Increasing Market and Planning Efficiency Through Improved Software; Supplemental Notice of Technical Conference on Increasing Real-Time and Day-Ahead Market and Planning Efficiency Through Improved Software, 28535-28536 [2023-09496]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 86 / Thursday, May 4, 2023 / Notices
Accession Number: 20230428–5366.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1762–000.
Applicants: Evergy Kansas Central,
Inc.
Description: § 205(d) Rate Filing: TFR
Reg Asset 205 Filing April 2023 to be
effective 7/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5379.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1763–000.
Applicants: AE–ESS NWS 1, LLC.
Description: Tariff Amendment: AE–
ESS NWS 1 Cancellation of MBR Tariff
to be effective 5/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5387.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1764–000.
Applicants: Evergy Kansas Central,
Inc.
Description: § 205(d) Rate Filing: GFR
Reg Asset 205 April 2023 to be effective
7/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5393.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1765–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing:
DEF—CFTOD Revised NITSA SA No.
147 to be effective 4/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5405.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1766–000.
Applicants: Boott Hydropower, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application and
Request for Expedited Action to be
effective 5/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5408.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: ER23–1767–000.
Applicants: ISO New England Inc.,
The Narragansett Electric Company.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: Second Revised
LGIA–ISONE/NEP–10–03 and First
Revised SGIA–ISONE/NEP–13–03 to be
effective 1/1/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5409.
Comment Date: 5 p.m. ET 5/19/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
VerDate Sep<11>2014
17:12 May 03, 2023
Jkt 259001
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–09495 Filed 5–3–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1733–000]
SFE Energy Massachusetts, Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of SFE
Energy Massachusetts, Inc.’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 18,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
28535
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: April 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–09494 Filed 5–3–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD10–12–014]
Increasing Market and Planning
Efficiency Through Improved Software;
Supplemental Notice of Technical
Conference on Increasing Real-Time
and Day-Ahead Market and Planning
Efficiency Through Improved Software
As first announced in the Notice of
Technical Conference issued in this
proceeding on February 7, 2023,
Commission staff will convene a
technical conference on June 27, 28, and
29, 2023 to discuss opportunities for
increasing real-time and day-ahead
market and planning efficiency of the
bulk power system through improved
software. Attached to this Second
Supplemental Notice is the agenda for
E:\FR\FM\04MYN1.SGM
04MYN1
28536
Federal Register / Vol. 88, No. 86 / Thursday, May 4, 2023 / Notices
the technical conference and speakers’
summaries of their presentations.
While the intent of the technical
conference is not to focus on any
specific matters before the Commission,
some conference discussions might
include topics at issue in proceedings
that are currently pending before the
Commission, including topics related to
capacity valuation methodologies for
renewable, hybrid, or storage resources.
These proceedings include, but are not
limited to:
ddrumheller on DSK120RN23PROD with NOTICES1
PJM Interconnection,
L.L.C.
California Independent System
Operator Corp.
New York Independent System
Operator, Inc.
ISO New England,
Inc.
PJM Interconnection,
L.L.C.
Southwest Power
Pool, Inc.
Midcontinent Independent System
Operator, Inc.
ISO New England,
Inc.
Southwest Power
Pool, Inc.
PJM Interconnection,
L.L.C.
California Independent System
Operator Corp.
California Independent System
Operator Corp.
California Independent System
Operator Corp.
Midcontinent Independent System
Operator, Inc.
Midcontinent Independent System
Operator, Inc.
Midcontinent Independent System
Operator, Inc.
Docket No. EL21–83–
000.
Docket No. ER21–
2455–004.
Docket No. ER21–
2460–003.
Docket No. ER22–
983–002.
Docket No. ER22–
962–003.
Docket No. ER22–
1697–001.
Docket No. ER22–
1640–000.
Docket No. EL22–42–
000.
Docket No. ER22–
379–000.
Docket No. ER22–
1200–000.
Docket No. ER23–
1485–000.
Docket No. ER23–
1533–000.
Dated: April 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
Docket No. EL23–28.
[FR Doc. 2023–09496 Filed 5–3–23; 8:45 am]
BILLING CODE 6717–01–P
Docket No. ER23–
1195.
DEPARTMENT OF ENERGY
Docket No. EL23–46.
1 https://www.ferc.gov/news-events/events/
increasing-real-time-and-day-ahead-market-andplanning-efficiency-through.
17:12 May 03, 2023
Jkt 259001
Federal Energy Regulatory
Commission
[Project No. 2445–028]
Green Mountain Power Corporation;
Notice of Intent To Prepare an
Environmental Assessment
On December 23, 2021, Green
Mountain Power Corporation filed a
relicense application for the 275kilowatt Center Rutland Hydroelectric
Project No. 2445 (project). The project is
located on Otter Creek in Rutland
County, Vermont.
In accordance with the Commission’s
regulations, on February 17, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
PO 00000
Frm 00078
Fmt 4703
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues EA
Comments on EA ..........
Target date
October 2023.1
November 2023.
Any questions regarding this notice
may be directed to Nicholas Tackett at
(202) 502–6783 or Nicholas.Tackett@
ferc.gov.
Dated: April 28, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–09487 Filed 5–3–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Docket No. ER23–
1534–000.
The conference will take place in a
hybrid format, with presenters and
attendees allowed to participate either
in-person or virtually. Further details on
both in-person and virtual participation
will be available on the conference web
page.1 Foreign nationals attending inperson must register through the
Commission’s website on or before June
2, 2023. We also encourage all other inperson attendees to also register through
the Commission’s website on or before
June 2, 2023, to help ensure
VerDate Sep<11>2014
Commission staff can provide sufficient
physical and virtual facilities and to
communicate with attendees in the case
of unanticipated emergencies or other
changes to the conference schedule or
location. Access to the conference
(virtual or in-person) may not be
available to those who do not register.
The Commission will accept
comments following the conference,
with a deadline of July 28, 2023.
There is an ‘‘eSubscription’’ link on
the Commission’s website that enables
subscribers to receive email notification
when a document is added to a
subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
For further information about these
conferences, please contact:
Sarah McKinley (Logistical
Information), Office of External
Affairs, (202) 502–8004,
Sarah.McKinley@ferc.gov
Alexander Smith (Technical
Information), Office of Energy Policy
and Innovation, (202) 502–6601,
Alexander.Smith@ferc.gov
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23–49–000.
Applicants: Columbia Gas of Ohio,
Inc.
Description: § 284.123 Rate Filing:
COH Rates effective 3–30–2023 to be
effective 3/30/2023.
Filed Date: 4/28/23.
Accession Number: 20230428–5110.
Comment Date: 5 p.m. ET 5/19/23.
Docket Numbers: RP23–715–000.
Applicants: Midship Pipeline
Company, LLC.
Description: Compliance filing:
Midship Pipeline CP17–458 Compliance
Filing to be effective N/A.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Center Rutland Hydroelectric
Project. Therefore, in accordance with CEQ’s
regulations, the EA must be issued within 1 year of
the issuance date of this notice.
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 88, Number 86 (Thursday, May 4, 2023)]
[Notices]
[Pages 28535-28536]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09496]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD10-12-014]
Increasing Market and Planning Efficiency Through Improved
Software; Supplemental Notice of Technical Conference on Increasing
Real-Time and Day-Ahead Market and Planning Efficiency Through Improved
Software
As first announced in the Notice of Technical Conference issued in
this proceeding on February 7, 2023, Commission staff will convene a
technical conference on June 27, 28, and 29, 2023 to discuss
opportunities for increasing real-time and day-ahead market and
planning efficiency of the bulk power system through improved software.
Attached to this Second Supplemental Notice is the agenda for
[[Page 28536]]
the technical conference and speakers' summaries of their
presentations.
While the intent of the technical conference is not to focus on any
specific matters before the Commission, some conference discussions
might include topics at issue in proceedings that are currently pending
before the Commission, including topics related to capacity valuation
methodologies for renewable, hybrid, or storage resources. These
proceedings include, but are not limited to:
------------------------------------------------------------------------
------------------------------------------------------------------------
PJM Interconnection, L.L.C................ Docket No. EL21-83-000.
California Independent System Operator Docket No. ER21-2455-004.
Corp.
New York Independent System Operator, Inc. Docket No. ER21-2460-003.
ISO New England, Inc...................... Docket No. ER22-983-002.
PJM Interconnection, L.L.C................ Docket No. ER22-962-003.
Southwest Power Pool, Inc................. Docket No. ER22-1697-001.
Midcontinent Independent System Operator, Docket No. ER22-1640-000.
Inc.
ISO New England, Inc...................... Docket No. EL22-42-000.
Southwest Power Pool, Inc................. Docket No. ER22-379-000.
PJM Interconnection, L.L.C................ Docket No. ER22-1200-000.
California Independent System Operator Docket No. ER23-1485-000.
Corp.
California Independent System Operator Docket No. ER23-1533-000.
Corp.
California Independent System Operator Docket No. ER23-1534-000.
Corp.
Midcontinent Independent System Operator, Docket No. EL23-28.
Inc.
Midcontinent Independent System Operator, Docket No. ER23-1195.
Inc.
Midcontinent Independent System Operator, Docket No. EL23-46.
Inc.
------------------------------------------------------------------------
The conference will take place in a hybrid format, with presenters
and attendees allowed to participate either in-person or virtually.
Further details on both in-person and virtual participation will be
available on the conference web page.\1\ Foreign nationals attending
in-person must register through the Commission's website on or before
June 2, 2023. We also encourage all other in-person attendees to also
register through the Commission's website on or before June 2, 2023, to
help ensure Commission staff can provide sufficient physical and
virtual facilities and to communicate with attendees in the case of
unanticipated emergencies or other changes to the conference schedule
or location. Access to the conference (virtual or in-person) may not be
available to those who do not register.
---------------------------------------------------------------------------
\1\ https://www.ferc.gov/news-events/events/increasing-real-time-and-day-ahead-market-and-planning-efficiency-through.
---------------------------------------------------------------------------
The Commission will accept comments following the conference, with
a deadline of July 28, 2023.
There is an ``eSubscription'' link on the Commission's website that
enables subscribers to receive email notification when a document is
added to a subscribed docket(s). For assistance with any FERC Online
service, please email [email protected], or call (866) 208-
3676 (toll free). For TTY, call (202) 502-8659.
FERC conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations please
send an email to [email protected] or call toll free (866) 208-
3372 (voice) or (202) 502-8659 (TTY), or send a fax to (202) 208-2106
with the required accommodations.
For further information about these conferences, please contact:
Sarah McKinley (Logistical Information), Office of External Affairs,
(202) 502-8004, [email protected]
Alexander Smith (Technical Information), Office of Energy Policy and
Innovation, (202) 502-6601, [email protected]
Dated: April 28, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-09496 Filed 5-3-23; 8:45 am]