Download as PDF Federal Register / Vol. 88, No. 78 / Monday, April 24, 2023 / Notices The one-time burden of 23,168 hours that only applies for Year 1 and 2 will be averaged over three years (23,168 hours ÷ 3 = 7,722.667 (7,722.67 ¥ rounded) hours/year over three years). The number of responses is also averaged over three years (1,454 responses ÷ 3 = 484.667 (484.67 ¥ rounded) responses/year). The responses and burden hours for Years 1–3 will total respectively as follows for Year 1 one-time burden: Year 1: 484.67 responses; 7,722.67 hours Year 2: 484.67 responses; 7,722.67 hours Year 3: 484.67 responses; 7,722.67 hours Comments concerning the information collection and retirement approved by the Commission in this Docket and the associated burden estimates, should be sent to the Commission in this docket and may also be sent to the Office of Management and Budget, Office of Information and Regulatory Affairs [Attention: Desk Officer for the Federal Energy Regulatory Commission]. For security reasons, comments should be sent by email to OMB at the following email address: oira_submission@omb.eop.gov. ddrumheller on DSK120RN23PROD with NOTICES1 Environmental Analysis The Commission is required to prepare an Environmental Assessment or an Environmental Impact Statement for any action that may have a significant adverse effect on the human environment.5 The Commission has categorically excluded certain actions from this requirement as not having a significant effect on the human environment. Included in the exclusion are rules that are clarifying, corrective, or procedural or that do not substantially change the effect of the regulations being amended.6 The actions approved here fall within this categorical exclusion in the Commission’s regulations. Document Availability In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) and in the Commission’s Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE, Room 2A, Washington, DC 20426. From the Commission’s Home Page on the internet, this information is 5 Regulations Implementing the National Environmental Policy Act of 1969, Order No. 486, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs., Regulations Preambles 1986–1990 ¶ 30,783 (1987). 6 18 CFR 380.4(a)(2)(ii). VerDate Sep<11>2014 18:50 Apr 21, 2023 Jkt 259001 available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. User assistance is available for eLibrary and the Commission’s website during normal business hours from the Commission’s Online Support at (202) 502–6652 (toll free at 1–866–208–3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502–8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. By direction of the Commission. Comments: Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: April 17, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–08512 Filed 4–21–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–74–000. Applicants: Energy Harbor Corp. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Energy Harbor Corp. Filed Date: 4/17/23. Accession Number: 20230417–5260. Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: EC23–75–000. Applicants: Northern Indiana Public Service Company LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Northern Indiana Public Service Company LLC. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 24789 Filed Date: 4/17/23. Accession Number: 20230417–5263 Comment Date: 5 p.m. ET 5/8/23. Docket Numbers: EC23–76–000. Applicants: Sunrise Power Company, LLC, Hull Street Energy, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Sunrise Power Company, LLC, et al. Filed Date: 4/17/23. Accession Number: 20230417–5264. Comment Date: 5 p.m. ET 5/8/23. Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL23–5–000; QF22– 1120–002; QF22–1121–002; QF22– 1122–002. Applicants: CSU 2020 Renewable Energy, LLC, CSU 2020 Renewable Energy, LLC, CSU 2020 Renewable Energy, LLC, Standard Solar, Inc. Description: Errata to October 18, 2022 Petition for Declaratory Order of Standard Solar, Inc. Filed Date: 4/5/23. Accession Number: 20230405–5198. Comment Date: 5 p.m. ET 5/5/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–1435–002. Applicants: Energy Harbor LLC. Description: Compliance filing: Informational Filing Regarding Planned Transfer to be effective N/A. Filed Date: 4/17/23. Accession Number: 20230417–5161. Comment Date: 5 p.m. ET 5/8/23. Docket Numbers: ER20–1721–002. Applicants: Energy Harbor LLC. Description: Compliance filing: Informational Filing Regarding Generation Facilities Sale ER20–1721 to be effective N/A. Filed Date: 4/17/23. Accession Number: 20230417–5163. Comment Date: 5 p.m. ET 5/8/23. Docket Numbers: ER23–1038–001. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance to Clarify Future Extensions of Non-Performance Charges ER23–1038 to be effective 4/4/2023. Filed Date: 4/18/23. Accession Number: 20230418–5127. Comment Date: 5 p.m. ET 5/9/23. Docket Numbers: ER23–1158–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Request to Defer Action on SA Filing Original NSA SA No. 6788; Queue No. AC2–136 to be effective 12/31/9998. Filed Date: 4/18/23. E:\FR\FM\24APN1.SGM 24APN1 ddrumheller on DSK120RN23PROD with NOTICES1 24790 Federal Register / Vol. 88, No. 78 / Monday, April 24, 2023 / Notices Accession Number: 20230418–5051. Comment Date: 5 p.m. ET 5/9/23. Docket Numbers: ER23–1165–000. Applicants: McFarland Solar A, LLC. Description: McFarland Solar A, LLC submits Supplement to Application and Request for Shortened Comment Period. Filed Date: 4/10/23. Accession Number: 20230410–5045. Comment Date: 5 p.m. ET 4/28/23. Docket Numbers: ER23–1246–001. Applicants: Generac Grid Services LLC. Description: Tariff Amendment: Supplement to Application for MBR Authority to be effective 4/1/2023. Filed Date: 4/17/23. Accession Number: 20230417–5172. Comment Date: 5 p.m. ET 5/8/23. Docket Numbers: ER23–1656–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Magnolia Energy Park LGIA Filing to be effective 4/5/2023. Filed Date: 4/18/23. Accession Number: 20230418–5106. Comment Date: 5 p.m. ET 5/9/23. Docket Numbers: ER23–1657–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DEC–NCMPA1 SA No. 212 to be effective 5/1/2023. Filed Date: 4/18/23. Accession Number: 20230418–5111. Comment Date: 5 p.m. ET 5/9/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 18, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–08607 Filed 4–21–23; 8:45 am] DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project Nos. 2572–133, 2458–247] [Project No. 1927–140] PacifiCorp; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC) regulations, 18 CFR part 380, Commission staff reviewed PacifiCorp’s application for an amendment to the license of the North Umpqua Hydroelectric Project No. 1927 and have prepared an Environmental Assessment (EA) for the proposed amendment. The licensee proposes to amend the project license to include the construction, operation, and maintenance of new pumped storage facilities connecting the existing Toketee and Fish Creek developments. The North Umpqua project consists of eight developments located on the North Umpqua River and two of its tributaries, the Clearwater River and Fish Creek, in Douglas County, Oregon and is partially located on lands administered by the U.S. Department of Agriculture’s Forest Service and the U.S. Department of the Interior’s Bureau of Land Management. The EA contains Commission staff’s analysis of the potential environmental effects of the proposed amendment to the license, and concludes that the proposed amendment, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket number (P–1927) in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. For further information, contact Brian Bartos at 202–502–6679 or Brian.bartos@ferc.gov. 18:50 Apr 21, 2023 Jkt 259001 The Federal Energy Regulatory Commission and Great Lakes Hydro America, LLC will conduct, in conjunction with the Initial Study Report meeting(s), an environmental site review of the Ripogenus and Penobscot Mills Projects. The projects are located on the West Branch of the Penobscot River and Millinocket Stream, in Piscataquis and Penobscot Counties, Maine. The site review will focus on Ripogenus Dam and McKay Station, Millinocket Lake Pump Station, and Stone Dam, as well as the West Branch Penobscot River in those areas. As time permits, other areas that may toured include the Holbrook Side Channel; boat launches, including the Ambajejus Boat Launch; transmission line corridors; Millinocket Gate House; and Millinocket battery bank. Date and Time: Friday, May 5, 2023; 8:00 a.m.–about 12:00 p.m. (EST). Location: Meet at the Millinocket Office, 1024 Central St., Millinocket, Maine 04462. The site review is open to the public and resource agencies. All participants interested in attending the site review should provide their own transportation. Questions about the site review should be directed to Allan Creamer at (202) 502–8365, or allan.creamer@ ferc.gov. If you plan to attend, please notify Randy Dorman at (207) 775–5605, or randy.dorman@ brookfieldrenewable.com, as well as Allan Creamer, no later than April 28, 2023. Dated: April 17, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–08513 Filed 4–21–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2023–0075; FRL–10887–01– OCSPP] Dated: April 17, 2023. Kimberly D. Bose, Secretary. Notice of Receipt of Requests To Voluntarily Cancel Certain Pesticide Registrations [FR Doc. 2023–08514 Filed 4–21–23; 8:45 am] AGENCY: BILLING CODE 6717–01–P BILLING CODE 6717–01–P VerDate Sep<11>2014 Great Lakes Hydro America, LLC; Notice of Environmental Site Review PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Environmental Protection Agency (EPA). ACTION: Notice. E:\FR\FM\24APN1.SGM 24APN1

Agencies

[Federal Register Volume 88, Number 78 (Monday, April 24, 2023)]
[Notices]
[Pages 24789-24790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08607]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-74-000.
    Applicants: Energy Harbor Corp.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Energy Harbor Corp.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5260.
    Comment Date: 5 p.m. ET 6/16/23.

    Docket Numbers: EC23-75-000.
    Applicants: Northern Indiana Public Service Company LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Northern Indiana Public Service Company LLC.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5263
    Comment Date: 5 p.m. ET 5/8/23.

    Docket Numbers: EC23-76-000.
    Applicants: Sunrise Power Company, LLC, Hull Street Energy, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Sunrise Power Company, LLC, et al.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5264.
    Comment Date: 5 p.m. ET 5/8/23.

    Take notice that the Commission received the following Complaints 
and Compliance filings in EL Dockets:

    Docket Numbers: EL23-5-000; QF22-1120-002; QF22-1121-002; QF22-
1122-002.
    Applicants: CSU 2020 Renewable Energy, LLC, CSU 2020 Renewable 
Energy, LLC, CSU 2020 Renewable Energy, LLC, Standard Solar, Inc.
    Description: Errata to October 18, 2022 Petition for Declaratory 
Order of Standard Solar, Inc.
    Filed Date: 4/5/23.
    Accession Number: 20230405-5198.
    Comment Date: 5 p.m. ET 5/5/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER20-1435-002.
    Applicants: Energy Harbor LLC.
    Description: Compliance filing: Informational Filing Regarding 
Planned Transfer to be effective N/A.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5161.
    Comment Date: 5 p.m. ET 5/8/23.

    Docket Numbers: ER20-1721-002.
    Applicants: Energy Harbor LLC.
    Description: Compliance filing: Informational Filing Regarding 
Generation Facilities Sale ER20-1721 to be effective N/A.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5163.
    Comment Date: 5 p.m. ET 5/8/23.

    Docket Numbers: ER23-1038-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance to Clarify Future 
Extensions of Non-Performance Charges ER23-1038 to be effective 4/4/
2023.
    Filed Date: 4/18/23.
    Accession Number: 20230418-5127.
    Comment Date: 5 p.m. ET 5/9/23.

    Docket Numbers: ER23-1158-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Request to Defer Action on SA Filing 
Original NSA SA No. 6788; Queue No. AC2-136 to be effective 12/31/9998.
    Filed Date: 4/18/23.

[[Page 24790]]

    Accession Number: 20230418-5051.
    Comment Date: 5 p.m. ET 5/9/23.

    Docket Numbers: ER23-1165-000.
    Applicants: McFarland Solar A, LLC.
    Description: McFarland Solar A, LLC submits Supplement to 
Application and Request for Shortened Comment Period.
    Filed Date: 4/10/23.
    Accession Number: 20230410-5045.
    Comment Date: 5 p.m. ET 4/28/23.

    Docket Numbers: ER23-1246-001.
    Applicants: Generac Grid Services LLC.
    Description: Tariff Amendment: Supplement to Application for MBR 
Authority to be effective 4/1/2023.
    Filed Date: 4/17/23.
    Accession Number: 20230417-5172.
    Comment Date: 5 p.m. ET 5/8/23.

    Docket Numbers: ER23-1656-000.
    Applicants: Alabama Power Company, Georgia Power Company, 
Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: Alabama Power Company 
submits tariff filing per 35.13(a)(2)(iii: Magnolia Energy Park LGIA 
Filing to be effective 4/5/2023.
    Filed Date: 4/18/23.
    Accession Number: 20230418-5106.
    Comment Date: 5 p.m. ET 5/9/23.

    Docket Numbers: ER23-1657-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Sec.  205(d) Rate Filing: DEC-NCMPA1 SA No. 212 to be 
effective 5/1/2023.
    Filed Date: 4/18/23.
    Accession Number: 20230418-5111.
    Comment Date: 5 p.m. ET 5/9/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-08607 Filed 4-21-23; 8:45 am]
BILLING CODE 6717-01-P