Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, 24402-24403 [2023-08320]
Download as PDF
24402
Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–08349 Filed 4–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–141–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
and Establishing Intervention Deadline
Take notice that on April 5, 2023
Transcontinental Gas Pipe Line
Company, LLC, (Transco) P.O. Box
1396, Houston, Texas 77251–1396, filed
an application under section 7(b) of the
Natural Gas Act (NGA), and Part 157, of
the Commission’s regulations requesting
the authority to abandon its existing 20inch offshore gathering supply laterals
with appurtenant metering facilities
extending from the Quarter Northowned Brazos Area 133A Platform,
Offshore Texas to the Transco-owned
Brazos Area 538 Platform, Offshore
Texas.
Specifically, Transco is requesting
approval to abandon (1) approximately
10.71 miles of 20-inch pipeline laterals
comprising of 4.44 miles extending from
the producer-owned Brazos Area Block
133 Platform A to the Brazos Area Block
105 subsea tie-in (SSTI), Offshore Texas
Pipeline Segment Number (PSN) PSN
20125–1, and 6.27 miles extending from
the Brazos Area Block 105 SSTI to the
Brazos Area Block 76 SSTI, Offshore
Texas PSN 20125–2; (2) approximately
30.18 miles of a 20-inch pipeline lateral
extending from the Brazos Area Block
76 SSTI to the Brazos Area Block 538
Platform, Offshore Texas PSN 20124 (3)
related appurtenant facilities, including
metering facilities, located on the Brazos
Area Block 133 Platform A MS 1334.
The total estimated cost of abandonment
is approximately $1.6 million.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
VerDate Sep<11>2014
20:01 Apr 19, 2023
Jkt 259001
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Jordan
Kirwin, Director, Rate & Regulatory,
Transcontinental Gas Pipe Line
Company, LLC, Post Office Box 1396,
Houston, Texas 77251–1396; by phone
at (346) 439–0447 or by email to
Jordan.Kirwin@Williams.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on May 4, 2023. How to
file protests, motions to intervene, and
comments is explained below.
1 18
PO 00000
CFR (Code of Federal Regulations) 157.9.
Frm 00021
Fmt 4703
Sfmt 4703
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is May 4,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is May 4, 2023. As
described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
how-guides.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
2 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
4 18 CFR 157.205(e).
5 18 CFR 385.214.
6 18 CFR 157.10.
3 Persons
E:\FR\FM\20APN1.SGM
20APN1
Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before May 4,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
ddrumheller on DSK120RN23PROD with NOTICES1
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–141–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–141–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To send via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FERCOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served to the applicant by mail
to: Jordan Kirwin, Director, Rates &
Regulatory, Transcontinental Gas Pipe
Line Company, LLC, Post Office Box
1396, Houston, Texas 77251–1396; or by
email (with a link to the document) at
Jordan.Kirwin@Williams.com.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at https://
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to https://www.ferc.gov/ferconline/overview.
Intervention Deadline: 5:00 p.m.
Eastern Time on May 4, 2023.
Dated: April 13, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08320 Filed 4–19–23; 8:45 am]
BILLING CODE 6717–01–P
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
VerDate Sep<11>2014
20:01 Apr 19, 2023
Jkt 259001
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
24403
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2391–053, Project No. 2425–
057, Project No. 2509–051]
PE Hydro Generation, LLC; Notice of
Scoping Meetings and Environmental
Site Reviews and Soliciting Scoping
Comments
Take notice that the following
hydroelectric applications have been
filed with the Commission and is
available for public inspection.
a. Type of Applications: Subsequent
Minor, New Major License, Subsequent
Minor.
b. Project Nos.: P–2391–053, P–2425–
057, and P–2509–051.
c. Date Filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Names of Projects: Warren
Hydroelectric Project, Luray and
Newport Hydroelectric Project, and
Shenandoah Hydroelectric Project.
f. Locations: The Warren Project is on
the Shenandoah River near the Town of
Front Royal in Warren County, Virginia.
The two-development Luray and
Newport Project is located on the South
Fork of the Shenandoah River near the
Towns of Luray (Luray Development)
and Newport (Newport Development) in
Page County, Virginia. The Shenandoah
Project is located on the South Fork of
the Shenandoah River near the Town of
Shenandoah in Page and Rockingham,
Counties, Virginia. The projects do not
occupy any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (240) 482–2700 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Kristine Sillett at
(202) 502–6575; or email at
kristine.sillett@ferc.gov.
j. Deadline for filing scoping
comments: June 12, 2023.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx.
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 88, Number 76 (Thursday, April 20, 2023)]
[Notices]
[Pages 24402-24403]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08320]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-141-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Application and Establishing Intervention Deadline
Take notice that on April 5, 2023 Transcontinental Gas Pipe Line
Company, LLC, (Transco) P.O. Box 1396, Houston, Texas 77251-1396, filed
an application under section 7(b) of the Natural Gas Act (NGA), and
Part 157, of the Commission's regulations requesting the authority to
abandon its existing 20-inch offshore gathering supply laterals with
appurtenant metering facilities extending from the Quarter North-owned
Brazos Area 133A Platform, Offshore Texas to the Transco-owned Brazos
Area 538 Platform, Offshore Texas.
Specifically, Transco is requesting approval to abandon (1)
approximately 10.71 miles of 20-inch pipeline laterals comprising of
4.44 miles extending from the producer-owned Brazos Area Block 133
Platform A to the Brazos Area Block 105 subsea tie-in (SSTI), Offshore
Texas Pipeline Segment Number (PSN) PSN 20125-1, and 6.27 miles
extending from the Brazos Area Block 105 SSTI to the Brazos Area Block
76 SSTI, Offshore Texas PSN 20125-2; (2) approximately 30.18 miles of a
20-inch pipeline lateral extending from the Brazos Area Block 76 SSTI
to the Brazos Area Block 538 Platform, Offshore Texas PSN 20124 (3)
related appurtenant facilities, including metering facilities, located
on the Brazos Area Block 133 Platform A MS 1334. The total estimated
cost of abandonment is approximately $1.6 million.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed project should be directed to
Jordan Kirwin, Director, Rate & Regulatory, Transcontinental Gas Pipe
Line Company, LLC, Post Office Box 1396, Houston, Texas 77251-1396; by
phone at (346) 439-0447 or by email to [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on May 4, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is May 4, 2023. A protest may also serve as
a motion to intervene so long as the protestor states it also seeks to
be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is May 4, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the
[[Page 24403]]
intervention deadline are untimely and may be denied. Any late-filed
motion to intervene must show good cause for being late and must
explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before May 4, 2023. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-141-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-141-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To send via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
Protests and motions to intervene must be served to the applicant
by mail to: Jordan Kirwin, Director, Rates & Regulatory,
Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396,
Houston, Texas 77251-1396; or by email (with a link to the document) at
[email protected].
Any subsequent submissions by an intervenor must be served on the
applicant and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.
Intervention Deadline: 5:00 p.m. Eastern Time on May 4, 2023.
Dated: April 13, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-08320 Filed 4-19-23; 8:45 am]
BILLING CODE 6717-01-P