Download as PDF 26534 Federal Register / Vol. 88, No. 83 / Monday, May 1, 2023 / Notices lotter on DSK11XQN23PROD with NOTICES1 717b(a). This Order affirms and amends Order No. 3643–A, previously issued to Alaska LNG on August 20, 2020, under NGA section 3(a). Order No. 3643–A authorized Alaska LNG to export LNG produced from Alaskan sources by vessel to any country with which the United States has not entered into a free trade agreement (FTA) requiring national treatment for trade in natural gas, and with which trade is not prohibited by U.S. law or policy (nonFTA countries). On April 15, 2021, DOE issued Order No. 3643–B, which granted rehearing of Order No. 3643–A for the purpose of conducting two Alaskaspecific environmental studies. DOE issued Order No. 3643–C following its evaluation of the additional studies. Under Order No. 3643–C, Alaska LNG is authorized to export LNG in a volume equivalent to 929 billion cubic feet (Bcf) per year of natural gas (2.55 Bcf/day) to non-FTA countries from the proposed Alaska LNG Project (Project) to be located in the Nikiski area of the Kenai Peninsula, Alaska. The Order reaffirms and maintains all obligations, rights, responsibilities, and deadlines established in Order No. 3643–A. In addition, it requires Alaska LNG to certify monthly to DOE that, except under strictly limited circumstances, the natural gas produced for export in the form of LNG in the prior month did not result in the venting of byproduct carbon dioxide into the atmosphere. DOE conducted the additional environmental studies in the rehearing process through preparation of a Supplemental Environmental Impact Statement (SEIS). DOE had participated as a cooperating agency with the Federal Energy Regulatory Commission in preparing an environmental impact statement (EIS) analyzing the potential environmental impacts of the proposed Project (including an LNG export terminal, along with the associated facilities and pipeline) that would be used to support the export authorization Alaska LNG sought from DOE. DOE adopted the EIS and prepared a ROD, which is attached as an appendix to Order No. 3643–A. The Amended ROD is based on the SEIS and is attached as an appendix to Order No. 3643–C. The Amended ROD can be found here: www.energy.gov/sites/default/files/ 2023–04/ord3643–C.pdf. Signed in Washington, DC, on April 26, 2023. Amy Sweeney, Director, Office of Regulation, Analysis, and Engagement, Office of Resource Sustainability. [FR Doc. 2023–09159 Filed 4–28–23; 8:45 am] BILLING CODE 6450–01–P VerDate Sep<11>2014 17:10 Apr 28, 2023 Jkt 259001 DEPARTMENT OF ENERGY Environmental Management SiteSpecific Advisory Board, Paducah Office of Environmental Management, Department of Energy. ACTION: Notice of open meeting: correction. AGENCY: On April 24, 2023, the Department of Energy published a notice of open meeting announcing a meeting on May 18, 2023, of the Environmental Management SiteSpecific Advisory Board, Paducah, in the April 24, 2023 Federal Register. This document makes a correction to that notice. FOR FURTHER INFORMATION CONTACT: Eric Roberts, Board Support Manager, by Phone: (270) 554–3004 or Email: eric@ pgdpcab.org. SUMMARY: Corrections In the Federal Register of April 24, 2023, in FR Doc. 2023–08520, on page 24785, please make the following corrections: In that notice under DATES, third column, second paragraph, the meeting date has been changed. The original date was May 18, 2023. The new date is May 25, 2023. In that notice under ADDRESSES, third column, third paragraph, the meeting room has been changed. The original address and meeting room was West Kentucky Community and Technical College, Emerging Technology Center, Room 109, 5100 Alben Barkley Drive, Paducah, Kentucky 42001. The new meeting room is Room 216. The reason for the corrections is a scheduling conflict with the original meeting date. Signed in Washington, DC, on April 26, 2023. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2023–09122 Filed 4–28–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [Docket No. 13–132–LNG] Magnolia LNG LLC; Order Amending Long-Term Authorization To Export Liquefied Natural Gas to Non-Free Trade Agreement Nations Office of Fossil Energy and Carbon Management, Department of Energy. ACTION: Amended record of decision. AGENCY: The Office of Fossil Energy and Carbon Management (FECM) of the SUMMARY: PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 Department of Energy (DOE) gives notice of an Amended Record of Decision (ROD) published under the National Environmental Policy Act of 1969 (NEPA) and implementing regulations. This Amended ROD is an Appendix to DOE/FECM Order No. 3909–C, an order that amends the previously-issued DOE/FE Order No. 3909, an opinion and order authorizing Magnolia LNG LLC to export domestically-produced liquefied natural gas (LNG) to non-free trade agreement countries under section 3(a) of the Natural Gas Act (NGA). FOR FURTHER INFORMATION CONTACT: Brian Lavoie, U.S. Department of Energy (FE–34), Office of Regulation, Analysis, and Engagement, Office of Resource Sustainability, Office of Fossil Energy and Carbon Management, Forrestal Building, Room 3E–042, 1000 Independence Avenue SW, Washington, DC 20585, (202) 586–2459, brian.lavoie@ hq.doe.gov. Cassandra Bernstein, U.S. Department of Energy (GC–76), Office of the Assistant General Counsel for Energy Delivery and Resilience, Forrestal Building, Room 6D–033, 1000 Independence Avenue SW, Washington, DC 20585, (202) 586– 9793, cassandra.bernstein@ hq.doe.gov. SUPPLEMENTARY INFORMATION: On April 27, 2022, DOE issued Order No. 3909– C to Magnolia LNG LLC (Magnolia LNG) under NGA section 3(a), 15 U.S.C. 717b(a). This Order further amends Order No. 3909, previously issued to Magnolia LNG on November 30, 2016, under NGA section 3(a). Order No. 3909, as amended, authorized Magnolia LNG to export domestically-produced LNG by vessel to any country with which the United States has not entered into a free trade agreement (FTA) requiring national treatment for trade in natural gas, and with which trade is not prohibited by U.S. law or policy (nonFTA countries). Order No. 3909–C authorizes an increase in the volume of exports previously authorized in the amended Order No. 3909. Under Order No. 3909– C, Magnolia LNG is authorized to export LNG in a volume equivalent to 449 billion cubic feet (Bcf) per year of natural gas (approximately 1.23 Bcf per day) to non-FTA countries from the proposed Magnolia LNG Terminal, to be located near Lake Charles, Calcasieu Parish, Louisiana. DOE participated as a cooperating agency with the Federal Energy Regulatory Commission (FERC) in preparing a supplemental E:\FR\FM\01MYN1.SGM 01MYN1 Federal Register / Vol. 88, No. 83 / Monday, May 1, 2023 / Notices environmental impact statement (SEIS) analyzing the potential environmental impacts of the proposed increase in authorized export capacity. DOE adopted the SEIS and reviewed FERC’s order authorizing the volume increase, under NEPA. DOE also supplemented FERC’s environmental review with its own additional environmental studies, as well as the Marine Transport Technical Support Document prepared by DOE to consider the potential effects associated with transporting natural gas, including LNG, on marine vessels. On the basis of this record, DOE issued an Amended ROD, which is attached as an appendix to the Order. The Amended ROD can be found here: www.energy.gov/sites/default/files/ 2022-04/ord3909c.pdf. Signed in Washington, DC, on April 26, 2023. Amy Sweeney, Director, Office of Regulation, Analysis, and Engagement, Office of Resource Sustainability. [FR Doc. 2023–09161 Filed 4–28–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1852–078; ER10–2641–045. Applicants: Oleander Power Project, Limited Partnership, Florida Power & Light Company. Description: Notice of Change in Status of Florida Power & Light Company, et al. Filed Date: 4/20/23. Accession Number: 20230420–5252. Comment Date: 5 p.m. ET 5/11/23. Docket Numbers: ER18–2418–008. Applicants: Great River Hydro, LLC. Description: Notice of Non-Material Change in Status of Great River Hydro, LLC. Filed Date: 4/24/23. Accession Number: 20230424–5282. Comment Date: 5 p.m. ET 5/15/23. Docket Numbers: ER23–1277–000. Applicants: Aron Energy Prepay 23 LLC. Description: Supplement to Aron Energy Prepay 23 LLC submits tariff filing per 35.12: Baseline new to be effective 5/9/2023. Filed Date: 3/28/23. Accession Number: 20230328–5303. Comment Date: 5 p.m. ET 5/5/23. VerDate Sep<11>2014 17:10 Apr 28, 2023 Jkt 259001 Docket Numbers: ER23–1700–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Update Default Gross Cost of New Entry & Default Gross Avoidable Cost Rate to be effective 6/23/2023. Filed Date: 4/24/23. Accession Number: 20230424–5203. Comment Date: 5 p.m. ET 5/15/23. Docket Numbers: ER23–1701–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: TriState Master Installation, O&M Agmt for Metering (Rev 5) to be effective 6/25/ 2023. Filed Date: 4/25/23. Accession Number: 20230425–5091. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1702–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.15: Columbiana PV II LGIA Termination Filing to be effective 4/25/ 2023. Filed Date: 4/25/23. Accession Number: 20230425–5144. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1703–000. Applicants: Stanton Battery Energy Storage, LLC. Description: Baseline eTariff Filing: Application for Market Based Rate Authority to be effective 6/5/2023. Filed Date: 4/25/23. Accession Number: 20230425–5174. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1704–000. Applicants: WGP Redwood Holdings, LLC. Description: § 205(d) Rate Filing: Updated Market Based Rate Tariff to be effective 4/26/2023. Filed Date: 4/25/23. Accession Number: 20230425–5176. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1705–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 6884; Queue No. AC1–074/AC2–075 to be effective 6/26/2023. Filed Date: 4/25/23. Accession Number: 20230425–5191. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1706–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, SA No. 6869; Queue No. AE2–071/AF1–203 to be effective 4/26/ 2023. Filed Date: 4/25/23. PO 00000 Frm 00020 Fmt 4703 Sfmt 9990 26535 Accession Number: 20230425–5192. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1707–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6436; Queue No. AE2–224 to be effective 6/26/2023. Filed Date: 4/25/23. Accession Number: 20230425–5197. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1708–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL 2021 True-Up Revisions to Appendix B of Rate Schedule No. 317 to be effective 1/1/2021. Filed Date: 4/25/23. Accession Number: 20230425–5229. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1709–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL 2021 True-Up Revisions to Appendix B of Rate Schedule No. 322 to be effective 1/1/2021. Filed Date: 4/25/23. Accession Number: 20230425–5231. Comment Date: 5 p.m. ET 5/16/23. Docket Numbers: ER23–1710–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Concurrence of EPE to APS Service Agreement No. 387, Sonoran Solar Energy to be effective 5/7/2023. Filed Date: 4/25/23. Accession Number: 20230425–5265. Comment Date: 5 p.m. ET 5/16/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 25, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–09132 Filed 4–28–23; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\01MYN1.SGM 01MYN1

Agencies

[Federal Register Volume 88, Number 83 (Monday, May 1, 2023)]
[Notices]
[Pages 26534-26535]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09161]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Docket No. 13-132-LNG]


Magnolia LNG LLC; Order Amending Long-Term Authorization To 
Export Liquefied Natural Gas to Non-Free Trade Agreement Nations

AGENCY: Office of Fossil Energy and Carbon Management, Department of 
Energy.

ACTION: Amended record of decision.

-----------------------------------------------------------------------

SUMMARY: The Office of Fossil Energy and Carbon Management (FECM) of 
the Department of Energy (DOE) gives notice of an Amended Record of 
Decision (ROD) published under the National Environmental Policy Act of 
1969 (NEPA) and implementing regulations. This Amended ROD is an 
Appendix to DOE/FECM Order No. 3909-C, an order that amends the 
previously-issued DOE/FE Order No. 3909, an opinion and order 
authorizing Magnolia LNG LLC to export domestically-produced liquefied 
natural gas (LNG) to non-free trade agreement countries under section 
3(a) of the Natural Gas Act (NGA).

FOR FURTHER INFORMATION CONTACT: 
Brian Lavoie, U.S. Department of Energy (FE-34), Office of Regulation, 
Analysis, and Engagement, Office of Resource Sustainability, Office of 
Fossil Energy and Carbon Management, Forrestal Building, Room 3E-042, 
1000 Independence Avenue SW, Washington, DC 20585, (202) 586-2459, 
[email protected].
Cassandra Bernstein, U.S. Department of Energy (GC-76), Office of the 
Assistant General Counsel for Energy Delivery and Resilience, Forrestal 
Building, Room 6D-033, 1000 Independence Avenue SW, Washington, DC 
20585, (202) 586-9793, [email protected].

SUPPLEMENTARY INFORMATION: On April 27, 2022, DOE issued Order No. 
3909-C to Magnolia LNG LLC (Magnolia LNG) under NGA section 3(a), 15 
U.S.C. 717b(a). This Order further amends Order No. 3909, previously 
issued to Magnolia LNG on November 30, 2016, under NGA section 3(a). 
Order No. 3909, as amended, authorized Magnolia LNG to export 
domestically-produced LNG by vessel to any country with which the 
United States has not entered into a free trade agreement (FTA) 
requiring national treatment for trade in natural gas, and with which 
trade is not prohibited by U.S. law or policy (non-FTA countries).
    Order No. 3909-C authorizes an increase in the volume of exports 
previously authorized in the amended Order No. 3909. Under Order No. 
3909-C, Magnolia LNG is authorized to export LNG in a volume equivalent 
to 449 billion cubic feet (Bcf) per year of natural gas (approximately 
1.23 Bcf per day) to non-FTA countries from the proposed Magnolia LNG 
Terminal, to be located near Lake Charles, Calcasieu Parish, Louisiana.
    DOE participated as a cooperating agency with the Federal Energy 
Regulatory Commission (FERC) in preparing a supplemental

[[Page 26535]]

environmental impact statement (SEIS) analyzing the potential 
environmental impacts of the proposed increase in authorized export 
capacity. DOE adopted the SEIS and reviewed FERC's order authorizing 
the volume increase, under NEPA. DOE also supplemented FERC's 
environmental review with its own additional environmental studies, as 
well as the Marine Transport Technical Support Document prepared by DOE 
to consider the potential effects associated with transporting natural 
gas, including LNG, on marine vessels. On the basis of this record, DOE 
issued an Amended ROD, which is attached as an appendix to the Order. 
The Amended ROD can be found here: www.energy.gov/sites/default/files/2022-04/ord3909c.pdf.

    Signed in Washington, DC, on April 26, 2023.
Amy Sweeney,
Director, Office of Regulation, Analysis, and Engagement, Office of 
Resource Sustainability.
[FR Doc. 2023-09161 Filed 4-28-23; 8:45 am]