Combined Notice of Filings #1, 24789-24790 [2023-08607]
Download as PDF
Federal Register / Vol. 88, No. 78 / Monday, April 24, 2023 / Notices
The one-time burden of 23,168 hours
that only applies for Year 1 and 2 will
be averaged over three years (23,168
hours ÷ 3 = 7,722.667 (7,722.67 ¥
rounded) hours/year over three years).
The number of responses is also
averaged over three years (1,454
responses ÷ 3 = 484.667 (484.67 ¥
rounded) responses/year).
The responses and burden hours for
Years 1–3 will total respectively as
follows for Year 1 one-time burden:
Year 1: 484.67 responses; 7,722.67 hours
Year 2: 484.67 responses; 7,722.67 hours
Year 3: 484.67 responses; 7,722.67 hours
Comments concerning the
information collection and retirement
approved by the Commission in this
Docket and the associated burden
estimates, should be sent to the
Commission in this docket and may also
be sent to the Office of Management and
Budget, Office of Information and
Regulatory Affairs [Attention: Desk
Officer for the Federal Energy
Regulatory Commission]. For security
reasons, comments should be sent by
email to OMB at the following email
address: oira_submission@omb.eop.gov.
ddrumheller on DSK120RN23PROD with NOTICES1
Environmental Analysis
The Commission is required to
prepare an Environmental Assessment
or an Environmental Impact Statement
for any action that may have a
significant adverse effect on the human
environment.5 The Commission has
categorically excluded certain actions
from this requirement as not having a
significant effect on the human
environment. Included in the exclusion
are rules that are clarifying, corrective,
or procedural or that do not
substantially change the effect of the
regulations being amended.6 The
actions approved here fall within this
categorical exclusion in the
Commission’s regulations.
Document Availability
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) and in the Commission’s
Public Reference Room during normal
business hours (8:30 a.m. to 5:00 p.m.
Eastern time) at 888 First Street NE,
Room 2A, Washington, DC 20426.
From the Commission’s Home Page
on the internet, this information is
5 Regulations Implementing the National
Environmental Policy Act of 1969, Order No. 486,
52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs.,
Regulations Preambles 1986–1990 ¶ 30,783 (1987).
6 18 CFR 380.4(a)(2)(ii).
VerDate Sep<11>2014
18:50 Apr 21, 2023
Jkt 259001
available on eLibrary. The full text of
this document is available on eLibrary
in PDF and Microsoft Word format for
viewing, printing, and/or downloading.
To access this document in eLibrary,
type the docket number excluding the
last three digits of this document in the
docket number field.
User assistance is available for
eLibrary and the Commission’s website
during normal business hours from the
Commission’s Online Support at (202)
502–6652 (toll free at 1–866–208–3676)
or email at ferconlinesupport@ferc.gov,
or the Public Reference Room at (202)
502–8371, TTY (202) 502–8659. Email
the Public Reference Room at
public.referenceroom@ferc.gov.
By direction of the Commission.
Comments: Comments are invited on:
(1) whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08512 Filed 4–21–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC23–74–000.
Applicants: Energy Harbor Corp.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Energy Harbor
Corp.
Filed Date: 4/17/23.
Accession Number: 20230417–5260.
Comment Date: 5 p.m. ET 6/16/23.
Docket Numbers: EC23–75–000.
Applicants: Northern Indiana Public
Service Company LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Northern Indiana
Public Service Company LLC.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
24789
Filed Date: 4/17/23.
Accession Number: 20230417–5263
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: EC23–76–000.
Applicants: Sunrise Power Company,
LLC, Hull Street Energy, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Sunrise Power
Company, LLC, et al.
Filed Date: 4/17/23.
Accession Number: 20230417–5264.
Comment Date: 5 p.m. ET 5/8/23.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–5–000; QF22–
1120–002; QF22–1121–002; QF22–
1122–002.
Applicants: CSU 2020 Renewable
Energy, LLC, CSU 2020 Renewable
Energy, LLC, CSU 2020 Renewable
Energy, LLC, Standard Solar, Inc.
Description: Errata to October 18,
2022 Petition for Declaratory Order of
Standard Solar, Inc.
Filed Date: 4/5/23.
Accession Number: 20230405–5198.
Comment Date: 5 p.m. ET 5/5/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1435–002.
Applicants: Energy Harbor LLC.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 4/17/23.
Accession Number: 20230417–5161.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER20–1721–002.
Applicants: Energy Harbor LLC.
Description: Compliance filing:
Informational Filing Regarding
Generation Facilities Sale ER20–1721 to
be effective N/A.
Filed Date: 4/17/23.
Accession Number: 20230417–5163.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER23–1038–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Compliance to Clarify Future Extensions
of Non-Performance Charges ER23–1038
to be effective 4/4/2023.
Filed Date: 4/18/23.
Accession Number: 20230418–5127.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23–1158–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Request to Defer Action on SA Filing
Original NSA SA No. 6788; Queue No.
AC2–136 to be effective 12/31/9998.
Filed Date: 4/18/23.
E:\FR\FM\24APN1.SGM
24APN1
ddrumheller on DSK120RN23PROD with NOTICES1
24790
Federal Register / Vol. 88, No. 78 / Monday, April 24, 2023 / Notices
Accession Number: 20230418–5051.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23–1165–000.
Applicants: McFarland Solar A, LLC.
Description: McFarland Solar A, LLC
submits Supplement to Application and
Request for Shortened Comment Period.
Filed Date: 4/10/23.
Accession Number: 20230410–5045.
Comment Date: 5 p.m. ET 4/28/23.
Docket Numbers: ER23–1246–001.
Applicants: Generac Grid Services
LLC.
Description: Tariff Amendment:
Supplement to Application for MBR
Authority to be effective 4/1/2023.
Filed Date: 4/17/23.
Accession Number: 20230417–5172.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER23–1656–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Magnolia
Energy Park LGIA Filing to be effective
4/5/2023.
Filed Date: 4/18/23.
Accession Number: 20230418–5106.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23–1657–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–NCMPA1 SA No. 212 to be
effective 5/1/2023.
Filed Date: 4/18/23.
Accession Number: 20230418–5111.
Comment Date: 5 p.m. ET 5/9/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–08607 Filed 4–21–23; 8:45 am]
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project Nos. 2572–133, 2458–247]
[Project No. 1927–140]
PacifiCorp; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 CFR part 380,
Commission staff reviewed PacifiCorp’s
application for an amendment to the
license of the North Umpqua
Hydroelectric Project No. 1927 and have
prepared an Environmental Assessment
(EA) for the proposed amendment. The
licensee proposes to amend the project
license to include the construction,
operation, and maintenance of new
pumped storage facilities connecting the
existing Toketee and Fish Creek
developments. The North Umpqua
project consists of eight developments
located on the North Umpqua River and
two of its tributaries, the Clearwater
River and Fish Creek, in Douglas
County, Oregon and is partially located
on lands administered by the U.S.
Department of Agriculture’s Forest
Service and the U.S. Department of the
Interior’s Bureau of Land Management.
The EA contains Commission staff’s
analysis of the potential environmental
effects of the proposed amendment to
the license, and concludes that the
proposed amendment, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (P–1927) in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
For further information, contact Brian
Bartos at 202–502–6679 or
Brian.bartos@ferc.gov.
18:50 Apr 21, 2023
Jkt 259001
The Federal Energy Regulatory
Commission and Great Lakes Hydro
America, LLC will conduct, in
conjunction with the Initial Study
Report meeting(s), an environmental site
review of the Ripogenus and Penobscot
Mills Projects. The projects are located
on the West Branch of the Penobscot
River and Millinocket Stream, in
Piscataquis and Penobscot Counties,
Maine. The site review will focus on
Ripogenus Dam and McKay Station,
Millinocket Lake Pump Station, and
Stone Dam, as well as the West Branch
Penobscot River in those areas. As time
permits, other areas that may toured
include the Holbrook Side Channel;
boat launches, including the Ambajejus
Boat Launch; transmission line
corridors; Millinocket Gate House; and
Millinocket battery bank.
Date and Time: Friday, May 5, 2023;
8:00 a.m.–about 12:00 p.m. (EST).
Location: Meet at the Millinocket
Office, 1024 Central St., Millinocket,
Maine 04462.
The site review is open to the public
and resource agencies. All participants
interested in attending the site review
should provide their own
transportation.
Questions about the site review
should be directed to Allan Creamer at
(202) 502–8365, or allan.creamer@
ferc.gov. If you plan to attend, please
notify Randy Dorman at (207) 775–5605,
or randy.dorman@
brookfieldrenewable.com, as well as
Allan Creamer, no later than April 28,
2023.
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08513 Filed 4–21–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2023–0075; FRL–10887–01–
OCSPP]
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
Notice of Receipt of Requests To
Voluntarily Cancel Certain Pesticide
Registrations
[FR Doc. 2023–08514 Filed 4–21–23; 8:45 am]
AGENCY:
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
VerDate Sep<11>2014
Great Lakes Hydro America, LLC;
Notice of Environmental Site Review
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Environmental Protection
Agency (EPA).
ACTION: Notice.
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 88, Number 78 (Monday, April 24, 2023)]
[Notices]
[Pages 24789-24790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08607]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC23-74-000.
Applicants: Energy Harbor Corp.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Energy Harbor Corp.
Filed Date: 4/17/23.
Accession Number: 20230417-5260.
Comment Date: 5 p.m. ET 6/16/23.
Docket Numbers: EC23-75-000.
Applicants: Northern Indiana Public Service Company LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Northern Indiana Public Service Company LLC.
Filed Date: 4/17/23.
Accession Number: 20230417-5263
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: EC23-76-000.
Applicants: Sunrise Power Company, LLC, Hull Street Energy, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Sunrise Power Company, LLC, et al.
Filed Date: 4/17/23.
Accession Number: 20230417-5264.
Comment Date: 5 p.m. ET 5/8/23.
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL23-5-000; QF22-1120-002; QF22-1121-002; QF22-
1122-002.
Applicants: CSU 2020 Renewable Energy, LLC, CSU 2020 Renewable
Energy, LLC, CSU 2020 Renewable Energy, LLC, Standard Solar, Inc.
Description: Errata to October 18, 2022 Petition for Declaratory
Order of Standard Solar, Inc.
Filed Date: 4/5/23.
Accession Number: 20230405-5198.
Comment Date: 5 p.m. ET 5/5/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-1435-002.
Applicants: Energy Harbor LLC.
Description: Compliance filing: Informational Filing Regarding
Planned Transfer to be effective N/A.
Filed Date: 4/17/23.
Accession Number: 20230417-5161.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER20-1721-002.
Applicants: Energy Harbor LLC.
Description: Compliance filing: Informational Filing Regarding
Generation Facilities Sale ER20-1721 to be effective N/A.
Filed Date: 4/17/23.
Accession Number: 20230417-5163.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER23-1038-001.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance to Clarify Future
Extensions of Non-Performance Charges ER23-1038 to be effective 4/4/
2023.
Filed Date: 4/18/23.
Accession Number: 20230418-5127.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23-1158-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Request to Defer Action on SA Filing
Original NSA SA No. 6788; Queue No. AC2-136 to be effective 12/31/9998.
Filed Date: 4/18/23.
[[Page 24790]]
Accession Number: 20230418-5051.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23-1165-000.
Applicants: McFarland Solar A, LLC.
Description: McFarland Solar A, LLC submits Supplement to
Application and Request for Shortened Comment Period.
Filed Date: 4/10/23.
Accession Number: 20230410-5045.
Comment Date: 5 p.m. ET 4/28/23.
Docket Numbers: ER23-1246-001.
Applicants: Generac Grid Services LLC.
Description: Tariff Amendment: Supplement to Application for MBR
Authority to be effective 4/1/2023.
Filed Date: 4/17/23.
Accession Number: 20230417-5172.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER23-1656-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Magnolia Energy Park LGIA
Filing to be effective 4/5/2023.
Filed Date: 4/18/23.
Accession Number: 20230418-5106.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23-1657-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-NCMPA1 SA No. 212 to be
effective 5/1/2023.
Filed Date: 4/18/23.
Accession Number: 20230418-5111.
Comment Date: 5 p.m. ET 5/9/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-08607 Filed 4-21-23; 8:45 am]
BILLING CODE 6717-01-P