Elkhart & Western Railroad Co. LLC-Discontinuance of Trackage Rights Exemption-in Marshall and Fulton Counties, Ind., 22513 [2023-07832]
Download as PDF
Federal Register / Vol. 88, No. 71 / Thursday, April 13, 2023 / Notices
lotter on DSK11XQN23PROD with NOTICES1
GMRC and NECR have entered into a
written trackage rights agreement 2 that
grants GMRC overhead trackage rights
over the Line. Those rights allow GMRC
to enter and exit the Line at certain
intermediate points as well as its
terminal points, as described in the
verified notice. GMRC states that the
trackage rights are among settlement
terms that the Board imposed ‘‘as a
condition of the Board’s approval’’ in
CSX Corp.—Control & Merger—Pan Am
Systems, Inc., FD 36472 et al., (STB
served Apr. 14, 2022).
The transaction may be consummated
on or after April 27, 2023, the effective
date of the exemption.
As a condition to this exemption, any
employees affected by the acquisition of
the trackage rights will be protected by
the conditions imposed in Norfolk &
Western Railway—Trackage Rights—
Burlington Northern, Inc., 354 I.C.C. 605
(1978), as modified in Mendocino Coast
Railway—Lease & Operate—California
Western Railroad, 360 I.C.C. 653 (1980).
If the notice contains false or
misleading information, the exemption
is void ab initio. Petitions to revoke the
exemption under 49 U.S.C. 10502(d)
may be filed at any time. The filing of
a petition to revoke will not
automatically stay the effectiveness of
the exemption. Petitions for stay must
be filed no later than April 20, 2023 (at
least seven days before the exemption
becomes effective).
All pleadings, referring to Docket No.
FD 36688, must be filed with the
Surface Transportation Board via efiling on the Board’s website or in
writing addressed to 395 E Street SW,
Washington, DC 20423–0001. In
addition, a copy of each pleading must
be served on GMRC’s representative,
Robert A. Wimbish, Fletcher & Sippel
LLC, 29 North Wacker Drive, Suite 800,
Chicago, IL 60606.
According to GMRC, this action is
categorically excluded from
environmental review under 49 CFR
1105.6(c) and from historic preservation
reporting requirements under 49 CFR
1105.8(b).
Board decisions and notices are
available at www.stb.gov.
Decided: April 7, 2023.
2 A redacted version of the trackage rights
agreement between GMRC and NECR was filed with
the verified notice. An unredacted version of the
agreement was submitted to the Board under seal
concurrently with a motion for protective order,
which is addressed in a separate decision.
VerDate Sep<11>2014
17:56 Apr 12, 2023
Jkt 259001
By the Board, Mai T. Dinh, Director, Office
of Proceedings.
Kenyatta Clay,
Clearance Clerk.
[FR Doc. 2023–07721 Filed 4–12–23; 8:45 am]
BILLING CODE 4915–01–P
SURFACE TRANSPORTATION BOARD
[Docket No. AB 1329X]
Elkhart & Western Railroad Co. LLC—
Discontinuance of Trackage Rights
Exemption—in Marshall and Fulton
Counties, Ind.
On March 24, 2023, Elkhart & Western
Railroad Co. LLC (E&W), a Class III rail
carrier, filed a petition under 49 U.S.C.
10502 for exemption from the prior
approval requirements of 49 U.S.C.
10903 to discontinue trackage rights
over approximately 11.7 miles of rail
line owned by Fulton County, L.L.C.
(FC), extending from milepost I–108.6
near Argos, Ind., to milepost I–96.9 at
Rochester, Ind., in Marshall and Fulton
Counties, Ind. (the Line). The Line
traverses United States Postal Services
Zip Codes 46501 and 46975.
According to E&W, until recently, it
was the exclusive service provider on
the Line, pursuant to a trackage rights
agreement (Agreement) with FC. E&W
states that the Agreement expired on
March 15, 2023, and, on the same day,
Patriot Rail Company, LLC, which
indirectly controls E&W, embargoed the
Line due to unsafe track conditions.
E&W notes that FC has a common
carrier obligation on the Line as well as
a plan for a corporate affiliate, Rochester
& Erie Railway, LLC (RERY), to operate
the Line, see RERY, Notice of
Exemption, Rochester & Erie Ry.—
Operation Exemption—Fulton Cnty.,
LLC, FD 36671. Therefore, according to
E&W, RERY will be affiliated with the
Line as its operator, and shippers will
have access to common carrier service,
should FC and RERY determine that
operations can be resumed safely.
E&W states that it does not believe
that the Lines contain federally granted
rights-of-way. E&W also states that any
documentation in its possession will be
made available promptly to those
requesting it.
As a condition to this exemption, any
employee adversely affected by the
discontinuance of service shall be
protected under Oregon Short Line
Railroad—Abandonment Portion
Goshen Branch Between Firth &
Ammon, in Bingham & Bonneville
Counties, Idaho, 360 I.C.C. 91 (1979).
By issuance of this notice, the Board
is instituting an exemption proceeding
PO 00000
Frm 00110
Fmt 4703
Sfmt 9990
22513
pursuant to 49 U.S.C. 10502(b). A final
decision will be issued by July 12, 2023.
Because this is a discontinuance
proceeding and not an abandonment,
interim trail use/rail banking and public
use conditions are not appropriate.
Because there will be environmental
review during any subsequent
abandonment, this discontinuance does
not require an environmental review.
See 49 CFR 1105.6(c)(5), 1105.8(b).
Any offer of financial assistance
(OFA) for subsidy under 49 CFR
1152.27(b)(2) will be due no later than
120 days after the filing of the petition
for exemption, or 10 days after service
of a decision granting the petition for
exemption, whichever occurs sooner.1
Persons interested in submitting an OFA
must first file a formal expression of
intent to file an offer by April 24, 2023,
indicating the intent to file an OFA for
subsidy and demonstrating that they are
preliminarily financially responsible.
See 49 CFR 1152.27(c)(1)(i).
All filings in response to this notice
must refer to Docket No. AB 1329X and
must be filed with the Surface
Transportation Board either via e-filing
on the Board’s website or in writing
addressed to 395 E Street SW,
Washington, DC 20423–0001. In
addition, a copy of each pleading must
be served on E&W’s representative,
Robert A. Wimbish, Fletcher & Sippel
LLC, 29 North Wacker Drive, Suite 800,
Chicago, IL 60606–3208. Replies to the
petition are due on or before May 3,
2023.
Persons seeking further information
concerning discontinuance procedures
may contact the Board’s Office of Public
Assistance, Governmental Affairs, and
Compliance at (202) 245–0238 or refer
to the full abandonment and
discontinuance regulations at 49 CFR
part 1152. Questions concerning
environmental issues may be directed to
the Board’s Office of Environmental
Analysis at (202) 245–0294. If you
require accommodation under the
Americans with Disabilities Act, please
call (202) 245–0245.
Board decisions and notices are
available at www.stb.gov.
Decided: April 7, 2023.
By the Board, Mai T. Dinh, Director, Office
of Proceedings.
Raina White,
Clearance Clerk.
[FR Doc. 2023–07832 Filed 4–12–23; 8:45 am]
BILLING CODE 4915–01–P
1 The filing fee for OFAs can be found at 49 CFR
1002.2(f)(25).
E:\FR\FM\13APN1.SGM
13APN1
Agencies
[Federal Register Volume 88, Number 71 (Thursday, April 13, 2023)]
[Notices]
[Page 22513]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07832]
-----------------------------------------------------------------------
SURFACE TRANSPORTATION BOARD
[Docket No. AB 1329X]
Elkhart & Western Railroad Co. LLC--Discontinuance of Trackage
Rights Exemption--in Marshall and Fulton Counties, Ind.
On March 24, 2023, Elkhart & Western Railroad Co. LLC (E&W), a
Class III rail carrier, filed a petition under 49 U.S.C. 10502 for
exemption from the prior approval requirements of 49 U.S.C. 10903 to
discontinue trackage rights over approximately 11.7 miles of rail line
owned by Fulton County, L.L.C. (FC), extending from milepost I-108.6
near Argos, Ind., to milepost I-96.9 at Rochester, Ind., in Marshall
and Fulton Counties, Ind. (the Line). The Line traverses United States
Postal Services Zip Codes 46501 and 46975.
According to E&W, until recently, it was the exclusive service
provider on the Line, pursuant to a trackage rights agreement
(Agreement) with FC. E&W states that the Agreement expired on March 15,
2023, and, on the same day, Patriot Rail Company, LLC, which indirectly
controls E&W, embargoed the Line due to unsafe track conditions. E&W
notes that FC has a common carrier obligation on the Line as well as a
plan for a corporate affiliate, Rochester & Erie Railway, LLC (RERY),
to operate the Line, see RERY, Notice of Exemption, Rochester & Erie
Ry.--Operation Exemption--Fulton Cnty., LLC, FD 36671. Therefore,
according to E&W, RERY will be affiliated with the Line as its
operator, and shippers will have access to common carrier service,
should FC and RERY determine that operations can be resumed safely.
E&W states that it does not believe that the Lines contain
federally granted rights-of-way. E&W also states that any documentation
in its possession will be made available promptly to those requesting
it.
As a condition to this exemption, any employee adversely affected
by the discontinuance of service shall be protected under Oregon Short
Line Railroad--Abandonment Portion Goshen Branch Between Firth & Ammon,
in Bingham & Bonneville Counties, Idaho, 360 I.C.C. 91 (1979).
By issuance of this notice, the Board is instituting an exemption
proceeding pursuant to 49 U.S.C. 10502(b). A final decision will be
issued by July 12, 2023.
Because this is a discontinuance proceeding and not an abandonment,
interim trail use/rail banking and public use conditions are not
appropriate. Because there will be environmental review during any
subsequent abandonment, this discontinuance does not require an
environmental review. See 49 CFR 1105.6(c)(5), 1105.8(b).
Any offer of financial assistance (OFA) for subsidy under 49 CFR
1152.27(b)(2) will be due no later than 120 days after the filing of
the petition for exemption, or 10 days after service of a decision
granting the petition for exemption, whichever occurs sooner.\1\
Persons interested in submitting an OFA must first file a formal
expression of intent to file an offer by April 24, 2023, indicating the
intent to file an OFA for subsidy and demonstrating that they are
preliminarily financially responsible. See 49 CFR 1152.27(c)(1)(i).
---------------------------------------------------------------------------
\1\ The filing fee for OFAs can be found at 49 CFR
1002.2(f)(25).
---------------------------------------------------------------------------
All filings in response to this notice must refer to Docket No. AB
1329X and must be filed with the Surface Transportation Board either
via e-filing on the Board's website or in writing addressed to 395 E
Street SW, Washington, DC 20423-0001. In addition, a copy of each
pleading must be served on E&W's representative, Robert A. Wimbish,
Fletcher & Sippel LLC, 29 North Wacker Drive, Suite 800, Chicago, IL
60606-3208. Replies to the petition are due on or before May 3, 2023.
Persons seeking further information concerning discontinuance
procedures may contact the Board's Office of Public Assistance,
Governmental Affairs, and Compliance at (202) 245-0238 or refer to the
full abandonment and discontinuance regulations at 49 CFR part 1152.
Questions concerning environmental issues may be directed to the
Board's Office of Environmental Analysis at (202) 245-0294. If you
require accommodation under the Americans with Disabilities Act, please
call (202) 245-0245.
Board decisions and notices are available at www.stb.gov.
Decided: April 7, 2023.
By the Board, Mai T. Dinh, Director, Office of Proceedings.
Raina White,
Clearance Clerk.
[FR Doc. 2023-07832 Filed 4-12-23; 8:45 am]
BILLING CODE 4915-01-P