Combined Notice of Filings #1, 26295-26297 [2023-09040]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 82 / Friday, April 28, 2023 / Notices
Advisory Committee Act (FACA)
requires that public notice of these
meetings be announced in the Federal
Register.
DATES:
Thursday, May 18, 2023; 9:40 a.m. to
11:30 a.m. PDT
Friday, May 19, 2023; 9:10 a.m. to 12:25
p.m. PDT
ADDRESSES: Information to participate
virtually can be found on the PCAST
website closer to the meeting at:
www.whitehouse.gov/PCAST/meetings.
FOR FURTHER INFORMATION CONTACT: Dr.
Reba Bandyopadhyay, Designated
Federal Officer, PCAST, email: PCAST@
ostp.eop.gov; telephone: (202) 881–
7163.
SUPPLEMENTARY INFORMATION: PCAST is
an advisory group of the nation’s
leading scientists and engineers,
appointed by the President to augment
the science and technology advice
available to him from the White House,
cabinet departments, and other Federal
agencies. See the Executive Order at
whitehouse.gov. PCAST provides advice
and recommendations concerning a
wide range of issues where
understanding of science, technology,
and innovation may bear on the policy
choices before the President. The
Designated Federal Officer is Dr. Reba
Bandyopadhyay. Information about
PCAST can be found at:
www.whitehouse.gov/PCAST.
Tentative Agenda: PCAST will
discuss and consider for approval one or
more reports from PCAST SubCommittees. PCAST will hear from
invited speakers on and discuss the
impacts of Artificial Intelligence (AI) on
Science and the impacts of AI on
Society. Additional information and the
meeting agenda, including any changes
that arise, will be posted on the PCAST
website at: www.whitehouse.gov/
PCAST/meetings.
Public Participation: The meeting is
open to the public. The meeting will be
held virtually for members of the public.
It is the policy of the PCAST to accept
written public comments no longer than
10 pages and to accommodate oral
public comments whenever possible.
The PCAST expects that public
statements presented at its meetings will
not be repetitive of previously
submitted oral or written statements.
The public comment period for this
meeting will take place on May 18,
2023, at a time specified in the meeting
agenda. This public comment period is
designed only for substantive
commentary on PCAST’s work, not for
business marketing purposes.
Oral Comments: To be considered for
the public speaker list at the meeting,
VerDate Sep<11>2014
18:44 Apr 27, 2023
Jkt 259001
interested parties should register to
speak at PCAST@ostp.eop.gov no later
than 12:00 p.m. Eastern Time on May
11, 2023. To accommodate as many
speakers as possible, the time for public
comments will be limited to two (2)
minutes per person, with a total public
comment period of up to 10 minutes. If
more speakers register than there is
space available on the agenda, PCAST
will select speakers on a first-come,
first-served basis from those who
registered. Those not able to present oral
comments may file written comments
with the council.
Written Comments: Although written
comments are accepted continuously,
written comments should be submitted
to PCAST@ostp.eop.gov no later than
12:00 p.m. Eastern Time on May 11,
2023, so that the comments can be made
available to the PCAST members for
their consideration prior to this meeting.
PCAST operates under the provisions
of FACA, all public comments and/or
presentations will be treated as public
documents and will be made available
for public inspection, including being
posted on the PCAST website at:
www.whitehouse.gov/PCAST/meetings.
Minutes: Minutes will be available
within 45 days at: www.whitehouse.gov/
PCAST/meetings.
Signed in Washington, DC, on April 25,
2023.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2023–09012 Filed 4–27–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–699–000.
Applicants: Cheyenne Plains Gas
Pipeline Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel
and LU Annual Update and OPS Report
2023 to be effective 6/1/2023.
Filed Date: 4/21/23.
Accession Number: 20230421–5196.
Comment Date: 5 p.m. ET 5/3/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
26295
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–09039 Filed 4–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–131–000.
Applicants: Big Elm Solar, LLC.
Description: Big Elm Solar, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 4/24/23.
Accession Number: 20230424–5095.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: EG23–132–000.
Applicants: Angelo Storage, LLC.
Description: Angelo Storage, LLC
submits Notice of Self-Certification of
Exempt Wholesale Generator Status.
Filed Date: 4/24/23.
Accession Number: 20230424–5135.
Comment Date: 5 p.m. ET 5/15/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1873–017;
ER16–1720–023; ER18–471–011; ER21–
2137–007.
Applicants: IR Energy Management
LLC, States Edge Wind I LLC, Invenergy
Energy Management LLC, Buckeye
Wind Energy LLC.
Description: Notice of Change in
Status of Buckeye Wind Energy LLC, et
al.
Filed Date: 4/21/23.
Accession Number: 20230421–5246.
Comment Date: 5 p.m. ET 5/12/23.
Docket Numbers: ER18–1667–008;
ER18–2327–006; ER19–846–008; ER19–
847–008; ER19–2527–003; ER20–1953–
E:\FR\FM\28APN1.SGM
28APN1
ddrumheller on DSK120RN23PROD with NOTICES1
26296
Federal Register / Vol. 88, No. 82 / Friday, April 28, 2023 / Notices
001; ER20–1596–004; ER20–1597–004;
ER20–1599–004; ER20–2065–003;
ER20–2066–003; ER20–2519–002;
ER21–2156–003; ER21–2289–002;
ER21–2766–002.
Applicants: Central Line Solar, LLC,
Clover Creek Solar, LLC, Antelope
Expansion 1B, LLC, East Line Solar,
LLC, Antelope Expansion 3B, LLC,
Antelope Expansion 3A, LLC,
Richmond Spider Solar, LLC, Pleinmont
Solar 2, LLC, Pleinmont Solar 1, LLC,
Highlander Solar Energy Station 1, LLC,
Prevailing Wind Park, LLC, San Pablo
Raceway, LLC, Antelope DSR 3, LLC,
Riverhead Solar Farm, LLC, Antelope
Expansion 2, LLC.
Description: Notice of Change in
Status of Antelope Expansion 2, LLC, et
al.
Filed Date: 4/19/23.
Accession Number: 20230419–5282.
Comment Date: 5 p.m. ET 5/10/23.
Docket Numbers: ER22–296–001.
Applicants: Jackson Generation, LLC.
Description: Notice of Change in
Status of Jackson Generation, LLC.
Filed Date: 4/19/23.
Accession Number: 20230419–5281.
Comment Date: 5 p.m. ET 5/10/23.
Docket Numbers: ER23–317–002.
Applicants: Riverstart Solar Park LLC.
Description: Tariff Amendment:
Response to Deficiency Letter Under
Docket ER23–317 to be effective 11/2/
2022.
Filed Date: 4/24/23.
Accession Number: 20230424–5195.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1263–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment of Notice of Cancellation,
SA No. 5310; Queue No. AB2–174 in
ER23–1467 to be effective 5/8/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5140.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1467–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment of Original NSA, SA No.
6857; Queue No. AC1–168, Docket No.
ER23–1467 to be effective 5/28/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5153.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1691–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 5754; Queue No. AF2–
289 to be effective 6/23/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5031.
VerDate Sep<11>2014
18:44 Apr 27, 2023
Jkt 259001
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1692–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6874 and CSA, SA
No. 6875; Queue No. AD2–086/AE1–090
to be effective 3/24/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5053.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1693–000.
Applicants: Lucky Corridor, LLC.
Description: Application for Renewed
Negotiated Rate Authority of Lucky
Corridor, LLC.
Filed Date: 4/20/23.
Accession Number: 20230420–5248.
Comment Date: 5 p.m. ET 5/11/23.
Docket Numbers: ER23–1694–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Tri-State Solar
Project Second Amended and Restated
LGIA Filing to be effective 4/12/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5107.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1695–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Tri-State Solar
Project (Phase 2) Amended and Restated
LGIA Filing to be effective 4/12/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5108.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1696–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Initial Filing of Rate Schedule FERC No.
354 to be effective 4/18/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5137.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1697–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Rate Schedule FERC No.
19 to be effective 6/23/2023.
Filed Date: 4/24/23.
Accession Number: 20230424–5139.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1698–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Tariff Amendment:
Notice of Cancellation of Rate Schedule
FERC No. 168 to be effective 6/23/2023.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Filed Date: 4/24/23.
Accession Number: 20230424–5146.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23–1699–000.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2023–
04–24 Petition for Limited Waiver—
Meter Data to be effective N/A.
Filed Date: 4/24/23.
Accession Number: 20230424–5191.
Comment Date: 5 p.m. ET 5/15/23.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES23–42–000.
Applicants: GridLiance West LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
GridLiance West LLC.
Filed Date: 4/21/23.
Accession Number: 20230421–5249.
Comment Date: 5 p.m. ET 5/12/23.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH23–11–000.
Applicants: Spire Inc.
Description: Spire Inc. submits FERC
65–A Exemption Notification.
Filed Date: 4/21/23.
Accession Number: 20230421–5248.
Comment Date: 5 p.m. ET 5/12/23.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF23–872–000.
Applicants: Clarion Boards LLC.
Description: Form 556 of Clarion
Boards LLC.
Filed Date: 4/24/23.
Accession Number: 20230424–5202.
Comment Date: 5 p.m. ET 5/15/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\28APN1.SGM
28APN1
Federal Register / Vol. 88, No. 82 / Friday, April 28, 2023 / Notices
Dated: April 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–09040 Filed 4–27–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1922–052]
ddrumheller on DSK120RN23PROD with NOTICES1
Ketchikan Public Utilities; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: 1922–052.
c. Date Filed: October 27, 2022.
d. Applicant: Ketchikan Public
Utilities (KPU).
e. Name of Project: Beaver Falls
Hydroelectric Project (project).
f. Location: On Beaver Falls Creek in
Ketchikan Gateway Borough, Alaska.
The project currently occupies 478.4
acres of United States lands
administered by U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Jennifer
Holstrom, Senior Project Engineer,
Ketchikan Public Utilities, 1065 Fair
Street, Ketchikan, Alaska 99901; (907)
228–4733; or email at jenniferh@ktnak.us.
i. FERC Contact: Kristen Sinclair at
(202) 502–6587, or kristen.sinclair@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: June 23, 2023.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
VerDate Sep<11>2014
18:44 Apr 27, 2023
Jkt 259001
must clearly identify the project name
and docket number on the first page:
Beaver Falls Hydroelectric Project (P–
1922–052).
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The existing Beaver Falls Project
consists of two developments: Silvis
and Beaver Falls. The Silvis
development consists of: (1) a 60-foothigh, 135-foot-long concrete-face, rockfilled Upper Silvis Lake dam; (2) an 800foot-long excavated rock spillway
channel leading from Upper Silvis Lake
to Lower Silvis Lake; (3) a 300-acre
reservoir (Upper Silvis Lake) with gross
storage capacity of approximately
38,000 acre-feet; (4) a 980-foot-long
underground power tunnel connecting
to a 375-foot-long, 36-inch-diameter
steel penstock that conveys water to the
Silvis Powerhouse; (5) a 30-feet by 40feet by 25-feet-high Silvis powerhouse
containing a single Francis-type turbine
with a rated capacity of 2.1 megawatts;
(6) a 150-foot-long trapezoidal shaped
channel tailrace discharging into Lower
Silvis Lake; (7) a 2,900-foot-long, 5kilovolt submarine cable beneath Lower
Silvis Lake; (8) a 7,000-foot-long, 34.5kilovolt aerial transmission line; and (9)
appurtenant facilities.
The Beaver Falls development
consists of: (1) a 32-foot-high, 140-footlong concrete-face, rock-filled Lower
Silvis dam; (2) a spillway with an
ungated control weir and unlined rock
discharge channel; (3) a 67.5-acre
reservoir (Lower Silvis Lake) with gross
storage capacity of approximately 8,052
acre-feet; (4) a 3-foot-high, 40-foot-long
concrete diversion dam on Beaver Falls
Creek; (5) a 3,800-foot-long underground
power tunnel connecting to a 3,610-footlong above ground steel penstock that
conveys water from Lower Silvis Lake to
the Beaver Falls powerhouse and
supplies water to Units 3 and 4 in the
powerhouse; (6) a 225-foot-long adit that
taps the 3,800-foot-long underground
power tunnel and discharges water into
Beaver Falls Creek approximately 500feet upstream of the Beaver Falls
diversion dam; (7) a 4,170-foot-long
above ground steel penstock that
conveys water from the Beaver Falls
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
26297
Creek diversion dam to the Beaver Falls
powerhouse and supplies Unit 1 in the
powerhouse; (8) a 30-feet by 147-feet by
25-feet-high Beaver Falls powerhouse
containing three horizontal Pelton
generating units with a total installed
capacity of 5 MW (Units 1, 3 and 4; Unit
2 is decommissioned); (9) a Beaver Falls
substation; and (10) appurtenant
facilities. The project generates an
annual average of 54,711,280 megawatthours.
m. A copy of the application is
available for review via the internet
through the Commission’s Home Page
(https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room.
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (886) 208–3676 or TTY (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 88, Number 82 (Friday, April 28, 2023)]
[Notices]
[Pages 26295-26297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09040]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG23-131-000.
Applicants: Big Elm Solar, LLC.
Description: Big Elm Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 4/24/23.
Accession Number: 20230424-5095.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: EG23-132-000.
Applicants: Angelo Storage, LLC.
Description: Angelo Storage, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
Filed Date: 4/24/23.
Accession Number: 20230424-5135.
Comment Date: 5 p.m. ET 5/15/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1873-017; ER16-1720-023; ER18-471-011; ER21-
2137-007.
Applicants: IR Energy Management LLC, States Edge Wind I LLC,
Invenergy Energy Management LLC, Buckeye Wind Energy LLC.
Description: Notice of Change in Status of Buckeye Wind Energy LLC,
et al.
Filed Date: 4/21/23.
Accession Number: 20230421-5246.
Comment Date: 5 p.m. ET 5/12/23.
Docket Numbers: ER18-1667-008; ER18-2327-006; ER19-846-008; ER19-
847-008; ER19-2527-003; ER20-1953-
[[Page 26296]]
001; ER20-1596-004; ER20-1597-004; ER20-1599-004; ER20-2065-003; ER20-
2066-003; ER20-2519-002; ER21-2156-003; ER21-2289-002; ER21-2766-002.
Applicants: Central Line Solar, LLC, Clover Creek Solar, LLC,
Antelope Expansion 1B, LLC, East Line Solar, LLC, Antelope Expansion
3B, LLC, Antelope Expansion 3A, LLC, Richmond Spider Solar, LLC,
Pleinmont Solar 2, LLC, Pleinmont Solar 1, LLC, Highlander Solar Energy
Station 1, LLC, Prevailing Wind Park, LLC, San Pablo Raceway, LLC,
Antelope DSR 3, LLC, Riverhead Solar Farm, LLC, Antelope Expansion 2,
LLC.
Description: Notice of Change in Status of Antelope Expansion 2,
LLC, et al.
Filed Date: 4/19/23.
Accession Number: 20230419-5282.
Comment Date: 5 p.m. ET 5/10/23.
Docket Numbers: ER22-296-001.
Applicants: Jackson Generation, LLC.
Description: Notice of Change in Status of Jackson Generation, LLC.
Filed Date: 4/19/23.
Accession Number: 20230419-5281.
Comment Date: 5 p.m. ET 5/10/23.
Docket Numbers: ER23-317-002.
Applicants: Riverstart Solar Park LLC.
Description: Tariff Amendment: Response to Deficiency Letter Under
Docket ER23-317 to be effective 11/2/2022.
Filed Date: 4/24/23.
Accession Number: 20230424-5195.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1263-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Amendment of Notice of Cancellation,
SA No. 5310; Queue No. AB2-174 in ER23-1467 to be effective 5/8/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5140.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1467-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Amendment of Original NSA, SA No.
6857; Queue No. AC1-168, Docket No. ER23-1467 to be effective 5/28/
2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5153.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1691-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, Service
Agreement No. 5754; Queue No. AF2-289 to be effective 6/23/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5031.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1692-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 6874
and CSA, SA No. 6875; Queue No. AD2-086/AE1-090 to be effective 3/24/
2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5053.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1693-000.
Applicants: Lucky Corridor, LLC.
Description: Application for Renewed Negotiated Rate Authority of
Lucky Corridor, LLC.
Filed Date: 4/20/23.
Accession Number: 20230420-5248.
Comment Date: 5 p.m. ET 5/11/23.
Docket Numbers: ER23-1694-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Tri-State Solar Project
Second Amended and Restated LGIA Filing to be effective 4/12/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5107.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1695-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Tri-State Solar Project
(Phase 2) Amended and Restated LGIA Filing to be effective 4/12/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5108.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1696-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Initial Filing of Rate
Schedule FERC No. 354 to be effective 4/18/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5137.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1697-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Rate Schedule
FERC No. 19 to be effective 6/23/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5139.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1698-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Tariff Amendment: Notice of Cancellation of Rate
Schedule FERC No. 168 to be effective 6/23/2023.
Filed Date: 4/24/23.
Accession Number: 20230424-5146.
Comment Date: 5 p.m. ET 5/15/23.
Docket Numbers: ER23-1699-000.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2023-04-24 Petition for Limited
Waiver--Meter Data to be effective N/A.
Filed Date: 4/24/23.
Accession Number: 20230424-5191.
Comment Date: 5 p.m. ET 5/15/23.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES23-42-000.
Applicants: GridLiance West LLC.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of GridLiance West LLC.
Filed Date: 4/21/23.
Accession Number: 20230421-5249.
Comment Date: 5 p.m. ET 5/12/23.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH23-11-000.
Applicants: Spire Inc.
Description: Spire Inc. submits FERC 65-A Exemption Notification.
Filed Date: 4/21/23.
Accession Number: 20230421-5248.
Comment Date: 5 p.m. ET 5/12/23.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF23-872-000.
Applicants: Clarion Boards LLC.
Description: Form 556 of Clarion Boards LLC.
Filed Date: 4/24/23.
Accession Number: 20230424-5202.
Comment Date: 5 p.m. ET 5/15/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 26297]]
Dated: April 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-09040 Filed 4-27-23; 8:45 am]
BILLING CODE 6717-01-P