Great Lakes Hydro America, LLC; Notice of Environmental Site Review, 24790 [2023-08513]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
24790
Federal Register / Vol. 88, No. 78 / Monday, April 24, 2023 / Notices
Accession Number: 20230418–5051.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23–1165–000.
Applicants: McFarland Solar A, LLC.
Description: McFarland Solar A, LLC
submits Supplement to Application and
Request for Shortened Comment Period.
Filed Date: 4/10/23.
Accession Number: 20230410–5045.
Comment Date: 5 p.m. ET 4/28/23.
Docket Numbers: ER23–1246–001.
Applicants: Generac Grid Services
LLC.
Description: Tariff Amendment:
Supplement to Application for MBR
Authority to be effective 4/1/2023.
Filed Date: 4/17/23.
Accession Number: 20230417–5172.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: ER23–1656–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Magnolia
Energy Park LGIA Filing to be effective
4/5/2023.
Filed Date: 4/18/23.
Accession Number: 20230418–5106.
Comment Date: 5 p.m. ET 5/9/23.
Docket Numbers: ER23–1657–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–NCMPA1 SA No. 212 to be
effective 5/1/2023.
Filed Date: 4/18/23.
Accession Number: 20230418–5111.
Comment Date: 5 p.m. ET 5/9/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 18, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–08607 Filed 4–21–23; 8:45 am]
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project Nos. 2572–133, 2458–247]
[Project No. 1927–140]
PacifiCorp; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 CFR part 380,
Commission staff reviewed PacifiCorp’s
application for an amendment to the
license of the North Umpqua
Hydroelectric Project No. 1927 and have
prepared an Environmental Assessment
(EA) for the proposed amendment. The
licensee proposes to amend the project
license to include the construction,
operation, and maintenance of new
pumped storage facilities connecting the
existing Toketee and Fish Creek
developments. The North Umpqua
project consists of eight developments
located on the North Umpqua River and
two of its tributaries, the Clearwater
River and Fish Creek, in Douglas
County, Oregon and is partially located
on lands administered by the U.S.
Department of Agriculture’s Forest
Service and the U.S. Department of the
Interior’s Bureau of Land Management.
The EA contains Commission staff’s
analysis of the potential environmental
effects of the proposed amendment to
the license, and concludes that the
proposed amendment, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (P–1927) in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
For further information, contact Brian
Bartos at 202–502–6679 or
Brian.bartos@ferc.gov.
18:50 Apr 21, 2023
Jkt 259001
The Federal Energy Regulatory
Commission and Great Lakes Hydro
America, LLC will conduct, in
conjunction with the Initial Study
Report meeting(s), an environmental site
review of the Ripogenus and Penobscot
Mills Projects. The projects are located
on the West Branch of the Penobscot
River and Millinocket Stream, in
Piscataquis and Penobscot Counties,
Maine. The site review will focus on
Ripogenus Dam and McKay Station,
Millinocket Lake Pump Station, and
Stone Dam, as well as the West Branch
Penobscot River in those areas. As time
permits, other areas that may toured
include the Holbrook Side Channel;
boat launches, including the Ambajejus
Boat Launch; transmission line
corridors; Millinocket Gate House; and
Millinocket battery bank.
Date and Time: Friday, May 5, 2023;
8:00 a.m.–about 12:00 p.m. (EST).
Location: Meet at the Millinocket
Office, 1024 Central St., Millinocket,
Maine 04462.
The site review is open to the public
and resource agencies. All participants
interested in attending the site review
should provide their own
transportation.
Questions about the site review
should be directed to Allan Creamer at
(202) 502–8365, or allan.creamer@
ferc.gov. If you plan to attend, please
notify Randy Dorman at (207) 775–5605,
or randy.dorman@
brookfieldrenewable.com, as well as
Allan Creamer, no later than April 28,
2023.
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08513 Filed 4–21–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2023–0075; FRL–10887–01–
OCSPP]
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
Notice of Receipt of Requests To
Voluntarily Cancel Certain Pesticide
Registrations
[FR Doc. 2023–08514 Filed 4–21–23; 8:45 am]
AGENCY:
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
VerDate Sep<11>2014
Great Lakes Hydro America, LLC;
Notice of Environmental Site Review
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Environmental Protection
Agency (EPA).
ACTION: Notice.
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 88, Number 78 (Monday, April 24, 2023)]
[Notices]
[Page 24790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08513]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2572-133, 2458-247]
Great Lakes Hydro America, LLC; Notice of Environmental Site
Review
The Federal Energy Regulatory Commission and Great Lakes Hydro
America, LLC will conduct, in conjunction with the Initial Study Report
meeting(s), an environmental site review of the Ripogenus and Penobscot
Mills Projects. The projects are located on the West Branch of the
Penobscot River and Millinocket Stream, in Piscataquis and Penobscot
Counties, Maine. The site review will focus on Ripogenus Dam and McKay
Station, Millinocket Lake Pump Station, and Stone Dam, as well as the
West Branch Penobscot River in those areas. As time permits, other
areas that may toured include the Holbrook Side Channel; boat launches,
including the Ambajejus Boat Launch; transmission line corridors;
Millinocket Gate House; and Millinocket battery bank.
Date and Time: Friday, May 5, 2023; 8:00 a.m.-about 12:00 p.m.
(EST).
Location: Meet at the Millinocket Office, 1024 Central St.,
Millinocket, Maine 04462.
The site review is open to the public and resource agencies. All
participants interested in attending the site review should provide
their own transportation.
Questions about the site review should be directed to Allan Creamer
at (202) 502-8365, or [email protected]. If you plan to attend,
please notify Randy Dorman at (207) 775-5605, or
[email protected], as well as Allan Creamer, no
later than April 28, 2023.
Dated: April 17, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-08513 Filed 4-21-23; 8:45 am]