Combined Notice of Filings, 20159-20160 [2023-07105]
Download as PDF
Federal Register / Vol. 88, No. 65 / Wednesday, April 5, 2023 / Notices
program measures that will be used to
assess the grantees’ performance in
achieving the goals and objectives of the
competition.
VII. Other Information
Accessible Format: On request to the
program contact person listed under FOR
FURTHER INFORMATION CONTACT,
individuals with disabilities can obtain
this document and a copy of the
application package in an accessible
format. The Department will provide the
requestor with an accessible format that
may include Rich Text Format (RTF) or
text format (txt), a thumb drive, an MP3
file, braille, large print, audiotape, or
compact disc, or other accessible format.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. You may access the official
edition of the Federal Register and the
Code of Federal Regulations at
www.govinfo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Portable Document Format
(PDF). To use PDF, you must have
Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Katherine Neas,
Deputy Assistant Secretary, Delegated the
authority to perform the functions and duties
of the Assistant Secretary for the Office of
Special Education and Rehabilitative
Services.
[FR Doc. 2023–07204 Filed 4–3–23; 4:15 pm]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15029–001]
lotter on DSK11XQN23PROD with NOTICES1
SV Hydro, LLC; Notice of Surrender of
Preliminary Permit
Take notice that SV Hydro, LLC,
permittee for the proposed Itasca
County Pumped Storage Project, has
requested that its preliminary permit be
terminated. The permit was issued on
October 28, 2020, and would have
expired on September 30, 2024.1 The
1 173
FERC ¶ 62,047 (2020).
VerDate Sep<11>2014
17:44 Apr 04, 2023
project would have been located near
the City of Marble, Itasca County,
Minnesota.
The preliminary permit for Project
No. 15029 will remain in effect until the
close of business, April 28, 2023. But, if
the Commission is closed on this day,
then the permit remains in effect until
the close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: March 29, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07016 Filed 4–4–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23–39–000.
Applicants: Southwest Gas
Corporation.
Description: § 284.123(g) Rate Filing:
Amended SOC for Blanket Certificate to
be effective 4/1/2023.
Filed Date: 4/19/23.
Accession Number: 20230329–5197.
Comment Date: 5 p.m. ET 5/30/23.
Docket Numbers: RP23–607–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
Non-Conforming Agreement—FP&L to
be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329–5203.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23–608–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing: New
NRAs—OUC and Peoples and Update
Non-Conf List to be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329–5205.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23–609–000.
Applicants: Horizon Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: NRA
Filing—Natural Gas Pipeline Company
of America LLC to be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329–5209.
2 18
Jkt 259001
PO 00000
CFR 385.2007(a)(2) (2022).
Frm 00042
Fmt 4703
Sfmt 4703
20159
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23–610–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Iroquois Gas
Transmission System, L.P. submits Fuel
and Losses Retention Percentage
calculations for 2022.
Filed Date: 3/29/23.
Accession Number: 20230329–5226.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23–611–000.
Applicants: Northern Border Pipeline
Company.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement—Sequent
TL368F/101321 to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5002.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–612–000.
Applicants: MountainWest Overthrust
Pipeline, LLC.
Description: § 4(d) Rate Filing: Nonconforming TSA WIC 6343 to be
effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5025.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–613–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Amended Negotiated Rate Agreement—
4/1/2023 to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5030.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–614–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreements to be
effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5031.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–615–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Cancel
SWEPCO Agreement to be effective 4/1/
2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5060.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–616–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Amended NRA Filing—SWEPCO to be
effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5061.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23–617–000.
Applicants: Stagecoach Pipeline &
Storage Company LLC.
Description: § 4(d) Rate Filing:
Stagecoach—Chesapeake, DTE, Amera &
E:\FR\FM\05APN1.SGM
05APN1
20160
Federal Register / Vol. 88, No. 65 / Wednesday, April 5, 2023 / Notices
KM Gas Marketing to be effective 4/1/
2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5065.
Comment Date: 5 p.m. ET 4/11/23.
DEPARTMENT OF ENERGY
Docket Numbers: RP23–618–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agmt Update (Conoco—
Apr 23) to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5079.
Comment Date: 5 p.m. ET 4/11/23.
Notice of Availability of Revised Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 16—Part 12d Program
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
lotter on DSK11XQN23PROD with NOTICES1
Docket Numbers: RP20–780–002.
Applicants: Pine Needle LNG
Company, LLC.
Description: Compliance filing:
Petition to Amend Settlement in Docket
No. RP20–780–000 to be effective N/A.
Filed Date: 3/30/23.
Accession Number: 20230330–5108.
Comment Date: 5 p.m. ET 4/11/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 30, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07105 Filed 4–4–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:44 Apr 04, 2023
Jkt 259001
Federal Energy Regulatory
Commission
•
[Docket No. AD20–21–000]
On December 16, 2021, the Federal
Energy Regulatory Commission issued a
Notice of Availability of Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 16—Part 12D Program.1 Chapter
16 provides licensee guidance related to
any Periodic Inspection or
Comprehensive Assessment performed,
and the report on it filed, to fulfill the
requirements defined in Title 18 Code of
Federal Regulations (CFR) Part 12,
Subpart D. The Chapter includes an
overview of the part 12D program, as
well as six appendices. Appendices B,
C, D, and E are outlines for the four
major types of reports that must be
submitted. Due to a compilation error
during final preparation of the chapter,
four of the included appendices were
from an outdated draft version that did
not incorporate all of the changes that
staff made to address comments
received on the draft chapter. This
notice provides a revised version of
Chapter 16’s appendices B, C, D, and E,
which were the only portions of Chapter
16 that were affected by this error.
The appendices provide the outlines
and instructions for several required
filings that document a Part 12D
Inspection and are required by the
Commission’s regulations: Appendix B:
the Periodic Inspection Report (PIR),
Appendix C: Periodic Inspection PreInspection Preparation Report (PI–
PIPR), Appendix D: Comprehensive
Assessment Report (CAR), and
Appendix E: Comprehensive
Assessment Pre-Inspection Preparation
Report (CA–PIPR). These revisions to
Appendices B through E ensure that the
report outlines and content are
consistent with the corresponding text
in the body of Chapter 16. The revisions
in each appendix are described below.
•
•
•
•
•
•
•
•
•
Chapter 16, Appendix B—Outline for
the Periodic Inspection Report
• Section 1.2 Potential Failure Modes
and Risk
1 Chapter 16 is one of four new chapters of the
Guidelines providing additional guidance related to
18 CFR part 12, Safety of Water Power Projects and
Project Works, for which a Final Rule was also
issued on December 16, 2021. Final Rule, Order No.
880, 87 FR 1490 (Jan. 11, 2022), 177 FERC ¶ 61,204
(2021).
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
•
•
Æ Listed the types of potential failure
modes (PFMs) to summarize and
provided an example table to
document the findings.
Section 1.3.3 Hazard Potential
Classification
Æ Clarified that the significant
changes to the population at risk
must be identified since the
previous Part 12D Inspection.
Section 1.4 Recommendations
Æ Provided an example table to
summarize recommendations and
the suggested schedule.
Section 2.1 Location and Purpose
Æ Revised reference to Appendix C:
Project Figures.
Section 2.2 Description of Project
Features
Æ Clarified that the project
information must not be a copy and
paste from the STID.
Æ Added ‘‘tunnel lining drainage
holes’’ to the bulleted list for Water
Conveyances.
Section 3.3 Recommendations of
Previous Independent Consultants
Æ Revised heading text.
Æ Clarified that the summary table
must include recommendations
from ‘‘earlier’’ Part 12D reports.
Section 3.7 Previously Identified
PFMs
Æ Clarified that the IC Team can
provide recommendations to
improve the PFMA and PFMs
Section 4 Field Inspection
Observations and Interpretation of
Monitoring Data
Æ Revised the use of standard terms
to describe the condition of project
features allowing the IC Team to
use consistent terminology
provided the terms are identified
and defined.
Section 4.2.1 Field Inspection
Observations
Æ Revised reference to Appendix E:
Inspection Photographs.
Section 4.2.2 Review and Evaluation
of Instrumentation Data and
Surveillance
Æ Revised reference to Appendix D:
Instrumented Monitoring Data
Plots.
Section 5.5 Public Safety Plan
Æ Inserted the requirement that the
Public Safety Plan must also
document the licensee’s response
and implementation of any required
remediation measures related to
project-related public safety
incidents.
Appendix B FERC Letter Approving
Part 12D Inspection Plan and IC
Team
Æ Revised appendix title.
Appendix C Summary of Independent
Consultant’s Recommendations
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 88, Number 65 (Wednesday, April 5, 2023)]
[Notices]
[Pages 20159-20160]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07105]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas & Oil Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR23-39-000.
Applicants: Southwest Gas Corporation.
Description: Sec. 284.123(g) Rate Filing: Amended SOC for Blanket
Certificate to be effective 4/1/2023.
Filed Date: 4/19/23.
Accession Number: 20230329-5197.
Comment Date: 5 p.m. ET 5/30/23.
Docket Numbers: RP23-607-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: New Non-Conforming Agreement--
FP&L to be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329-5203.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23-608-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: New NRAs--OUC and Peoples and
Update Non-Conf List to be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329-5205.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23-609-000.
Applicants: Horizon Pipeline Company, L.L.C.
Description: Sec. 4(d) Rate Filing: NRA Filing--Natural Gas
Pipeline Company of America LLC to be effective 4/1/2023.
Filed Date: 3/29/23.
Accession Number: 20230329-5209.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23-610-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Iroquois Gas Transmission System, L.P. submits Fuel
and Losses Retention Percentage calculations for 2022.
Filed Date: 3/29/23.
Accession Number: 20230329-5226.
Comment Date: 5 p.m. ET 4/10/23.
Docket Numbers: RP23-611-000.
Applicants: Northern Border Pipeline Company.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement--
Sequent TL368F/101321 to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5002.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-612-000.
Applicants: MountainWest Overthrust Pipeline, LLC.
Description: Sec. 4(d) Rate Filing: Non-conforming TSA WIC 6343 to
be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5025.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-613-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Amended Negotiated Rate
Agreement--4/1/2023 to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5030.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-614-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreements to
be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5031.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-615-000.
Applicants: Enable Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Cancel SWEPCO Agreement to be
effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5060.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-616-000.
Applicants: Enable Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Amended NRA Filing--SWEPCO to
be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5061.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-617-000.
Applicants: Stagecoach Pipeline & Storage Company LLC.
Description: Sec. 4(d) Rate Filing: Stagecoach--Chesapeake, DTE,
Amera &
[[Page 20160]]
KM Gas Marketing to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5065.
Comment Date: 5 p.m. ET 4/11/23.
Docket Numbers: RP23-618-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agmt Update
(Conoco--Apr 23) to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330-5079.
Comment Date: 5 p.m. ET 4/11/23.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP20-780-002.
Applicants: Pine Needle LNG Company, LLC.
Description: Compliance filing: Petition to Amend Settlement in
Docket No. RP20-780-000 to be effective N/A.
Filed Date: 3/30/23.
Accession Number: 20230330-5108.
Comment Date: 5 p.m. ET 4/11/23.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 30, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-07105 Filed 4-4-23; 8:45 am]
BILLING CODE 6717-01-P