Public Hearing, 22083-22084 [2023-07602]
Download as PDF
Federal Register / Vol. 88, No. 70 / Wednesday, April 12, 2023 / Notices
Consumptive Use of Up to 7.5000 mgd;
Approval Date: March 31, 2023.
33. Coterra Energy Inc.; Pad ID: LoffredoJ
P1; ABR–201211017.R2; Nicholson
Township, Wyoming County, Pa.;
Consumptive Use of Up to 5.0000 mgd;
Approval Date: March 31, 2023.
34. Inflection Energy (P.A.) L.L.C.; Pad ID:
Brass Well Site; ABR–201802004.R1; Upper
Fairfield Township, Lycoming County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: March 31, 2023.
35. Range Resources—Appalachia, L.L.C.;
Pad ID: Bobst A Unit 25H–27H; ABR–
201202018.R2; Cogan House Township,
Lycoming County, Pa.; Consumptive Use of
Up to 5.0000 mgd; Approval Date: March 31,
2023.
36. Range Resources—Appalachia, L.L.C.;
Pad ID: Goodwill Hunting Club Unit #4H#9H Drilling Pad; ABR–201011054.R2; Lewis
Township, Lycoming County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: March 31, 2023.
37. Seneca Resources Company, L.L.C.; Pad
ID: Covington Pad M; ABR–201102031.R2;
Covington Township, Tioga County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: March 31, 2023.
38. S.W.N. Production Company, L.L.C.;
Pad ID: FLICKS RUN EAST PAD; ABR–
201302003.R2; Cogan House Township,
Lycoming County, Pa.; Consumptive Use of
Up to 4.9990 mgd; Approval Date: March 31,
2023.
Authority: Public Law 91–575, 84
Stat. 1509 et seq., 18 CFR parts 806 and
808.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–07603 Filed 4–11–23; 8:45 am]
BILLING CODE 7040–01–P
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806 and 808.
Dated: April 7, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
[FR Doc. 2023–07665 Filed 4–11–23; 8:45 am]
BILLING CODE 7040–01–P
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
DATES: January 1–31, 2023.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
ddrumheller on DSK120RN23PROD with NOTICES1
SUMMARY:
VerDate Sep<11>2014
19:25 Apr 11, 2023
This
notice lists GF Registration for projects
described below, pursuant to 18 CFR
part 806, subpart E, for the time period
specified above:
1. Penn-View, Inc.—Wyncote Golf
Club, GF Certificate No. GF–202303243,
Lower Oxford Township, Chester
County, Pa.; On-site Well; Issue Date:
March 6, 2023.
2. Red Hill Farms, Inc., GF Certificate
No. GF–202303244, Various
Municipalities and Counties, Pa.; see
Addendum; Issue Date: March 6, 2023.
3. Ski Roundtop Operating Corp—
Roundtop Mountain Resort, GF
Certificate No. GF–202303245,
Warrington Township, York County,
Pa.; Well 1; Issue Date: March 6, 2023.
4. Village of South Corning—Public
Water Supply System, GF Certificate
No. GF–202303246, Village of South
Corning, Steuben County, N.Y.; Well 1;
Issue Date: March 6, 2023.
5. Strasburg Lancaster County
Borough Authority—Public Water
Supply System, GF Certificate No. GF–
202303247, Paradise and Strasburg
Townships, Lancaster County, Pa.;
combined withdrawal from the King
Well and Rohrer Well; Issue Date:
March 14, 2023.
6. Knouse Foods Cooperative, Inc.—
Peach Glen Plant, GF Certificate No.
GF–202303248, Tyrone and Huntingdon
Townships, Adams County, and
Dickinson Township, Cumberland
County, Pa.; combined withdrawal from
Wells 2, 4, 5, 7, 8, 9, 10, and 13 and
Well 13; Issue Date: March 16, 2023.
SUPPLEMENTARY INFORMATION:
Jkt 259001
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on May 4, 2023. The Commission will
hold this hearing in person and
telephonically. At this public hearing,
the Commission will hear testimony on
the projects listed in the SUPPLEMENTARY
INFORMATION section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
SUMMARY:
PO 00000
Frm 00123
Fmt 4703
Sfmt 4703
22083
business meeting, tentatively scheduled
for June 15, 2023, which will be noticed
separately. The public should note that
this public hearing will be the only
opportunity to offer oral comments to
the Commission for the listed projects.
The deadline for the submission of
written comments is May 15, 2023.
DATES: The public hearing will convene
on May 4, 2023, at 6:30 p.m. The public
hearing will end at 9 p.m. or at the
conclusion of public testimony,
whichever is earlier. The deadline for
submitting written comments is
Monday, May 15, 2023.
ADDRESSES: This public hearing will be
conducted in person and virtually. You
may attend in person at Susquehanna
River Basin Commission, 4423 N Front
St., Harrisburg, Pennsylvania, or join by
telephone at Toll-Free Number 1–877–
304–9269 and then enter the guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423 or joyler@srbc.net.
Information concerning the project
applications is available at the
Commission’s Water Application and
Approval Viewer at https://
www.srbc.net/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009–02.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor: Biglerville Borough
Authority. Project Facility: Biglerville
Borough Water Company, Biglerville
Borough and Butler Township, Adams
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.112 mgd
(30-day average) from Well 7 (Docket No.
19930503).
2. Project Sponsor and Facility: Blackhill
Energy LLC (Susquehanna River), Ulster
Township, Bradford County, Pa. Application
for surface water withdrawal of up to 3.024
mgd (peak day).
3. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C. (Sugar Creek),
North Towanda Township, Bradford County,
Pa. Application for renewal of surface water
withdrawal of up to 0.999 mgd (peak day)
(Docket No. 20180602).
4. Project Sponsor and Facility:
Chesapeake Appalachia, L.L.C. (Susquehanna
River), Asylum Township, Bradford County,
Pa. Application for surface water withdrawal
of up to 3.000 mgd (peak day).
5. Project Sponsor: Coal Mountain
Development and Recreation LLC. Project
Facility: Eagles Ridge Golf Course, Ferguson
Township, Clearfield County, Pa.
E:\FR\FM\12APN1.SGM
12APN1
ddrumheller on DSK120RN23PROD with NOTICES1
22084
Federal Register / Vol. 88, No. 70 / Wednesday, April 12, 2023 / Notices
Application for renewal of consumptive use
of up to 0.099 mgd (30-day average) (Docket
No. 20080613).
6. Project Sponsor and Facility: Dillsburg
Area Authority, Carroll Township, York
County, Pa. Application for renewal of
groundwater withdrawal of up to 0.460 mgd
(30-day average) from Well 7 (Docket No.
20070907).
7. Project Sponsor: Glenn O. Hawbaker,
Inc. Project Facility: Naginey Facility
(Naginey Quarry Processing Pond), Armagh
Township, Mifflin County, Pa. Modification
to increase groundwater withdrawal (30-day
average) by an additional 0.425 mgd, for a
total groundwater withdrawal of up to 0.725
mgd (Docket No. 20211204).
8. Project Sponsor: Hazleton City
Authority. Project Facility: Delano Division,
Mahanoy Township, Schuylkill County, Pa.
Application for groundwater withdrawal of
up to 0.275 mgd (30-day average) from Park
Place Well 1.
9. Project Sponsor and Facility: HillandaleGettysburg, L.P., Tyrone Township, Adams
County, Pa. Application for groundwater
withdrawal of up to 0.050 mgd (30-day
average) from Well 5.
10. Project Sponsor and Facility: LDG
Innovation, LLC (Tioga River), Lawrenceville
Borough, Tioga County, Pa. Application for
renewal of surface water withdrawal of up to
0.750 mgd (peak day) (Docket No. 20180603).
11. Project Sponsor: Milton Hershey
School. Project Facility: Spring Creek Golf
Course, Derry Township, Dauphin County,
Pa. Application for renewal of consumptive
use of up to 0.081 mgd (peak day) (Docket
No. 20080615).
12. Project Sponsor and Facility: Mountain
Energy Services, Inc. (Tunkhannock Creek),
Tunkhannock Township, Wyoming County,
Pa. Application for renewal of surface water
withdrawal of up to 1.498 mgd (peak day)
(Docket No. 20180605).
13. Project Sponsor: New Enterprise Stone
& Lime Co., Inc. Project Facility: Laflin
Quarry, Plains Township, Luzerne County,
Pa. Applications for consumptive use (peak
day) of up to 0.040 mgd and groundwater
withdrawals (30-day averages) of up to 0.110
mgd from Well 1, 0.132 mgd from Well 2,
0.484 mgd from Well 3, 0.110 mgd from Well
4, 0.209 mgd from Well 5, and 0.209 mgd
from Well 6.
14. Project Sponsor and Facility: Nicholas
Meat, LLC, Greene Township, Clinton
County, Pa. Applications for groundwater
withdrawals (30-day averages) of up to 0.288
mgd from Well WS–1, 0.173 mgd from Well
WS–3, and 0.144 mgd from Well WS–4.
15. Project Sponsor and Facility: Northeast
Marcellus Aqua Midstream I, LLC
(Susquehanna River), Tunkhannock
Township, Wyoming County, Pa. Application
for renewal of surface water withdrawal of up
to 5.000 mgd (peak day) (Docket No.
20200919).
16. Project Sponsor and Facility:
Pennsylvania General Energy Company,
L.L.C. (Pine Creek), Watson Township,
Lycoming County, Pa. Application for
renewal of surface water withdrawal of up to
0.918 mgd (peak day) (Docket No. 20180608).
17. Project Sponsor and Facility: Pilgrim’s
Oak Golf Course (Peters Creek and Unnamed
VerDate Sep<11>2014
19:25 Apr 11, 2023
Jkt 259001
Tributary to Peters Creek), Drumore
Township, Lancaster County, Pa.
Applications for renewal of surface water
withdrawal of up to 0.237 mgd (peak day)
and consumptive use of up to 0.237 mgd (30day average) (Docket No. 19980505).
18. Project Sponsor and Facility: ProEnvironmental, LLC (Martins Creek), Lathrop
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 0.999 mgd (peak day)
(Docket No. 20180609).
19. Project Sponsor and Facility: Repsol
Oil & Gas USA, LLC (Fall Brook), Troy
Township, Bradford County, Pa. Application
for renewal of surface water withdrawal of up
to 0.176 mgd (peak day) (Docket No.
20180610).
20. Project Sponsor and Facility: Repsol
Oil & Gas USA, LLC (Unnamed Tributary to
North Branch Sugar Creek), Columbia
Township, Bradford County, Pa. Application
for renewal of surface water withdrawal of up
to 0.926 mgd (peak day) (Docket No.
20180611).
21. Project Sponsor and Facility: State
College Borough Water Authority, Benner
Township, Centre County, Pa. Applications
for renewal of groundwater withdrawals (30day averages) of up to 2.160 mgd from Well
62, 0.720 mgd from Well 63, 0.850 mgd from
Well 64, and 0.720 mgd from Well 65 (Docket
No. 19920102).
22. Project Sponsor and Facility: Sugar
Hollow Water Services LLC (Bowman Creek),
Eaton Township, Wyoming County, Pa.
Application for renewal of surface water
withdrawal of up to 0.249 mgd (peak day)
(Docket No. 20180612).
23. Project Sponsor and Facility:
Susquehanna Gas Field Services, LLC
(Susquehanna River), Meshoppen Township,
Wyoming County, Pa. Application for
renewal of surface water withdrawal of up to
1.650 mgd (peak day) (Docket No. 20180614).
24. Project Sponsor and Facility: SWN
Production Company, LLC (Cowanesque
River), Deerfield Township, Tioga County,
Pa. Application for surface water withdrawal
of up to 1.500 mgd (peak day).
25. Project Sponsor and Facility: Titanium
Metals Corporation (TIMET), Caernarvon
Township, Berks County, Pa. Application for
renewal of consumptive use of up to 0.177
mgd (30-day average) (Docket No. 20080616).
26. Project Sponsor and Facility: Town Big
Flats, Chemung County, N.Y. Applications
for renewal with an increase of groundwater
withdrawals (30-day averages) of up to 0.577
mgd from WD 2-Well 1 and 0.365 mgd from
WD 2-Well 2 (Docket No. 19910304).
27. Project Sponsor and Facility: Town of
Erwin, Steuben County, N.Y. Application for
groundwater withdrawal of up to 1.440 mgd
(30-day average) from Well 7.
Commission-Initiated Project Approval
Modification
28. Project Sponsor and Facility: Village of
Oxford, Town of Oxford, Chenango County,
N.Y. Conforming the grandfathered amount
with the forthcoming determination for
groundwater withdrawals (30-day averages)
of up to 0.402 mgd from Well 1 and 0.099
mgd from Well 2 (Docket No. 20040601).
PO 00000
Frm 00124
Fmt 4703
Sfmt 4703
Opportunity To Appear and Comment
Interested parties may call into the
hearing to offer comments to the
Commission on any business listed
above required to be the subject of a
public hearing. Given the nature of the
meeting, the Commission strongly
encourages those members of the public
wishing to provide oral comments to
pre-register with the Commission by
emailing Jason Oyler at joyler@srbc.net
before the hearing date. The presiding
officer reserves the right to limit oral
statements in the interest of time and to
control the course of the hearing
otherwise. Access to the hearing via
telephone will begin at 6:15 p.m.
Guidelines for the public hearing are
posted on the Commission’s website,
www.srbc.net, before the hearing for
review. The presiding officer reserves
the right to modify or supplement such
guidelines at the hearing. Written
comments on any business listed above
required to be the subject of a public
hearing may also be mailed to Mr. Jason
Oyler, Secretary to the Commission,
Susquehanna River Basin Commission,
4423 North Front Street, Harrisburg, Pa.
17110–1788, or submitted electronically
through https://www.srbc.net/
regulatory/public-comment/. Comments
mailed or electronically submitted must
be received by the Commission on or
before Monday, May 15, 2023, to be
considered.
Authority: Pub. L. 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806, 807, and
808.
Dated: April 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2023–07602 Filed 4–11–23; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2014–0379; FMCSA–
2016–0011; FMCSA–2016–0313; FMCSA–
2018–0057; FMCSA–2020–0045; FMCSA–
2020–0047; FMCSA–2020–0053]
Qualification of Drivers; Exemption
Applications; Epilepsy and Seizure
Disorders
Federal Motor Carrier Safety
Administration (FMCSA), Department
of Transportation (DOT).
ACTION: Notice of renewal of
exemptions; request for comments.
AGENCY:
FMCSA announces its
decision to renew exemptions for 13
SUMMARY:
E:\FR\FM\12APN1.SGM
12APN1
Agencies
[Federal Register Volume 88, Number 70 (Wednesday, April 12, 2023)]
[Notices]
[Pages 22083-22084]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07602]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on May 4, 2023. The Commission will hold this hearing in person
and telephonically. At this public hearing, the Commission will hear
testimony on the projects listed in the Supplementary Information
section of this notice. Such projects are intended to be scheduled for
Commission action at its next business meeting, tentatively scheduled
for June 15, 2023, which will be noticed separately. The public should
note that this public hearing will be the only opportunity to offer
oral comments to the Commission for the listed projects. The deadline
for the submission of written comments is May 15, 2023.
DATES: The public hearing will convene on May 4, 2023, at 6:30 p.m. The
public hearing will end at 9 p.m. or at the conclusion of public
testimony, whichever is earlier. The deadline for submitting written
comments is Monday, May 15, 2023.
ADDRESSES: This public hearing will be conducted in person and
virtually. You may attend in person at Susquehanna River Basin
Commission, 4423 N Front St., Harrisburg, Pennsylvania, or join by
telephone at Toll-Free Number 1-877-304-9269 and then enter the guest
passcode 2619070 followed by #.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423 or
[email protected].
Information concerning the project applications is available at the
Commission's Water Application and Approval Viewer at https://www.srbc.net/waav. Additional supporting documents are available to
inspect and copy in accordance with the Commission's Access to Records
Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover the following
projects:
Projects Scheduled for Action
1. Project Sponsor: Biglerville Borough Authority. Project
Facility: Biglerville Borough Water Company, Biglerville Borough and
Butler Township, Adams County, Pa. Application for renewal of
groundwater withdrawal of up to 0.112 mgd (30-day average) from Well
7 (Docket No. 19930503).
2. Project Sponsor and Facility: Blackhill Energy LLC
(Susquehanna River), Ulster Township, Bradford County, Pa.
Application for surface water withdrawal of up to 3.024 mgd (peak
day).
3. Project Sponsor and Facility: Chesapeake Appalachia, L.L.C.
(Sugar Creek), North Towanda Township, Bradford County, Pa.
Application for renewal of surface water withdrawal of up to 0.999
mgd (peak day) (Docket No. 20180602).
4. Project Sponsor and Facility: Chesapeake Appalachia, L.L.C.
(Susquehanna River), Asylum Township, Bradford County, Pa.
Application for surface water withdrawal of up to 3.000 mgd (peak
day).
5. Project Sponsor: Coal Mountain Development and Recreation
LLC. Project Facility: Eagles Ridge Golf Course, Ferguson Township,
Clearfield County, Pa.
[[Page 22084]]
Application for renewal of consumptive use of up to 0.099 mgd (30-
day average) (Docket No. 20080613).
6. Project Sponsor and Facility: Dillsburg Area Authority,
Carroll Township, York County, Pa. Application for renewal of
groundwater withdrawal of up to 0.460 mgd (30-day average) from Well
7 (Docket No. 20070907).
7. Project Sponsor: Glenn O. Hawbaker, Inc. Project Facility:
Naginey Facility (Naginey Quarry Processing Pond), Armagh Township,
Mifflin County, Pa. Modification to increase groundwater withdrawal
(30-day average) by an additional 0.425 mgd, for a total groundwater
withdrawal of up to 0.725 mgd (Docket No. 20211204).
8. Project Sponsor: Hazleton City Authority. Project Facility:
Delano Division, Mahanoy Township, Schuylkill County, Pa.
Application for groundwater withdrawal of up to 0.275 mgd (30-day
average) from Park Place Well 1.
9. Project Sponsor and Facility: Hillandale-Gettysburg, L.P.,
Tyrone Township, Adams County, Pa. Application for groundwater
withdrawal of up to 0.050 mgd (30-day average) from Well 5.
10. Project Sponsor and Facility: LDG Innovation, LLC (Tioga
River), Lawrenceville Borough, Tioga County, Pa. Application for
renewal of surface water withdrawal of up to 0.750 mgd (peak day)
(Docket No. 20180603).
11. Project Sponsor: Milton Hershey School. Project Facility:
Spring Creek Golf Course, Derry Township, Dauphin County, Pa.
Application for renewal of consumptive use of up to 0.081 mgd (peak
day) (Docket No. 20080615).
12. Project Sponsor and Facility: Mountain Energy Services, Inc.
(Tunkhannock Creek), Tunkhannock Township, Wyoming County, Pa.
Application for renewal of surface water withdrawal of up to 1.498
mgd (peak day) (Docket No. 20180605).
13. Project Sponsor: New Enterprise Stone & Lime Co., Inc.
Project Facility: Laflin Quarry, Plains Township, Luzerne County,
Pa. Applications for consumptive use (peak day) of up to 0.040 mgd
and groundwater withdrawals (30-day averages) of up to 0.110 mgd
from Well 1, 0.132 mgd from Well 2, 0.484 mgd from Well 3, 0.110 mgd
from Well 4, 0.209 mgd from Well 5, and 0.209 mgd from Well 6.
14. Project Sponsor and Facility: Nicholas Meat, LLC, Greene
Township, Clinton County, Pa. Applications for groundwater
withdrawals (30-day averages) of up to 0.288 mgd from Well WS-1,
0.173 mgd from Well WS-3, and 0.144 mgd from Well WS-4.
15. Project Sponsor and Facility: Northeast Marcellus Aqua
Midstream I, LLC (Susquehanna River), Tunkhannock Township, Wyoming
County, Pa. Application for renewal of surface water withdrawal of
up to 5.000 mgd (peak day) (Docket No. 20200919).
16. Project Sponsor and Facility: Pennsylvania General Energy
Company, L.L.C. (Pine Creek), Watson Township, Lycoming County, Pa.
Application for renewal of surface water withdrawal of up to 0.918
mgd (peak day) (Docket No. 20180608).
17. Project Sponsor and Facility: Pilgrim's Oak Golf Course
(Peters Creek and Unnamed Tributary to Peters Creek), Drumore
Township, Lancaster County, Pa. Applications for renewal of surface
water withdrawal of up to 0.237 mgd (peak day) and consumptive use
of up to 0.237 mgd (30-day average) (Docket No. 19980505).
18. Project Sponsor and Facility: Pro-Environmental, LLC
(Martins Creek), Lathrop Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 0.999
mgd (peak day) (Docket No. 20180609).
19. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Fall Brook), Troy Township, Bradford County, Pa. Application for
renewal of surface water withdrawal of up to 0.176 mgd (peak day)
(Docket No. 20180610).
20. Project Sponsor and Facility: Repsol Oil & Gas USA, LLC
(Unnamed Tributary to North Branch Sugar Creek), Columbia Township,
Bradford County, Pa. Application for renewal of surface water
withdrawal of up to 0.926 mgd (peak day) (Docket No. 20180611).
21. Project Sponsor and Facility: State College Borough Water
Authority, Benner Township, Centre County, Pa. Applications for
renewal of groundwater withdrawals (30-day averages) of up to 2.160
mgd from Well 62, 0.720 mgd from Well 63, 0.850 mgd from Well 64,
and 0.720 mgd from Well 65 (Docket No. 19920102).
22. Project Sponsor and Facility: Sugar Hollow Water Services
LLC (Bowman Creek), Eaton Township, Wyoming County, Pa. Application
for renewal of surface water withdrawal of up to 0.249 mgd (peak
day) (Docket No. 20180612).
23. Project Sponsor and Facility: Susquehanna Gas Field
Services, LLC (Susquehanna River), Meshoppen Township, Wyoming
County, Pa. Application for renewal of surface water withdrawal of
up to 1.650 mgd (peak day) (Docket No. 20180614).
24. Project Sponsor and Facility: SWN Production Company, LLC
(Cowanesque River), Deerfield Township, Tioga County, Pa.
Application for surface water withdrawal of up to 1.500 mgd (peak
day).
25. Project Sponsor and Facility: Titanium Metals Corporation
(TIMET), Caernarvon Township, Berks County, Pa. Application for
renewal of consumptive use of up to 0.177 mgd (30-day average)
(Docket No. 20080616).
26. Project Sponsor and Facility: Town Big Flats, Chemung
County, N.Y. Applications for renewal with an increase of
groundwater withdrawals (30-day averages) of up to 0.577 mgd from WD
2-Well 1 and 0.365 mgd from WD 2-Well 2 (Docket No. 19910304).
27. Project Sponsor and Facility: Town of Erwin, Steuben County,
N.Y. Application for groundwater withdrawal of up to 1.440 mgd (30-
day average) from Well 7.
Commission-Initiated Project Approval Modification
28. Project Sponsor and Facility: Village of Oxford, Town of
Oxford, Chenango County, N.Y. Conforming the grandfathered amount
with the forthcoming determination for groundwater withdrawals (30-
day averages) of up to 0.402 mgd from Well 1 and 0.099 mgd from Well
2 (Docket No. 20040601).
Opportunity To Appear and Comment
Interested parties may call into the hearing to offer comments to
the Commission on any business listed above required to be the subject
of a public hearing. Given the nature of the meeting, the Commission
strongly encourages those members of the public wishing to provide oral
comments to pre-register with the Commission by emailing Jason Oyler at
[email protected] before the hearing date. The presiding officer reserves
the right to limit oral statements in the interest of time and to
control the course of the hearing otherwise. Access to the hearing via
telephone will begin at 6:15 p.m. Guidelines for the public hearing are
posted on the Commission's website, www.srbc.net, before the hearing
for review. The presiding officer reserves the right to modify or
supplement such guidelines at the hearing. Written comments on any
business listed above required to be the subject of a public hearing
may also be mailed to Mr. Jason Oyler, Secretary to the Commission,
Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or
electronically submitted must be received by the Commission on or
before Monday, May 15, 2023, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806,
807, and 808.
Dated: April 6, 2023.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2023-07602 Filed 4-11-23; 8:45 am]
BILLING CODE 7040-01-P