Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, 24402-24403 [2023-08320]

Download as PDF 24402 Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 14, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–08349 Filed 4–19–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP23–141–000] ddrumheller on DSK120RN23PROD with NOTICES1 Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline Take notice that on April 5, 2023 Transcontinental Gas Pipe Line Company, LLC, (Transco) P.O. Box 1396, Houston, Texas 77251–1396, filed an application under section 7(b) of the Natural Gas Act (NGA), and Part 157, of the Commission’s regulations requesting the authority to abandon its existing 20inch offshore gathering supply laterals with appurtenant metering facilities extending from the Quarter Northowned Brazos Area 133A Platform, Offshore Texas to the Transco-owned Brazos Area 538 Platform, Offshore Texas. Specifically, Transco is requesting approval to abandon (1) approximately 10.71 miles of 20-inch pipeline laterals comprising of 4.44 miles extending from the producer-owned Brazos Area Block 133 Platform A to the Brazos Area Block 105 subsea tie-in (SSTI), Offshore Texas Pipeline Segment Number (PSN) PSN 20125–1, and 6.27 miles extending from the Brazos Area Block 105 SSTI to the Brazos Area Block 76 SSTI, Offshore Texas PSN 20125–2; (2) approximately 30.18 miles of a 20-inch pipeline lateral extending from the Brazos Area Block 76 SSTI to the Brazos Area Block 538 Platform, Offshore Texas PSN 20124 (3) related appurtenant facilities, including metering facilities, located on the Brazos Area Block 133 Platform A MS 1334. The total estimated cost of abandonment is approximately $1.6 million. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this VerDate Sep<11>2014 20:01 Apr 19, 2023 Jkt 259001 document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding the proposed project should be directed to Jordan Kirwin, Director, Rate & Regulatory, Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251–1396; by phone at (346) 439–0447 or by email to Jordan.Kirwin@Williams.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on May 4, 2023. How to file protests, motions to intervene, and comments is explained below. 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00021 Fmt 4703 Sfmt 4703 Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,2 any person 3 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,4 and must be submitted by the protest deadline, which is May 4, 2023. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 5 and the regulations under the NGA 6 by the intervention deadline for the project, which is May 4, 2023. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ how-guides. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the 2 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 4 18 CFR 157.205(e). 5 18 CFR 385.214. 6 18 CFR 157.10. 3 Persons E:\FR\FM\20APN1.SGM 20APN1 Federal Register / Vol. 88, No. 76 / Thursday, April 20, 2023 / Notices intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before May 4, 2023. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. ddrumheller on DSK120RN23PROD with NOTICES1 How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP23–141–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing’’; or 7 (2) You can file a paper copy of your submission by mailing it to the address below. Your submission must reference the Project docket number CP23–141– 000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To send via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FERCOnlineSupport@ferc.gov. Protests and motions to intervene must be served to the applicant by mail to: Jordan Kirwin, Director, Rates & Regulatory, Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, Houston, Texas 77251–1396; or by email (with a link to the document) at Jordan.Kirwin@Williams.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at https:// www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to https://www.ferc.gov/ferconline/overview. Intervention Deadline: 5:00 p.m. Eastern Time on May 4, 2023. Dated: April 13, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–08320 Filed 4–19–23; 8:45 am] BILLING CODE 6717–01–P 7 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. VerDate Sep<11>2014 20:01 Apr 19, 2023 Jkt 259001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 24403 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2391–053, Project No. 2425– 057, Project No. 2509–051] PE Hydro Generation, LLC; Notice of Scoping Meetings and Environmental Site Reviews and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with the Commission and is available for public inspection. a. Type of Applications: Subsequent Minor, New Major License, Subsequent Minor. b. Project Nos.: P–2391–053, P–2425– 057, and P–2509–051. c. Date Filed: January 3, 2022. d. Applicant: PE Hydro Generation, LLC. e. Names of Projects: Warren Hydroelectric Project, Luray and Newport Hydroelectric Project, and Shenandoah Hydroelectric Project. f. Locations: The Warren Project is on the Shenandoah River near the Town of Front Royal in Warren County, Virginia. The two-development Luray and Newport Project is located on the South Fork of the Shenandoah River near the Towns of Luray (Luray Development) and Newport (Newport Development) in Page County, Virginia. The Shenandoah Project is located on the South Fork of the Shenandoah River near the Town of Shenandoah in Page and Rockingham, Counties, Virginia. The projects do not occupy any federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, Bethesda, MD 20814; Phone at (240) 482–2700 or email at jody.smet@eaglecreekre.com. i. FERC Contact: Kristine Sillett at (202) 502–6575; or email at kristine.sillett@ferc.gov. j. Deadline for filing scoping comments: June 12, 2023. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. E:\FR\FM\20APN1.SGM 20APN1

Agencies

[Federal Register Volume 88, Number 76 (Thursday, April 20, 2023)]
[Notices]
[Pages 24402-24403]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08320]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-141-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Application and Establishing Intervention Deadline

    Take notice that on April 5, 2023 Transcontinental Gas Pipe Line 
Company, LLC, (Transco) P.O. Box 1396, Houston, Texas 77251-1396, filed 
an application under section 7(b) of the Natural Gas Act (NGA), and 
Part 157, of the Commission's regulations requesting the authority to 
abandon its existing 20-inch offshore gathering supply laterals with 
appurtenant metering facilities extending from the Quarter North-owned 
Brazos Area 133A Platform, Offshore Texas to the Transco-owned Brazos 
Area 538 Platform, Offshore Texas.
    Specifically, Transco is requesting approval to abandon (1) 
approximately 10.71 miles of 20-inch pipeline laterals comprising of 
4.44 miles extending from the producer-owned Brazos Area Block 133 
Platform A to the Brazos Area Block 105 subsea tie-in (SSTI), Offshore 
Texas Pipeline Segment Number (PSN) PSN 20125-1, and 6.27 miles 
extending from the Brazos Area Block 105 SSTI to the Brazos Area Block 
76 SSTI, Offshore Texas PSN 20125-2; (2) approximately 30.18 miles of a 
20-inch pipeline lateral extending from the Brazos Area Block 76 SSTI 
to the Brazos Area Block 538 Platform, Offshore Texas PSN 20124 (3) 
related appurtenant facilities, including metering facilities, located 
on the Brazos Area Block 133 Platform A MS 1334. The total estimated 
cost of abandonment is approximately $1.6 million.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
Jordan Kirwin, Director, Rate & Regulatory, Transcontinental Gas Pipe 
Line Company, LLC, Post Office Box 1396, Houston, Texas 77251-1396; by 
phone at (346) 439-0447 or by email to [email protected].
    Pursuant to Section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on May 4, 2023. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\2\ any person \3\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \2\ 18 CFR 157.205.
    \3\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\4\ and must be submitted by 
the protest deadline, which is May 4, 2023. A protest may also serve as 
a motion to intervene so long as the protestor states it also seeks to 
be an intervenor.
---------------------------------------------------------------------------

    \4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \5\ and the regulations under the NGA \6\ by the 
intervention deadline for the project, which is May 4, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/how-guides.
---------------------------------------------------------------------------

    \5\ 18 CFR 385.214.
    \6\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the

[[Page 24403]]

intervention deadline are untimely and may be denied. Any late-filed 
motion to intervene must show good cause for being late and must 
explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before May 4, 2023. The filing of a comment alone will not serve 
to make the filer a party to the proceeding. To become a party, you 
must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-141-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------

    \7\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-141-000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To send via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected].
    Protests and motions to intervene must be served to the applicant 
by mail to: Jordan Kirwin, Director, Rates & Regulatory, 
Transcontinental Gas Pipe Line Company, LLC, Post Office Box 1396, 
Houston, Texas 77251-1396; or by email (with a link to the document) at 
[email protected].
    Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at https://www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to https://www.ferc.gov/ferc-online/overview.
    Intervention Deadline: 5:00 p.m. Eastern Time on May 4, 2023.

    Dated: April 13, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-08320 Filed 4-19-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.