Appalachian Power Company; Notice of Waiver Period for Water Quality Certification Application, 23664 [2023-08165]
Download as PDF
23664
Federal Register / Vol. 88, No. 74 / Tuesday, April 18, 2023 / Notices
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Issue Scoping Document 1 for
comments May 2023
Scoping Document 1 comments due
June 2023
Issue Scoping Document 2 (if necessary)
July 2023
Issue Notice of Ready for Environmental
Analysis July 2023
Dated: April 11, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–08134 Filed 4–17–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ddrumheller on DSK120RN23PROD with NOTICES1
[FR Doc. 2023–08165 Filed 4–17–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL23–25–000]
Bellflower Solar 1, LLC Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On March 30, 2023, the Commission
issued an order in Docket No. EL23–25–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e, instituting an investigation into
whether Bellflower Solar 1, LLC’s
proposed Rate Schedule 1 setting forth
the revenue requirement of its 152.5
MW solar generating facility for
Reactive Supply and Voltage Control
from Generation Sources Services, as
defined in Schedule 2 of the PJM
Interconnection, L.L.C. (PJM) Open
Access Transmission Tariff (Tariff) 2 is
unjust, unreasonable, unduly
discriminatory or preferential, or
otherwise unlawful. Bellflower Solar 1,
LLC, 182 FERC ¶ 61,219 (2023).
The refund effective date in Docket
No. EL23–25–000, established pursuant
18 CFR 5.23(b).
Bellflower Solar 1, LLC, Rate Schedule Tariff,
Rate Schedule FERC No. 1, Reactive Supply and
Voltage Control (0.0.0).
2 PJM, Intra-PJM Tariffs, OATT, Schedule 2
(4.0.0). Bellflower is a new seller that has not
previously provided reactive power services to PJM
and has no prior transactions and no prior
customers. See Chehalis Power Generating, LP, 152
FERC ¶ 61,050, at P 14 (2015) (‘‘In order for a rate
to be considered an initial rate, it must provide for
a new service to a new customer.’’) (citing Sw. Elec.
Power Co., 39 FERC ¶ 61,099, at 61,293 (1987)).
1
Appalachian Power Company; Notice
of Waiver Period for Water Quality
Certification Application
On April 5, 2023, Appalachian Power
Company submitted to the Federal
Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
18:08 Apr 17, 2023
Dated: April 12, 2023.
Kimberly D. Bose,
Secretary.
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL23–25–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2022),
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: March 30, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–08157 Filed 4–17–23; 8:45 am]
BILLING CODE 6717–01–P
1
[Project No. 2466–037]
VerDate Sep<11>2014
water quality certification filed with the
Virginia Department of Environmental
Quality (Virginia DEQ), in conjunction
with the above captioned project.
Pursuant to 40 CFR 121.6 and section
5.23(b) of the Commission’s
regulations,1 we hereby notify Virginia
DEQ of the following:
Date of Receipt of the Certification
Request: April 4, 2023.
Reasonable Period of Time to Act on
the Certification Request: One year
(April 4, 2024).
If Virginia DEQ fails or refuses to act
on the water quality certification request
on or before the above date, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Jkt 259001
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER22–1999–002.
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 88, Number 74 (Tuesday, April 18, 2023)]
[Notices]
[Page 23664]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-08165]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2466-037]
Appalachian Power Company; Notice of Waiver Period for Water
Quality Certification Application
On April 5, 2023, Appalachian Power Company submitted to the
Federal Energy Regulatory Commission (Commission) a copy of its
application for a Clean Water Act section 401(a)(1) water quality
certification filed with the Virginia Department of Environmental
Quality (Virginia DEQ), in conjunction with the above captioned
project. Pursuant to 40 CFR 121.6 and section 5.23(b) of the
Commission's regulations,\1\ we hereby notify Virginia DEQ of the
following:
---------------------------------------------------------------------------
\1\ 18 CFR 5.23(b).
---------------------------------------------------------------------------
Date of Receipt of the Certification Request: April 4, 2023.
Reasonable Period of Time to Act on the Certification Request: One
year (April 4, 2024).
If Virginia DEQ fails or refuses to act on the water quality
certification request on or before the above date, then the agency
certifying authority is deemed waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C. 1341(a)(1).
Dated: April 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-08165 Filed 4-17-23; 8:45 am]
BILLING CODE 6717-01-P