Green Mountain Power Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 18533-18534 [2023-06511]
Download as PDF
Federal Register / Vol. 88, No. 60 / Wednesday, March 29, 2023 / Notices
ensure that your comments are timely
and properly recorded, please submit
your comments on or before May 22,
2023. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
ddrumheller on DSK120RN23PROD with NOTICES1
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP23–92–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’ The
Commission’s eFiling staff are available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP23–92–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: David A. Alonzo,
Manager, Project Authorizations, Bison
Pipeline LLC, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002, by
phone at (832) 320–477; or by email to
david_alonzo@tcenergy.com. Any
subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
VerDate Sep<11>2014
19:20 Mar 28, 2023
Jkt 259001
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: March 22, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–06439 Filed 3–28–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2879–013]
Green Mountain Power Corporation;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-capacity
Amendment of License.
b. Project No: 2879–013.
c. Date Filed: February 7, 2023, and
supplemented March 8, 2023.
d. Applicant: Green Mountain Power
Corporation (licensee).
e. Name of Project: Bolton Falls
Hydroelectric Project.
f. Location: The project is located on
the Winooski River near the town of
Duxbury in Washington County,
Vermont, and does not occupy federal
land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Jason L. Lisai,
Green Mountain Power Corporation, 163
Acorn Lane, Colchester, VT 05446–
6611, (802) 655–8723, jason.lisai@
greenmountainpower.com.
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: April
24, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
18533
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2879–013. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to replace the two
existing turbine-generator units with
two new turbine-generator units, and
add an additional steel roof hatch to the
powerhouse. The new turbine-generator
units would be placed in the same
location as the existing turbinegenerator units. The installation of the
new units would result in the
authorized installed capacity of the
project decreasing from 7,500 kilowatts
(kW) to 6,962 kW and the maximum
hydraulic capacity decreasing from
2,400 cubic feet per second (cfs) to 2,210
cfs. The licensee does not propose any
other structural modifications to the
powerhouse or any other project
structures. In addition, the licensee
states there will be no change in the
project’s operating mode and all
construction activities associated with
the proposed amendment would occur
within the existing powerhouse and be
isolated from the river.
l. Locations of the Application: This
filing may be viewed on the
E:\FR\FM\29MRN1.SGM
29MRN1
ddrumheller on DSK120RN23PROD with NOTICES1
18534
Federal Register / Vol. 88, No. 60 / Wednesday, March 29, 2023 / Notices
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 23, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–06511 Filed 3–28–23; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:20 Mar 28, 2023
Jkt 259001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7189–015]
Green Lake Water Power Company;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 7189–015.
c. Date Filed: March 31, 2022.
d. Applicant: Green Lake Water Power
Company (Green Lake Power).
e. Name of Project: Green Lake
Hydroelectric Project (project).
f. Location: On Green Lake and Reeds
Brook in Hancock County, Maine. The
project occupies approximately two
acres of the U.S. Fish and Wildlife
Service’s Green Lake National Fish
Hatchery.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Caroline
Kleinschmidt, Green Lake Water Power
Company, 120 Hatchery Way, Ellsworth,
ME 04605; Phone at (207) 667–3322; or
email at caroline@
greenlakewaterpower.com.
i. FERC Contact: Arash Barsari at
(202) 502–6207, or Arash.JalaliBarsari@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions: 60 days from the
issuance date of this notice; reply
comments are due 105 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–7189–
015.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The existing
Green Lake Project consists of: (1) a
272.2-foot-long, 7.5-foot-high dam that
includes: (a) an 83-foot-long concretegravity section with a 79.8-foot-long
spillway that has a crest elevation of
160.7 feet National Geodetic Vertical
Datum of 1929 (NGVD 29), and is
topped with a 2-foot-high fish screen;
(b) a 12-foot-long concrete intake
structure with a 4.5-foot-wide, 4.5-foothigh sluice gate equipped with an 8foot-wide, 12-foot-high trashrack with a
1-inch clear bar spacing; (c) a 20.2-footlong concrete gate structure with two
approximately 6-foot-wide, 7-foot-high
sluice gates, each equipped with a
vertical lift, fish screen with an
approximately 0.75-inch mesh size; and
(d) a 157-foot-long section that includes:
(i) a 35.5-foot-long auxiliary spillway
with a crest elevation of 161.5 feet
NGVD 29; (ii) a 71-foot-long auxiliary
spillway with a crest elevation of 163.4
feet NGVD 29; and (iii) a 50.5-foot-long
auxiliary spillway with a crest elevation
of 163.8 feet NGVD 29; (2) an
impoundment (Green Lake) with a
surface area of 2,989 acres at an
elevation of 160.7 feet NGVD 29; (3) an
approximately 92-foot-long concrete
channel that conveys flows from the
spillway to Reeds Brook; (4) a 1,744foot-long penstock; (5) a 27-foot-long,
35-foot-wide concrete powerhouse
containing a 400-kilowatt (kW) AllisChalmers tube turbine-generator unit
and a 25-kW centrifugal pump turbine-
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 88, Number 60 (Wednesday, March 29, 2023)]
[Notices]
[Pages 18533-18534]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-06511]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2879-013]
Green Mountain Power Corporation; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project No: 2879-013.
c. Date Filed: February 7, 2023, and supplemented March 8, 2023.
d. Applicant: Green Mountain Power Corporation (licensee).
e. Name of Project: Bolton Falls Hydroelectric Project.
f. Location: The project is located on the Winooski River near the
town of Duxbury in Washington County, Vermont, and does not occupy
federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Jason L. Lisai, Green Mountain Power
Corporation, 163 Acorn Lane, Colchester, VT 05446-6611, (802) 655-8723,
[email protected].
i. FERC Contact: Jeremy Jessup, (202) 502-6779,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: April 24, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-2879-013. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee proposes to replace the two
existing turbine-generator units with two new turbine-generator units,
and add an additional steel roof hatch to the powerhouse. The new
turbine-generator units would be placed in the same location as the
existing turbine-generator units. The installation of the new units
would result in the authorized installed capacity of the project
decreasing from 7,500 kilowatts (kW) to 6,962 kW and the maximum
hydraulic capacity decreasing from 2,400 cubic feet per second (cfs) to
2,210 cfs. The licensee does not propose any other structural
modifications to the powerhouse or any other project structures. In
addition, the licensee states there will be no change in the project's
operating mode and all construction activities associated with the
proposed amendment would occur within the existing powerhouse and be
isolated from the river.
l. Locations of the Application: This filing may be viewed on the
[[Page 18534]]
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 23, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-06511 Filed 3-28-23; 8:45 am]
BILLING CODE 6717-01-P