Erie Boulevard Hydropower, L.P.; Notice of Authorization for Continued Project Operation, 19297-19298 [2023-06748]

Download as PDF Federal Register / Vol. 88, No. 62 / Friday, March 31, 2023 / Notices visit the Board’s internet homepage at https://energy.gov/em/icpcab. SUPPLEMENTARY INFORMATION: Purpose of the Board: The purpose of the Board is to make recommendations to DOE–EM and site management in the areas of environmental restoration, waste management, and related activities. Tentative Agenda (agenda topics may change up to the day of the meeting; please contact Mariah Porter for the most current agenda): 1. Recent Public Outreach 2. Program Presentations 3. DOE Presentation Public Participation: The in-person/ online virtual hybrid meeting is open to the public either in-person at the Residence Inn or via Zoom. To sign-up for public comment, please contact the ICP CAB Administrator (above) no later than 5:00 p.m. MDT on Tuesday, April 25, 2023. In addition to participation in the live public comment sessions identified above, written statements may be filed with the Board either five days before or five days after the meeting by sending them to the ICP CAB Administrator at the aforementioned email address. Written public comment received prior to the meeting will be read into the record. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Mariah Porter, ICP CAB Administrator, phone (208) 557– 7857 or email mariah.porter@ northwindgrp.com. Minutes will also be available at the following website: https://www.energy.gov/em/icpcab/ listings/cab-meetings. Signed in Washington, DC, on March 27, 2023. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2023–06728 Filed 3–30–23; 8:45 am] BILLING CODE 6450–01–P ddrumheller on DSK120RN23PROD with NOTICES1 DEPARTMENT OF ENERGY Agency Information Collection Extension; Correction Office of Sustainability and Asset Management, Department of Energy. ACTION: Notice of request for comments; correction. AGENCY: On January 19, 2023, the Office of Sustainability and Asset SUMMARY: VerDate Sep<11>2014 17:54 Mar 30, 2023 Jkt 259001 Management, Department of Energy, published a request for comments in the Federal Register on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. FOR FURTHER INFORMATION CONTACT: Monja Vadnais, Acting Director, Office of Sustainability and Asset Management, U.S. Department of Energy, 1000 Independence Avenue, Washington, DC 20585; Telephone: (202) 287–1563; Email: monja.vadnais@ hq.doe.gov. Correction In the Federal Register of January 19, 2023, FR Doc. 2023–00966, (88 FR 3398) under the SUPPLEMENTARY INFORMATION section, the following corrections are made: (5) Annual Estimated Number of Respondents: 201; (6) Annual Estimated Number of Total Responses: 367; (7) Annual Estimated Number of Burden Hours: 3722; (8) Annual Estimated Reporting and Recordkeeping Cost Burden: $160,826. Reason for Correction: The change aims to correct the collection information based upon the new OMB 1910–1000 Supporting Statement template. Signing Authority This document of the Department of Energy was signed on March 14, 2023, by Monja Vadnais, Acting Director for the Office of Sustainability and Asset Management, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on March 28, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–06725 Filed 3–30–23; 8:45 am] BILLING CODE 6450–01–P PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 19297 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2701–000] Erie Boulevard Hydropower, L.P.; Notice of Authorization for Continued Project Operation The license for the West Canada Creek Hydroelectric Project No. 2701 was issued for a period ending February 28, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2701 is issued to Erie Boulevard Hydropower, L.P., for a period effective March 1, 2023, through February 29, 2024, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before February 29, 2024, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Erie Boulevard Hydropower, L.P. is authorized to continue operation of the West Canada Creek Hydroelectric Project under the terms and conditions of the prior license until the issuance of E:\FR\FM\31MRN1.SGM 31MRN1 19298 Federal Register / Vol. 88, No. 62 / Friday, March 31, 2023 / Notices a new license for the project or other disposition under the FPA, whichever comes first. Dated: March 27, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–06748 Filed 3–30–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas & Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP23–591–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Amendment to Non-Conforming Agreements to be effective 4/1/2023. Filed Date: 3/27/23. Accession Number: 20230327–5025. Comment Date: 5 pm ET 4/10/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 27, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06694 Filed 3–30–23; 8:45 am] ddrumheller on DSK120RN23PROD with NOTICES1 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: VerDate Sep<11>2014 17:54 Mar 30, 2023 Jkt 259001 Docket Numbers: EL23–49–000; QF22–58–000. Applicants: McAdoo & Allen, Inc. Description: Petition for Enforcement and Declaratory Order of McAdoo & Allen, Inc. d/b/a Quaker Color. Filed Date: 3/17/23. Accession Number: 20230317–5180. Comment Date: 5 p.m. ET 4/7/23. Docket Numbers: EL23–50–000. Applicants: Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. Description: Complaint of Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. Filed Date: 3/27/23. Accession Number: 20230327–5039. Comment Date: 5 p.m. ET 4/17/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1489–002; ER16–1154–009; ER13–1101–027; ER13–1541–026; ER14–787–020; ER14– 661–017; ER15–54–011; ER15–55–011; ER15–1475–012; ER15–2593–011; ER16–452–010; ER16–1882–004; ER16– 705–008; ER16–706–008; ER17–2508– 003; ER17–252–005; ER21–1988–003; ER21–2867–001. Applicants: Tri-State Generation and Transmission Association, Inc., SP Garland Solar Storage, LLC, 2016 ESA Project Company, LLC, RE Gaskell West 1 LLC, RE Garland A LLC, RE Garland LLC, Boulder Solar Power, LLC, RE Tranquillity LLC, Desert Stateline LLC, North Star Solar, LLC, Blackwell Solar, LLC, Lost Hills Solar, LLC, SG2 Imperial Valley LLC, Macho Springs Solar, LLC, Campo Verde Solar, LLC, Spectrum Nevada Solar, LLC, Parrey, LLC, SP Cimarron I, LLC. Description: Supplement to June 30, 2022, Triennial Market Power Analysis for Southwest Region of SP Cimarron I, LLC, et al. Filed Date: 3/24/23. Accession Number: 20230324–5336. Comment Date: 5 p.m. ET 4/14/23. Docket Numbers: ER19–1078–002. Applicants: PPA Grand Johanna LLC. Description: Compliance filing: Notice of Change in Status to be effective 3/28/ 2023. Filed Date: 3/27/23. Accession Number: 20230327–5184. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER22–611–002. Applicants: Wildcat I Energy Storage, LLC. Description: Compliance filing: Notice of Change in Status to be effective 3/28/ 2023. Filed Date: 3/27/23. Accession Number: 20230327–5185. Comment Date: 5 p.m. ET 4/17/23. PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 Docket Numbers: ER22–1554–003. Applicants: Ford County Wind Farm LLC. Description: Compliance filing: Compliance Filing Revising Tariff Record to be effective 7/1/2022. Filed Date: 3/27/23. Accession Number: 20230327–5145. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–567–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: Deficiency Response—Transmission Owner Project Evaluation Process to be effective 2/6/2023. Filed Date: 3/27/23. Accession Number: 20230327–5186. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–1034–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Amendment to ISA, SA No. 6000; Queue No. AD2–116 in Docket No. ER23–1034 to be effective 4/3/2023. Filed Date: 3/27/23. Accession Number: 20230327–5180. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–1466–000. Applicants: Interstate Power and Light Company, ITC Midwest LLC. Description: § 205(d) Rate Filing: Interstate Power and Light Company submits tariff filing per 35.13(a)(2)(iii: Update to O&T Agreement Exhibits and Appendices (2023) to be effective 5/29/ 2023. Filed Date: 3/27/23. Accession Number: 20230327–5017. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–1467–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 6857; Queue No. AC1–168 to be effective 2/23/2023. Filed Date: 3/27/23. Accession Number: 20230327–5042. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–1468–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, Service Agreement No. 5836; Queue No. AE2– 227 to be effective 5/27/2023. Filed Date: 3/27/23. Accession Number: 20230327–5047. Comment Date: 5 p.m. ET 4/17/23. Docket Numbers: ER23–1469–000. Applicants: Arroyo Solar LLC. Description: Initial rate filing: Certificate of Concurrence to Operational Control and Maintenance Agreement to be effective 12/31/2022. E:\FR\FM\31MRN1.SGM 31MRN1

Agencies

[Federal Register Volume 88, Number 62 (Friday, March 31, 2023)]
[Notices]
[Pages 19297-19298]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06748]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2701-000]


Erie Boulevard Hydropower, L.P.; Notice of Authorization for 
Continued Project Operation

    The license for the West Canada Creek Hydroelectric Project No. 
2701 was issued for a period ending February 28, 2023.
    Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the 
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and 
conditions of the prior license until a new license is issued, or the 
project is otherwise disposed of as provided in section 15 or any other 
applicable section of the FPA. If the project's prior license waived 
the applicability of section 15 of the FPA, then, based on section 9(b) 
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth 
at 18 CFR 16.21(a), if the licensee of such project has filed an 
application for a subsequent license, the licensee may continue to 
operate the project in accordance with the terms and conditions of the 
license after the minor or minor part license expires, until the 
Commission acts on its application. If the licensee of such a project 
has not filed an application for a subsequent license, then it may be 
required, pursuant to 18 CFR 16.21(b), to continue project operations 
until the Commission issues someone else a license for the project or 
otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2701 is issued to 
Erie Boulevard Hydropower, L.P., for a period effective March 1, 2023, 
through February 29, 2024, or until the issuance of a new license for 
the project or other disposition under the FPA, whichever comes first. 
If issuance of a new license (or other disposition) does not take place 
on or before February 29, 2024, notice is hereby given that, pursuant 
to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA 
is renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Erie Boulevard Hydropower, L.P. is authorized to 
continue operation of the West Canada Creek Hydroelectric Project under 
the terms and conditions of the prior license until the issuance of

[[Page 19298]]

a new license for the project or other disposition under the FPA, 
whichever comes first.

    Dated: March 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-06748 Filed 3-30-23; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.