Combined Notice of Filings #1, 19133-19134 [2023-06590]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 61 / Thursday, March 30, 2023 / Notices annual generation of 2,478 megawatthours. Ampersand proposes to operate the project in a run-of-river mode with an impoundment level fluctuation limit of 3 inches from the dam crest or flashboards when in place (i.e., from a normal water surface elevation of 1,699.68 feet NGVD29 with flashboards in place, and 1,696.68 feet NGVD29 without flashboards in place). As described in its October 11, 2022, settlement agreement with the U.S. Fish and Wildlife Service, New York State Department of Environmental Conservation, American Whitewater, and the New York State Council of Trout Unlimited, Ampersand proposes the following changes to project operation and facilities: (1) providing two seasonal minimum flow regimes over the spillway and through the bypass gate within 3 years of license issuance: (a) a 15-cfs minimum flow or inflow, whichever is less, from June 1 to October 31, and (b) a 35-cfs minimum flow or inflow, whichever is less, from November 1 to May 31; (2) installing trash racks with 1-inch clear spacing or the equivalent (e.g., an overlay-type system) whereby approach velocities are less than or equal to 2 feet per second, as measured 1 foot in front of the trash racks; and (3) installing and maintaining a year-round downstream fish passage structure. Ampersand also proposes to: (1) remove the existing 9,315-foot-long transmission line from the project, stating that the line also provides power to the project from the grid and thus should not be considered a primary transmission line; and (2) enhance recreational opportunities by sharing data on daily river conditions, constructing a parking area for two vehicles, and collecting and hauling trash. m. In addition to publishing the full text of this notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding (e.g., scoping document) via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document (P–4639). For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the VerDate Sep<11>2014 17:22 Mar 29, 2023 Jkt 259001 Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (886) 208–3676 or TTY (202) 502–8659. n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process: Commission staff will prepare either an environmental assessment (EA) or an environmental impact statement (EIS) that describes and evaluates the probable effects, if any, of the licensee’s proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commission’s scoping process will help determine the required level of analysis and satisfy the National Environmental Policy Act (NEPA) scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. At this time, we do not anticipate holding on-site scoping meetings. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 (SD1), issued March 24, 2023. Commission staff may hold a public environmental site visit to examine project facilities and lands within the project boundary at a later date. Copies of SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866– 208–3676 or for TTY, (202) 502–8659. Dated: March 24, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06603 Filed 3–29–23; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 19133 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC23–65–000. Applicants: GC PGR Holdco, LLC, PGR Holdco, LLC, Allora Solar, LLC, PGR 2021 Lessee 19, LLC, Beulah Solar, LLC, PGR 2021 Lessee 2, LLC, TWE Bowman Solar Project, LLC, PGR Lessee L, LLC, Bulldog Solar, LLC, PGR 2021 Lessee 9, LLC, Cabin Creek Solar, LLC, PGR 2021 Lessee 12, LLC, Centerfield Cooper Solar, LLC, PGR Lessee O, LLC, Eastover Solar, LLC, PGR 2021 Lessee 17, LLC, Fresh Air Energy XXIII, LLC, PGR 2022 Lessee 2, LLC, Gunsight Solar, LLC, PGR 2021 Lessee 15, LLC, Highest Power Solar, LLC, PGR 2021 Lessee 7, LLC, Landrace Holdings, LLC, PGR 2021 Lessee 18, LLC, Lick Creek Solar, LLC, PGR 2021 Lessee 5, LLC, Peony Solar, LLC, Phobos Solar, LLC, PGR 2021 Lessee 11, LLC, Sonny Solar, LLC, PGR 2021 Lessee 13, LLC, Stanly Solar, LLC, PGR 2021 Lessee 1, LLC, Sugar Solar, LLC, PGR 2020 Lessee 8, LLC, Trent River Solar, LLC, Trent River Solar Mile Lessee, LLC, Virginia Line Solar, LLC, PGR 2022 Lessee 1, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of GC PGR HoldCo, LLC, et al. Filed Date: 3/21/23. Accession Number: 20230321–5176. Comment Date: 5 p.m. ET 4/11/23. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG23–102–000. Applicants: Cavalier Solar A, LLC. Description: Cavalier Solar A, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/21/23. Accession Number: 20230321–5127. Comment Date: 5 p.m. ET 4/11/23. Docket Numbers: EG23–103–000. Applicants: Foxhound Solar, LLC. Description: Foxhound Solar, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/21/23. Accession Number: 20230321–5131. Comment Date: 5 p.m. ET 4/11/23. Docket Numbers: EG23–104–000. Applicants: Texas Solar Nova 2, LLC. Description: Texas Solar Nova 2, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 3/22/23. E:\FR\FM\30MRN1.SGM 30MRN1 lotter on DSK11XQN23PROD with NOTICES1 19134 Federal Register / Vol. 88, No. 61 / Thursday, March 30, 2023 / Notices Accession Number: 20230322–5044. Comment Date: 5 p.m. ET 4/12/23. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER23–1319–000. Applicants: Baldy Mesa Solar, LLC. Description: Supplement to March 13, 2023, Baldy Mesa Solar, LLC tariff filing. Filed Date: 3/21/23. Accession Number: 20230321–5180. Comment Date: 5 p.m. ET 3/31/23. Docket Numbers: ER23–1435–000. Applicants: ISO New England Inc. Description: ISO New England Inc., submits the Forward Capacity Auction Results Filing for Forward Capacity Auction 17. Filed Date: 3/21/23. Accession Number: 20230321–5170. Comment Date: 5 p.m. ET 5/5/23. Docket Numbers: ER23–1436–000. Applicants: Upper Missouri G. & T. Electric Cooperative, Inc. Description: § 205(d) Rate Filing: Revised Rate Schedules FERC Nos. 1,2,3,4,5,7 and 9 to be effective 6/1/ 2023. Filed Date: 3/22/23. Accession Number: 20230322–5070. Comment Date: 5 p.m. ET 4/12/23. Docket Numbers: ER23–1437–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, SA No. 5875; Queue No. AE2–129 (amend) to be effective 5/22/2023. Filed Date: 3/22/23. Accession Number: 20230322–5073. Comment Date: 5 p.m. ET 4/12/23. Docket Numbers: ER23–1438–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company, ITC Midwest LLC, Michigan Electric Transmission Company, LLC. Description: § 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023–03–22_Revisions to Attachment GG–ITC Companies Annual True-Up Procedure to be effective 6/1/ 2023. Filed Date: 3/22/23. Accession Number: 20230322–5093. Comment Date: 5 p.m. ET 4/12/23. Docket Numbers: ER23–1439–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA/ICSA, Service Agreement Nos. 6829/6830; Queue No. AD1–100 to be effective 5/22/2023. Filed Date: 3/22/23. Accession Number: 20230322–5107. VerDate Sep<11>2014 17:22 Mar 29, 2023 Jkt 259001 Comment Date: 5 p.m. ET 4/12/23. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD23–5–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation submits Petition for Approval of Proposed Reliability Standard PRC–023–6. Filed Date: 3/2/23. Accession Number: 20230302–5212. Comment Date: 5 p.m. ET 4/21/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–06590 Filed 3–29–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: March 22, 2023. Debbie-Anne A. Reese, Deputy Secretary. Combined Notice of Filings Take notice that the Commission has received the following Natural Gas & Oil Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP23–580–000. Applicants: Midcontinent Express Pipeline LLC. Description: Compliance filing: 2023 Annual Penalty Revenue Crediting Report to be effective N/A. Filed Date: 3/20/23. Accession Number: 20230320–5144. Comment Date: 5 p.m. ET 4/3/23. Docket Numbers: RP23–581–000. Applicants: Transwestern Pipeline Company, LLC. PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 Description: § 4(d) Rate Filing: Negotiated Rate & Update NonConforming to be effective 4/1/2023. Filed Date: 3/22/23. Accession Number: 20230322–5034. Comment Date: 5 p.m. ET 4/3/23. Docket Numbers: RP23–582–000. Applicants: Transwestern Pipeline Company, LLC. Description: § 4(d) Rate Filing: NonConforming NRA—BP to be effective 4/1/2023. Filed Date: 3/22/23. Accession Number: 20230322–5038. Comment Date: 5 p.m. ET 4/3/23. Docket Numbers: RP23–583–000. Applicants: Bear Creek Storage Company, L.L.C. Description: Compliance filing: Annual Report on Operational Transactions 2023 to be effective N/A. Filed Date: 3/22/23. Accession Number: 20230322–5099. Comment Date: 5 p.m. ET 4/3/23. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2023–06589 Filed 3–29–23; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2003–0004; FRL–10799– 01–OCSPP] Access to Confidential Business Information by Abt Associates Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: EPA has authorized its contractor Abt Associates of Rockville, SUMMARY: E:\FR\FM\30MRN1.SGM 30MRN1

Agencies

[Federal Register Volume 88, Number 61 (Thursday, March 30, 2023)]
[Notices]
[Pages 19133-19134]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06590]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC23-65-000.
    Applicants: GC PGR Holdco, LLC, PGR Holdco, LLC, Allora Solar, LLC, 
PGR 2021 Lessee 19, LLC, Beulah Solar, LLC, PGR 2021 Lessee 2, LLC, TWE 
Bowman Solar Project, LLC, PGR Lessee L, LLC, Bulldog Solar, LLC, PGR 
2021 Lessee 9, LLC, Cabin Creek Solar, LLC, PGR 2021 Lessee 12, LLC, 
Centerfield Cooper Solar, LLC, PGR Lessee O, LLC, Eastover Solar, LLC, 
PGR 2021 Lessee 17, LLC, Fresh Air Energy XXIII, LLC, PGR 2022 Lessee 
2, LLC, Gunsight Solar, LLC, PGR 2021 Lessee 15, LLC, Highest Power 
Solar, LLC, PGR 2021 Lessee 7, LLC, Landrace Holdings, LLC, PGR 2021 
Lessee 18, LLC, Lick Creek Solar, LLC, PGR 2021 Lessee 5, LLC, Peony 
Solar, LLC, Phobos Solar, LLC, PGR 2021 Lessee 11, LLC, Sonny Solar, 
LLC, PGR 2021 Lessee 13, LLC, Stanly Solar, LLC, PGR 2021 Lessee 1, 
LLC, Sugar Solar, LLC, PGR 2020 Lessee 8, LLC, Trent River Solar, LLC, 
Trent River Solar Mile Lessee, LLC, Virginia Line Solar, LLC, PGR 2022 
Lessee 1, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of GC PGR HoldCo, LLC, et al.
    Filed Date: 3/21/23.
    Accession Number: 20230321-5176.
    Comment Date: 5 p.m. ET 4/11/23.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG23-102-000.
    Applicants: Cavalier Solar A, LLC.
    Description: Cavalier Solar A, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/21/23.
    Accession Number: 20230321-5127.
    Comment Date: 5 p.m. ET 4/11/23.

    Docket Numbers: EG23-103-000.
    Applicants: Foxhound Solar, LLC.
    Description: Foxhound Solar, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/21/23.
    Accession Number: 20230321-5131.
    Comment Date: 5 p.m. ET 4/11/23.

    Docket Numbers: EG23-104-000.
    Applicants: Texas Solar Nova 2, LLC.
    Description: Texas Solar Nova 2, LLC submits Notice of Self-
Certification of Exempt Wholesale Generator Status.
    Filed Date: 3/22/23.

[[Page 19134]]

    Accession Number: 20230322-5044.
    Comment Date: 5 p.m. ET 4/12/23.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER23-1319-000.
    Applicants: Baldy Mesa Solar, LLC.
    Description: Supplement to March 13, 2023, Baldy Mesa Solar, LLC 
tariff filing.
    Filed Date: 3/21/23.
    Accession Number: 20230321-5180.
    Comment Date: 5 p.m. ET 3/31/23.

    Docket Numbers: ER23-1435-000.
    Applicants: ISO New England Inc.
    Description: ISO New England Inc., submits the Forward Capacity 
Auction Results Filing for Forward Capacity Auction 17.
    Filed Date: 3/21/23.
    Accession Number: 20230321-5170.
    Comment Date: 5 p.m. ET 5/5/23.

    Docket Numbers: ER23-1436-000.
    Applicants: Upper Missouri G. & T. Electric Cooperative, Inc.
    Description: Sec.  205(d) Rate Filing: Revised Rate Schedules FERC 
Nos. 1,2,3,4,5,7 and 9 to be effective 6/1/2023.
    Filed Date: 3/22/23.
    Accession Number: 20230322-5070.
    Comment Date: 5 p.m. ET 4/12/23.

    Docket Numbers: ER23-1437-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to WMPA, SA No. 
5875; Queue No. AE2-129 (amend) to be effective 5/22/2023.
    Filed Date: 3/22/23.
    Accession Number: 20230322-5073.
    Comment Date: 5 p.m. ET 4/12/23.

    Docket Numbers: ER23-1438-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
International Transmission Company, ITC Midwest LLC, Michigan Electric 
Transmission Company, LLC.
    Description: Sec.  205(d) Rate Filing: Midcontinent Independent 
System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2023-
03-22_Revisions to Attachment GG-ITC Companies Annual True-Up Procedure 
to be effective 6/1/2023.
    Filed Date: 3/22/23.
    Accession Number: 20230322-5093.
    Comment Date: 5 p.m. ET 4/12/23.

    Docket Numbers: ER23-1439-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA/ICSA, Service 
Agreement Nos. 6829/6830; Queue No. AD1-100 to be effective 5/22/2023.
    Filed Date: 3/22/23.
    Accession Number: 20230322-5107.
    Comment Date: 5 p.m. ET 4/12/23.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RD23-5-000.
    Applicants: North American Electric Reliability Corporation.
    Description: North American Electric Reliability Corporation 
submits Petition for Approval of Proposed Reliability Standard PRC-023-
6.
    Filed Date: 3/2/23.
    Accession Number: 20230302-5212.
    Comment Date: 5 p.m. ET 4/21/23.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 22, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-06590 Filed 3-29-23; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.