Great Basin Gas Transmission Company; Notice of Application and, 32212-32213 [2023-10738]
Download as PDF
32212
Federal Register / Vol. 88, No. 97 / Friday, May 19, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–466–000]
Great Basin Gas Transmission
Company; Notice of Application and
Establishing Intervention Deadline
Take notice that on May 1, 2023,
Great Basin Gas Transmission Company
(Great Basin), P.O. Box 94197, Las
Vegas, Nevada 89193–4197, filed an
application under sections 7b and 7c of
the Natural Gas Act (NGA), and part 157
of the Commission’s regulations
requesting authorization for its 2024
Expansion Project (Project). Great Basin
proposes to: (1) construct approximately
0.25 miles of 20-inch-diameter pipeline
loop along its Carson Lateral in Storey
County, Nevada; (2) replace
approximately 2.88 miles of existing 10inch-diameter pipeline with new 20inch-diameter pipeline along the Carson
Lateral in Lyon County, Nevada; and (3)
construct approximately 0.28 miles of
12-inch-diameter pipeline loop on its
South Tahoe Lateral in Douglas County,
Nevada. The Project will provide 5,674
dekatherms per day of incremental firm
transportation service to meet the
growth requirements of two existing
firm transportation shippers. Great
Basin estimates the total cost of the
Project to be $14,939,850 and proposes
a new incremental recourse rate to
apply to the Project capacity, all as more
fully set forth in the application which
is on file with the Commission and open
for public inspection.
ddrumheller on DSK120RN23PROD with NOTICES1
Water Quality Certification
Great Basin’s application states that a
water quality certificate under section
401 of the Clean Water Act is required
for the project from the Nevada Division
of Environmental Protection—Bureau of
Water Quality Planning. The request for
certification must be submitted to the
certifying agency and to the
Commission concurrently. Proof of the
certifying agency’s receipt date must be
filed no later than five (5) days after the
request is submitted to the certifying
agency.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
VerDate Sep<11>2014
18:30 May 18, 2023
Jkt 259001
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions regarding the proposed
project should be directed to Frank J.
Magliette Jr., Senior Manager/Interstate
Pipelines/Business Operations, P.O. Box
94197, Las Vegas, Nevada 89193–4197,
by phone at (702) 876–7384, or by email
at frank.magliette@swgas.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify Federal and State
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: you can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on June 5, 2023.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before June 5, 2023.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
1 18
PO 00000
CFR (Code of Federal Regulations) 157.9.
Frm 00037
Fmt 4703
Sfmt 4703
reference the Project docket number
CP23–466–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address below. Your written
comments must reference the Project
docket number (CP23–466–000).
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other method:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,2 has
2 18
CFR 385.102(d).
E:\FR\FM\19MYN1.SGM
19MYN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 97 / Friday, May 19, 2023 / Notices
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 3 and the regulations under
the NGA 4 by the intervention deadline
for the project, which is June 5, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as the your
interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP23–466–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below. Your motion to
intervene must reference the Project
docket number CP23–466–000.
To file via USPS: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
To file via any other method:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages
electronic filing of motions to intervene
3 18
4 18
CFR 385.214.
CFR 157.10.
VerDate Sep<11>2014
18:30 May 18, 2023
Jkt 259001
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail or email at: Frank J. Magliettei
Jr., Senior Manager/Interstate Pipelines/
Business Operations, P.O. Box 94197,
Las Vegas, Nevada 89193–4197 or at
frank.maglietti@swgas.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online. Service can be via email with a
link to the document.
All timely, unopposed 5 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).6 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.7
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on June 5, 2023.
5 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
6 18 CFR 385.214(c)(1).
7 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
32213
Dated: May 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–10738 Filed 5–18–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–88–000.
Applicants: Mustang Hills, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Mustang Hills,
LLC.
Filed Date: 5/12/23.
Accession Number: 20230512–5190.
Comment Date: 5 p.m. ET 6/2/23.
Docket Numbers: EC23–89–000.
Applicants: Consolidated Water
Power Company.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Consolidated
Water Power Company.
Filed Date: 5/15/23.
Accession Number: 20230515–5173.
Comment Date: 5 p.m. ET 6/5/23.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–67–000.
Applicants: Invenergy Nelson LLC,
Invenergy Nelson LLC v. PJM
Interconnection, L.L.C.
Description: Complaint of Invenergy
Nelson LLC v. PJM Interconnection,
L.L.C.
Filed Date: 5/12/23.
Accession Number: 20230512–5179.
Comment Date: 5 p.m. ET 6/1/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2584–002.
Applicants: Transource Maryland,
LLC, American Electric Power Service
Corporation, PJM Interconnection,
L.L.C.
Description: Compliance filing:
American Electric Power Service
Corporation submits tariff filing per 35:
Transource MD Order No. 864
Compliance Filing, Att. H–30A ER20–
2584 to be effective 1/27/2020.
Filed Date: 5/15/23.
Accession Number: 20230515–5047.
Comment Date: 5 p.m. ET 6/5/23.
Docket Numbers: ER23–1876–000.
Applicants: Public Service Company
of Colorado.
E:\FR\FM\19MYN1.SGM
19MYN1
Agencies
[Federal Register Volume 88, Number 97 (Friday, May 19, 2023)]
[Notices]
[Pages 32212-32213]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-10738]
[[Page 32212]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-466-000]
Great Basin Gas Transmission Company; Notice of Application and
Establishing Intervention Deadline
Take notice that on May 1, 2023, Great Basin Gas Transmission
Company (Great Basin), P.O. Box 94197, Las Vegas, Nevada 89193-4197,
filed an application under sections 7b and 7c of the Natural Gas Act
(NGA), and part 157 of the Commission's regulations requesting
authorization for its 2024 Expansion Project (Project). Great Basin
proposes to: (1) construct approximately 0.25 miles of 20-inch-diameter
pipeline loop along its Carson Lateral in Storey County, Nevada; (2)
replace approximately 2.88 miles of existing 10-inch-diameter pipeline
with new 20-inch-diameter pipeline along the Carson Lateral in Lyon
County, Nevada; and (3) construct approximately 0.28 miles of 12-inch-
diameter pipeline loop on its South Tahoe Lateral in Douglas County,
Nevada. The Project will provide 5,674 dekatherms per day of
incremental firm transportation service to meet the growth requirements
of two existing firm transportation shippers. Great Basin estimates the
total cost of the Project to be $14,939,850 and proposes a new
incremental recourse rate to apply to the Project capacity, all as more
fully set forth in the application which is on file with the Commission
and open for public inspection.
Water Quality Certification
Great Basin's application states that a water quality certificate
under section 401 of the Clean Water Act is required for the project
from the Nevada Division of Environmental Protection--Bureau of Water
Quality Planning. The request for certification must be submitted to
the certifying agency and to the Commission concurrently. Proof of the
certifying agency's receipt date must be filed no later than five (5)
days after the request is submitted to the certifying agency.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions regarding the proposed project should be directed to
Frank J. Magliette Jr., Senior Manager/Interstate Pipelines/Business
Operations, P.O. Box 94197, Las Vegas, Nevada 89193-4197, by phone at
(702) 876-7384, or by email at [email protected].
Pursuant to section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
Federal and State agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all Federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: you can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on June 5, 2023.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before June 5, 2023.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP23-466-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below. Your written comments must reference the
Project docket number (CP23-466-000).
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other method: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\2\ has
[[Page 32213]]
the option to file a motion to intervene in this proceeding. Only
intervenors have the right to request rehearing of Commission orders
issued in this proceeding and to subsequently challenge the
Commission's orders in the U.S. Circuit Courts of Appeal.
---------------------------------------------------------------------------
\2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \3\ and the regulations under the NGA \4\ by the
intervention deadline for the project, which is June 5, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
the your interest in the proceeding. For an individual, this could
include your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\3\ 18 CFR 385.214.
\4\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP23-466-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below. Your
motion to intervene must reference the Project docket number CP23-466-
000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other method:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected].
Protests and motions to intervene must be served on the applicant
either by mail or email at: Frank J. Magliettei Jr., Senior Manager/
Interstate Pipelines/Business Operations, P.O. Box 94197, Las Vegas,
Nevada 89193-4197 or at [email protected]. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Service can be via email with a link to the document.
All timely, unopposed \5\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\6\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\7\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\5\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\6\ 18 CFR 385.214(c)(1).
\7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on June 5, 2023.
Dated: May 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10738 Filed 5-18-23; 8:45 am]
BILLING CODE 6717-01-P