Combined Notice of Filings #1, 24401-24402 [2023-08349]

Download as PDF Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices All timely, unopposed 9 motions to intervene are automatically granted by operation of Rule 214(c)(1).10 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.11 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at https:// www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on May 4, 2023. Dated: April 13, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–08321 Filed 4–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ddrumheller on DSK120RN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–121–000. 9 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 10 18 CFR 385.214(c)(1). 11 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 20:01 Apr 19, 2023 Jkt 259001 Applicants: Clearwater Wind East, LLC. Description: Clearwater Wind East, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 4/13/23. Accession Number: 20230413–5176. Comment Date: 5 p.m. ET 5/4/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER22–2867–003. Applicants: Bluegrass Solar, LLC. Description: Tariff Amendment: Response to Second Deficiency Letter to be effective 10/1/2022. Filed Date: 4/14/23. Accession Number: 20230414–5101. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–888–001. Applicants: New England Power Company. Description: Tariff Amendment: 2023–04–14 Deficiency Letter Response to be effective 12/19/2022. Filed Date: 4/14/23. Accession Number: 20230414–5029. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1638–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 6864; Queue No. AF1–019 to be effective 3/14/2023. Filed Date: 4/13/23. Accession Number: 20230413–5165. Comment Date: 5 p.m. ET 5/4/23. Docket Numbers: ER23–1639–000. Applicants: Midcontinent Independent System Operator, Inc., American Transmission Company LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023–04–14_SA 3909 ATC-City of Negaunee 1st Rev PCA (Irontown) to be effective 6/14/2023. Filed Date: 4/14/23. Accession Number: 20230414–5017. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1640–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2023–04–14—Att O PSCo Appendix 1 to be effective 4/27/2022. Filed Date: 4/14/23. Accession Number: 20230414–5059. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1641–000. Applicants: Stored Solar Tamworth, LLC. Description: Tariff Amendment: Cancellation of Stored Solar Tamworth, LLC MBR Tariff to be effective 4/14/ 2023. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 24401 Filed Date: 4/14/23. Accession Number: 20230414–5070. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1642–000. Applicants: Stored Solar J&WE, LLC. Description: § 205(d) Rate Filing: NE Renewable Power, LLC MBR Tariff to be effective 1/31/2023. Filed Date: 4/14/23. Accession Number: 20230414–5074. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1643–000. Applicants: PacifiCorp. Description: Tariff Amendment: Notice of Termination to be effective 6/14/2023. Filed Date: 4/14/23. Accession Number: 20230414–5095. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1644–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Rate Schedule FERC No. 35 to be effective 6/13/2023. Filed Date: 4/14/23. Accession Number: 20230414–5103. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1645–000. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Virginia Electric and Power Company submits tariff filing per 35.13(a)(2)(iii: VEPCO revisions to OPEB Expense in OATT Att. H–16C Formula Rate to be effective 6/15/2023. Filed Date: 4/14/23. Accession Number: 20230414–5111. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1646–000. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Virginia Electric and Power Company submits tariff filing per 35.13(a)(2)(iii: VEPCO submits revisions to OATT Att. H–16A Pt. 2 Depreciation Rates to be effective 6/14/2023. Filed Date: 4/14/23. Accession Number: 20230414–5112. Comment Date: 5 p.m. ET 5/5/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but E:\FR\FM\20APN1.SGM 20APN1 24402 Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–08349 Filed 4–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–141–000] ddrumheller on DSK120RN23PROD with NOTICES1 Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on April 5, 2023 Transcontinental Gas Pipe Line Company, LLC, (Transco) P.O. Box 1396, Houston, Texas 77251–1396, filed an application under section 7(b) of the Natural Gas Act (NGA), and Part 157, of the Commission’s regulations requesting the authority to abandon its existing 20inch offshore gathering supply laterals with appurtenant metering facilities extending from the Quarter Northowned Brazos Area 133A Platform, Offshore Texas to the Transco-owned Brazos Area 538 Platform, Offshore Texas. Specifically, Transco is requesting approval to abandon (1) approximately 10.71 miles of 20-inch pipeline laterals comprising of 4.44 miles extending from the producer-owned Brazos Area Block 133 Platform A to the Brazos Area Block 105 subsea tie-in (SSTI), Offshore Texas Pipeline Segment Number (PSN) PSN 20125–1, and 6.27 miles extending from the Brazos Area Block 105 SSTI to the Brazos Area Block 76 SSTI, Offshore Texas PSN 20125–2; (2) approximately 30.18 miles of a 20-inch pipeline lateral extending from the Brazos Area Block 76 SSTI to the Brazos Area Block 538 Platform, Offshore Texas PSN 20124 (3) related appurtenant facilities, including metering facilities, located on the Brazos Area Block 133 Platform A MS 1334. The total estimated cost of abandonment is approximately $1.6 million. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this VerDate Sep<11>2014 20:01 Apr 19, 2023 Jkt 259001 document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the proposed project should be directed to Jordan Kirwin, Director, Rate & Regulatory, Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251–1396; by phone at (346) 439–0447 or by email to Jordan.Kirwin@Williams.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on May 4, 2023. How to file protests, motions to intervene, and comments is explained below. 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00021 Fmt 4703 Sfmt 4703 Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is May 4, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is May 4, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 5 18 CFR 385.214. 6 18 CFR 157.10. 3 Persons E:\FR\FM\20APN1.SGM 20APN1

Agencies

[Federal Register Volume 88, Number 76 (Thursday, April 20, 2023)]
[Notices]
[Pages 24401-24402]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08349]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-121-000.
    Applicants: Clearwater Wind East, LLC.
    Description: Clearwater Wind East, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 4/13/23.
    Accession Number: 20230413-5176.
    Comment Date: 5 p.m. ET 5/4/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER22-2867-003.
    Applicants: Bluegrass Solar, LLC.
    Description: Tariff Amendment: Response to Second Deficiency Letter 
to be effective 10/1/2022.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5101.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-888-001.
    Applicants: New England Power Company.
    Description: Tariff Amendment: 2023-04-14 Deficiency Letter 
Response to be effective 12/19/2022.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5029.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1638-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 6864; Queue No. AF1-019 to be effective 3/14/2023.
    Filed Date: 4/13/23.
    Accession Number: 20230413-5165.
    Comment Date: 5 p.m. ET 5/4/23.

    Docket Numbers: ER23-1639-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
American Transmission Company LLC.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
04-14_SA 3909 ATC-City of Negaunee 1st Rev PCA (Irontown) to be 
effective 6/14/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5017.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1640-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: 2023-04-14--Att O PSCo 
Appendix 1 to be effective 4/27/2022.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5059.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1641-000.
    Applicants: Stored Solar Tamworth, LLC.
    Description: Tariff Amendment: Cancellation of Stored Solar 
Tamworth, LLC MBR Tariff to be effective 4/14/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5070.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1642-000.
    Applicants: Stored Solar J&WE, LLC.
    Description: Sec.  205(d) Rate Filing: NE Renewable Power, LLC MBR 
Tariff to be effective 1/31/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5074.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1643-000.
    Applicants: PacifiCorp.
    Description: Tariff Amendment: Notice of Termination to be 
effective 6/14/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5095.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1644-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment to Rate Schedule 
FERC No. 35 to be effective 6/13/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5103.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1645-000.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Virginia Electric and Power 
Company submits tariff filing per 35.13(a)(2)(iii: VEPCO revisions to 
OPEB Expense in OATT Att. H-16C Formula Rate to be effective 6/15/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5111.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1646-000.
    Applicants: Virginia Electric and Power Company, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Virginia Electric and Power 
Company submits tariff filing per 35.13(a)(2)(iii: VEPCO submits 
revisions to OATT Att. H-16A Pt. 2 Depreciation Rates to be effective 
6/14/2023.
    Filed Date: 4/14/23.
    Accession Number: 20230414-5112.
    Comment Date: 5 p.m. ET 5/5/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but

[[Page 24402]]

intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: April 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-08349 Filed 4-19-23; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.