Combined Notice of Filings #1
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–53–000.
Applicants: Essential Power OPP,
LLC, et al v. PJM Interconnection, L.L.C.
Description: Complaint of Essential
Power OPP, LLC, et al. v. PJM
Interconnection, L.L.C.
Filed Date: 3/31/23.
Accession Number: 20230331–5217.
Comment Date: 5 p.m. ET 4/20/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER23–629–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
2023–04–03 Att N Revisions—Response
to Deficiency Ltr to be effective 6/3/
2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5146.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–920–000.
Applicants: Meadow Lake Solar Park
LLC.
Description: Report Filing:
Supplement to Notice of Non-Material
Change in Status and MBR Tariff
Revisions to be effective N/A.
Filed Date: 3/21/23.
Accession Number: 20230321–5007.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23–944–001.
Applicants: Calpine Community
Energy, LLC.
Description: Tariff Amendment:
Amendment to Market-Based Rate
Application to be effective 1/27/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5186.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1219–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: ISA,
SA No. 6816; Queue No. AF1–271A
Supplement to Filing to be effective 2/
1/2023.
Filed Date: 3/31/23.
Accession Number: 20230331–5474.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23–1251–001.
Applicants: San Jacinto Grid, LLC.
Description: Tariff Amendment:
Supplement to Market-Based Rate
Application to be effective 5/6/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5252.
VerDate Sep<11>2014
19:11 Apr 06, 2023
Jkt 259001
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1252–001.
Applicants: Ortega Grid, LLC.
Description: Tariff Amendment:
Supplement to Market-Based Rate
Application to be effective 5/6/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5238.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1544–000.
Applicants: Otter Tail Power
Company.
Description: Request for Approval of
Transmission Rate Incentives of Otter
Tail Power Company.
Filed Date: 3/31/23.
Accession Number: 20230331–5589.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23–1545–000.
Applicants: Great Plains Windpark
Legacy, LLC.
Description: Request for Limited
Waiver, et al. of Great Plains Windpark
Legacy, LLC.
Filed Date: 3/31/23.
Accession Number: 20230331–5591.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23–1546–000.
Applicants: IP Oberon, LLC.
Description: Baseline eTariff Filing:
Filing of LGIA Co-Tenancy Agreement
to be effective 6/5/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5057.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1547–000.
Applicants: IP Oberon, LLC.
Description: § 205(d) Rate Filing:
Shared Facilities Agreement to be
effective 6/5/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5061.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1548–000.
Applicants: Southwest Power Pool,
Inc.
Description: Notice of Cancellation of
Network Integration Transmission
Service Agreement and Network
Operating Agreement of Southwest
Power Pool, Inc.
Filed Date: 4/3/23.
Accession Number: 20230403–5134.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1549–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Timberland
Solar 3 LGIA Filing to be effective 3/22/
2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5148.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1550–000
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Southwest
Atlanta Energy Storage LGIA Filing to
be effective 3/22/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5149.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1551–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Brooker Trail
Solar LGIA Filing to be effective 3/22/
2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5150.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1552–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6278; Queue No. AD2–048 to be
effective 6/2/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5185.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1553–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6555; Queue No. AC1–086 to be
effective 6/3/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5193.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1554–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6842; Queue No.
AF1–215 & Cancellation of IISA, SA No.
6216 to be effective 3/2/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5200.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1555–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 6276;
Queue No. AE2–060 (amend) to be
effective 6/3/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5218.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23–1556–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
E:\FR\FM\07APN1.SGM
07APN1
Federal Register / Vol. 88, No. 67 / Friday, April 7, 2023 / Notices
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(i): Attachment S
(GPCO) 2023 Updated Depreciation
Rates Filing to be effective 1/1/2023.
Filed Date: 4/3/23.
Accession Number: 20230403–5241.
Comment Date: 5 p.m. ET 4/24/23.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH23–10–000.
Applicants: Alberta Investment
Management Corporation.
Description: Alberta Investment
Management Corporation submits FERC
65–B Notice of Change in Fact to Waiver
Notification.
Filed Date: 3/31/23.
Accession Number: 20230331–5597.
Comment Date: 5 p.m. ET 4/21/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 3, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07339 Filed 4–6–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southeastern Power Administration
ddrumheller on DSK120RN23PROD with NOTICES1
Proposed Power Marketing Policy,
Public Forum, and Opportunities for
Public Review and Comment for the
Jim Woodruff System Project
Southeastern Power
Administration, DOE.
ACTION: Notice of proposed power
marketing policy.
AGENCY:
Southeastern Power
Administration (Southeastern) proposes
a Power Marketing Policy for the Jim
SUMMARY:
VerDate Sep<11>2014
19:11 Apr 06, 2023
Jkt 259001
Woodruff System Project pursuant to
Notice published in the Federal
Register of August 5, 2022, and in
accordance with Procedure for Public
Participation in the Formulation of
Marketing Policy published July 6,
1978. The proposed power marketing
policy will be implemented through
contracts for terms not to exceed 10
years. Additionally, opportunities will
be available for interested persons to
review the proposed Power Marketing
Policy, to participate in a public forum
and to submit additional written
comments. Southeastern will evaluate
all comments received in this process.
DATES: Written comments are due on or
before June 23, 2023. A public
information and comment forum will be
held via a virtual web based meeting to
allow maximum participation June 8,
2023. Persons desiring to attend the
forum should notify Southeastern by
June 1, 2023, so a list of forum
participants can be prepared. Persons
desiring to speak at the forum should
specify this in their notification to
Southeastern; others may speak if time
permits. Notifications should be
submitted by email to Comments@
sepa.doe.gov. If Southeastern has not
been notified by close of business on
June 1, 2023, that at least one person
intends to be present at the forum, the
forum may be canceled with no further
notice.
ADDRESSES: Written comments should
be submitted to: Administrator,
Southeastern Power Administration,
Department of Energy, 1166 Athens
Tech Road, Elberton, Georgia 30635–
6711; Email: Comments@sepa.doe.gov.
The public information and comment
forum for the Jim Woodruff System
Project will take place via a virtual web
based meeting.
FOR FURTHER INFORMATION CONTACT:
Carter Edge, Assistant Administrator for
Finance and Marketing, Southeastern
Power Administration, Department of
Energy, 1166 Athens Tech Road,
Elberton, Georgia 30635, (706) 213–
3800; Email: carter.edge@sepa.doe.gov.
SUPPLEMENTARY INFORMATION: Notice of
intent to create a marketing policy for
future disposition of power from the Jim
Woodruff System was published in the
Federal Register August 5, 2022 (87 FR
48016). The notice advised interested
parties to provide comments and
proposals in formulating the proposed
marketing policy. Comments and
proposals were accepted through
October 4, 2022. Comments were
received from two interested parties.
Written comments were received from
Seminole Electric Cooperative, Inc. and
Southeastern Federal Power Customers,
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
20879
Inc. (SeFPC) are summarized below.
Southeastern’s responses are also
provided.
Comment 1: Seminole Electric
Cooperative, Inc. is interested in
receiving allocation of power and
energy generated at Jim Woodruff Lock
and Dam, if such power were deemed
available.
Response 1: Southeastern does not
expect any additional power or energy
to be available to be allocated.
Southeastern has included a mechanism
in the proposed policy to allow power
and energy to be allocated should any
become available in the future.
Comment 2: SeFPC encourages
Southeastern to follow the statutory
guidance in the Flood Control Act of
1944, 16 U.S.C. 825s, to market the
output of the Jim Woodruff Project to
eligible ‘‘preference customers.’’
Response 2: Southeastern will follow
the guidance in the Flood Control Act
of 1944.
Comment 3: SeFPC encourages the
marketing plan include the following
important components:
1. Limiting the marketing plan to the
Jim Woodruff Project. SEPA has
previously rejected calls to create an
integrated marketing area for all power
available from Corps multipurpose
projects in the Southeast. This approach
should be followed with the marketing
plan for the Jim Woodruff Project.
2. Extend allocations to preference
customers with existing contracts. In
revising marketing plans for the
Georgia-Alabama-South Carolina system
of projects, SEPA offered allocations to
existing customers.
3. Refrain from allocating the output
of the Jim Woodruff project on a pro rata
basis to all potential preference
customers. Although the Flood Control
Act of 1944 calls for allocations to
promote ‘‘widespread use,’’ SEPA has
previously reconciled that responsibility
with the obligation to allocate power
consistent with sound business
principles. In this context, SEPA must
recognize that the limited output of the
Jim Woodruff Project requires
allocations that provide a meaningful
rather than marginal benefit.
Response 3: Jim Woodruff could be
integrated financially, hydraulically and
electrically with the GA–AL–SC System
of projects to provide back stand service
to this single-project, run-of-the-river
system. Preliminary discussions with
the transmission provider indicate a
70% increase in the amount of
purchased power costs passed through
to the customer each month without
integration under the Open Access
Transmission Tariff. However,
delivering federal hydropower at the
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 88, Number 67 (Friday, April 7, 2023)]
[Notices]
[Pages 20878-20879]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07339]
[[Page 20878]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL23-53-000.
Applicants: Essential Power OPP, LLC, et al v. PJM Interconnection,
L.L.C.
Description: Complaint of Essential Power OPP, LLC, et al. v. PJM
Interconnection, L.L.C.
Filed Date: 3/31/23.
Accession Number: 20230331-5217.
Comment Date: 5 p.m. ET 4/20/23.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER23-629-001.
Applicants: Public Service Company of Colorado.
Description: Tariff Amendment: 2023-04-03 Att N Revisions--Response
to Deficiency Ltr to be effective 6/3/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5146.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-920-000.
Applicants: Meadow Lake Solar Park LLC.
Description: Report Filing: Supplement to Notice of Non-Material
Change in Status and MBR Tariff Revisions to be effective N/A.
Filed Date: 3/21/23.
Accession Number: 20230321-5007.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: ER23-944-001.
Applicants: Calpine Community Energy, LLC.
Description: Tariff Amendment: Amendment to Market-Based Rate
Application to be effective 1/27/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5186.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1219-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: ISA, SA No. 6816; Queue No. AF1-271A
Supplement to Filing to be effective 2/1/2023.
Filed Date: 3/31/23.
Accession Number: 20230331-5474.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23-1251-001.
Applicants: San Jacinto Grid, LLC.
Description: Tariff Amendment: Supplement to Market-Based Rate
Application to be effective 5/6/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5252.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1252-001.
Applicants: Ortega Grid, LLC.
Description: Tariff Amendment: Supplement to Market-Based Rate
Application to be effective 5/6/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5238.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1544-000.
Applicants: Otter Tail Power Company.
Description: Request for Approval of Transmission Rate Incentives
of Otter Tail Power Company.
Filed Date: 3/31/23.
Accession Number: 20230331-5589.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23-1545-000.
Applicants: Great Plains Windpark Legacy, LLC.
Description: Request for Limited Waiver, et al. of Great Plains
Windpark Legacy, LLC.
Filed Date: 3/31/23.
Accession Number: 20230331-5591.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER23-1546-000.
Applicants: IP Oberon, LLC.
Description: Baseline eTariff Filing: Filing of LGIA Co-Tenancy
Agreement to be effective 6/5/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5057.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1547-000.
Applicants: IP Oberon, LLC.
Description: Sec. 205(d) Rate Filing: Shared Facilities Agreement
to be effective 6/5/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5061.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1548-000.
Applicants: Southwest Power Pool, Inc.
Description: Notice of Cancellation of Network Integration
Transmission Service Agreement and Network Operating Agreement of
Southwest Power Pool, Inc.
Filed Date: 4/3/23.
Accession Number: 20230403-5134.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1549-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Timberland Solar 3 LGIA
Filing to be effective 3/22/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5148.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1550-000
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Southwest Atlanta Energy
Storage LGIA Filing to be effective 3/22/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5149.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1551-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(iii: Brooker Trail Solar LGIA
Filing to be effective 3/22/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5150.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1552-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 6278; Queue No. AD2-048 to be effective 6/2/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5185.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1553-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 6555; Queue No. AC1-086 to be effective 6/3/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5193.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1554-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, SA No. 6842;
Queue No. AF1-215 & Cancellation of IISA, SA No. 6216 to be effective
3/2/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5200.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1555-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, SA No.
6276; Queue No. AE2-060 (amend) to be effective 6/3/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5218.
Comment Date: 5 p.m. ET 4/24/23.
Docket Numbers: ER23-1556-000.
Applicants: Alabama Power Company, Georgia Power Company,
Mississippi Power Company.
[[Page 20879]]
Description: Sec. 205(d) Rate Filing: Alabama Power Company
submits tariff filing per 35.13(a)(2)(i): Attachment S (GPCO) 2023
Updated Depreciation Rates Filing to be effective 1/1/2023.
Filed Date: 4/3/23.
Accession Number: 20230403-5241.
Comment Date: 5 p.m. ET 4/24/23.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH23-10-000.
Applicants: Alberta Investment Management Corporation.
Description: Alberta Investment Management Corporation submits FERC
65-B Notice of Change in Fact to Waiver Notification.
Filed Date: 3/31/23.
Accession Number: 20230331-5597.
Comment Date: 5 p.m. ET 4/21/23.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 3, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-07339 Filed 4-6-23; 8:45 am]