Notice of Availability of Revised Final Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 16-Part 12d Program, 20160-20162 [2023-07015]
Download as PDF
20160
Federal Register / Vol. 88, No. 65 / Wednesday, April 5, 2023 / Notices
KM Gas Marketing to be effective 4/1/
2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5065.
Comment Date: 5 p.m. ET 4/11/23.
DEPARTMENT OF ENERGY
Docket Numbers: RP23–618–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agmt Update (Conoco—
Apr 23) to be effective 4/1/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5079.
Comment Date: 5 p.m. ET 4/11/23.
Notice of Availability of Revised Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 16—Part 12d Program
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
lotter on DSK11XQN23PROD with NOTICES1
Docket Numbers: RP20–780–002.
Applicants: Pine Needle LNG
Company, LLC.
Description: Compliance filing:
Petition to Amend Settlement in Docket
No. RP20–780–000 to be effective N/A.
Filed Date: 3/30/23.
Accession Number: 20230330–5108.
Comment Date: 5 p.m. ET 4/11/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 30, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07105 Filed 4–4–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:44 Apr 04, 2023
Jkt 259001
Federal Energy Regulatory
Commission
•
[Docket No. AD20–21–000]
On December 16, 2021, the Federal
Energy Regulatory Commission issued a
Notice of Availability of Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 16—Part 12D Program.1 Chapter
16 provides licensee guidance related to
any Periodic Inspection or
Comprehensive Assessment performed,
and the report on it filed, to fulfill the
requirements defined in Title 18 Code of
Federal Regulations (CFR) Part 12,
Subpart D. The Chapter includes an
overview of the part 12D program, as
well as six appendices. Appendices B,
C, D, and E are outlines for the four
major types of reports that must be
submitted. Due to a compilation error
during final preparation of the chapter,
four of the included appendices were
from an outdated draft version that did
not incorporate all of the changes that
staff made to address comments
received on the draft chapter. This
notice provides a revised version of
Chapter 16’s appendices B, C, D, and E,
which were the only portions of Chapter
16 that were affected by this error.
The appendices provide the outlines
and instructions for several required
filings that document a Part 12D
Inspection and are required by the
Commission’s regulations: Appendix B:
the Periodic Inspection Report (PIR),
Appendix C: Periodic Inspection PreInspection Preparation Report (PI–
PIPR), Appendix D: Comprehensive
Assessment Report (CAR), and
Appendix E: Comprehensive
Assessment Pre-Inspection Preparation
Report (CA–PIPR). These revisions to
Appendices B through E ensure that the
report outlines and content are
consistent with the corresponding text
in the body of Chapter 16. The revisions
in each appendix are described below.
•
•
•
•
•
•
•
•
•
Chapter 16, Appendix B—Outline for
the Periodic Inspection Report
• Section 1.2 Potential Failure Modes
and Risk
1 Chapter 16 is one of four new chapters of the
Guidelines providing additional guidance related to
18 CFR part 12, Safety of Water Power Projects and
Project Works, for which a Final Rule was also
issued on December 16, 2021. Final Rule, Order No.
880, 87 FR 1490 (Jan. 11, 2022), 177 FERC ¶ 61,204
(2021).
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
•
•
Æ Listed the types of potential failure
modes (PFMs) to summarize and
provided an example table to
document the findings.
Section 1.3.3 Hazard Potential
Classification
Æ Clarified that the significant
changes to the population at risk
must be identified since the
previous Part 12D Inspection.
Section 1.4 Recommendations
Æ Provided an example table to
summarize recommendations and
the suggested schedule.
Section 2.1 Location and Purpose
Æ Revised reference to Appendix C:
Project Figures.
Section 2.2 Description of Project
Features
Æ Clarified that the project
information must not be a copy and
paste from the STID.
Æ Added ‘‘tunnel lining drainage
holes’’ to the bulleted list for Water
Conveyances.
Section 3.3 Recommendations of
Previous Independent Consultants
Æ Revised heading text.
Æ Clarified that the summary table
must include recommendations
from ‘‘earlier’’ Part 12D reports.
Section 3.7 Previously Identified
PFMs
Æ Clarified that the IC Team can
provide recommendations to
improve the PFMA and PFMs
Section 4 Field Inspection
Observations and Interpretation of
Monitoring Data
Æ Revised the use of standard terms
to describe the condition of project
features allowing the IC Team to
use consistent terminology
provided the terms are identified
and defined.
Section 4.2.1 Field Inspection
Observations
Æ Revised reference to Appendix E:
Inspection Photographs.
Section 4.2.2 Review and Evaluation
of Instrumentation Data and
Surveillance
Æ Revised reference to Appendix D:
Instrumented Monitoring Data
Plots.
Section 5.5 Public Safety Plan
Æ Inserted the requirement that the
Public Safety Plan must also
document the licensee’s response
and implementation of any required
remediation measures related to
project-related public safety
incidents.
Appendix B FERC Letter Approving
Part 12D Inspection Plan and IC
Team
Æ Revised appendix title.
Appendix C Summary of Independent
Consultant’s Recommendations
E:\FR\FM\05APN1.SGM
05APN1
Federal Register / Vol. 88, No. 65 / Wednesday, April 5, 2023 / Notices
Æ Appendix deleted.
• Appendices D through H
Æ Redesignated as Appendices C
through G due to the removal of
Appendix C.
Æ Subsequent revisions listed below
are for the redesignated appendix
label.
• Appendix D Instrumented Monitoring
Data Plots
Æ Revised appendix title and text
from ‘‘Instrumentation Monitoring’’
to ‘‘Instrumented Monitoring.’’
Æ Revised content to be provided in
the appendix from reproductions of
entire Dam Safety Surveillance and
Monitoring Reports (DSSMRs) to
excerpts from and citations to
previous DSSMRs relevant to the
review.
• Appendix E Inspection Photographs
Æ Revised description of how to
provide full resolution digital
photographs.
Chapter 16, Appendix C—Outline for
the Periodic Inspection Pre-Inspection
Preparation Report (PI–PIPR)
• Changes to ensure consistency in
headings and text with the above
list of changes in Chapter 16,
Appendix B
• Addition of placeholder sections to
the outline to ensure consistent
numbering between the PIR and PI–
PIPR. Placeholder sections are
marked with the following text:
‘‘This section is reserved as a
placeholder so the numbering is
consistent with the PIR. No content
is required to be provided in this
section of the PI–PIPR.’’
lotter on DSK11XQN23PROD with NOTICES1
Chapter 16, Appendix D—Outline for
the Comprehensive Assessment Report
(CAR)
• Section 1.2 Potential Failure Modes
and Risk
Æ Section 1.2 is redesignated as
Section 1.5 Potential Failure Modes
Analysis, Risk Analysis, and Dam
Safety Risk Classification.
Æ Revised Section 1.5 to provide
separate subsections as listed
below, describing the required
content:
D Section 1.5.1 Potential Failure
Modes Analysis
D Section 1.5.2 Level 2 Risk Analysis
D Section 1.5.3 Dam Safety Risk
Classification
• Sections 1.3 through 1.5
Æ Redesignated as Sections 1.2
through 1.4 due to the redesignation
of the above listed item.
• Section 1.6 Recommendations
Æ Provided an example table to
summarize recommendations and
the suggested schedule.
VerDate Sep<11>2014
17:44 Apr 04, 2023
Jkt 259001
• Section 2.2 Description of Project
Features
Æ Clarified that the project
information must not be a copy and
paste from the STID
Æ Added ‘‘tunnel lining drainage
holes’’ to the bulleted list for Water
Conveyances.
• Section 3.2.1 Design Considerations
Æ Revised final bullet to clarify that
the current state of practice means
‘‘at the time of the Comprehensive
Assessment.’’
• Section 3.5
Æ Revised heading text from
‘‘Powerplant’’ to ‘‘Powerhouse’’
• Section 4: Review and Evaluation of
Previous Analysis
Æ Revised reference to Appendix J:
Independent Calculations
• Section 4.4 Analyses of Project
Features
Æ Redesignated subheadings from
‘‘4.4.X’’ to ‘‘4.4.1’’ for Project
Feature 1, with a further example
provided as ‘‘4.4.2’’ for Project
Feature 2 and so forth.
• Section 5.3 Recommendations of
Previous Independent Consultants
Æ Revised heading text.
Æ Clarified that the summary table
must include recommendations
from ‘‘earlier’’ Part 12D reports.
• Section 6 Field Inspection
Observations and Interpretation of
Monitoring Data
Æ Revised the use of standard terms
to describe the condition of project
features allowing the IC Team to
use consistent terminology
provided the terms are identified
and defined.
• Section 6.2.1 Field Inspection
Observations
Æ Revised reference to Appendix E:
Inspection Photographs.
• Section 6.2.2 Review and Evaluation
of Instrumentation Data and
Surveillance
Æ Revised reference to Appendix D:
Instrumented Monitoring Data
Plots.
• Section 7.5 PFMA
Æ Provided two sets of instructions
depending on whether the IC Team
prepared the PFMA report.
• Section 7.6 Risk Analysis and
Summary
Æ Revised instructions depending on
whether the IC Team prepared the
Risk Analysis report.
• Section 8.8 Supporting Technical
Information Document and Digital
Project Archive
Æ Added ‘‘and Digital Project
Archive’’ to the heading text.
Æ Revised subheadings 8.8.5, 8.8.7,
8.8.8, and 8.8.9 to more closely
match the STID headings provided
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
•
•
•
•
20161
in Chapter 15 of the Engineering
Guidelines.
Appendix B FERC Letter Approving
Part 12D Inspection Plan and IC
Team
Æ Revised appendix title.
Appendix C Summary of Independent
Consultant’s Recommendations
Æ Appendix deleted.
Appendices D through H
Æ Redesignated as Appendices C
through J due to the removal of
Appendix C.
Æ Subsequent revisions listed below
are for the redesignated appendix
label.
Appendix D Instrumented Monitoring
Data Plots
Æ Revised appendix title and text
from ‘‘Instrumentation Monitoring’’
to ‘‘Instrumented Monitoring’’
Æ Revised content to be provided in
the appendix from reproductions of
entire Dam Safety Surveillance and
Monitoring Reports (DSSMRs) to
excerpts from and citations to
previous DSSMRs relevant to the
review.
Chapter 16, Appendix E—Outline for
the Comprehensive Assessment PreInspection Preparation Report (CA–
PIPR)
• Changes to ensure consistency in
headings and text with the above
list of changes in Chapter 16,
Appendix D
• Addition of placeholder sections to
the outline to ensure consistent
numbering between the CAR and
CA–PIPR. Placeholder sections are
marked with the following text:
‘‘This section is reserved as a
placeholder so the numbering is
consistent with the CAR. No
content is required to be provided
in this section of the CA–PIPR.’’
All information related to ‘‘Chapter
16—Part 12D Program,’’ including the
draft chapter, all submitted comments,
the final chapter, and the revised final
chapter incorporating the above listed
revisions, can be found on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
AD20–21). Be sure you have selected an
appropriate date range. The Commission
also offers a free service called
eSubscription that allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
electronic notification of these filings
and direct links to the documents. Go to
E:\FR\FM\05APN1.SGM
05APN1
20162
Federal Register / Vol. 88, No. 65 / Wednesday, April 5, 2023 / Notices
the Commission’s website
(www.ferc.gov), select the FERC Online
option from the left-hand column, and
click on eSubscription. Users must be
registered in order to use eSubscription.
The revised version of Chapter 16 is
also available on the Commission’s
Division of Dam Safety and Inspections
website at: Engineering Guidelines for
the Evaluation of Hydropower Projects |
Federal Energy Regulatory Commission
(ferc.gov).
For assistance with any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: March 29, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07015 Filed 4–4–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1512–000]
lotter on DSK11XQN23PROD with NOTICES1
Westlake Natrium LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Westlake Natrium LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 19,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
VerDate Sep<11>2014
17:44 Apr 04, 2023
Jkt 259001
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: March 30, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–07104 Filed 4–4–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL23–51–000.
Applicants: American Municipal
Power, Inc., et al. v. AEP Appalachian
Transmission Company Inc., et al.
Description: Joint Formal Challenge
and Complaint of American Municipal
Power, Inc., et al. v. AEP Appalachian
Transmission Company Inc., et al.
Filed Date: 3/15/23.
Accession Number: 20230315–5231.
Comment Date: 5 p.m. ET 4/11/23.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–2678–004.
Applicants: Westlands Transmission,
LLC.
Description: Compliance filing:
Settlement—Approved Effective Date—
Solar Blue (ER21–2678–) to be effective
10/13/2021.
Filed Date: 3/30/23.
Accession Number: 20230330–5213.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER21–2679–004.
Applicants: Westlands Transmission,
LLC.
Description: Compliance filing:
Settlement—Approved Effective Date—
Grape (ER21–2679–) to be effective 10/
13/2021.
Filed Date: 3/30/23.
Accession Number: 20230330–5205.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER21–2680–004.
Applicants: Westlands Transmission,
LLC.
Description: Compliance filing:
Settlement—Approved Effective Date—
Chestnut (ER21–2680–) to be effective
10/13/2021.
Filed Date: 3/30/23.
Accession Number: 20230330–5198.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER21–2681–004.
Applicants: Westlands Transmission,
LLC.
Description: Compliance filing:
Settlement—Approved Effective Date—
Cherry (ER21–2681–) to be effective 10/
13/2021.
Filed Date: 3/30/23.
Accession Number: 20230330–5196.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER23–1041–001.
Applicants: Florida Power & Light
Company.
Description: Tariff Amendment: FPL
Amendment to Attachment A
Specifications for Amended TSA No.
332 to be effective 1/4/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5129.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER23–1512–000.
Applicants: Westlake Natrium LLC.
Description: Baseline eTariff Filing:
Application for Market Based Rate
Authority to be effective 5/29/2023.
Filed Date: 3/30/23.
Accession Number: 20230330–5000.
Comment Date: 5 p.m. ET 4/20/23.
Docket Numbers: ER23–1513–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Termination of High Winds, LLC (TO
SA 40) to be effective 5/30/2023.
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 88, Number 65 (Wednesday, April 5, 2023)]
[Notices]
[Pages 20160-20162]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07015]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD20-21-000]
Notice of Availability of Revised Final Engineering Guidelines
for the Evaluation of Hydropower Projects: Chapter 16--Part 12d Program
On December 16, 2021, the Federal Energy Regulatory Commission
issued a Notice of Availability of Final Engineering Guidelines for the
Evaluation of Hydropower Projects: Chapter 16--Part 12D Program.\1\
Chapter 16 provides licensee guidance related to any Periodic
Inspection or Comprehensive Assessment performed, and the report on it
filed, to fulfill the requirements defined in Title 18 Code of Federal
Regulations (CFR) Part 12, Subpart D. The Chapter includes an overview
of the part 12D program, as well as six appendices. Appendices B, C, D,
and E are outlines for the four major types of reports that must be
submitted. Due to a compilation error during final preparation of the
chapter, four of the included appendices were from an outdated draft
version that did not incorporate all of the changes that staff made to
address comments received on the draft chapter. This notice provides a
revised version of Chapter 16's appendices B, C, D, and E, which were
the only portions of Chapter 16 that were affected by this error.
---------------------------------------------------------------------------
\1\ Chapter 16 is one of four new chapters of the Guidelines
providing additional guidance related to 18 CFR part 12, Safety of
Water Power Projects and Project Works, for which a Final Rule was
also issued on December 16, 2021. Final Rule, Order No. 880, 87 FR
1490 (Jan. 11, 2022), 177 FERC ] 61,204 (2021).
---------------------------------------------------------------------------
The appendices provide the outlines and instructions for several
required filings that document a Part 12D Inspection and are required
by the Commission's regulations: Appendix B: the Periodic Inspection
Report (PIR), Appendix C: Periodic Inspection Pre-Inspection
Preparation Report (PI-PIPR), Appendix D: Comprehensive Assessment
Report (CAR), and Appendix E: Comprehensive Assessment Pre-Inspection
Preparation Report (CA-PIPR). These revisions to Appendices B through E
ensure that the report outlines and content are consistent with the
corresponding text in the body of Chapter 16. The revisions in each
appendix are described below.
Chapter 16, Appendix B--Outline for the Periodic Inspection Report
Section 1.2 Potential Failure Modes and Risk
[cir] Listed the types of potential failure modes (PFMs) to
summarize and provided an example table to document the findings.
Section 1.3.3 Hazard Potential Classification
[cir] Clarified that the significant changes to the population at
risk must be identified since the previous Part 12D Inspection.
Section 1.4 Recommendations
[cir] Provided an example table to summarize recommendations and
the suggested schedule.
Section 2.1 Location and Purpose
[cir] Revised reference to Appendix C: Project Figures.
Section 2.2 Description of Project Features
[cir] Clarified that the project information must not be a copy and
paste from the STID.
[cir] Added ``tunnel lining drainage holes'' to the bulleted list
for Water Conveyances.
Section 3.3 Recommendations of Previous Independent
Consultants
[cir] Revised heading text.
[cir] Clarified that the summary table must include recommendations
from ``earlier'' Part 12D reports.
Section 3.7 Previously Identified PFMs
[cir] Clarified that the IC Team can provide recommendations to
improve the PFMA and PFMs
Section 4 Field Inspection Observations and Interpretation of
Monitoring Data
[cir] Revised the use of standard terms to describe the condition
of project features allowing the IC Team to use consistent terminology
provided the terms are identified and defined.
Section 4.2.1 Field Inspection Observations
[cir] Revised reference to Appendix E: Inspection Photographs.
Section 4.2.2 Review and Evaluation of Instrumentation Data
and Surveillance
[cir] Revised reference to Appendix D: Instrumented Monitoring Data
Plots.
Section 5.5 Public Safety Plan
[cir] Inserted the requirement that the Public Safety Plan must
also document the licensee's response and implementation of any
required remediation measures related to project-related public safety
incidents.
Appendix B FERC Letter Approving Part 12D Inspection Plan and
IC Team
[cir] Revised appendix title.
Appendix C Summary of Independent Consultant's Recommendations
[[Page 20161]]
[cir] Appendix deleted.
Appendices D through H
[cir] Redesignated as Appendices C through G due to the removal of
Appendix C.
[cir] Subsequent revisions listed below are for the redesignated
appendix label.
Appendix D Instrumented Monitoring Data Plots
[cir] Revised appendix title and text from ``Instrumentation
Monitoring'' to ``Instrumented Monitoring.''
[cir] Revised content to be provided in the appendix from
reproductions of entire Dam Safety Surveillance and Monitoring Reports
(DSSMRs) to excerpts from and citations to previous DSSMRs relevant to
the review.
Appendix E Inspection Photographs
[cir] Revised description of how to provide full resolution digital
photographs.
Chapter 16, Appendix C--Outline for the Periodic Inspection Pre-
Inspection Preparation Report (PI-PIPR)
Changes to ensure consistency in headings and text with the
above list of changes in Chapter 16, Appendix B
Addition of placeholder sections to the outline to ensure
consistent numbering between the PIR and PI-PIPR. Placeholder sections
are marked with the following text: ``This section is reserved as a
placeholder so the numbering is consistent with the PIR. No content is
required to be provided in this section of the PI-PIPR.''
Chapter 16, Appendix D--Outline for the Comprehensive Assessment Report
(CAR)
Section 1.2 Potential Failure Modes and Risk
[cir] Section 1.2 is redesignated as Section 1.5 Potential Failure
Modes Analysis, Risk Analysis, and Dam Safety Risk Classification.
[cir] Revised Section 1.5 to provide separate subsections as listed
below, describing the required content:
[ssquf] Section 1.5.1 Potential Failure Modes Analysis
[ssquf] Section 1.5.2 Level 2 Risk Analysis
[ssquf] Section 1.5.3 Dam Safety Risk Classification
Sections 1.3 through 1.5
[cir] Redesignated as Sections 1.2 through 1.4 due to the
redesignation of the above listed item.
Section 1.6 Recommendations
[cir] Provided an example table to summarize recommendations and
the suggested schedule.
Section 2.2 Description of Project Features
[cir] Clarified that the project information must not be a copy and
paste from the STID
[cir] Added ``tunnel lining drainage holes'' to the bulleted list
for Water Conveyances.
Section 3.2.1 Design Considerations
[cir] Revised final bullet to clarify that the current state of
practice means ``at the time of the Comprehensive Assessment.''
Section 3.5
[cir] Revised heading text from ``Powerplant'' to ``Powerhouse''
Section 4: Review and Evaluation of Previous Analysis
[cir] Revised reference to Appendix J: Independent Calculations
Section 4.4 Analyses of Project Features
[cir] Redesignated subheadings from ``4.4.X'' to ``4.4.1'' for
Project Feature 1, with a further example provided as ``4.4.2'' for
Project Feature 2 and so forth.
Section 5.3 Recommendations of Previous Independent
Consultants
[cir] Revised heading text.
[cir] Clarified that the summary table must include recommendations
from ``earlier'' Part 12D reports.
Section 6 Field Inspection Observations and Interpretation of
Monitoring Data
[cir] Revised the use of standard terms to describe the condition
of project features allowing the IC Team to use consistent terminology
provided the terms are identified and defined.
Section 6.2.1 Field Inspection Observations
[cir] Revised reference to Appendix E: Inspection Photographs.
Section 6.2.2 Review and Evaluation of Instrumentation Data
and Surveillance
[cir] Revised reference to Appendix D: Instrumented Monitoring Data
Plots.
Section 7.5 PFMA
[cir] Provided two sets of instructions depending on whether the IC
Team prepared the PFMA report.
Section 7.6 Risk Analysis and Summary
[cir] Revised instructions depending on whether the IC Team
prepared the Risk Analysis report.
Section 8.8 Supporting Technical Information Document and
Digital Project Archive
[cir] Added ``and Digital Project Archive'' to the heading text.
[cir] Revised subheadings 8.8.5, 8.8.7, 8.8.8, and 8.8.9 to more
closely match the STID headings provided in Chapter 15 of the
Engineering Guidelines.
Appendix B FERC Letter Approving Part 12D Inspection Plan and
IC Team
[cir] Revised appendix title.
Appendix C Summary of Independent Consultant's Recommendations
[cir] Appendix deleted.
Appendices D through H
[cir] Redesignated as Appendices C through J due to the removal of
Appendix C.
[cir] Subsequent revisions listed below are for the redesignated
appendix label.
Appendix D Instrumented Monitoring Data Plots
[cir] Revised appendix title and text from ``Instrumentation
Monitoring'' to ``Instrumented Monitoring''
[cir] Revised content to be provided in the appendix from
reproductions of entire Dam Safety Surveillance and Monitoring Reports
(DSSMRs) to excerpts from and citations to previous DSSMRs relevant to
the review.
Chapter 16, Appendix E--Outline for the Comprehensive Assessment Pre-
Inspection Preparation Report (CA-PIPR)
Changes to ensure consistency in headings and text with the
above list of changes in Chapter 16, Appendix D
Addition of placeholder sections to the outline to ensure
consistent numbering between the CAR and CA-PIPR. Placeholder sections
are marked with the following text: ``This section is reserved as a
placeholder so the numbering is consistent with the CAR. No content is
required to be provided in this section of the CA-PIPR.''
All information related to ``Chapter 16--Part 12D Program,''
including the draft chapter, all submitted comments, the final chapter,
and the revised final chapter incorporating the above listed revisions,
can be found on the FERC website (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on ``General Search'' and enter
the docket number, excluding the last three digits in the Docket Number
field (i.e., AD20-21). Be sure you have selected an appropriate date
range. The Commission also offers a free service called eSubscription
that allows you to keep track of all formal issuances and submittals in
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with electronic
notification of these filings and direct links to the documents. Go to
[[Page 20162]]
the Commission's website (www.ferc.gov), select the FERC Online option
from the left-hand column, and click on eSubscription. Users must be
registered in order to use eSubscription.
The revised version of Chapter 16 is also available on the
Commission's Division of Dam Safety and Inspections website at:
Engineering Guidelines for the Evaluation of Hydropower Projects [bond]
Federal Energy Regulatory Commission (ferc.gov).
For assistance with any of the Commission's online systems, please
contact FERC Online Support at ferc.gov">[email protected]ferc.gov or toll free
at (866) 208-3676, or for TTY, contact (202) 502-8258.
Dated: March 29, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-07015 Filed 4-4-23; 8:45 am]