Combined Notice of Filings, 24405-24406 [2023-08347]
Download as PDF
Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices
public. A daytime meeting will be held
at 10:00 a.m. on May 17, 2023, at the
same location, and will focus on the
concerns of resource agencies, nongovernmental organizations (NGOs), and
Native American tribes. We invite all
interested agencies, Indian Tribes, nongovernmental organizations, and
individuals to attend one or both of
these meetings. The times and locations
of these meetings are as follows:
Evening Scoping Meeting
Date: Tuesday, May 16, 2023.
Time: 7:00 p.m. (EDT).
Place: Mimslyn Inn (Blue Ridge
Room).
Address: 401 W Main St., Luray, VA
22835.
Daytime Scoping Meeting
Date: Wednesday, May 17, 2023.
Time: 10:00 a.m. (EDT).
Place: Mimslyn Inn (Blue Ridge
Room).
Address: 401 W Main St., Luray, VA
22835.
Copies of the Scoping Document
(SD1) outlining the subject areas to be
addressed in the NEPA document were
distributed to the parties on the
Commission’s mailing list. Copies of the
SD1 will be available at the scoping
meeting or may be viewed on the web
at https://www.ferc.gov using the
‘‘eLibrary’’ link (see item m above).
Environmental Site Reviews
The applicant and Commission staff
will conduct environmental site reviews
of the projects. All interested
individuals, agencies, tribes, and NGOs
are invited to attend. All participants
are responsible for their own
transportation to the sites and during
the site visits. Please RSVP via email to
joyce.foster@eaglecreekre.com or notify
Joyce Foster at 804–338–5110 on or
before May 9, 2023, if you plan to attend
the environmental site reviews. The
times and locations of the
environmental site reviews are as
follows:
ddrumheller on DSK120RN23PROD with NOTICES1
Luray and Newport, and Shenandoah
Hydroelectric Projects
Date: Tuesday, May 16, 2023.
Time: 9:30 a.m. (EDT).
Place: Luray and Newport
Hydroelectric Project: Luray
Development.
Address: 650 Power Dam Road, Luray,
VA 22835.
Participants will meet in the Luray
Development parking lot; after the site
visit for the Luray Development, we will
travel to the Newport Development,
located off U.S. Highway 340 near the
intersection of U.S. Highway Business
VerDate Sep<11>2014
20:01 Apr 19, 2023
Jkt 259001
24405
340 and U.S. Highway 340. After the
site visit for the Luray and Newport
Project, we will travel to the
Shenandoah Hydroelectric Project,
located at 575 Long Avenue,
Shenandoah, VA 22849.
DEPARTMENT OF ENERGY
Warren Hydroelectric Project
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Date: Wednesday, May 17, 2023.
Time: 1:30 p.m. (EDT).
Place: Warren Hydroelectric Project.
Address: 106 Bennys Beach Road,
Front Royal, VA 22630.
All persons attending the
environmental site reviews must adhere
to the following requirements: (1) all
persons must wear sturdy, closed-toe
shoes or boots; (2) persons with opentoed shoes/sandals/flip flops/high heels,
etc. will not be allowed on the
environmental site reviews; (3) persons
must be 18 years or older; (4) no
photography will be allowed inside the
powerhouses; (5) no weapons are
allowed on-site; (6) no alcohol/drugs are
allowed on-site (or persons exhibiting
the effects thereof); and (7) no animals
(except for service animals) are allowed
on the environmental site reviews.
Objectives
At the scoping meetings, Commission
staff will: (1) summarize the
environmental issues tentatively
identified for analysis in the NEPA
document; (2) solicit from the meeting
participants all available information,
especially quantifiable data, on the
resources at issue; (3) encourage
statements from experts and the public
on issues that should be analyzed in the
NEPA document, including viewpoints
in opposition to, or in support of, the
staff’s preliminary views; (4) determine
the resource issues to be addressed in
the NEPA document; and (5) identify
those issues that require a detailed
analysis, as well as those issues that do
not require a detailed analysis.
Procedures
The meetings are recorded by a
stenographer and become part of the
formal record of the Commission
proceeding on the project. Individuals,
NGOs, Native American tribes, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting and to assist the staff in
defining and clarifying the issues to be
addressed in the NEPA document.
Dated: April 13, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08319 Filed 4–19–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings
Filings Instituting Proceedings
Docket Numbers: PR23–44–000.
Applicants: Moss Bluff Hub, LLC.
Description: § 284.123 Rate Filing:
Moss Bluff—TPGS Acquisition
Notification to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413–5121.
Comment Date: 5 p.m. ET 5/4/23.
Docket Numbers: RP23–682–000.
Applicants: Natural Gas Pipeline
Company of America LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Filing—
Amend Macquarie Energy SP149963 to
be effective 4/14/2023.
Filed Date: 4/13/23.
Accession Number: 20230413–5101.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23–683–000.
Applicants: Egan Hub Storage, LLC.
Description: Compliance filing:
Egan—TPGS Acquisition Notification to
be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413–5120.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23–684–000.
Applicants: Steckman Ridge, LP.
Description: Compliance filing:
Steckman—TPGS Acquisition
Notification to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413–5123.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23–685–000.
Applicants: Bobcat Gas Storage.
Description: Compliance filing:
Bobcat—TPGS Acquisition Notification
to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413–5124.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23–686–000.
Applicants: Tres Palacios Gas Storage
LLC.
Description: Compliance filing: Tres
Palacios Acquisition Notification Filing
to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413–5127.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23–687–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (Chevron
E:\FR\FM\20APN1.SGM
20APN1
24406
Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices
41610 eff 4–14–23) to be effective 4/14/
2023.
Filed Date: 4/14/23.
Accession Number: 20230414–5009.
Comment Date: 5 p.m. ET 4/26/23.
DEPARTMENT OF ENERGY
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Androscoggin Reservoir Company;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Filings in Existing Proceedings
Docket Numbers: RP19–73–008.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Compliance filing: Rate
Case Settlement Implementation Filing
to be effective 5/13/2023.
Filed Date: 4/13/23.
Accession Number: 20230413–5092.
Comment Date: 5 p.m. ET 4/25/23.
ddrumheller on DSK120RN23PROD with NOTICES1
Docket Numbers: RP22–501–006.
Applicants: ANR Pipeline Company.
Description: Compliance filing: ANR
Rate Case—Compliance to Settlement
Agreement to be effective 8/1/2022.
Filed Date: 4/14/23.
Accession Number: 20230414–5048.
Comment Date: 5 p.m. ET 4/26/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–08347 Filed 4–19–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:01 Apr 19, 2023
Jkt 259001
Federal Energy Regulatory
Commission
[Project No. 4026–055]
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 4026–055.
c. Date Filed: March 31, 2023.
d. Applicant: Androscoggin Reservoir
Company (ARCO).
e. Name of Project: Aziscohos
Hydroelectric Project (project).
f. Location: On the Magalloway River
in Oxford and Franklin Counties,
Maine. The project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Randy Dorman,
Relicensing Manager, Brookfield
Renewable, 150 Maine Street, Lewiston,
ME 04240; phone at (207) 755–5605, or
email at Randy.Dorman@
brookfieldrenewable.com.
i. FERC Contact: Michael Watts at
(202) 502–6123, or michael.watts@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
project consists of: (1) a 74-foot-high,
881-foot-long concrete multiple archbuttress dam consisting of the following
sections: (a) a 236-foot-long concrete
ogee spillway section with a crest
elevation of 1,517.3 feet National
Geodetic Vertical Datum of 1929
(NGVD29), and 3-foot-high flashboards
at an elevation of 1,520.3 feet NGVD29
at the top of the flashboards; (b) a 265foot-long concrete non-overflow section
with two, 7-foot-diameter cylindrical
discharge gates; (c) a 120-foot-long
earthen dike north abutment; and (d) a
260-foot-long earthen dike south
abutment; (2) a 27-foot-high, 900-footlong earthen containment dike (Abbott
Brooke Dike) located two miles
upstream of the dam; (3) an
impoundment (Aziscohos Lake) with a
maximum water surface elevation of
1,520.3 feet NGVD29; (4) an intake
structure consisting of a modified log
sluice with stoplogs and a 96-inch
butterfly valve in the non-overflow
section of the dam; (5) a 2,462-foot-long,
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
8-foot-diameter steel penstock that
provides flow to a 5.311-megawatt
vertical Kaplan turbine-generator unit
located in a concrete powerhouse; (6) a
60-foot-long tailrace; (7) a 12.47/34.5kilovolt (kV) step-up transformer and a
23.5-mile long, 34.5-kV transmission
line connecting the project generator to
the regional grid; and (8) appurtenant
facilities. The project creates an
approximately 2,400-foot-long bypassed
reach of the Magalloway River.
The project is operated as a seasonal
storage reservoir as part of the
Androscoggin River Storage System.
The current license requires ARCO to
provide a minimum flow of 130 cubic
feet per second (cfs) downstream of the
powerhouse from the start of spring
refill through September 15. The
minimum flow is increased to 214 cfs
from September 16 to the start of spring
refill each year. The current license
requires that 50 cfs of the required
minimum flow, be released from the
Aziscohos Dam into the bypassed reach
of the Magalloway River. The current
license also requires that a whitewater
flow of 900 cfs be released during the
4th weekend of June, 1st weekend of
July, and 1st weekend of September;
and a whitewater flow of 1,200 cfs be
released on the 2nd weekend of July,
and the 3rd and 4th weekend of August.
The minimum and maximum
hydraulic capacities of the powerhouse
are 290 cfs and 623 cfs, respectively.
The average annual generation of the
project was approximately 30,788
megawatt-hours from 2012 through
2022.
ARCO is not proposing any changes to
project facilities or operation at this
time.
l. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–4026).
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). At this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact FERC at FERCOnlineSupport@
ferc.gov or call toll free, (886) 208–3676
or TTY (202) 502–8659.
m. You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 88, Number 76 (Thursday, April 20, 2023)]
[Notices]
[Pages 24405-24406]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08347]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas & Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23-44-000.
Applicants: Moss Bluff Hub, LLC.
Description: Sec. 284.123 Rate Filing: Moss Bluff--TPGS
Acquisition Notification to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413-5121.
Comment Date: 5 p.m. ET 5/4/23.
Docket Numbers: RP23-682-000.
Applicants: Natural Gas Pipeline Company of America LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Filing--Amend Macquarie Energy SP149963 to be effective 4/14/2023.
Filed Date: 4/13/23.
Accession Number: 20230413-5101.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23-683-000.
Applicants: Egan Hub Storage, LLC.
Description: Compliance filing: Egan--TPGS Acquisition Notification
to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413-5120.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23-684-000.
Applicants: Steckman Ridge, LP.
Description: Compliance filing: Steckman--TPGS Acquisition
Notification to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413-5123.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23-685-000.
Applicants: Bobcat Gas Storage.
Description: Compliance filing: Bobcat--TPGS Acquisition
Notification to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413-5124.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23-686-000.
Applicants: Tres Palacios Gas Storage LLC.
Description: Compliance filing: Tres Palacios Acquisition
Notification Filing to be effective N/A.
Filed Date: 4/13/23.
Accession Number: 20230413-5127.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP23-687-000.
Applicants: Gulf South Pipeline Company, LLC.
Description: Sec. 4(d) Rate Filing: Amendment to Neg Rate Agmt
(Chevron
[[Page 24406]]
41610 eff 4-14-23) to be effective 4/14/2023.
Filed Date: 4/14/23.
Accession Number: 20230414-5009.
Comment Date: 5 p.m. ET 4/26/23.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP19-73-008.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Compliance filing: Rate Case Settlement Implementation
Filing to be effective 5/13/2023.
Filed Date: 4/13/23.
Accession Number: 20230413-5092.
Comment Date: 5 p.m. ET 4/25/23.
Docket Numbers: RP22-501-006.
Applicants: ANR Pipeline Company.
Description: Compliance filing: ANR Rate Case--Compliance to
Settlement Agreement to be effective 8/1/2022.
Filed Date: 4/14/23.
Accession Number: 20230414-5048.
Comment Date: 5 p.m. ET 4/26/23.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-08347 Filed 4-19-23; 8:45 am]
BILLING CODE 6717-01-P