Download as PDF 30302 Federal Register / Vol. 88, No. 91 / Thursday, May 11, 2023 / Notices ddrumheller on DSK120RN23PROD with NOTICES1 (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail at: David A. Alonzo, Manager, Project Authorizations, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 77002–2700 or at david_alonzo@ tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on May 26, 2023. 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 17:07 May 10, 2023 Jkt 259001 Dated: May 5, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10061 Filed 5–10–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–144–000. Applicants: Clearwater Wind II, LLC. Description: Clearwater Wind II, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 5/5/23. Accession Number: 20230505–5056. Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: EG23–145–000. Applicants: Johnson County Power, LLC. Description: Johnson County Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date:5/5/23. Accession Number: 20230505–5066. Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: EG23–146–000. Applicants: RW Miller Power, LLC. Description: RW Miller Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 5/5/23. Accession Number: 20230505–5067. Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: EG23–147–000. Applicants: Jack County Power, LLC Description: Jack County Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 5/5/23. Accession Number: 20230505–5069. Comment Date: 5 p.m. ET 5/26/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2042–044; ER10–1862–038; ER10–1873–018; ER10–1875–018; ER10–1876–019; ER10–1878–018; ER10–1883–018; ER10–1884–018; ER10–1885–018; ER10–1888–018; ER10–1893–038; ER10–1934–038; ER10–1938–039; ER10–1941–018; ER10–1942–036; ER10–1947–019; ER10–2985–042; ER10–3049–043; ER10–3051–043; ER11–4369–023; ER12–1987–016; ER12–2261–017; ER12–2645–011; ER16–2218–024; ER17–696–024; ER19– 1127–008; ER20–1699–006; ER23–944– 002. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Applicants: Calpine Community Energy, LLC, Johanna Energy Center, LLC, Calpine King City Cogen, LLC, Calpine Energy Solutions, LLC, North American Power Business, LLC, Pastoria Energy Facility L.L.C., Russell City Energy Company, LLC, O.L.S. EnergyAgnews, Inc., North American Power and Gas, LLC, Champion Energy, LLC, Champion Energy Services, LLC, Champion Energy Marketing LLC, Otay Mesa Energy Center, LLC, Calpine Construction Finance Co., L.P., Calpine Gilroy Cogen, L.P., Calpine Power America—CA, LLC, CES Marketing IX, LLC, CES Marketing X, LLC, Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center, LLC, Los Esteros Critical Energy Facility, LLC, Los Medanos Energy Center LLC, Metcalf Energy Center, LLC, Power Contract Financing, L.L.C., Calpine Energy Services, L.P. Description: Notice of Change in Status of Calpine Energy Services, L.P., et al. Filed Date: 5/1/23. Accession Number: 20230501–5586. Comment Date: 5 p.m. ET 5/22/23. Docket Numbers: ER10–2294–008; ER11–3808–007; ER11–3980–007; ER13–413–008; ER13–534–007; ER13– 2103–005; ER13–2414–004; ER15–2330– 004; ER16–131–004; ER20–2696–001; ER17–737–001; ER17–2471–005; ER17– 2472–005; ER18–301–004; ER18–664– 005; ER22–645–001; ER18–2214–002; ER18–2216–002; ER18–2435–004; ER19–1047–003; ER20–2977–001; ER22–1882–002; ER22–2178–002; ER22–2799–001; ER22–2800–001; ER22–2801–001. Applicants: VESI 25 LLC, VESI 24 LLC, VESI 21 LLC, ORNI 50 LLC, VESI 10 LLC, ORNI 34 LLC, VESIVEC LLC, ORNI 41 LLC, Plumsted 537 LLC, Stryker 22, LLC, Ormat Dixie Valley LLC, Steamboat Hills LLC, Ormesa LLC, ONGP LLC, ORNI 43 LLC, Viridity Energy Solutions Inc., VESI Pomona Energy Storage, Inc., Heber Geothermal Company LLC, ORNI 37 LLC, Mammoth Three LLC, ORNI 47 LLC, Mammoth One LLC, USG Oregon LLC, ORNI 14 LLC, ORNI 39 LLC, ORNI 18 LLC. Description: Notice of Change in Status of ORNI 18 LLC, et al. Filed Date: 5/2/23. Accession Number: 20230502–5280. Comment Date: 5 p.m. ET 5/23/23. Docket Numbers: ER10–2381–013; ER11–2206–014; ER11–2207–014; ER11–2209–014; ER11–2210–014; ER11–2211–014; ER11–2855–028; ER11–2856–028; ER11–2857–028; ER11–3727–020; ER12–21–026; ER12– E:\FR\FM\11MYN1.SGM 11MYN1 ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 91 / Thursday, May 11, 2023 / Notices 1711–020; ER13–1150–012; ER13–1151– 012; ER13–1991–027; ER13–1992–027; ER18–814–005; ER19–672–005; ER19– 843–005; ER19–1061–005; ER19–1063– 005; ER19–1200–008; ER20–486–005. Applicants: Golden Fields Solar III, LLC, Clearway Power Marketing LLC, Solar Borrego I LLC, Solar Alpine LLC, Solar Blythe LLC, Marsh Landing LLC, Carlsbad Energy Center LLC, Desert Sunlight 300, LLC, Desert Sunlight 300, LLC, Alta Wind XI, LLC, Alta Wind X, LLC, High Plains Ranch II, LLC, Agua Caliente Solar, LLC, El Segundo Energy Center LLC, Sun City Project LLC, Sand Drag LLC, Avenal Park LLC, Alta Wind I, LLC, Alta Wind III, LLC, Alta Wind II, LLC, Alta Wind IV, LLC, Alta Wind V, LLC, Walnut Creek Energy, LLC. Description: Supplement to March 3, 2023, Notice of Change in Status of Agua Caliente Solar, LLC, et al. Filed Date: 5/2/23. Accession Number: 20230502–5279. Comment Date: 5 p.m. ET 5/23/23. Docket Numbers: ER21–2382–000. Applicants: Shell Energy North America (US), L.P. Description: Refund Report: Refund Report to be effective N/A. Filed Date: 5/5/23. Accession Number: 20230505–5182. Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: ER23–643–002. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to ISA, SA No. 5596; Queue No. AD1–020 to be effective 2/ 15/2023. Filed Date: 5/5/23 Accession Number: 20230505–5136 Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: ER23–1832–000. Applicants: Homer City Generation, L.P. Description: Tariff Amendment: Notice of Cancellation of Reactive Service Tariff to be effective 12/31/9998. Filed Date: 5/4/23. Accession Number: 20230504–5129 Comment Date: 5 p.m. ET 5/25/23. Docket Numbers: ER23–1833–000. Applicants: Bio Energy (Ohio II), LLC. Description: Tariff Amendment: Bio Energy (Ohio II), LLC Notice of MBR Cancellation to be effective 5/4/2023. Filed Date: 5/4/23. Accession Number: 20230504–5130. Comment Date: 5 p.m. ET 5/25/23. Docket Numbers: ER23–1834–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC–NCEMC NITSA SA No. 210 (2023) to be effective 5/1/2023. Filed Date: 5/4/23. Accession Number: 20230504–5151. VerDate Sep<11>2014 17:07 May 10, 2023 Jkt 259001 Comment Date: 5 p.m. ET 5/25/23. DEPARTMENT OF ENERGY Docket Numbers: ER23–1835–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 6899 and CSA, SA No. 6900; Queue No. AD2–091 to be effective 4/5/2023. Filed Date: 5/5/23. Accession Number: 20230505–5078. Comment Date: 5 p.m. ET 5/26/23. Federal Energy Regulatory Commission Docket Numbers: ER23–1836–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Evergreen PV1 LGIA Filing to be effective 4/21/2023. Filed Date: 5/5/23. Accession Number: 20230505–5115. Comment Date: 5 p.m. ET 5/26/23. Docket Numbers: ER23–1837–000 Applicants: PacifiCorp Description: § 205(d) Rate Filing: Provisional Large Generator Interconnection Agreement to be effective 5/6/2023. Filed Date: 5/5/23. Accession Number: 20230505–5124. Comment Date: 5 p.m. ET 5/26/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 5, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–10066 Filed 5–10–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 30303 [Project No. 3071–008] Blue Earth County; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for surrender of exemption. b. Project No.: P–3071–008. c. Date Filed: April 14, 2023. d. Applicant: Blue Earth County. e. Name of Project: Rapidan Dam Hydroelectric Project. f. Location: The project is located on the Blue Earth River, in Blue Earth County, approximately 10 miles south of Mankato, Minnesota. The project does not occupy any federal lands. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Ryan Thilges, P.E., Public Works Director, Blue Earth County, 35 Map Drive, P.O. Box 3083, Mankato, MN 56002–3083. Phone (507) 304–4031 or ryan.thilges@ blueearthcountymn.gov. i. FERC Contact: Diana Shannon, (202) 502–6136, diana.shannon@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 5, 2023. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, E:\FR\FM\11MYN1.SGM 11MYN1

Agencies

[Federal Register Volume 88, Number 91 (Thursday, May 11, 2023)]
[Notices]
[Pages 30302-30303]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-10066]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-144-000.
    Applicants: Clearwater Wind II, LLC.
    Description: Clearwater Wind II, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5056.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: EG23-145-000.
    Applicants: Johnson County Power, LLC.
    Description: Johnson County Power, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date:5/5/23.
    Accession Number: 20230505-5066.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: EG23-146-000.
    Applicants: RW Miller Power, LLC.
    Description: RW Miller Power, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5067.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: EG23-147-000.
    Applicants: Jack County Power, LLC
    Description: Jack County Power, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5069.
    Comment Date: 5 p.m. ET 5/26/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2042-044; ER10-1862-038; ER10-1873-018; ER10-
1875-018; ER10-1876-019; ER10-1878-018; ER10-1883-018; ER10-1884-018; 
ER10-1885-018; ER10-1888-018; ER10-1893-038; ER10-1934-038; ER10-1938-
039; ER10-1941-018; ER10-1942-036; ER10-1947-019; ER10-2985-042; ER10-
3049-043; ER10-3051-043; ER11-4369-023; ER12-1987-016; ER12-2261-017; 
ER12-2645-011; ER16-2218-024; ER17-696-024; ER19-1127-008; ER20-1699-
006; ER23-944-002.
    Applicants: Calpine Community Energy, LLC, Johanna Energy Center, 
LLC, Calpine King City Cogen, LLC, Calpine Energy Solutions, LLC, North 
American Power Business, LLC, Pastoria Energy Facility L.L.C., Russell 
City Energy Company, LLC, O.L.S. Energy-Agnews, Inc., North American 
Power and Gas, LLC, Champion Energy, LLC, Champion Energy Services, 
LLC, Champion Energy Marketing LLC, Otay Mesa Energy Center, LLC, 
Calpine Construction Finance Co., L.P., Calpine Gilroy Cogen, L.P., 
Calpine Power America--CA, LLC, CES Marketing IX, LLC, CES Marketing X, 
LLC, Creed Energy Center, LLC, Delta Energy Center, LLC, Geysers Power 
Company, LLC, Gilroy Energy Center, LLC, Goose Haven Energy Center, 
LLC, Los Esteros Critical Energy Facility, LLC, Los Medanos Energy 
Center LLC, Metcalf Energy Center, LLC, Power Contract Financing, 
L.L.C., Calpine Energy Services, L.P.
    Description: Notice of Change in Status of Calpine Energy Services, 
L.P., et al.
    Filed Date: 5/1/23.
    Accession Number: 20230501-5586.
    Comment Date: 5 p.m. ET 5/22/23.

    Docket Numbers: ER10-2294-008; ER11-3808-007; ER11-3980-007; ER13-
413-008; ER13-534-007; ER13-2103-005; ER13-2414-004; ER15-2330-004; 
ER16-131-004; ER20-2696-001; ER17-737-001; ER17-2471-005; ER17-2472-
005; ER18-301-004; ER18-664-005; ER22-645-001; ER18-2214-002; ER18-
2216-002; ER18-2435-004; ER19-1047-003; ER20-2977-001; ER22-1882-002; 
ER22-2178-002; ER22-2799-001; ER22-2800-001; ER22-2801-001.
    Applicants: VESI 25 LLC, VESI 24 LLC, VESI 21 LLC, ORNI 50 LLC, 
VESI 10 LLC, ORNI 34 LLC, VESIVEC LLC, ORNI 41 LLC, Plumsted 537 LLC, 
Stryker 22, LLC, Ormat Dixie Valley LLC, Steamboat Hills LLC, Ormesa 
LLC, ONGP LLC, ORNI 43 LLC, Viridity Energy Solutions Inc., VESI Pomona 
Energy Storage, Inc., Heber Geothermal Company LLC, ORNI 37 LLC, 
Mammoth Three LLC, ORNI 47 LLC, Mammoth One LLC, USG Oregon LLC, ORNI 
14 LLC, ORNI 39 LLC, ORNI 18 LLC.
    Description: Notice of Change in Status of ORNI 18 LLC, et al.
    Filed Date: 5/2/23.
    Accession Number: 20230502-5280.
    Comment Date: 5 p.m. ET 5/23/23.

    Docket Numbers: ER10-2381-013; ER11-2206-014; ER11-2207-014; ER11-
2209-014; ER11-2210-014; ER11-2211-014; ER11-2855-028; ER11-2856-028; 
ER11-2857-028; ER11-3727-020; ER12-21-026; ER12-

[[Page 30303]]

1711-020; ER13-1150-012; ER13-1151-012; ER13-1991-027; ER13-1992-027; 
ER18-814-005; ER19-672-005; ER19-843-005; ER19-1061-005; ER19-1063-005; 
ER19-1200-008; ER20-486-005.
    Applicants: Golden Fields Solar III, LLC, Clearway Power Marketing 
LLC, Solar Borrego I LLC, Solar Alpine LLC, Solar Blythe LLC, Marsh 
Landing LLC, Carlsbad Energy Center LLC, Desert Sunlight 300, LLC, 
Desert Sunlight 300, LLC, Alta Wind XI, LLC, Alta Wind X, LLC, High 
Plains Ranch II, LLC, Agua Caliente Solar, LLC, El Segundo Energy 
Center LLC, Sun City Project LLC, Sand Drag LLC, Avenal Park LLC, Alta 
Wind I, LLC, Alta Wind III, LLC, Alta Wind II, LLC, Alta Wind IV, LLC, 
Alta Wind V, LLC, Walnut Creek Energy, LLC.
    Description: Supplement to March 3, 2023, Notice of Change in 
Status of Agua Caliente Solar, LLC, et al.
    Filed Date: 5/2/23.
    Accession Number: 20230502-5279.
    Comment Date: 5 p.m. ET 5/23/23.

    Docket Numbers: ER21-2382-000.
    Applicants: Shell Energy North America (US), L.P.
    Description: Refund Report: Refund Report to be effective N/A.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5182.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: ER23-643-002.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Amendment to ISA, SA No. 5596; Queue 
No. AD1-020 to be effective 2/15/2023.
    Filed Date: 5/5/23
    Accession Number: 20230505-5136
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: ER23-1832-000.
    Applicants: Homer City Generation, L.P.
    Description: Tariff Amendment: Notice of Cancellation of Reactive 
Service Tariff to be effective 12/31/9998.
    Filed Date: 5/4/23.
    Accession Number: 20230504-5129
    Comment Date: 5 p.m. ET 5/25/23.

    Docket Numbers: ER23-1833-000.
    Applicants: Bio Energy (Ohio II), LLC.
    Description: Tariff Amendment: Bio Energy (Ohio II), LLC Notice of 
MBR Cancellation to be effective 5/4/2023.
    Filed Date: 5/4/23.
    Accession Number: 20230504-5130.
    Comment Date: 5 p.m. ET 5/25/23.

    Docket Numbers: ER23-1834-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-NCEMC NITSA SA No. 210 
(2023) to be effective 5/1/2023.
    Filed Date: 5/4/23.
    Accession Number: 20230504-5151.
    Comment Date: 5 p.m. ET 5/25/23.

    Docket Numbers: ER23-1835-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 6899 
and CSA, SA No. 6900; Queue No. AD2-091 to be effective 4/5/2023.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5078.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: ER23-1836-000.
    Applicants: Alabama Power Company, Georgia Power Company, 
Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: Alabama Power Company 
submits tariff filing per 35.13(a)(2)(iii: Evergreen PV1 LGIA Filing to 
be effective 4/21/2023.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5115.
    Comment Date: 5 p.m. ET 5/26/23.

    Docket Numbers: ER23-1837-000
    Applicants: PacifiCorp
    Description: Sec.  205(d) Rate Filing: Provisional Large Generator 
Interconnection Agreement to be effective 5/6/2023.
    Filed Date: 5/5/23.
    Accession Number: 20230505-5124.
    Comment Date: 5 p.m. ET 5/26/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10066 Filed 5-10-23; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.