Erie Boulevard Hydropower, L.P.; Notice of Authorization for Continued Project Operation, 19297-19298 [2023-06748]
Download as PDF
Federal Register / Vol. 88, No. 62 / Friday, March 31, 2023 / Notices
visit the Board’s internet homepage at
https://energy.gov/em/icpcab.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
Tentative Agenda (agenda topics may
change up to the day of the meeting;
please contact Mariah Porter for the
most current agenda):
1. Recent Public Outreach
2. Program Presentations
3. DOE Presentation
Public Participation: The in-person/
online virtual hybrid meeting is open to
the public either in-person at the
Residence Inn or via Zoom. To sign-up
for public comment, please contact the
ICP CAB Administrator (above) no later
than 5:00 p.m. MDT on Tuesday, April
25, 2023. In addition to participation in
the live public comment sessions
identified above, written statements
may be filed with the Board either five
days before or five days after the
meeting by sending them to the ICP
CAB Administrator at the
aforementioned email address. Written
public comment received prior to the
meeting will be read into the record.
The Deputy Designated Federal Officer
is empowered to conduct the meeting in
a fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Mariah Porter, ICP
CAB Administrator, phone (208) 557–
7857 or email mariah.porter@
northwindgrp.com. Minutes will also be
available at the following website:
https://www.energy.gov/em/icpcab/
listings/cab-meetings.
Signed in Washington, DC, on March 27,
2023.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2023–06728 Filed 3–30–23; 8:45 am]
BILLING CODE 6450–01–P
ddrumheller on DSK120RN23PROD with NOTICES1
DEPARTMENT OF ENERGY
Agency Information Collection
Extension; Correction
Office of Sustainability and
Asset Management, Department of
Energy.
ACTION: Notice of request for comments;
correction.
AGENCY:
On January 19, 2023, the
Office of Sustainability and Asset
SUMMARY:
VerDate Sep<11>2014
17:54 Mar 30, 2023
Jkt 259001
Management, Department of Energy,
published a request for comments in the
Federal Register on a proposed
collection of information that DOE is
developing for submission to the Office
of Management and Budget (OMB)
pursuant to the Paperwork Reduction
Act of 1995.
FOR FURTHER INFORMATION CONTACT:
Monja Vadnais, Acting Director, Office
of Sustainability and Asset
Management, U.S. Department of
Energy, 1000 Independence Avenue,
Washington, DC 20585; Telephone:
(202) 287–1563; Email: monja.vadnais@
hq.doe.gov.
Correction
In the Federal Register of January 19,
2023, FR Doc. 2023–00966, (88 FR 3398)
under the SUPPLEMENTARY INFORMATION
section, the following corrections are
made:
(5) Annual Estimated Number of
Respondents: 201;
(6) Annual Estimated Number of
Total Responses: 367;
(7) Annual Estimated Number of
Burden Hours: 3722;
(8) Annual Estimated Reporting and
Recordkeeping Cost Burden: $160,826.
Reason for Correction: The change
aims to correct the collection
information based upon the new OMB
1910–1000 Supporting Statement
template.
Signing Authority
This document of the Department of
Energy was signed on March 14, 2023,
by Monja Vadnais, Acting Director for
the Office of Sustainability and Asset
Management, pursuant to delegated
authority from the Secretary of Energy.
That document with the original
signature and date is maintained by
DOE. For administrative purposes only,
and in compliance with requirements of
the Office of the Federal Register, the
undersigned DOE Federal Register
Liaison Officer has been authorized to
sign and submit the document in
electronic format for publication, as an
official document of the Department of
Energy. This administrative process in
no way alters the legal effect of this
document upon publication in the
Federal Register.
Signed in Washington, DC, on March 28,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2023–06725 Filed 3–30–23; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
19297
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2701–000]
Erie Boulevard Hydropower, L.P.;
Notice of Authorization for Continued
Project Operation
The license for the West Canada Creek
Hydroelectric Project No. 2701 was
issued for a period ending February 28,
2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2701
is issued to Erie Boulevard Hydropower,
L.P., for a period effective March 1,
2023, through February 29, 2024, or
until the issuance of a new license for
the project or other disposition under
the FPA, whichever comes first. If
issuance of a new license (or other
disposition) does not take place on or
before February 29, 2024, notice is
hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Erie Boulevard Hydropower, L.P. is
authorized to continue operation of the
West Canada Creek Hydroelectric
Project under the terms and conditions
of the prior license until the issuance of
E:\FR\FM\31MRN1.SGM
31MRN1
19298
Federal Register / Vol. 88, No. 62 / Friday, March 31, 2023 / Notices
a new license for the project or other
disposition under the FPA, whichever
comes first.
Dated: March 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–06748 Filed 3–30–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–591–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Amendment to Non-Conforming
Agreements to be effective 4/1/2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5025.
Comment Date: 5 pm ET 4/10/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–06694 Filed 3–30–23; 8:45 am]
ddrumheller on DSK120RN23PROD with NOTICES1
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
VerDate Sep<11>2014
17:54 Mar 30, 2023
Jkt 259001
Docket Numbers: EL23–49–000;
QF22–58–000.
Applicants: McAdoo & Allen, Inc.
Description: Petition for Enforcement
and Declaratory Order of McAdoo &
Allen, Inc. d/b/a Quaker Color.
Filed Date: 3/17/23.
Accession Number: 20230317–5180.
Comment Date: 5 p.m. ET 4/7/23.
Docket Numbers: EL23–50–000.
Applicants: Independent Market
Monitor for PJM v. PJM Interconnection,
L.L.C.
Description: Complaint of
Independent Market Monitor for PJM v.
PJM Interconnection, L.L.C.
Filed Date: 3/27/23.
Accession Number: 20230327–5039.
Comment Date: 5 p.m. ET 4/17/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1489–002;
ER16–1154–009; ER13–1101–027;
ER13–1541–026; ER14–787–020; ER14–
661–017; ER15–54–011; ER15–55–011;
ER15–1475–012; ER15–2593–011;
ER16–452–010; ER16–1882–004; ER16–
705–008; ER16–706–008; ER17–2508–
003; ER17–252–005; ER21–1988–003;
ER21–2867–001.
Applicants: Tri-State Generation and
Transmission Association, Inc., SP
Garland Solar Storage, LLC, 2016 ESA
Project Company, LLC, RE Gaskell West
1 LLC, RE Garland A LLC, RE Garland
LLC, Boulder Solar Power, LLC, RE
Tranquillity LLC, Desert Stateline LLC,
North Star Solar, LLC, Blackwell Solar,
LLC, Lost Hills Solar, LLC, SG2 Imperial
Valley LLC, Macho Springs Solar, LLC,
Campo Verde Solar, LLC, Spectrum
Nevada Solar, LLC, Parrey, LLC, SP
Cimarron I, LLC.
Description: Supplement to June 30,
2022, Triennial Market Power Analysis
for Southwest Region of SP Cimarron I,
LLC, et al.
Filed Date: 3/24/23.
Accession Number: 20230324–5336.
Comment Date: 5 p.m. ET 4/14/23.
Docket Numbers: ER19–1078–002.
Applicants: PPA Grand Johanna LLC.
Description: Compliance filing: Notice
of Change in Status to be effective 3/28/
2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5184.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER22–611–002.
Applicants: Wildcat I Energy Storage,
LLC.
Description: Compliance filing: Notice
of Change in Status to be effective 3/28/
2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5185.
Comment Date: 5 p.m. ET 4/17/23.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Docket Numbers: ER22–1554–003.
Applicants: Ford County Wind Farm
LLC.
Description: Compliance filing:
Compliance Filing Revising Tariff
Record to be effective 7/1/2022.
Filed Date: 3/27/23.
Accession Number: 20230327–5145.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–567–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
Deficiency Response—Transmission
Owner Project Evaluation Process to be
effective 2/6/2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5186.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–1034–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to ISA, SA No. 6000;
Queue No. AD2–116 in Docket No.
ER23–1034 to be effective 4/3/2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5180.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–1466–000.
Applicants: Interstate Power and
Light Company, ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Interstate Power and Light Company
submits tariff filing per 35.13(a)(2)(iii:
Update to O&T Agreement Exhibits and
Appendices (2023) to be effective 5/29/
2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5017.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–1467–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
6857; Queue No. AC1–168 to be
effective 2/23/2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5042.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–1468–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 5836; Queue No. AE2–
227 to be effective 5/27/2023.
Filed Date: 3/27/23.
Accession Number: 20230327–5047.
Comment Date: 5 p.m. ET 4/17/23.
Docket Numbers: ER23–1469–000.
Applicants: Arroyo Solar LLC.
Description: Initial rate filing:
Certificate of Concurrence to
Operational Control and Maintenance
Agreement to be effective 12/31/2022.
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 88, Number 62 (Friday, March 31, 2023)]
[Notices]
[Pages 19297-19298]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06748]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2701-000]
Erie Boulevard Hydropower, L.P.; Notice of Authorization for
Continued Project Operation
The license for the West Canada Creek Hydroelectric Project No.
2701 was issued for a period ending February 28, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee(s) under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth
at 18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2701 is issued to
Erie Boulevard Hydropower, L.P., for a period effective March 1, 2023,
through February 29, 2024, or until the issuance of a new license for
the project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take place
on or before February 29, 2024, notice is hereby given that, pursuant
to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA
is renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Erie Boulevard Hydropower, L.P. is authorized to
continue operation of the West Canada Creek Hydroelectric Project under
the terms and conditions of the prior license until the issuance of
[[Page 19298]]
a new license for the project or other disposition under the FPA,
whichever comes first.
Dated: March 27, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-06748 Filed 3-30-23; 8:45 am]
BILLING CODE 6717-01-P