Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 32765-32767 [2023-10831]
Download as PDF
Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 16, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–10829 Filed 5–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM93–11–000]
Revisions to Oil Pipeline Regulations
Pursuant to the Energy Policy Act of
1992; Notice of Annual Change in the
Producer Price Index for Finished
Goods
ddrumheller on DSK120RN23PROD with NOTICES1
The Commission’s regulations include
a methodology for oil pipelines to
change their rates through use of an
index system that establishes ceiling
levels for such rates. The Commission
bases the index system, found at 18 CFR
342.3, on the annual change in the
Producer Price Index for Finished
Goods (PPI–FG), minus point two one
percent (PPI–FG—0.21%). The
Commission determined in the January
2022 Order 1 that PPI–FG—0.21% is the
appropriate oil pricing index factor for
pipelines to use for this period.
The regulations provide that the
Commission will publish annually an
index figure reflecting the final change
in the PPI–FG after the Bureau of Labor
Statistics publishes the final PPI–FG in
May of each calendar year. The annual
average PPI–FG index figures were
221.0 for 2021 and 250.9 for 2022.2
Thus, the percent change (expressed as
a decimal) in the annual average PPI–FG
from 2021 to 2022, minus 0.21 percent,
is positive 0.133194.3 Oil pipelines
must multiply their July 1, 2022,
through June 30, 2023, index ceiling
1 Five-Year Rev. of the Oil Pipeline Index, 178
FERC ¶ 61,023, at P 105 (January 2022 Order), reh’g
denied, 179 FERC ¶ 61,100 (2022).
2 Bureau of Labor Statistics (BLS) publishes the
final figure in mid-May of each year. This figure is
publicly available from the Division of Industrial
Prices and Price Indexes of the BLS, at 202–691–
7705, and in print in August in Table 1 of the
annual data supplement to the BLS publication
Producer Price Indexes via the internet at https://
www.bls.gov/ppi/home.htm. To obtain the BLS
data, scroll down to ‘‘PPI Databases’’ and click on
‘‘Top Picks’’ of the Commodity Data including
‘‘headline’’ FD–ID indexes (Producer Price Index—
PPI). At the next screen, under the heading ‘‘PPI
Commodity Data,’’ select the box, ‘‘Finished
goods—WPUFD49207,’’ then scroll to the bottom of
this screen and click on Retrieve data.
3 [250.9¥221.0]/221.0 = 0.135294¥0.0021 =
0.133194.
VerDate Sep<11>2014
18:54 May 19, 2023
Jkt 259001
levels 4 by positive 1.133194 5 to
compute their index ceiling levels for
July 1, 2023, through June 30, 2024, in
accordance with 18 CFR 342.3(d). For
guidance in calculating the ceiling
levels for each 12-month period
beginning January 1, 1995,6 see Explorer
Pipeline Company, 71 FERC ¶ 61,416, at
n.6 (1995).
In addition to publishing the full text
of this Notice in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print this Notice via the internet
through FERC’s Home Page (https://
www.ferc.gov) using the eLibrary link.
To access this document in eLibrary,
type the docket number excluding the
last three digits of this document in the
docket number field and follow other
directions on the search page.
User assistance is available for
eLibrary and other aspects of FERC’s
website during normal business hours.
For assistance, please contact the
Commission’s Online Support at 1–866–
208–3676 (toll free) or 202–502–6652
(email at FERCOnlineSupport@ferc.gov),
or the Public Reference Room at 202–
502–8371, TTY 202–502–8659. Email
the Public Reference Room at
public.referenceroom@ferc.gov.
Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–10832 Filed 5–19–23; 8:45 am]
BILLING CODE 6717–01–P
32765
Preparedness, Coordination Standard
Drafting Team Meetings:
May 30, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 1, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 6, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 8, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 15, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 20, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 22, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 27, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
June 29, 2023 (1:00 p.m.–3:00 p.m.
eastern time)
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceeding:
Docket Nos. RD23–1–000, RD23–1–001
Extreme Cold Weather Reliability
Standards EOP–011–3 and EOP–
012–1.
For further information, please
contact Chanel Chasanov, 202–502–
8569, or chanel.chasanov@ferc.gov.
Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–10830 Filed 5–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Notice of Staff Attendance at North
American Electric Reliability
Corporation Standard Drafting Team
Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation Project 2021–07 Extreme
Cold Weather Grid Operations,
4 See January 2022 Order, 178 FERC ¶ 61,023 at
P 106 (directing oil pipelines to recompute their
July 1, 2021 through June 30, 2022 index ceiling
levels to be effective March 1, 2022), reh’g denied,
179 FERC ¶ 61,100 at P 8; see also Revisions to Oil
Pipeline Reguls. Pursuant to the Energy Pol’y Act
of 1992, 178 FERC ¶ 61,046 (2022).
5 1 + 0.133194 = 1.133194.
6 For a listing of all prior multipliers issued by the
Commission, see the Commission’s website, https://
www.ferc.gov/industries-data/oil/generalinformation/oil-pipeline-index.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. CP23–476–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on May 9, 2023,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request for authorization, in
accordance with section 7 of the Natural
Gas Act, and part 157 sections 157.205
and 157.216 of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
and Columbia’s blanket certificate
issued in Docket No. CP83–76–000 for
authorization to abandon one injection/
withdrawal well, connecting pipeline,
and appurtenances located in the Ripley
E:\FR\FM\22MYN1.SGM
22MYN1
32766
Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices
Storage Field in Jackson County, West
Virginia, all as more fully set forth in
the application which is on file with the
Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov
or call toll-free, (886) 208–3676 or TYY,
(202) 502–8659.
Any questions regarding this prior
notice request should be directed to
David A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at (832) 320–5477 or
david.alonzo@tcenergy.com.
ddrumheller on DSK120RN23PROD with NOTICES1
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5 p.m.
Eastern Time on July 15, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
VerDate Sep<11>2014
18:54 May 19, 2023
Jkt 259001
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is July 15,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is July 15, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
your comments on or before July 15,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–476–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–476–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov. Protests
and motions to intervene must be served
on the applicant either by mail at: David
A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 1300, Houston, Texas
77002–2700, at david.alonzo@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online.
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
E:\FR\FM\22MYN1.SGM
22MYN1
Federal Register / Vol. 88, No. 98 / Monday, May 22, 2023 / Notices
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
FERC.gov using the ‘‘eLibrary’’ link as
described above. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–10831 Filed 5–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ID–9788–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Yellepeddi, Sarat K.; Notice of Filing
Take notice that on May 16, 2023,
Sarat K.Yellepeddi submitted for filing,
application for authority to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d(b) and part 45.8 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR part
45.8.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
VerDate Sep<11>2014
18:54 May 19, 2023
Jkt 259001
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5 p.m. Eastern Time
on June 6, 2023.
Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–770–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreements—5/15/2023
to be effective 5/15/2023.
Filed Date: 5/15/23.
Accession Number: 20230515–5183.
Comment Date: 5 p.m. ET 5/30/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
PO 00000
Frm 00047
Fmt 4703
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 16, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–10828 Filed 5–19–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2023–0067; FRL–10578–03–
OCSPP]
Pesticide Product Registration;
Receipt of Applications for New Uses
(March 2023)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received applications
to register new uses for pesticide
products containing currently registered
active ingredients. Pursuant to the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), EPA is hereby
providing notice of receipt and
opportunity to comment on these
applications.
DATES: Comments must be received on
or before June 21, 2023.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2023–0067,
through the Federal eRulemaking Portal
at https://www.regulations.gov. Follow
the online instructions for submitting
comments. Do not submit electronically
any information you consider to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute. Additional
instructions on commenting and visiting
the docket, along with more information
about dockets generally, is available at
https://www.epa.gov/dockets.
FOR FURTHER INFORMATION CONTACT: Dan
Rosenblatt, Registration Division (RD)
SUMMARY:
[FR Doc. 2023–10833 Filed 5–19–23; 8:45 am]
Sfmt 4703
32767
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 88, Number 98 (Monday, May 22, 2023)]
[Notices]
[Pages 32765-32767]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-10831]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-476-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on May 9, 2023, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, filed in the above referenced docket, a prior notice request for
authorization, in accordance with section 7 of the Natural Gas Act, and
part 157 sections 157.205 and 157.216 of the Federal Energy Regulatory
Commission's (Commission) regulations under the Natural Gas Act and
Columbia's blanket certificate issued in Docket No. CP83-76-000 for
authorization to abandon one injection/withdrawal well, connecting
pipeline, and appurtenances located in the Ripley
[[Page 32766]]
Storage Field in Jackson County, West Virginia, all as more fully set
forth in the application which is on file with the Commission and open
for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to David A. Alonzo, Manager, Project Authorizations, Columbia
Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas
77002-2700, at (832) 320-5477 or [email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5 p.m. Eastern Time on July 15, 2023. How to
file protests, motions to intervene, and comments is explained below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is July 15, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is July 15, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 15, 2023. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-476-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-476-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To send via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected] Protests and motions to intervene
must be served on the applicant either by mail at: David A. Alonzo,
Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston, Texas 77002-2700, at
[email protected]. Any subsequent submissions by an intervenor
must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
[[Page 32767]]
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at FERC.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: May 16, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10831 Filed 5-19-23; 8:45 am]
BILLING CODE 6717-01-P