Natural Gas Pipeline Company of America, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 21670-21671 [2023-07574]
Download as PDF
21670
Federal Register / Vol. 88, No. 69 / Tuesday, April 11, 2023 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 5, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07582 Filed 4–10–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos., EG23–53–000, EG23–54–000,
EG23–55–000, EG23–56–000, EG23–57–000,
EG23–58–000, EG23–59–000, EG23–60–000,
EG23–61–000, EG23–62–000, EG23–63–000,
EG23–64–000, EG23–65–000, EG23–66–000,
EG23–67–000, EG23–68–000, EG23–69–000,
EG23–70–000, EG23–71–000, EG23–72–000,
EG23–73–000, EG23–74–000, EG23–75–000,
EG23–76–000, EG23–77–000, EG23–78–000]
lotter on DSK11XQN23PROD with NOTICES1
Pike Solar, LLC; Black Mesa Energy,
LLC; Wildflower Solar, LLC; 92JT 8ME,
LLC; Cavalry Energy Center, LLC;
Dunns Bridge Energy Storage, LLC;
Big Plain Solar, LLC; Oak Trail Solar,
LLC; Westlands Solar Blue (OZ)
Owner, LLC; Rodeo Ranch Energy
Storage, LLC; Sonoran Solar Energy,
LLC; Saint Energy Storage II, LLC;
Storey Energy Center, LLC; Texas
Solar Nova 1, LLC; Chevelon Butte RE
LLC; White Trillium Solar, LLC; Second
Division Solar, LLC; Starr Solar Ranch,
LLC; Prairie Ronde Solar Farm, LLC;
Honeysuckle Solar, LLC; Wolfskin
Solar; LLC Bird Dog Solar, LLC;
Hobnail Solar, LLC; Blackwater Solar,
LLC; Nevada Cogeneration Associates
#1; Goleta Energy Storage, LLC; Notice
of Effectiveness of Exempt Wholesale
Generator Status
Take notice that during the month of
March 2023, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2022).
Dated: April 5, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07584 Filed 4–10–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:45 Apr 10, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP23–125–000]
Natural Gas Pipeline Company of
America, LLC; Notice of Request
Under Blanket Authorization and
Establishing Intervention and Protest
Deadline
Take notice that on March 30, 2023,
Natural Gas Pipeline Company of
America, LLC (Natural), 1001 Louisiana
Street, Suite 1000, Houston, Texas
77002, filed in the above referenced
docket, a prior notice request pursuant
to sections 157.205, 157.206, 157.213(b),
and 157.216(b) of the Commission’s
regulations under the Natural Gas Act
(NGA), and Natural’s blanket certificate
issued in Docket No. CP82–402–000, for
authorization to reclassify four
injection/withdrawal (I/W) wells to
water removal wells and perform certain
associated work, including adding a
new launcher assembly for inspection of
a lateral, and abandoning associated
storage field laterals and above ground
appurtenances, all at Natural’s Herscher
Storage Field, which is located in
Kankakee County, Illinois and utilizes
the Galesville and Mount Simon
reservoirs.
Natural also states that the project
will not result in any abandonment of,
or decrease in service to, Natural’s
customers, and that the project will
have no impact on the Herscher Storage
Field’s certificated parameters, all as
more fully set forth in the application,
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to Ben
Carranza, Vice President, Regulatory,
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
Kinder Morgan, Inc., as Operator of
Natural Gas Pipeline Company of
America, LLC, 1001 Louisiana Street,
Suite 1000, Houston, Texas 77002, at
(713) 420–5535, or by email at ben_
carranza@kindermorgan.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on June 5, 2023. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,2 any person 3 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
1 18
CFR (Code of Federal Regulations) 157.9.
CFR 157.205.
3 Persons include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 18
E:\FR\FM\11APN1.SGM
11APN1
Federal Register / Vol. 88, No. 69 / Tuesday, April 11, 2023 / Notices
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,4 and must be submitted by
the protest deadline, which is June 5,
2023. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
lotter on DSK11XQN23PROD with NOTICES1
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 5 and the regulations under
the NGA 6 by the intervention deadline
for the project, which is June 5, 2023.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
18 CFR 157.205(e).
CFR 385.214.
6 18 CFR 157.10.
4
5 18
VerDate Sep<11>2014
17:45 Apr 10, 2023
Jkt 259001
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before June 5,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions,
and Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–125–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 7
(2) You can file a paper copy of your
submission by mailing it to the address
below. Your submission must reference
the Project docket number CP23–125–
000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: Ben Carranza, Vice
President, Regulatory, Kinder Morgan,
Inc., as Operator of Natural Gas Pipeline
Company of America, LLC, 1001
Louisiana Street, Suite 1000, Houston,
Texas 77002, or by email at ben_
carranza@kindermorgan.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
7 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
21671
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: April 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07574 Filed 4–10–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1512–000]
Westlake Natrium LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Westlake Natrium LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 88, Number 69 (Tuesday, April 11, 2023)]
[Notices]
[Pages 21670-21671]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07574]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-125-000]
Natural Gas Pipeline Company of America, LLC; Notice of Request
Under Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on March 30, 2023, Natural Gas Pipeline Company of
America, LLC (Natural), 1001 Louisiana Street, Suite 1000, Houston,
Texas 77002, filed in the above referenced docket, a prior notice
request pursuant to sections 157.205, 157.206, 157.213(b), and
157.216(b) of the Commission's regulations under the Natural Gas Act
(NGA), and Natural's blanket certificate issued in Docket No. CP82-402-
000, for authorization to reclassify four injection/withdrawal (I/W)
wells to water removal wells and perform certain associated work,
including adding a new launcher assembly for inspection of a lateral,
and abandoning associated storage field laterals and above ground
appurtenances, all at Natural's Herscher Storage Field, which is
located in Kankakee County, Illinois and utilizes the Galesville and
Mount Simon reservoirs.
Natural also states that the project will not result in any
abandonment of, or decrease in service to, Natural's customers, and
that the project will have no impact on the Herscher Storage Field's
certificated parameters, all as more fully set forth in the
application, which is on file with the Commission and open to public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (www.ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Ben Carranza, Vice President, Regulatory, Kinder Morgan,
Inc., as Operator of Natural Gas Pipeline Company of America, LLC, 1001
Louisiana Street, Suite 1000, Houston, Texas 77002, at (713) 420-5535,
or by email at [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on June 5, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for
[[Page 21671]]
authorization will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is June 5, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is June 5, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before June 5, 2023. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-125-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \7\
---------------------------------------------------------------------------
\7\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-125-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail at: Ben Carranza, Vice President, Regulatory, Kinder
Morgan, Inc., as Operator of Natural Gas Pipeline Company of America,
LLC, 1001 Louisiana Street, Suite 1000, Houston, Texas 77002, or by
email at [email protected]. Any subsequent submissions by
an intervenor must be served on the applicant and all other parties to
the proceeding. Contact information for parties can be downloaded from
the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: April 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-07574 Filed 4-10-23; 8:45 am]
BILLING CODE 6717-01-P