FG in May of each calendar year. The annual average PPI–FG index figures were 221.0 for 2021 and 250.9 for 2022.2 Thus, the percent change (expressed as a decimal) in the annual average PPI–FG from 2021 to 2022, minus 0.21 percent, is positive 0.133194.3 Oil pipelines must multiply their July 1, 2022, through June 30, 2023, index ceiling 1 Five-Year Rev. of the Oil Pipeline Index, 178 FERC ¶ 61,023, at P 105 (January 2022 Order), reh’g denied, 179 FERC ¶ 61,100 (2022). 2 Bureau of Labor Statistics (BLS) publishes the final figure in mid-May of each year. This figure is publicly available from the Division of Industrial Prices and Price Indexes of the BLS, at 202–691– 7705, and in print in August in Table 1 of the annual data supplement to the BLS publication Producer Price Indexes via the internet at https:// www.bls.gov/ppi/home.htm. To obtain the BLS data, scroll down to ‘‘PPI Databases’’ and click on ‘‘Top Picks’’ of the Commodity Data including ‘‘headline’’ FD–ID indexes (Producer Price Index— PPI). At the next screen, under the heading ‘‘PPI Commodity Data,’’ select the box, ‘‘Finished goods—WPUFD49207,’’ then scroll to the bottom of this screen and click on Retrieve data. 3 [250.9¥221.0]/221.0 = 0.135294¥0.0021 = 0.133194. VerDate Sep<11>2014 18:54 May 19, 2023 Jkt 259001 levels 4 by positive 1.133194 5 to compute their index ceiling levels for July 1, 2023, through June 30, 2024, in accordance with 18 CFR 342.3(d). For guidance in calculating the ceiling levels for each 12-month period beginning January 1, 1995,6 see Explorer Pipeline Company, 71 FERC ¶ 61,416, at n.6 (1995). In addition to publishing the full text of this Notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print this Notice via the internet through FERC’s Home Page (https:// www.ferc.gov) using the eLibrary link. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field and follow other directions on the search page. User assistance is available for eLibrary and other aspects of FERC’s website during normal business hours. For assistance, please contact the Commission’s Online Support at 1–866– 208–3676 (toll free) or 202–502–6652 (email at FERCOnlineSupport@ferc.gov), or the Public Reference Room at 202– 502–8371, TTY 202–502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Dated: May 16, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10832 Filed 5–19–23; 8:45 am] BILLING CODE 6717–01–P 32765 Preparedness, Coordination Standard Drafting Team Meetings: May 30, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 1, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 6, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 8, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 15, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 20, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 22, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 27, 2023 (1:00 p.m.–3:00 p.m. eastern time) June 29, 2023 (1:00 p.m.–3:00 p.m. eastern time) Further information regarding these meetings may be found at: https:// www.nerc.com/Pages/Calendar.aspx. The discussions at the meetings, which are open to the public, may address matters at issue in the following Commission proceeding: Docket Nos. RD23–1–000, RD23–1–001 Extreme Cold Weather Reliability Standards EOP–011–3 and EOP– 012–1. For further information, please contact Chanel Chasanov, 202–502– 8569, or chanel.chasanov@ferc.gov. Dated: May 16, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10830 Filed 5–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Notice of Staff Attendance at North American Electric Reliability Corporation Standard Drafting Team Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the following meetings: North American Electric Reliability Corporation Project 2021–07 Extreme Cold Weather Grid Operations, 4 See January 2022 Order, 178 FERC ¶ 61,023 at P 106 (directing oil pipelines to recompute their July 1, 2021 through June 30, 2022 index ceiling levels to be effective March 1, 2022), reh’g denied, 179 FERC ¶ 61,100 at P 8; see also Revisions to Oil Pipeline Reguls. Pursuant to the Energy Pol’y Act of 1992, 178 FERC ¶ 61,046 (2022). 5 1 + 0.133194 = 1.133194. 6 For a listing of all prior multipliers issued by the Commission, see the Commission’s website, https:// www.ferc.gov/industries-data/oil/generalinformation/oil-pipeline-index. PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. CP23–476–000] Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on May 9, 2023, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, filed in the above referenced docket, a prior notice request for authorization, in accordance with section 7 of the Natural Gas Act, and part 157 sections 157.205 and 157.216 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act and Columbia’s blanket certificate issued in Docket No. CP83–76–000 for authorization to abandon one injection/ withdrawal well, connecting pipeline, and appurtenances located in the Ripley E:\FR\FM\22MYN1.SGM 22MYN1 32766 Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices Storage Field in Jackson County, West Virginia, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this prior notice request should be directed to David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, at (832) 320–5477 or david.alonzo@tcenergy.com. ddrumheller on DSK120RN23PROD with NOTICES1 Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5 p.m. Eastern Time on July 15, 2023. How to file protests, motions to intervene, and comments is explained below. Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons VerDate Sep<11>2014 18:54 May 19, 2023 Jkt 259001 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is July 15, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is July 15, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 your comments on or before July 15, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–476–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 6 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–476– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To send via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700, at david.alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. E:\FR\FM\22MYN1.SGM 22MYN1 Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at FERC.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: May 16, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10831 Filed 5–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ID–9788–000] ddrumheller on DSK120RN23PROD with NOTICES1 Yellepeddi, Sarat K.; Notice of Filing Take notice that on May 16, 2023, Sarat K.Yellepeddi submitted for filing, application for authority to hold interlocking positions, pursuant to section 305(b) of the Federal Power Act, 16 U.S.C. 825d(b) and part 45.8 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR part 45.8. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. VerDate Sep<11>2014 18:54 May 19, 2023 Jkt 259001 In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5 p.m. Eastern Time on June 6, 2023. Dated: May 16, 2023. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas & Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP23–770–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Rate Agreements—5/15/2023 to be effective 5/15/2023. Filed Date: 5/15/23. Accession Number: 20230515–5183. Comment Date: 5 p.m. ET 5/30/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 PO 00000 Frm 00047 Fmt 4703 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 16, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–10828 Filed 5–19–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2023–0067; FRL–10578–03– OCSPP] Pesticide Product Registration; Receipt of Applications for New Uses (March 2023) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA has received applications to register new uses for pesticide products containing currently registered active ingredients. Pursuant to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), EPA is hereby providing notice of receipt and opportunity to comment on these applications. DATES: Comments must be received on or before June 21, 2023. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2023–0067, through the Federal eRulemaking Portal at https://www.regulations.gov. Follow the online instructions for submitting comments. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Additional instructions on commenting and visiting the docket, along with more information about dockets generally, is available at https://www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: Dan Rosenblatt, Registration Division (RD) SUMMARY: [FR Doc. 2023–10833 Filed 5–19–23; 8:45 am] Sfmt 4703 32767 E:\FR\FM\22MYN1.SGM 22MYN1

Agencies

[Federal Register Volume 88, Number 98 (Monday, May 22, 2023)]
[Notices]
[Pages 32765-32767]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-10831]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-476-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization and Establishing Intervention and Protest Deadline

    Take notice that on May 9, 2023, Columbia Gas Transmission, LLC 
(Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, filed in the above referenced docket, a prior notice request for 
authorization, in accordance with section 7 of the Natural Gas Act, and 
part 157 sections 157.205 and 157.216 of the Federal Energy Regulatory 
Commission's (Commission) regulations under the Natural Gas Act and 
Columbia's blanket certificate issued in Docket No. CP83-76-000 for 
authorization to abandon one injection/withdrawal well, connecting 
pipeline, and appurtenances located in the Ripley

[[Page 32766]]

Storage Field in Jackson County, West Virginia, all as more fully set 
forth in the application which is on file with the Commission and open 
for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this prior notice request should be 
directed to David A. Alonzo, Manager, Project Authorizations, Columbia 
Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 
77002-2700, at (832) 320-5477 or [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5 p.m. Eastern Time on July 15, 2023. How to 
file protests, motions to intervene, and comments is explained below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is July 15, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is July 15, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before July 15, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-476-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-476-000.

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected] Protests and motions to intervene 
must be served on the applicant either by mail at: David A. Alonzo, 
Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at 
[email protected]. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be downloaded from the 
service list at the eService link on FERC Online.

[[Page 32767]]

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at FERC.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10831 Filed 5-19-23; 8:45 am]