Agency Information Collection Activities: Approval Request, 27556-27559 [2023-09314]
Download as PDF
27556
Federal Register / Vol. 88, No. 84 / Tuesday, May 2, 2023 / Notices
funds available to applicants that meet
the eligibility requirements under the
law. The continued viability of these
funds is critical in supporting the
transportation infrastructure and fish
passage needs across the United States.
Respondents: States, units of local
government, and an Indian Tribe as
defined in section 4 of the Indian SelfDetermination and Education
Assistance Act (25 U.S.C. 5304).
Expected Number of Respondents:
200.
Frequency: One-time application, to
be followed by project agreement
execution, reimbursement of funds,
reporting, and project closeout.
Estimated Average Burden Hours per
Response: 19.
Estimated Total Annual Burden
Hours: 8,600.
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including: (1)
Whether the proposed collection is
necessary for the FHWA’s performance;
(2) the accuracy of the estimated
burdens; (3) ways for the FHWA to
enhance the quality, usefulness, and
clarity of the collected information; and
(4) ways that the burden could be
minimized, including the use of
electronic technology, without reducing
the quality of the collected information.
The agency will summarize and/or
include your comments in the request
for OMB’s clearance of this information
collection.
Authority: The Paperwork Reduction
Act of 1995; 44 U.S.C. chapter 35, as
amended; 23 U.S.C. 134 and 135; and 23
CFR chapter 1, subchapter E, part 450.
Dated: April 27, 2023.
Michael Howell,
FHWA Information Collection Officer.
[FR Doc. 2023–09312 Filed 5–1–23; 8:45 am]
BILLING CODE 4910–22–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[Docket No. FHWA–2023–0012]
Agency Information Collection
Activities: Approval Request
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice and request for
comments.
ddrumheller on DSK120RN23PROD with NOTICES1
AGENCY:
FHWA invites public
comments about our intention to request
the Office of Management and Budget’s
(OMB) approval for a new information
collection. In compliance with the
Paperwork Reduction Act of 1995, the
SUMMARY:
VerDate Sep<11>2014
18:14 May 01, 2023
Jkt 259001
Department of Transportation (DOT)
provides notice that it will submit an
information collection request (ICR) to
the Office of Management and Budget
(OMB) for approval of a proposed
information collection. This collection
involves applicants to submit a proposal
for discretionary grant funding, under
the Charging and Fueling Infrastructure
Program established by the
Infrastructure Investment and Jobs Act
of 2021, November 15, 2021, ‘‘Bipartisan
Infrastructure Law’’, or ‘‘BIL’’. FHWA is
requesting emergency approval due to
the urgency of making the associated
funds available to applicants that meet
the eligibility requirements under the
law. The continued viability of these
funds is critical in supporting the
transportation infrastructure needs
across the United States.
DATES: Please submit comments by July
3, 2023.
ADDRESSES: You may send comments
within 60 days to the Office of
Information and Regulatory Affairs,
Office of Management and Budget, 725
17th Street NW, Washington, DC 20503,
Attention DOT Desk Officer. You are
asked to comment on any aspect of this
information collection, including: (1)
whether the proposed collection is
necessary for the FHWA’s performance;
(2) the accuracy of the estimated
burden; (3) ways for the FHWA to
enhance the quality, usefulness, and
clarity of the collected information; and
(4) ways that the burden could be
minimized, including the use of
electronic technology, without reducing
the quality of the collected information.
All comments should include the
Docket number FHWA–2023–0012.
FOR FURTHER INFORMATION CONTACT: Gary
Jensen, Director Office of Natural
Environment, Federal Highway
Administration, Department of
Transportation, 1200 New Jersey Ave.
SE, Washington, DC, between 9 a.m. and
5 p.m., Monday through Friday, except
Federal holidays.
SUPPLEMENTARY INFORMATION: This is a
request for Office of Management and
Budget (OMB) emergency clearance for
a new information collection request
(ICR) to enable the Department of
Transportation (DOT) Federal Highway
Administration (FHWA) to implement
the Charging and Fueling Infrastructure
Discretionary Grant Program. This
program provides two grant categories:
(1) Community Program and (2)
Corridor Program. The CFI was
authorized in the Bipartisan
Infrastructure Law (BIL), enacted as the
Infrastructure Investment and Jobs Act
(Act) (Pub. L. 117–58) on November 15,
2021. This historic Act is a once-in-a-
PO 00000
Frm 00126
Fmt 4703
Sfmt 4703
generation opportunity to support
transformational investments in our
Nation’s transportation infrastructure
that will create good jobs, modernize
our infrastructure, improve safety,
tackle the climate crisis, and invest in
communities that have too often been
left behind. The program will
strategically deploy publicly accessible
electric vehicle charging infrastructure,
and hydrogen, propane, or natural gas
fueling infrastructure along designated
alternative fuel corridors or in
community locations that will be
accessible to all drivers of electric
vehicles, hydrogen vehicles, propane
vehicles, and natural gas vehicles.
The CFI Grant Program is critical to
enabling eligible entities to accelerate an
electrified and alternative fuel
transportation system that is
convenient, affordable, reliable,
equitable, and safe. This program will
support a future where everyone can
ride and drive electric and have
alternative fuel options. The FHWA is
seeking to award CFI projects that
proactively address emission
reductions, infrastructure reliability,
development of a skilled and diverse
workforce, community engagement and
equity including the decades of
underinvestment in disadvantaged
communities—communities that are
underserved and overburdened.
The statutory requirements of the CFI
Grant Program are found under Subtitle
D section 11401 of the BIL and codified
at 23 U.S.C. 151. In BIL, Congress
authorized funding for five Fiscal Years
(including FY 2022/2023), totaling up to
$2.5B (FY 2022 $300M, FY 2023 $400M,
FY 2024 $500M, FY 2025 $600M, and
FY 2026 $700M) to CFI eligible projects.
For FY 2022/2023, a total of $700 M is
available under one NOFO for awards
under two funding categories:
Community Program and Corridor
Program.
The statute defines eligible applicants
for the CFI Grant Program as State or
political subdivision of a State; a
metropolitan planning organization; a
unit of local government; a special
purpose district or a public authority
with a transportation function; an
Indian Tribe; a territory of the United
States; or an authority, agency, or
instrumentality of, or an entity owned
by, 1 or more entities described above;
a group of entities as described above;
and a State or local authority with
ownership of publicly accessible
transportation facilities (Community
Program only).:
Title: Charging and Fueling
Infrastructure Discretionary Grant
Program.
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 88, No. 84 / Tuesday, May 2, 2023 / Notices
Expected Number of Respondents:
550.
Frequency: Application submission
and project agreement execution will
occur one time while project
management will occur over three years.
Estimated Average Burden per
Response: $3,280 (application
submission, project agreement
execution, and 3 years of project
management).
Estimated First Year Burden:
$1,408,000.
Abstract: On November 15, 2021, the
Infrastructure Investment and Jobs Act
of 2021 (Pub. L. 117–58).
‘‘Bipartisan Infrastructure Law (BIL)’’
was enacted. Section 1118 established
the Charging and Fueling Infrastructure
(CFI) Program.
Application Stage
In order to be considered to receive a
grant, a project sponsor must submit an
application to FHWA containing a
project narrative, as detailed in the
Notice of Funding Opportunity. The
application should contain the
information necessary for the FHWA to
determine that the project satisfies
eligibility requirements as required by
law.
The FHWA will receive applications
from project sponsors and reports from
grant recipients electronically via email
and via websites upon approval from
OMB. In order to minimize the burden
on applicants, OMB approved standard
forms are being used to collect
information where possible. Such
standard forms include the Application
for Federal Assistance (SF–424),
available online at https://
apply07.grants.gov/apply/forms/
sample/SF424_2_1-V2.1.pdf, and the
post-award Federal Financial Reports
form (SF–425), available online at
https://apply07.grants.gov/apply/forms/
sample/SF425_2_0-V2.0.pdf.
All information submitted as part of
or in support of any application shall
use publicly available data or data that
can be made public. If the application
includes information the applicant
considers to be a trade secret or
confidential commercial or financial
information, the applicant should do the
following: (1) Note on the front cover
that the submission ‘‘Contains
Confidential Business Information
(CBI)’’; (2) mark each affected page
‘‘CBI’’; and (3) highlight or otherwise
denote the CBI portions. DOT protects
such information from disclosure to the
extent allowed under applicable law. In
the event DOT receives a Freedom of
Information Act (FOIA) request for the
information, DOT will follow the
procedures described in its FOIA
regulations at 49 CFR 7.17. Only
information that is ultimately
determined to be confidential under that
procedure will be exempt from
disclosure under FOIA. This grant
program is voluntary. No entity eligible
to apply is required to participate.
However, applicants will be expected to
provide the following information.
The FHWA will collect the following
information:
Legal Name of the Applicant (i.e., the
legal name of eligible entity) as well as
any other identities under which the
applicant may use.
• Address, telephone, and email
contact information for the applicant.
27557
• Name and title of the authorized
representative of the applicant (who
will attest to the required certifications).
• DOT may also require the identity
of external parties involved in
preparation of the application, who may
be assisting the applicant that is
applying for assistance under this
program.
• The specific statutory criteria that
the applicant and project meet for
eligibility under this program.
Eligible Applicants
The statute defines eligible applicants
for the CFI Corridor Grants as: (1) a State
or political subdivision of a State; (2) a
metropolitan planning organization; (3)
a unit of local government; (4) a special
purpose district or a public authority
with a transportation function; (5) an
Indian tribe (as defined in section 4 of
the Indian Self-Determination and
Education Assistance Act (25 U.S.C.
5304)); (6) a territory of the United
States; (7) an authority, agency, or
instrumentality of, or an entity owned
by, 1 or more entities listed above; or (8)
a group of entities as described above in
1–7.
The statute defines eligible applicants
for the CFI Community Grants as a
group of entities as listed above in the
Corridor Grant Program and a State or
local authority with ownership of
publicly accessible transportation
facilities.
Eligible Projects
The statute defines eligible projects to
include:
ddrumheller on DSK120RN23PROD with NOTICES1
Eligible projects
Community grants
Corridor grants
Project that is expected to reduce greenhouse gas emissions and to
expand or fill gaps in access to publicly accessible electric vehicle
charging infrastructure, hydrogen fueling infrastructure, propane fueling infrastructure, or natural gas fueling infrastructure. (23 U.S.C. 151
(f)(8)((D)).
Development phase activities, including planning, feasibility analysis,
revenue forecasting, environmental review, preliminary engineering
and design work, and other preconstruction activities. (23 U.S.C.
151(f)(8)(D)(i)).
Acquisition and installation of publicly accessible electric vehicle charging infrastructure, hydrogen fueling infrastructure, propane fueling infrastructure, or natural gas fueling infrastructure that is directly related to the charging or fueling of a vehicle. (23 U.S.C. 151(f)(6)(A)).
VerDate Sep<11>2014
18:14 May 01, 2023
Jkt 259001
PO 00000
Frm 00127
Fmt 4703
Operations Assistance.
Operating assistance for the first 5 years of operations after the installation of publicly available electric vehicle charging infrastructure, hydrogen fueling infrastructure, propane fueling infrastructure, or natural gas fueling infrastructure while the facility transitions to independent system operations. (23 U.S.C. 151(f)(6)(C)).
Sfmt 4703
E:\FR\FM\02MYN1.SGM
02MYN1
27558
Federal Register / Vol. 88, No. 84 / Tuesday, May 2, 2023 / Notices
Eligible projects
Community grants
Corridor grants
The acquisition and installation of electric vehicle charging infrastructure, hydrogen fueling infrastructure, propane fueling infrastructure,
or natural gas fueling infrastructure that is directly related to the
charging or fueling of a vehicle, including any related construction or
reconstruction and the acquisition of real property directly related to
the project, such as locations described in section 3.d of this NOFO,
to expand access to electric vehicle charging infrastructure, hydrogen
fueling infrastructure, propane fueling infrastructure, or natural gas
fueling infrastructure. 23 U.S.C. 151(f)(8)(ii)).
Traffic Control Devices.1
Acquisition and installation of traffic control devices located in the rightof-way to provide directional information to publicly accessible electric vehicle charging infrastructure, hydrogen fueling infrastructure,
propane fueling infrastructure, or natural gas fueling infrastructure
acquired, installed, or operated with the grant. (23 U.S.C.
151(f)(6)(D)(i)).
Use of funds for the acquisition and installation traffic control devices
must be for the acquisition and installation of publicly accessible
electric vehicle charging infrastructure, hydrogen fueling infrastructure, propane fueling infrastructure, or natural gas fueling infrastructure. (23 U.S.C. 151(f)(6)(D)(ii)).
1 Any traffic control device or on-premises sign acquired, installed, or operated with a grant under this subsection shall comply with: (i) the
Manual on Uniform Traffic Control Devices, if located in the right-of-way; and (ii) other provisions of Federal, State, and local law, as applicable.
(23 U.S.C. 151(f)(9)(B))).
Statutory Selection Considerations,
Priories and Additional Considerations
Community Program and the Corridor
Program under the CFI Program Grants.
ddrumheller on DSK120RN23PROD with NOTICES1
The chart below outlines the Statutory
Section Criteria that will be used for the
Selection criteria
Community
program
Secretarial Statutory Selection Considerations 23 U.S.C. 151(f)(5) .......................................................................
Secretarial Statutory Selection Priorities 23 U.S.C. 151(f)(8)(F) ............................................................................
Secretarial Statutory Additional Considerations 23 U.S.C. 151(f)(8)(G) .................................................................
✓
✓
Secretarial Statutory Selection
Considerations—Corridor Program
Only
The following are Secretarial
Statutory Selection Considerations for
the CFI Program, which are unique to
the Corridor Program.
(1) The extent to which the
application would improve alternative
fueling corridor networks by (i)
converting corridor-pending corridors to
corridor-ready corridors or (ii) in the
case of corridor-ready corridors,
providing redundancy (aa) to meet
excess demand for charging or fueling
infrastructure; or (bb) to reduce
congestion at existing charging or
fueling infrastructure in high-traffic
locations (23 U.S.C. 151(f)(5)(A)(i)(I) and
(II) (aa) and (bb)).
(2) The extent to which the
application would meet current or
anticipated market demands for
charging or fueling infrastructure (23
U.S.C. 151(f)(5)(A)(ii)); The extent to
which the application would support a
long-term competitive market for
electric vehicle charging, or hydrogen,
propane, or natural gas fueling
infrastructure, and does not
significantly impair existing charging
and fueling infrastructure providers (23
U.S.C. 151(f)(5)(A)(iv)); and The extent
to which the application would provide
access to electric vehicle charging
infrastructure, hydrogen fueling
VerDate Sep<11>2014
18:14 May 01, 2023
Jkt 259001
infrastructure, propane fueling
infrastructure, or natural gas fueling
infrastructure in areas with a current or
forecasted need (23 U.S.C.
151(f)(5)(A)(v)).
(3) The extent to which the
application would enable or accelerate
the construction of charging or fueling
infrastructure that would be unlikely to
be completed without Federal assistance
(23 U.S.C. 151(f)(5)(A)(iii)).
(4) The extent to which the
application would deploy electric
vehicle charging infrastructure,
hydrogen fueling infrastructure,
propane fueling infrastructure, or
natural gas fueling infrastructure for
medium- and heavy-duty vehicles
(including along the National Highway
Freight Networkestablished under
section 167(c)) and in proximity to
intermodal transfer stations (23 U.S.C.
151(f)(5)(A)(vi).
(5) The extent to which the
application would ensure, to the
maximum extent practicable, geographic
diversity among grant recipients to
ensure that electric vehicle charging
infrastructure, hydrogen fueling
infrastructure, propane fueling
infrastructure, or natural gas fueling
infrastructure is available throughout
the United States (23 U.S.C.
151(f)(5)(B)).
(6) Whether the private entity that the
eligible entity contracts with an eligible
PO 00000
Frm 00128
Fmt 4703
Sfmt 4703
Corridor
program
✓
project (i) submits to the Secretary the
most recent year of audited financial
statements and (ii) has experience in
installing and operating electric vehicle
charging infrastructure, hydrogen
fueling infrastructure, propane fueling
infrastructure, or natural gas fueling
infrastructure(23 U.S.C. 151(f)(5)(C)(i)
and (ii)).
(7) Whether, to the maximum extent
practicable, the eligible entity and the
private entity that the eligible entity
contracts for an eligible project enter
into an agreement (i) to operate and
maintain publicly available electric
vehicle charging infrastructure,
hydrogen fueling infrastructure,
propane fueling infrastructure, or
natural gas infrastructure and (ii) that
provides a remedy and an opportunity
to cure if the requirements described in
clause (i) are not met (23 U.S.C.
151(f)(5)(D)(i) and (ii)).
Secretarial Statutory Selection
Priorities—Community Program Only
The following are Secretarial
Statutory Selection Priorities for the CFI
Program, which are unique to the
Community Program.
(1) Priority goes to projects that
expand access to electric vehicle
charging infrastructure, hydrogen
fueling infrastructure, propane fueling
infrastructure, or natural gas fueling
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 88, No. 84 / Tuesday, May 2, 2023 / Notices
infrastructure within rural areas (23
U.S.C. 151(f)(8)(F)(i));
(2) Priority goes to projects that
expand access to electric vehicle
charging infrastructure, hydrogen
fueling infrastructure, propane fueling
infrastructure, or natural gas fueling
infrastructure within low- and
moderate-income neighborhoods (23
U.S.C. 151(f)(8)(F)(ii)); and
(3) Priority goes to projects that
expand access to electric vehicle
charging infrastructure, hydrogen
fueling infrastructure, propane fueling
infrastructure, or natural gas fueling
infrastructure within communities with
a low ratio of private parking spaces to
households or a high ratio of multiunit
dwellings to single family homes, as
determined by the Secretary (23 U.S.C.
151(f)(8)(F)(iii)).
ddrumheller on DSK120RN23PROD with NOTICES1
Secretarial Statutory Additional
Considerations—Community Program
Only
The following are Secretarial
Statutory Additional Considerations for
the CFI Program which are unique to the
Community Program.
(1) The extent to which the project
contributes to geographic diversity
among eligible entities, including
achieving a balance between urban and
rural communities (23 U.S.C.
151(f)(8)(G)(i)); and
(2) The extent to which the project
meets current or anticipated market
demands for charging or fueling
infrastructure, including faster charging
speeds with high-powered capabilities
necessary to minimize the time to
charge or refuel current and anticipated
vehicles (23 U.S.C. 151(f)(8)(G)(ii)).
Application and/or Project Narrative
• A description of how the project
aligns with the project merit criteria and
statutory application information.
• DOT has designated five project
merit criteria which will be used to
evaluate and rate the responsiveness of
an application to the statutory required
selection considerations will evaluate
projects using the following criteria: (1)
Safety, (2) Climate Change, Resilience
and Sustainability, (3) Equity and
Justice40, (4) Workforce Development,
Job Quality, and Wealth Creation, and
(5) CFI Program Vision.
• A detailed project budget, including
the grant request amount, other Federal
funds, and non-Federal contributions.
DOT requires this information to
calculate the cost share requirements
outlined in statute. Applicants will be
required to provide supporting
documentation in sufficient detail to
describe the project cost breakdown.
• Project Readiness.
VerDate Sep<11>2014
18:14 May 01, 2023
Jkt 259001
• Other identification numbers, such
as their Data Universal Numbering
System (DUNS) number, Unique Entity
Identifier under 2 CFR part 25, etc. All
applicants will be required to have preregistered with the System for Award
Management (SAM) at https://sam.gov/
SAM/.
The grant agreement is an agreement
between FHWA and the recipient. If a
grant recipient under the CFI is a State
Department of Transportation (State
DOT), or if a State DOT serves as a passthrough entity to a non-State DOT
recipient, CFI funds will be awarded
upon the execution of a project
agreement: a type of grant agreement for
administration of funds allocated to a
State DOT in the FHWA Fiscal
Management Information System
(FMIS).
If a grant recipient under the CFI is
any other eligible applicant (i.e., not a
State DOT), CFI funds will be awarded
upon the execution of a grant agreement
between FHWA and the recipient. A
non-State DOT selected to receive a CFI
award may elect to have a State DOT
administer the CFI funds, subject to
agreement with the State DOT.
Project Management Stage
The reporting requirements under this
stage are necessary to ensure the proper
and timely expenditure of Federal funds
within the scope of the approved
project. The requirements comply with
the Common Grant Rule. During the
project management stage, the grantee
will complete Quarterly Progress and
Monitoring Reports to ensure that the
project budget and schedule will be
maintained to the maximum extent
possible, that the project will be
completed with the highest degree of
quality, and that compliance with
Federal regulations will be met. The
FHWA may also require substantive
requirements of the report include: The
project’s overall status; project
significant activities and issues; action
items/outstanding issues; project scope
overview; project schedule; project cost;
an SF–425 Federal Financial Report;
and certifications. This reporting
requirement will greatly reduce the
need for on-site visits by staff.
Authority: The Paperwork Reduction
Act of 1995; 44 U.S.C. chapter 35, as
amended; and 49 CFR 1.48.
Respondents: 2,050.
Estimated Average Burden for First
Year per Response: 46.
Estimated Total Annual Burden:
25,600.
Frm 00129
Fmt 4703
Sfmt 4703
Authority: The Paperwork Reduction
Act of 1995; 44 U.S.C. chapter 35, as
amended; and 49 CFR 1.48.
Issued On: April 27, 2023.
Michael Howell,
Information Collection Officer.
[FR Doc. 2023–09314 Filed 5–1–23; 8:45 am]
BILLING CODE P
Grant Agreement Stage
PO 00000
27559
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2022–0209]
Women of Trucking Advisory Board
(WOTAB); Notice of Public Meeting
Federal Motor Carrier Safety
Administration (FMCSA), Department
of Transportation (DOT).
ACTION: Notice of public meeting.
AGENCY:
This notice announces a
meeting of the WOTAB.
DATES: The meeting will be held on
Tuesday, May 16, 2023, from 10 a.m. to
4:30 p.m. ET. Requests for
accommodations for a disability must be
received by Tuesday, May 9. Requests to
submit written materials for
consideration during the meeting must
be received no later than Tuesday, May
9.
ADDRESSES: The meeting will be held
virtually for its entirety. Please register
in advance of the meeting at
www.fmcsa.dot.gov/wotab. Copies of
WOTAB task statements and an agenda
for the entire meeting will be made
available at www.fmcsa.dot.gov/wotab at
least 1 week in advance of the meeting.
Once approved, copies of the meeting
minutes will be available at the website
following the meeting. You may visit
the WOTAB website at
www.fmcsa.dot.gov/wotab for further
information on the committee and its
activities.
SUMMARY:
Ms.
Shannon L. Watson, Designated Federal
Officer, WOTAB, FMCSA, 1200 New
Jersey Avenue SE, Washington, DC
20590, (202) 360–2925, wotab@dot.gov.
Any committee-related request should
be sent to the person listed in this
section.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
I. Background
WOTAB was created under the
Federal Advisory Committee Act
(FACA) in accordance with section
23007(d)(1) of the Bipartisan
Infrastructure Law (BIL) (Pub. L. 117–
58), which requires the Federal Motor
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 88, Number 84 (Tuesday, May 2, 2023)]
[Notices]
[Pages 27556-27559]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09314]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
[Docket No. FHWA-2023-0012]
Agency Information Collection Activities: Approval Request
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice and request for comments.
-----------------------------------------------------------------------
SUMMARY: FHWA invites public comments about our intention to request
the Office of Management and Budget's (OMB) approval for a new
information collection. In compliance with the Paperwork Reduction Act
of 1995, the Department of Transportation (DOT) provides notice that it
will submit an information collection request (ICR) to the Office of
Management and Budget (OMB) for approval of a proposed information
collection. This collection involves applicants to submit a proposal
for discretionary grant funding, under the Charging and Fueling
Infrastructure Program established by the Infrastructure Investment and
Jobs Act of 2021, November 15, 2021, ``Bipartisan Infrastructure Law'',
or ``BIL''. FHWA is requesting emergency approval due to the urgency of
making the associated funds available to applicants that meet the
eligibility requirements under the law. The continued viability of
these funds is critical in supporting the transportation infrastructure
needs across the United States.
DATES: Please submit comments by July 3, 2023.
ADDRESSES: You may send comments within 60 days to the Office of
Information and Regulatory Affairs, Office of Management and Budget,
725 17th Street NW, Washington, DC 20503, Attention DOT Desk Officer.
You are asked to comment on any aspect of this information collection,
including: (1) whether the proposed collection is necessary for the
FHWA's performance; (2) the accuracy of the estimated burden; (3) ways
for the FHWA to enhance the quality, usefulness, and clarity of the
collected information; and (4) ways that the burden could be minimized,
including the use of electronic technology, without reducing the
quality of the collected information. All comments should include the
Docket number FHWA-2023-0012.
FOR FURTHER INFORMATION CONTACT: Gary Jensen, Director Office of
Natural Environment, Federal Highway Administration, Department of
Transportation, 1200 New Jersey Ave. SE, Washington, DC, between 9 a.m.
and 5 p.m., Monday through Friday, except Federal holidays.
SUPPLEMENTARY INFORMATION: This is a request for Office of Management
and Budget (OMB) emergency clearance for a new information collection
request (ICR) to enable the Department of Transportation (DOT) Federal
Highway Administration (FHWA) to implement the Charging and Fueling
Infrastructure Discretionary Grant Program. This program provides two
grant categories: (1) Community Program and (2) Corridor Program. The
CFI was authorized in the Bipartisan Infrastructure Law (BIL), enacted
as the Infrastructure Investment and Jobs Act (Act) (Pub. L. 117-58) on
November 15, 2021. This historic Act is a once-in-a-generation
opportunity to support transformational investments in our Nation's
transportation infrastructure that will create good jobs, modernize our
infrastructure, improve safety, tackle the climate crisis, and invest
in communities that have too often been left behind. The program will
strategically deploy publicly accessible electric vehicle charging
infrastructure, and hydrogen, propane, or natural gas fueling
infrastructure along designated alternative fuel corridors or in
community locations that will be accessible to all drivers of electric
vehicles, hydrogen vehicles, propane vehicles, and natural gas
vehicles.
The CFI Grant Program is critical to enabling eligible entities to
accelerate an electrified and alternative fuel transportation system
that is convenient, affordable, reliable, equitable, and safe. This
program will support a future where everyone can ride and drive
electric and have alternative fuel options. The FHWA is seeking to
award CFI projects that proactively address emission reductions,
infrastructure reliability, development of a skilled and diverse
workforce, community engagement and equity including the decades of
underinvestment in disadvantaged communities--communities that are
underserved and overburdened.
The statutory requirements of the CFI Grant Program are found under
Subtitle D section 11401 of the BIL and codified at 23 U.S.C. 151. In
BIL, Congress authorized funding for five Fiscal Years (including FY
2022/2023), totaling up to $2.5B (FY 2022 $300M, FY 2023 $400M, FY 2024
$500M, FY 2025 $600M, and FY 2026 $700M) to CFI eligible projects. For
FY 2022/2023, a total of $700 M is available under one NOFO for awards
under two funding categories: Community Program and Corridor Program.
The statute defines eligible applicants for the CFI Grant Program
as State or political subdivision of a State; a metropolitan planning
organization; a unit of local government; a special purpose district or
a public authority with a transportation function; an Indian Tribe; a
territory of the United States; or an authority, agency, or
instrumentality of, or an entity owned by, 1 or more entities described
above; a group of entities as described above; and a State or local
authority with ownership of publicly accessible transportation
facilities (Community Program only).:
Title: Charging and Fueling Infrastructure Discretionary Grant
Program.
[[Page 27557]]
Expected Number of Respondents: 550.
Frequency: Application submission and project agreement execution
will occur one time while project management will occur over three
years.
Estimated Average Burden per Response: $3,280 (application
submission, project agreement execution, and 3 years of project
management).
Estimated First Year Burden: $1,408,000.
Abstract: On November 15, 2021, the Infrastructure Investment and
Jobs Act of 2021 (Pub. L. 117-58).
``Bipartisan Infrastructure Law (BIL)'' was enacted. Section 1118
established the Charging and Fueling Infrastructure (CFI) Program.
Application Stage
In order to be considered to receive a grant, a project sponsor
must submit an application to FHWA containing a project narrative, as
detailed in the Notice of Funding Opportunity. The application should
contain the information necessary for the FHWA to determine that the
project satisfies eligibility requirements as required by law.
The FHWA will receive applications from project sponsors and
reports from grant recipients electronically via email and via websites
upon approval from OMB. In order to minimize the burden on applicants,
OMB approved standard forms are being used to collect information where
possible. Such standard forms include the Application for Federal
Assistance (SF-424), available online at https://apply07.grants.gov/apply/forms/sample/SF424_2_1-V2.1.pdf, and the post-award Federal
Financial Reports form (SF-425), available online at https://apply07.grants.gov/apply/forms/sample/SF425_2_0-V2.0.pdf.
All information submitted as part of or in support of any
application shall use publicly available data or data that can be made
public. If the application includes information the applicant considers
to be a trade secret or confidential commercial or financial
information, the applicant should do the following: (1) Note on the
front cover that the submission ``Contains Confidential Business
Information (CBI)''; (2) mark each affected page ``CBI''; and (3)
highlight or otherwise denote the CBI portions. DOT protects such
information from disclosure to the extent allowed under applicable law.
In the event DOT receives a Freedom of Information Act (FOIA) request
for the information, DOT will follow the procedures described in its
FOIA regulations at 49 CFR 7.17. Only information that is ultimately
determined to be confidential under that procedure will be exempt from
disclosure under FOIA. This grant program is voluntary. No entity
eligible to apply is required to participate. However, applicants will
be expected to provide the following information.
The FHWA will collect the following information:
Legal Name of the Applicant (i.e., the legal name of eligible
entity) as well as any other identities under which the applicant may
use.
Address, telephone, and email contact information for the
applicant.
Name and title of the authorized representative of the
applicant (who will attest to the required certifications).
DOT may also require the identity of external parties
involved in preparation of the application, who may be assisting the
applicant that is applying for assistance under this program.
The specific statutory criteria that the applicant and
project meet for eligibility under this program.
Eligible Applicants
The statute defines eligible applicants for the CFI Corridor Grants
as: (1) a State or political subdivision of a State; (2) a metropolitan
planning organization; (3) a unit of local government; (4) a special
purpose district or a public authority with a transportation function;
(5) an Indian tribe (as defined in section 4 of the Indian Self-
Determination and Education Assistance Act (25 U.S.C. 5304)); (6) a
territory of the United States; (7) an authority, agency, or
instrumentality of, or an entity owned by, 1 or more entities listed
above; or (8) a group of entities as described above in 1-7.
The statute defines eligible applicants for the CFI Community
Grants as a group of entities as listed above in the Corridor Grant
Program and a State or local authority with ownership of publicly
accessible transportation facilities.
Eligible Projects
The statute defines eligible projects to include:
------------------------------------------------------------------------
Eligible projects
-------------------------------------------------------------------------
Community grants Corridor grants
------------------------------------------------------------------------
Project that is expected to reduce Acquisition and installation of
greenhouse gas emissions and to expand publicly accessible electric
or fill gaps in access to publicly vehicle charging
accessible electric vehicle charging infrastructure, hydrogen
infrastructure, hydrogen fueling fueling infrastructure,
infrastructure, propane fueling propane fueling
infrastructure, or natural gas fueling infrastructure, or natural gas
infrastructure. (23 U.S.C. 151 fueling infrastructure that is
(f)(8)((D)). directly related to the
charging or fueling of a
vehicle. (23 U.S.C.
151(f)(6)(A)).
Development phase activities, including Operations Assistance.
planning, feasibility analysis, Operating assistance for the
revenue forecasting, environmental first 5 years of operations
review, preliminary engineering and after the installation of
design work, and other preconstruction publicly available electric
activities. (23 U.S.C. vehicle charging
151(f)(8)(D)(i)). infrastructure, hydrogen
fueling infrastructure,
propane fueling
infrastructure, or natural gas
fueling infrastructure while
the facility transitions to
independent system operations.
(23 U.S.C. 151(f)(6)(C)).
[[Page 27558]]
The acquisition and installation of Traffic Control Devices.\1\
electric vehicle charging Acquisition and installation of
infrastructure, hydrogen fueling traffic control devices
infrastructure, propane fueling located in the right-of-way to
infrastructure, or natural gas fueling provide directional
infrastructure that is directly information to publicly
related to the charging or fueling of accessible electric vehicle
a vehicle, including any related charging infrastructure,
construction or reconstruction and the hydrogen fueling
acquisition of real property directly infrastructure, propane
related to the project, such as fueling infrastructure, or
locations described in section 3.d of natural gas fueling
this NOFO, to expand access to infrastructure acquired,
electric vehicle charging installed, or operated with
infrastructure, hydrogen fueling the grant. (23 U.S.C.
infrastructure, propane fueling 151(f)(6)(D)(i)).
infrastructure, or natural gas fueling Use of funds for the
infrastructure. 23 U.S.C. acquisition and installation
151(f)(8)(ii)). traffic control devices must
be for the acquisition and
installation of publicly
accessible electric vehicle
charging infrastructure,
hydrogen fueling
infrastructure, propane
fueling infrastructure, or
natural gas fueling
infrastructure. (23 U.S.C.
151(f)(6)(D)(ii)).
------------------------------------------------------------------------
\1\ Any traffic control device or on-premises sign acquired, installed,
or operated with a grant under this subsection shall comply with: (i)
the Manual on Uniform Traffic Control Devices, if located in the right-
of-way; and (ii) other provisions of Federal, State, and local law, as
applicable. (23 U.S.C. 151(f)(9)(B))).
Statutory Selection Considerations, Priories and Additional
Considerations
The chart below outlines the Statutory Section Criteria that will
be used for the Community Program and the Corridor Program under the
CFI Program Grants.
------------------------------------------------------------------------
Community Corridor
Selection criteria program program
------------------------------------------------------------------------
Secretarial Statutory Selection [check]
Considerations 23 U.S.C. 151(f)(5)...
Secretarial Statutory Selection [check]
Priorities 23 U.S.C. 151(f)(8)(F)....
Secretarial Statutory Additional [check]
Considerations 23 U.S.C. 151(f)(8)(G)
------------------------------------------------------------------------
Secretarial Statutory Selection Considerations--Corridor Program Only
The following are Secretarial Statutory Selection Considerations
for the CFI Program, which are unique to the Corridor Program.
(1) The extent to which the application would improve alternative
fueling corridor networks by (i) converting corridor-pending corridors
to corridor-ready corridors or (ii) in the case of corridor-ready
corridors, providing redundancy (aa) to meet excess demand for charging
or fueling infrastructure; or (bb) to reduce congestion at existing
charging or fueling infrastructure in high-traffic locations (23 U.S.C.
151(f)(5)(A)(i)(I) and (II) (aa) and (bb)).
(2) The extent to which the application would meet current or
anticipated market demands for charging or fueling infrastructure (23
U.S.C. 151(f)(5)(A)(ii)); The extent to which the application would
support a long-term competitive market for electric vehicle charging,
or hydrogen, propane, or natural gas fueling infrastructure, and does
not significantly impair existing charging and fueling infrastructure
providers (23 U.S.C. 151(f)(5)(A)(iv)); and The extent to which the
application would provide access to electric vehicle charging
infrastructure, hydrogen fueling infrastructure, propane fueling
infrastructure, or natural gas fueling infrastructure in areas with a
current or forecasted need (23 U.S.C. 151(f)(5)(A)(v)).
(3) The extent to which the application would enable or accelerate
the construction of charging or fueling infrastructure that would be
unlikely to be completed without Federal assistance (23 U.S.C.
151(f)(5)(A)(iii)).
(4) The extent to which the application would deploy electric
vehicle charging infrastructure, hydrogen fueling infrastructure,
propane fueling infrastructure, or natural gas fueling infrastructure
for medium- and heavy-duty vehicles (including along the National
Highway Freight Networkestablished under section 167(c)) and in
proximity to intermodal transfer stations (23 U.S.C. 151(f)(5)(A)(vi).
(5) The extent to which the application would ensure, to the
maximum extent practicable, geographic diversity among grant recipients
to ensure that electric vehicle charging infrastructure, hydrogen
fueling infrastructure, propane fueling infrastructure, or natural gas
fueling infrastructure is available throughout the United States (23
U.S.C. 151(f)(5)(B)).
(6) Whether the private entity that the eligible entity contracts
with an eligible project (i) submits to the Secretary the most recent
year of audited financial statements and (ii) has experience in
installing and operating electric vehicle charging infrastructure,
hydrogen fueling infrastructure, propane fueling infrastructure, or
natural gas fueling infrastructure(23 U.S.C. 151(f)(5)(C)(i) and (ii)).
(7) Whether, to the maximum extent practicable, the eligible entity
and the private entity that the eligible entity contracts for an
eligible project enter into an agreement (i) to operate and maintain
publicly available electric vehicle charging infrastructure, hydrogen
fueling infrastructure, propane fueling infrastructure, or natural gas
infrastructure and (ii) that provides a remedy and an opportunity to
cure if the requirements described in clause (i) are not met (23 U.S.C.
151(f)(5)(D)(i) and (ii)).
Secretarial Statutory Selection Priorities--Community Program Only
The following are Secretarial Statutory Selection Priorities for
the CFI Program, which are unique to the Community Program.
(1) Priority goes to projects that expand access to electric
vehicle charging infrastructure, hydrogen fueling infrastructure,
propane fueling infrastructure, or natural gas fueling
[[Page 27559]]
infrastructure within rural areas (23 U.S.C. 151(f)(8)(F)(i));
(2) Priority goes to projects that expand access to electric
vehicle charging infrastructure, hydrogen fueling infrastructure,
propane fueling infrastructure, or natural gas fueling infrastructure
within low- and moderate-income neighborhoods (23 U.S.C.
151(f)(8)(F)(ii)); and
(3) Priority goes to projects that expand access to electric
vehicle charging infrastructure, hydrogen fueling infrastructure,
propane fueling infrastructure, or natural gas fueling infrastructure
within communities with a low ratio of private parking spaces to
households or a high ratio of multiunit dwellings to single family
homes, as determined by the Secretary (23 U.S.C. 151(f)(8)(F)(iii)).
Secretarial Statutory Additional Considerations--Community Program Only
The following are Secretarial Statutory Additional Considerations
for the CFI Program which are unique to the Community Program.
(1) The extent to which the project contributes to geographic
diversity among eligible entities, including achieving a balance
between urban and rural communities (23 U.S.C. 151(f)(8)(G)(i)); and
(2) The extent to which the project meets current or anticipated
market demands for charging or fueling infrastructure, including faster
charging speeds with high-powered capabilities necessary to minimize
the time to charge or refuel current and anticipated vehicles (23
U.S.C. 151(f)(8)(G)(ii)).
Application and/or Project Narrative
A description of how the project aligns with the project
merit criteria and statutory application information.
DOT has designated five project merit criteria which will
be used to evaluate and rate the responsiveness of an application to
the statutory required selection considerations will evaluate projects
using the following criteria: (1) Safety, (2) Climate Change,
Resilience and Sustainability, (3) Equity and Justice40, (4) Workforce
Development, Job Quality, and Wealth Creation, and (5) CFI Program
Vision.
A detailed project budget, including the grant request
amount, other Federal funds, and non-Federal contributions. DOT
requires this information to calculate the cost share requirements
outlined in statute. Applicants will be required to provide supporting
documentation in sufficient detail to describe the project cost
breakdown.
Project Readiness.
Other identification numbers, such as their Data Universal
Numbering System (DUNS) number, Unique Entity Identifier under 2 CFR
part 25, etc. All applicants will be required to have pre-registered
with the System for Award Management (SAM) at https://sam.gov/SAM/.
Grant Agreement Stage
The grant agreement is an agreement between FHWA and the recipient.
If a grant recipient under the CFI is a State Department of
Transportation (State DOT), or if a State DOT serves as a pass-through
entity to a non-State DOT recipient, CFI funds will be awarded upon the
execution of a project agreement: a type of grant agreement for
administration of funds allocated to a State DOT in the FHWA Fiscal
Management Information System (FMIS).
If a grant recipient under the CFI is any other eligible applicant
(i.e., not a State DOT), CFI funds will be awarded upon the execution
of a grant agreement between FHWA and the recipient. A non-State DOT
selected to receive a CFI award may elect to have a State DOT
administer the CFI funds, subject to agreement with the State DOT.
Project Management Stage
The reporting requirements under this stage are necessary to ensure
the proper and timely expenditure of Federal funds within the scope of
the approved project. The requirements comply with the Common Grant
Rule. During the project management stage, the grantee will complete
Quarterly Progress and Monitoring Reports to ensure that the project
budget and schedule will be maintained to the maximum extent possible,
that the project will be completed with the highest degree of quality,
and that compliance with Federal regulations will be met. The FHWA may
also require substantive requirements of the report include: The
project's overall status; project significant activities and issues;
action items/outstanding issues; project scope overview; project
schedule; project cost; an SF-425 Federal Financial Report; and
certifications. This reporting requirement will greatly reduce the need
for on-site visits by staff.
Authority: The Paperwork Reduction Act of 1995; 44 U.S.C. chapter
35, as amended; and 49 CFR 1.48.
Respondents: 2,050.
Estimated Average Burden for First Year per Response: 46.
Estimated Total Annual Burden: 25,600.
Authority: The Paperwork Reduction Act of 1995; 44 U.S.C. chapter
35, as amended; and 49 CFR 1.48.
Issued On: April 27, 2023.
Michael Howell,
Information Collection Officer.
[FR Doc. 2023-09314 Filed 5-1-23; 8:45 am]
BILLING CODE P