Draft Regulatory Guide: Quality Assurance Program Criteria (Design and Construction), 27713-27714 [2023-09160]
Download as PDF
Federal Register / Vol. 88, No. 85 / Wednesday, May 3, 2023 / Proposed Rules
its regulations to incorporate by
reference proposed revisions to three
regulatory guides, which would approve
new, revised, and reaffirmed code cases
published by the American Society of
Mechanical Engineers. In addition, the
NRC requested comments on its
proposal to extend the time periods
required for licensees to update their
codes of record. The public comment
period was originally scheduled to close
on May 5, 2023.
On April 19, 2023, the NRC received
two public comments (ADAMS
Accession Nos. ML23109A141 and
ML23109A142) requesting that the
comment period for the proposed rule
be extended by an additional 1 to 2
months. The requesters expressed that
American Society of Mechanical
Engineers (ASME) Code Committee
meetings are scheduled for May 2023,
and that these ASME meetings would be
beneficial to allow discussions of the
proposed rule before submission of any
further public comments.
The NRC seeks to ensure that the
public has a reasonable opportunity to
provide the NRC with comments on this
proposed action. The NRC
acknowledges that discussions at the
ASME Code Committee meetings may
assist in the development of comments.
The NRC has decided to extend the
public comment period on this
document until June 16, 2023, to allow
more time for members of the public to
submit their comments.
The NRC may post materials related
to this document, including public
comments, on the Federal rulemaking
website at https://www.regulations.gov
under Docket ID NRC–2018–0291. In
addition, the Federal rulemaking
website allows members of the public to
receive alerts when changes or additions
occur in a docket folder. To subscribe:
(1) navigate to the docket folder (NRC–
2018–0291); (2) click the ‘‘Subscribe’’
link; and (3) enter an email address and
click on the ‘‘Subscribe’’ link.
lotter on DSK11XQN23PROD with PROPOSALS1
Dated: April 26, 2023.
For the Nuclear Regulatory Commission.
Andrea D. Veil,
Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2023–09218 Filed 5–2–23; 8:45 am]
BILLING CODE 7590–01–P
VerDate Sep<11>2014
18:28 May 02, 2023
Jkt 259001
NUCLEAR REGULATORY
COMMISSION
10 CFR Parts 50 and 52
[NRC–2023–0054]
Draft Regulatory Guide: Quality
Assurance Program Criteria (Design
and Construction)
Nuclear Regulatory
Commission.
ACTION: Draft guide; request for
comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a draft regulatory guide (DG),
DG–1403, ‘‘Quality Assurance Program
Criteria (Design and Construction).’’
This DG is proposed Revision 6 of
Regulatory Guide (RG) 1.28 of the same
name. The proposed revision endorses
Nuclear Energy Institute (NEI) 14–05A,
‘‘Guidelines for the Use of Accreditation
in Lieu of Commercial Grade Surveys
for Procurement of Laboratory
Calibration and Test Services,’’ Revision
1, issued November 2020, as an
acceptable approach for licensees and
suppliers subject to the quality
assurance (QA) requirements of NRC
regulations. Also in this proposed
revision, the NRC staff endorses the Part
I and Part II requirements included in
NQA–1–2017, NQA–1–2019, and NQA–
1–2022 for the implementation of a QA
program during the design and
construction phases of nuclear power
plants and fuel reprocessing plants.
DATES: Submit comments by June 2,
2023. Comments received after this date
will be considered if it is practical to do
so, but the NRC is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal rulemaking website:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0054. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individuals listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A06, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
For additional direction on obtaining
information and submitting comments,
SUMMARY:
PO 00000
Frm 00002
Fmt 4702
Sfmt 4702
27713
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Andrea Keim, Office of Nuclear Reactor
Regulation, telephone: 301–415–1671;
email: Andrea.Keim@nrc.gov, or James
Steckel, Office of Nuclear Regulatory
Research, telephone: 301 415–1026;
email: James.Steckel@nrc.gov. Both are
staff members of the U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2023–
0054 when contacting the NRC about
the availability of information regarding
this action. You may obtain publicly
available information related to this
action, by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2023–0054.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, at
301–415–4737, or by email to
PDR.Resource@nrc.gov. The ADAMS
accession number for each document
referenced (if it is available in ADAMS)
is provided the first time that it is
mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents,
by appointment, at the NRC’s PDR,
Room P1 B35, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852. To make an
appointment to visit the PDR, please
send an email to PDR.Resource@nrc.gov
or call 1–800–397–4209 or 301–415–
4737, between 8 a.m. and 4 p.m. eastern
time (ET), Monday through Friday,
except Federal holidays.
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2023–0054 in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
E:\FR\FM\03MYP1.SGM
03MYP1
27714
Federal Register / Vol. 88, No. 85 / Wednesday, May 3, 2023 / Proposed Rules
lotter on DSK11XQN23PROD with PROPOSALS1
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enters
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Additional Information
The NRC is issuing for public
comment a DG in the NRC’s ‘‘Regulatory
Guide’’ series. This series was
developed to describe methods that are
acceptable to the NRC staff for
implementing specific parts of the
agency’s regulations, to explain
techniques that the staff uses in
evaluating specific issues or postulated
events, and to describe information that
the staff needs in its review of
applications for permits and licenses.
The DG, entitled, ‘‘Quality Assurance
Program Criteria (Design and
Construction)’’ is temporarily identified
by its task number, DG–1403 (ADAMS
Accession No. ML22304A054).
This DG is proposed Revision 6 of RG
1.28, ‘‘Quality Assurance Program
Criteria (Design and Construction).’’ The
proposed DG describes methods and
procedures that the NRC staff considers
acceptable for use in complying with
the agency’s regulations regarding the
QA program criteria for the design and
construction phases of nuclear power
plants and fuel reprocessing plants. It
provides an adequate basis for
complying with the requirements of
appendix B to part 50 of title 10 of the
Code of Federal Regulations (10 CFR),
subject to certain exceptions and
clarifications of NQA–1–2017, NQA–1–
2019, and NQA–1–2022 identified in
proposed Revision 6 of RG 1.28. DG–
1403, endorses, with some clarifications
and exceptions, three versions of the
American Society of Mechanical
Engineers (ASME) NQA–1 standard:
NQA–1–2017, NQA–1–2019, and NQA–
1–2022. The previous version of RG 1.28
(Revision 5) approved the use of NQA–
1b–2011 Addenda to ASME NQA–1–
2008, NQA–1–2012, and NQA–1–2015,
with certain clarifications and
VerDate Sep<11>2014
18:28 May 02, 2023
Jkt 259001
regulatory positions. The staff
determined that the NQA–1–2017,
NQA–1–2019, and NQA–1–2022
versions provide the most current
guidance for QA, and the NRC staff
endorses the Part I and Part II
requirements included in NQA–1–2017,
NQA–1–2019, and NQA–1–2022 for the
implementation of a QA program during
the design and construction phases of
nuclear power plants and fuel
reprocessing plants. These Parts provide
an adequate basis for complying with
the requirements of appendix B to 10
CFR part 50, subject to certain
exceptions and clarifications of NQA–1–
2017, NQA–1–2019, and NQA–1–2022
identified in DG–1403. This DG also
endorses NEI 14–05A, ‘‘Guidelines for
the Use of Accreditation in Lieu of
Commercial Grade Surveys for
Procurement of Laboratory Calibration
and Test Services,’’ Revision 1, issued
November 2020, as an acceptable
approach for licensees and suppliers
subject to the QA requirements of
appendix B to 10 CFR part 50.
The staff is also issuing for public
comment a draft regulatory analysis
(ADAMS Accession No. ML22304A055).
The staff developed a regulatory
analysis to assess the value of issuing or
revising a regulatory guide as well as
alternative courses of action.
As noted in the Federal Register on
December 9, 2022 (87 FR 75671), this
document is being published in the
‘‘Proposed Rules’’ section of the Federal
Register to comply with publication
requirements under 1 CFR chapter I.
III. Backfitting, Forward Fitting, and
Issue Finality
DG–1403, if finalized, would revise
RG 1.28, and provide NRC staff
endorsement of the Part I and Part II
requirements. This revision would
apply to both production and utilization
nuclear facilities. Issuance of DG–1403,
if finalized, would not constitute
backfitting as defined in 10 CFR 50.109,
‘‘Backfitting,’’ and as described in NRC
Management Directive (MD) 8.4,
‘‘Management of Backfitting, Forward
Fitting, Issue Finality, and Information
Requests’’; constitute forward fitting as
that term is defined and described in
MD 8.4; or affect the issue finality of any
approval issued under 10 CFR part 52.
IV. Submitting Suggestions for
Improvement of Regulatory Guides
A member of the public may, at any
time, submit suggestions to the NRC for
improvement of existing RGs or for the
development of new RGs. Suggestions
can be submitted on the NRC’s public
website at https://www.nrc.gov/readingrm/doc-collections/reg-guides/
PO 00000
Frm 00003
Fmt 4702
Sfmt 4702
contactus.html. Suggestions will be
considered in future updates and
enhancements to the ‘‘Regulatory
Guide’’ series.
Dated: April 26, 2023.
For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs
Management Branch, Division of Engineering,
Office of Nuclear Regulatory Research.
[FR Doc. 2023–09160 Filed 5–2–23; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
10 CFR Parts 50 and 52
[NRC–2023–0089]
Draft Regulatory Guide: Guidelines for
Lightning Protection for Production
and Utilization Facilities
Nuclear Regulatory
Commission
ACTION: Draft guide; request for
comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a draft regulatory guide (DG),
DG–1409, ‘‘Guidelines for Lightning
Protection for Production and
Utilization Facilities.’’ This DG is the
proposed Revision 1 of Regulatory
Guide (RG) 1.204, ‘‘Guidelines for
Lightning Protection of Nuclear Power
Plants.’’ DG–1409 describes an approach
that is acceptable to the staff of the NRC
to meet regulatory requirements for
adequate lightning protection of safetyrelated systems, structures, and
components (SSCs). This DG endorses,
with clarifications, the methods
described in Institute of Electrical and
Electronics Engineers (IEEE) Standard
(Std.) 665–1995, ‘‘IEEE Standard for
Generating Station Grounding’’; IEEE
Std. 666–2007, ‘‘IEEE Design Guide for
Electrical Power Service Systems for
Generating Stations’’; IEEE Std. 1050–
2004, ‘‘IEEE Guide for Instrumentation
and Control Equipment Grounding in
Generating Stations’’; and IEEE Std.
C62.23–2017, ‘‘IEEE Application Guide
for Surge Protection of Electric
Generating Plants.’’
DATES: Submit comments by June 2,
2023. Comments received after this date
will be considered if it is practical to do
so, but the NRC is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
SUMMARY:
E:\FR\FM\03MYP1.SGM
03MYP1
Agencies
[Federal Register Volume 88, Number 85 (Wednesday, May 3, 2023)]
[Proposed Rules]
[Pages 27713-27714]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09160]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
10 CFR Parts 50 and 52
[NRC-2023-0054]
Draft Regulatory Guide: Quality Assurance Program Criteria
(Design and Construction)
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft guide; request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment a draft regulatory guide (DG), DG-1403, ``Quality
Assurance Program Criteria (Design and Construction).'' This DG is
proposed Revision 6 of Regulatory Guide (RG) 1.28 of the same name. The
proposed revision endorses Nuclear Energy Institute (NEI) 14-05A,
``Guidelines for the Use of Accreditation in Lieu of Commercial Grade
Surveys for Procurement of Laboratory Calibration and Test Services,''
Revision 1, issued November 2020, as an acceptable approach for
licensees and suppliers subject to the quality assurance (QA)
requirements of NRC regulations. Also in this proposed revision, the
NRC staff endorses the Part I and Part II requirements included in NQA-
1-2017, NQA-1-2019, and NQA-1-2022 for the implementation of a QA
program during the design and construction phases of nuclear power
plants and fuel reprocessing plants.
DATES: Submit comments by June 2, 2023. Comments received after this
date will be considered if it is practical to do so, but the NRC is
able to ensure consideration only for comments received on or before
this date.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal rulemaking website:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0054. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individuals listed in the FOR FURTHER
INFORMATION CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A06, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Andrea Keim, Office of Nuclear Reactor
Regulation, telephone: 301-415-1671; email: [email protected], or
James Steckel, Office of Nuclear Regulatory Research, telephone: 301
415-1026; email: [email protected]. Both are staff members of the
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2023-0054 when contacting the NRC
about the availability of information regarding this action. You may
obtain publicly available information related to this action, by any of
the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2023-0054.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737,
or by email to [email protected]. The ADAMS accession number for
each document referenced (if it is available in ADAMS) is provided the
first time that it is mentioned in this document.
NRC's PDR: You may examine and purchase copies of public
documents, by appointment, at the NRC's PDR, Room P1 B35, One White
Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make
an appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2023-0054 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly
[[Page 27714]]
disclosed in your comment submission. The NRC will post all comment
submissions at https://www.regulations.gov as well as enters the
comment submissions into ADAMS. The NRC does not routinely edit comment
submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Additional Information
The NRC is issuing for public comment a DG in the NRC's
``Regulatory Guide'' series. This series was developed to describe
methods that are acceptable to the NRC staff for implementing specific
parts of the agency's regulations, to explain techniques that the staff
uses in evaluating specific issues or postulated events, and to
describe information that the staff needs in its review of applications
for permits and licenses.
The DG, entitled, ``Quality Assurance Program Criteria (Design and
Construction)'' is temporarily identified by its task number, DG-1403
(ADAMS Accession No. ML22304A054).
This DG is proposed Revision 6 of RG 1.28, ``Quality Assurance
Program Criteria (Design and Construction).'' The proposed DG describes
methods and procedures that the NRC staff considers acceptable for use
in complying with the agency's regulations regarding the QA program
criteria for the design and construction phases of nuclear power plants
and fuel reprocessing plants. It provides an adequate basis for
complying with the requirements of appendix B to part 50 of title 10 of
the Code of Federal Regulations (10 CFR), subject to certain exceptions
and clarifications of NQA-1-2017, NQA-1-2019, and NQA-1-2022 identified
in proposed Revision 6 of RG 1.28. DG-1403, endorses, with some
clarifications and exceptions, three versions of the American Society
of Mechanical Engineers (ASME) NQA-1 standard: NQA-1-2017, NQA-1-2019,
and NQA-1-2022. The previous version of RG 1.28 (Revision 5) approved
the use of NQA-1b-2011 Addenda to ASME NQA-1-2008, NQA-1-2012, and NQA-
1-2015, with certain clarifications and regulatory positions. The staff
determined that the NQA-1-2017, NQA-1-2019, and NQA-1-2022 versions
provide the most current guidance for QA, and the NRC staff endorses
the Part I and Part II requirements included in NQA-1-2017, NQA-1-2019,
and NQA-1-2022 for the implementation of a QA program during the design
and construction phases of nuclear power plants and fuel reprocessing
plants. These Parts provide an adequate basis for complying with the
requirements of appendix B to 10 CFR part 50, subject to certain
exceptions and clarifications of NQA-1-2017, NQA-1-2019, and NQA-1-2022
identified in DG-1403. This DG also endorses NEI 14-05A, ``Guidelines
for the Use of Accreditation in Lieu of Commercial Grade Surveys for
Procurement of Laboratory Calibration and Test Services,'' Revision 1,
issued November 2020, as an acceptable approach for licensees and
suppliers subject to the QA requirements of appendix B to 10 CFR part
50.
The staff is also issuing for public comment a draft regulatory
analysis (ADAMS Accession No. ML22304A055). The staff developed a
regulatory analysis to assess the value of issuing or revising a
regulatory guide as well as alternative courses of action.
As noted in the Federal Register on December 9, 2022 (87 FR 75671),
this document is being published in the ``Proposed Rules'' section of
the Federal Register to comply with publication requirements under 1
CFR chapter I.
III. Backfitting, Forward Fitting, and Issue Finality
DG-1403, if finalized, would revise RG 1.28, and provide NRC staff
endorsement of the Part I and Part II requirements. This revision would
apply to both production and utilization nuclear facilities. Issuance
of DG-1403, if finalized, would not constitute backfitting as defined
in 10 CFR 50.109, ``Backfitting,'' and as described in NRC Management
Directive (MD) 8.4, ``Management of Backfitting, Forward Fitting, Issue
Finality, and Information Requests''; constitute forward fitting as
that term is defined and described in MD 8.4; or affect the issue
finality of any approval issued under 10 CFR part 52.
IV. Submitting Suggestions for Improvement of Regulatory Guides
A member of the public may, at any time, submit suggestions to the
NRC for improvement of existing RGs or for the development of new RGs.
Suggestions can be submitted on the NRC's public website at https://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html.
Suggestions will be considered in future updates and enhancements to
the ``Regulatory Guide'' series.
Dated: April 26, 2023.
For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs Management Branch, Division of
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2023-09160 Filed 5-2-23; 8:45 am]
BILLING CODE 7590-01-P