Combined Notice of Filings, 27879 [2023-09385]
Download as PDF
Federal Register / Vol. 88, No. 85 / Wednesday, May 3, 2023 / Notices
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: April 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–09376 Filed 5–2–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
lotter on DSK11XQN23PROD with NOTICES1
Filings Instituting Proceedings
Docket Numbers: PR23–48–000.
Applicants: Spire Storage Salt Plains
LLC.
Description: § 284.123(g) Rate Filing:
Spire Storage Salts Plains SOC—April
2023 to be effective 4/1/2023.
Filed Date: 4/26/23.
Accession Number: 20230426–5169.
Comment Date: 5 p.m. ET 5/17/23.
Protest Date: 5 p.m. ET 6/26/23.
Docket Numbers: RP23–710–000.
Applicants: Northern Border Pipeline
Company.
Description: Compliance filing: 2023
Operational Purchases and Sales Report
to be effective N/A.
Filed Date: 4/26/23.
Accession Number: 20230426–5173.
Comment Date: 5 p.m. ET 5/8/23.
VerDate Sep<11>2014
18:32 May 02, 2023
Jkt 259001
Docket Numbers: RP23–711–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing: Rate
Schedule S–2 OFO Flow Through
Refund Report April 2023 to be effective
N/A.
Filed Date: 4/27/23.
Accession Number: 20230427–5041.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23–712–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
Service Agreements—Brotman II to be
effective 5/1/2023.
Filed Date: 4/27/23.
Accession Number: 20230427–5085.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23–713–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
NRA-Denbury and Update NonConforming List to be effective 5/1/
2023.
Filed Date: 4/27/23.
Accession Number: 20230427–5086.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23–714–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Housekeeping Filing—Remove
Surcharge-Related Language to be
effective 5/27/2023.
Filed Date: 4/27/23.
Accession Number: 20230427–5174.
Comment Date: 5 p.m. ET 5/9/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–09385 Filed 5–2–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
27879
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2790–076]
Boott Hydropower, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-capacity
Amendment of License.
b. Project No: 2790–076.
c. Date Filed: April 21, 2023.1
d. Applicant: Boott Hydropower, LLC
(licensee).
e. Name of Project: Lowell
Hydroelectric Project.
f. Location: The project is located on
the Merrimack River in the City of
Lowell in Middlesex County,
Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kevin Webb,
Hydro Licensing Manager, 670 N
Commercial Street, Suite 204,
Manchester, NH 03101, (978) 935–6039,
kwebb@patriothydro.com and Jim
Gibson, Vice-President, 1304 Buckley
Road, Syracuse, NY 13212, (315) 414–
2202, Jim.Gibson@hdrinc.com.
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
30, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
1 The April 21, 2023 filing supersedes the May 20,
2022, July 7, 2022, and March 10, 2023 filings.
E:\FR\FM\03MYN1.SGM
03MYN1
Agencies
[Federal Register Volume 88, Number 85 (Wednesday, May 3, 2023)]
[Notices]
[Page 27879]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09385]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas & Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23-48-000.
Applicants: Spire Storage Salt Plains LLC.
Description: Sec. 284.123(g) Rate Filing: Spire Storage Salts
Plains SOC--April 2023 to be effective 4/1/2023.
Filed Date: 4/26/23.
Accession Number: 20230426-5169.
Comment Date: 5 p.m. ET 5/17/23.
Protest Date: 5 p.m. ET 6/26/23.
Docket Numbers: RP23-710-000.
Applicants: Northern Border Pipeline Company.
Description: Compliance filing: 2023 Operational Purchases and
Sales Report to be effective N/A.
Filed Date: 4/26/23.
Accession Number: 20230426-5173.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: RP23-711-000.
Applicants: Transcontinental Gas Pipe Line Company, LLC.
Description: Compliance filing: Rate Schedule S-2 OFO Flow Through
Refund Report April 2023 to be effective N/A.
Filed Date: 4/27/23.
Accession Number: 20230427-5041.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23-712-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: New Service Agreements--
Brotman II to be effective 5/1/2023.
Filed Date: 4/27/23.
Accession Number: 20230427-5085.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23-713-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: New NRA-Denbury and Update
Non-Conforming List to be effective 5/1/2023.
Filed Date: 4/27/23.
Accession Number: 20230427-5086.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: RP23-714-000.
Applicants: Rover Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Housekeeping Filing--Remove
Surcharge-Related Language to be effective 5/27/2023.
Filed Date: 4/27/23.
Accession Number: 20230427-5174.
Comment Date: 5 p.m. ET 5/9/23.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-09385 Filed 5-2-23; 8:45 am]
BILLING CODE 6717-01-P