Great Basin Gas Transmission Company; Notice of Application and, 32212-32213 [2023-10738]

Download as PDF 32212 Federal Register / Vol. 88, No. 97 / Friday, May 19, 2023 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–466–000] Great Basin Gas Transmission Company; Notice of Application and Establishing Intervention Deadline Take notice that on May 1, 2023, Great Basin Gas Transmission Company (Great Basin), P.O. Box 94197, Las Vegas, Nevada 89193–4197, filed an application under sections 7b and 7c of the Natural Gas Act (NGA), and part 157 of the Commission’s regulations requesting authorization for its 2024 Expansion Project (Project). Great Basin proposes to: (1) construct approximately 0.25 miles of 20-inch-diameter pipeline loop along its Carson Lateral in Storey County, Nevada; (2) replace approximately 2.88 miles of existing 10inch-diameter pipeline with new 20inch-diameter pipeline along the Carson Lateral in Lyon County, Nevada; and (3) construct approximately 0.28 miles of 12-inch-diameter pipeline loop on its South Tahoe Lateral in Douglas County, Nevada. The Project will provide 5,674 dekatherms per day of incremental firm transportation service to meet the growth requirements of two existing firm transportation shippers. Great Basin estimates the total cost of the Project to be $14,939,850 and proposes a new incremental recourse rate to apply to the Project capacity, all as more fully set forth in the application which is on file with the Commission and open for public inspection. ddrumheller on DSK120RN23PROD with NOTICES1 Water Quality Certification Great Basin’s application states that a water quality certificate under section 401 of the Clean Water Act is required for the project from the Nevada Division of Environmental Protection—Bureau of Water Quality Planning. The request for certification must be submitted to the certifying agency and to the Commission concurrently. Proof of the certifying agency’s receipt date must be filed no later than five (5) days after the request is submitted to the certifying agency. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At VerDate Sep<11>2014 18:30 May 18, 2023 Jkt 259001 this time, the Commission has suspended access to the Commission’s Public Reference Room. For assistance, contact the Federal Energy Regulatory Commission at FercOnlineSupport@ ferc.gov or call toll-free, (886) 208–3676 or TTY (202) 502–8659. Any questions regarding the proposed project should be directed to Frank J. Magliette Jr., Senior Manager/Interstate Pipelines/Business Operations, P.O. Box 94197, Las Vegas, Nevada 89193–4197, by phone at (702) 876–7384, or by email at frank.magliette@swgas.com. Pursuant to section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify Federal and State agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all Federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are two ways to become involved in the Commission’s review of this project: you can file comments on the project, and you can file a motion to intervene in the proceeding. There is no fee or cost for filing comments or intervening. The deadline for filing a motion to intervene is 5:00 p.m. Eastern Time on June 5, 2023. Comments Any person wishing to comment on the project may do so. Comments may include statements of support or objections to the project as a whole or specific aspects of the project. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please submit your comments on or before June 5, 2023. There are three methods you can use to submit your comments to the Commission. In all instances, please 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00037 Fmt 4703 Sfmt 4703 reference the Project docket number CP23–466–000 in your submission. (1) You may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address below. Your written comments must reference the Project docket number (CP23–466–000). To file via USPS: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of comments (options 1 and 2 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be notified of meetings associated with the Commission’s environmental review process. The Commission considers all comments received about the project in determining the appropriate action to be taken. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. For instructions on how to intervene, see below. Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,2 has 2 18 CFR 385.102(d). E:\FR\FM\19MYN1.SGM 19MYN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 97 / Friday, May 19, 2023 / Notices the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 3 and the regulations under the NGA 4 by the intervention deadline for the project, which is June 5, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as the your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. There are two ways to submit your motion to intervene. In both instances, please reference the Project docket number CP23–466–000 in your submission. (1) You may file your motion to intervene by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below. Your motion to intervene must reference the Project docket number CP23–466–000. To file via USPS: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To file via any other method: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of motions to intervene 3 18 4 18 CFR 385.214. CFR 157.10. VerDate Sep<11>2014 18:30 May 18, 2023 Jkt 259001 (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email at: Frank J. Magliettei Jr., Senior Manager/Interstate Pipelines/ Business Operations, P.O. Box 94197, Las Vegas, Nevada 89193–4197 or at frank.maglietti@swgas.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 5 motions to intervene are automatically granted by operation of Rule 214(c)(1).6 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.7 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on June 5, 2023. 5 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 6 18 CFR 385.214(c)(1). 7 18 CFR 385.214(b)(3) and (d). PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 32213 Dated: May 15, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10738 Filed 5–18–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–88–000. Applicants: Mustang Hills, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Mustang Hills, LLC. Filed Date: 5/12/23. Accession Number: 20230512–5190. Comment Date: 5 p.m. ET 6/2/23. Docket Numbers: EC23–89–000. Applicants: Consolidated Water Power Company. Description: Application for Authorization Under Section 203 of the Federal Power Act of Consolidated Water Power Company. Filed Date: 5/15/23. Accession Number: 20230515–5173. Comment Date: 5 p.m. ET 6/5/23. Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL23–67–000. Applicants: Invenergy Nelson LLC, Invenergy Nelson LLC v. PJM Interconnection, L.L.C. Description: Complaint of Invenergy Nelson LLC v. PJM Interconnection, L.L.C. Filed Date: 5/12/23. Accession Number: 20230512–5179. Comment Date: 5 p.m. ET 6/1/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–2584–002. Applicants: Transource Maryland, LLC, American Electric Power Service Corporation, PJM Interconnection, L.L.C. Description: Compliance filing: American Electric Power Service Corporation submits tariff filing per 35: Transource MD Order No. 864 Compliance Filing, Att. H–30A ER20– 2584 to be effective 1/27/2020. Filed Date: 5/15/23. Accession Number: 20230515–5047. Comment Date: 5 p.m. ET 6/5/23. Docket Numbers: ER23–1876–000. Applicants: Public Service Company of Colorado. E:\FR\FM\19MYN1.SGM 19MYN1

Agencies

[Federal Register Volume 88, Number 97 (Friday, May 19, 2023)]
[Notices]
[Pages 32212-32213]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-10738]



[[Page 32212]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-466-000]


Great Basin Gas Transmission Company; Notice of Application and

Establishing Intervention Deadline

    Take notice that on May 1, 2023, Great Basin Gas Transmission 
Company (Great Basin), P.O. Box 94197, Las Vegas, Nevada 89193-4197, 
filed an application under sections 7b and 7c of the Natural Gas Act 
(NGA), and part 157 of the Commission's regulations requesting 
authorization for its 2024 Expansion Project (Project). Great Basin 
proposes to: (1) construct approximately 0.25 miles of 20-inch-diameter 
pipeline loop along its Carson Lateral in Storey County, Nevada; (2) 
replace approximately 2.88 miles of existing 10-inch-diameter pipeline 
with new 20-inch-diameter pipeline along the Carson Lateral in Lyon 
County, Nevada; and (3) construct approximately 0.28 miles of 12-inch-
diameter pipeline loop on its South Tahoe Lateral in Douglas County, 
Nevada. The Project will provide 5,674 dekatherms per day of 
incremental firm transportation service to meet the growth requirements 
of two existing firm transportation shippers. Great Basin estimates the 
total cost of the Project to be $14,939,850 and proposes a new 
incremental recourse rate to apply to the Project capacity, all as more 
fully set forth in the application which is on file with the Commission 
and open for public inspection.

Water Quality Certification

    Great Basin's application states that a water quality certificate 
under section 401 of the Clean Water Act is required for the project 
from the Nevada Division of Environmental Protection--Bureau of Water 
Quality Planning. The request for certification must be submitted to 
the certifying agency and to the Commission concurrently. Proof of the 
certifying agency's receipt date must be filed no later than five (5) 
days after the request is submitted to the certifying agency.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact the Federal Energy Regulatory 
Commission at [email protected] or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Frank J. Magliette Jr., Senior Manager/Interstate Pipelines/Business 
Operations, P.O. Box 94197, Las Vegas, Nevada 89193-4197, by phone at 
(702) 876-7384, or by email at [email protected].
    Pursuant to section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
Federal and State agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all Federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are two ways to become involved in the Commission's review of 
this project: you can file comments on the project, and you can file a 
motion to intervene in the proceeding. There is no fee or cost for 
filing comments or intervening. The deadline for filing a motion to 
intervene is 5:00 p.m. Eastern Time on June 5, 2023.

Comments

    Any person wishing to comment on the project may do so. Comments 
may include statements of support or objections to the project as a 
whole or specific aspects of the project. The more specific your 
comments, the more useful they will be. To ensure that your comments 
are timely and properly recorded, please submit your comments on or 
before June 5, 2023.
    There are three methods you can use to submit your comments to the 
Commission. In all instances, please reference the Project docket 
number CP23-466-000 in your submission.
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. Using eComment is an easy 
method for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; first select ``General'' and then select ``Comment on a 
Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address below. Your written comments must reference the 
Project docket number (CP23-466-000).
    To file via USPS: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    To file via any other method: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852.
    The Commission encourages electronic filing of comments (options 1 
and 2 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be notified of meetings associated 
with the Commission's environmental review process.
    The Commission considers all comments received about the project in 
determining the appropriate action to be taken. However, the filing of 
a comment alone will not serve to make the filer a party to the 
proceeding. To become a party, you must intervene in the proceeding. 
For instructions on how to intervene, see below.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\2\ has

[[Page 32213]]

the option to file a motion to intervene in this proceeding. Only 
intervenors have the right to request rehearing of Commission orders 
issued in this proceeding and to subsequently challenge the 
Commission's orders in the U.S. Circuit Courts of Appeal.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \3\ and the regulations under the NGA \4\ by the 
intervention deadline for the project, which is June 5, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
the your interest in the proceeding. For an individual, this could 
include your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.214.
    \4\ 18 CFR 157.10.
---------------------------------------------------------------------------

    There are two ways to submit your motion to intervene. In both 
instances, please reference the Project docket number CP23-466-000 in 
your submission.
    (1) You may file your motion to intervene by using the Commission's 
eFiling feature, which is located on the Commission's website 
(www.ferc.gov) under the link to Documents and Filings. New eFiling 
users must first create an account by clicking on ``eRegister.'' You 
will be asked to select the type of filing you are making; first select 
``General'' and then select ``Intervention.'' The eFiling feature 
includes a document-less intervention option; for more information, 
visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
    (2) You can file a paper copy of your motion to intervene, along 
with three copies, by mailing the documents to the address below. Your 
motion to intervene must reference the Project docket number CP23-466-
000.
    To file via USPS: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    To file via any other method:
    Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    The Commission encourages electronic filing of motions to intervene 
(option 1 above) and has eFiling staff available to assist you at (202) 
502-8258 or [email protected].
    Protests and motions to intervene must be served on the applicant 
either by mail or email at: Frank J. Magliettei Jr., Senior Manager/
Interstate Pipelines/Business Operations, P.O. Box 94197, Las Vegas, 
Nevada 89193-4197 or at [email protected]. Any subsequent 
submissions by an intervenor must be served on the applicant and all 
other parties to the proceeding. Contact information for parties can be 
downloaded from the service list at the eService link on FERC Online. 
Service can be via email with a link to the document.
    All timely, unopposed \5\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\6\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\7\ A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \5\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \6\ 18 CFR 385.214(c)(1).
    \7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on June 5, 2023.

    Dated: May 15, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10738 Filed 5-18-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.